CN216766812U - Device for preventing column concrete from leaking and vibrating - Google Patents

Device for preventing column concrete from leaking and vibrating Download PDF

Info

Publication number
CN216766812U
CN216766812U CN202220228820.6U CN202220228820U CN216766812U CN 216766812 U CN216766812 U CN 216766812U CN 202220228820 U CN202220228820 U CN 202220228820U CN 216766812 U CN216766812 U CN 216766812U
Authority
CN
China
Prior art keywords
pipe
wall
bottom tube
threaded sleeve
connecting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220228820.6U
Other languages
Chinese (zh)
Inventor
刘栋先
赖秀文
李锐平
陈云峰
郭小雨
赖常文
温红媚
肖基司
王志
陈利雄
郭春林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaoguan Zhongqun Construction Co ltd
Original Assignee
Shaoguan Zhongqun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoguan Zhongqun Construction Co ltd filed Critical Shaoguan Zhongqun Construction Co ltd
Priority to CN202220228820.6U priority Critical patent/CN216766812U/en
Application granted granted Critical
Publication of CN216766812U publication Critical patent/CN216766812U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The application discloses prevent device that post concrete leaked vibration relates to building construction equipment technical field, including the bottom tube, the top position of bottom tube is provided with the connecting pipe, and the top position of connecting pipe is provided with the push pipe, and the top and the bottom position of push pipe and connecting pipe all set up to the opening form, and the top position of bottom tube sets up to the opening form, and the hole of vibrating has been seted up to the lower extreme position of bottom tube one side outer wall, and the upper end position of bottom tube outer wall is fixed with eight groups of connecting rods, eight groups the structure of connecting rod sets up to the arch, and the connecting rod arches towards the direction of keeping away from the bottom tube. This application when using meets the reinforcing bar at the insertion in-process, thereby make this device that prevents that post concrete from leaking and shake under the arc structure effect of eight groups of connecting rods when contacting with the reinforcing bar automatic displacement avoid the reinforcing bar, the convenience is gone on inside the concrete column and need not insert in advance in the concrete column when needs vibrate.

Description

Device for preventing column concrete from leaking and vibrating
Technical Field
The utility model belongs to the technical field of building construction equipment's technique and specifically relates to a device that prevents post concrete leakage vibration is related to.
Background
Need pour the concrete column in building construction engineering, need vibrate after concrete column concreting, be equipped with the device of preventing that post concrete leaks to shake usually in order to prevent to leak to shake, and traditional device that prevents that post concrete leaks to shake can satisfy people's user demand basically, but still has certain problem, and specific problem is as follows:
at present for the intensity of promotion post, can ligature reinforcing bar in the post, and the device that the reinforcing bar of ligature can obstruct and prevent that post concrete from leaking to shake inserts in the post, and is convenient inadequately when leading to the staff to use.
SUMMERY OF THE UTILITY MODEL
At present, in order to improve the strength of a column, reinforcing steel bars can be bound in the column, and the bound reinforcing steel bars can prevent a device for preventing the concrete leakage vibration of the column from being inserted into the column, so that the device is inconvenient for workers to use.
The application provides a device for preventing post concrete leaks and shakes adopts following technical scheme:
the utility model provides a prevent device that post concrete leaked vibration, includes the bottom tube, the top position of bottom tube is provided with the connecting pipe, the top position of connecting pipe is provided with the push pipe, the top and the bottom position of push pipe and connecting pipe all set up to the opening form, the top position of bottom tube sets up to the opening form, the hole of vibrating has been seted up to the lower extreme position of bottom tube one side outer wall, the upper end position of bottom tube outer wall is fixed with eight groups of connecting rods, eight groups for angle such as upper end position of bottom tube outer wall the structure of connecting rod sets up to the arch, and the connecting rod arches towards the direction of keeping away from the bottom tube.
Through adopting above-mentioned technical scheme, thereby can insert the device that should prevent that post concrete from leaking to vibrate inside inserting the concrete post and vibrate after concreting the concrete through the vibrating rod under the common cooperation in bottom tube, connecting pipe and push pipe and the hole of vibrating under the use, make this device that prevents that post concrete from leaking to vibrate under the arc structural action of eight groups of connecting rods meet the reinforcing bar and can shift automatically when inserting, guarantee that this device that prevents that post concrete from leaking to vibrate can insert smoothly and take out.
Optionally, a guide plate is obliquely fixed on the side wall of the inner cavity of the bottom tube, and the bottom position of the guide plate is connected with the bottom position of the vibrating hole.
Through adopting above-mentioned technical scheme, make things convenient for the vibrating rod to stretch out through the hole of vibrating.
Optionally, the top of the outer wall of the bottom tube is fixedly sleeved with a second threaded sleeve, and the upper end of the inner wall of the second threaded sleeve is connected with the bottom of the outer wall of the connecting tube through threads.
Through adopting above-mentioned technical scheme, conveniently dismantle connecting pipe and bottom.
Optionally, the top of the outer wall of the connecting pipe is fixedly sleeved with a first threaded sleeve, and the upper end of the inner wall of the first threaded sleeve is connected with the bottom of the outer wall of the top pipe through threads.
Through adopting above-mentioned technical scheme, conveniently dismantle push pipe and connecting pipe.
Optionally, the inner diameters and the outer diameters of the top pipe, the connecting pipe and the bottom pipe are the same, and the outer diameters and the inner diameters of the first threaded sleeve and the second threaded sleeve are the same.
Through adopting above-mentioned technical scheme, thereby conveniently splice the use and can adjust the height of this device that prevents post concrete leakage vibration according to the height of concrete column.
Optionally, a shaking mechanism is fixedly sleeved at the middle position of the outer wall of the top pipe, and an indicating ball is fixed at one end of the shaking mechanism close to the vibrating hole.
Through adopting above-mentioned technical scheme, thereby conveniently instruct the direction in hole of vibrating and can instruct the position of vibrating rod.
Optionally, the shaking mechanism includes the lantern ring, the lantern ring is fixed the fixed sleeve and is located at the intermediate position of push pipe outer wall, the both sides position of lantern ring outer wall all is fixed with the pole of shaking hands, the instruction ball is fixed mutually with the pole of shaking hands that is close to instruction ball one side.
Through adopting above-mentioned technical scheme, conveniently get and put this device that prevents post concrete leakage vibration.
Optionally, a pyramid is fixed at the bottom of the bottom tube.
Through adopting above-mentioned technical scheme, make things convenient for this device that prevents post concrete leakage vibration to insert inside the concrete column smoothly.
In summary, the present application includes at least one of the following benefits: when this prevent device that post concrete leaked vibration meets the reinforcing bar at the insertion in-process, thereby make this prevent device that post concrete leaked vibration under the arc structure effect of eight groups of connecting rods automatic displacement when contacting with the reinforcing bar avoid the reinforcing bar, the convenience is gone on inside the concrete column of disect insertion when needs vibrate and need not insert in advance in the concrete column.
Drawings
FIG. 1 is a front view of the present application;
FIG. 2 is a schematic top view of a second threaded bushing, connecting rod, and bottom tube connection of the present application;
fig. 3 is a schematic view of a connection structure of a first threaded sleeve and a connection pipe according to the present application.
In the figure: 1. jacking pipes; 2. a first threaded bushing; 3. a connecting pipe; 4. a second threaded bushing; 5. a connecting rod; 6. a guide plate; 7. pyramid; 8. vibrating the hole; 9. a bottom tube; 10. an indicator ball; 11. a grip lever; 12. a collar.
Detailed Description
Referring to fig. 1 and 2 of the drawings, the present application provides an embodiment: a device for preventing column concrete from leaking vibration comprises a bottom pipe 9, a connecting pipe 3 is arranged at the top of the bottom pipe 9, a top pipe 1 is arranged at the top of the connecting pipe 3, the top and bottom positions of the top pipe 1 and the connecting pipe 3 are both arranged in an open shape, the top position of the bottom pipe 9 is arranged in an open shape, a vibrating hole 8 is arranged at the lower end of the outer wall of one side of the bottom pipe 9, eight groups of connecting rods 5 are fixed at the upper end of the outer wall of the bottom pipe 9 at equal angles, the structure of the eight groups of connecting rods 5 is arranged in an arch shape, the connecting rods 5 are arched towards the direction far away from the bottom pipe 9, a guide plate 6 is fixed at the side wall of the inner cavity of the bottom pipe 9 in an inclined manner, the bottom position of the guide plate 6 is connected with the bottom position of the vibrating hole 8, when the device for preventing column concrete from leaking vibration is used, a vibrating rod firstly stretches into the inner cavities of the connecting pipe 3 and the bottom pipe 9 through the bottom position of the vibrating hole 1, and stretches out through the vibrating rod under the action of the guide plate 6, the worker holds the two sets of grab bars 11 and inserts the device for preventing column concrete from leaking into the interior of the concrete column and vibrates it with the vibrator rods.
Please refer to fig. 1 in the drawings of the specification: fixed the having cup jointed handshake mechanism of the intermediate position department of 1 outer wall of push pipe, handshake mechanism is fixed with instruction ball 10 near the one end in hole 8 that vibrates, handshake mechanism includes lantern ring 12, lantern ring 12 is fixed to cup joint the intermediate position department at push pipe 1 outer wall, the both sides position of lantern ring 12 outer wall all is fixed with handle rod 11, it is fixed mutually with the handle rod 11 that is close to instruction ball 10 one side to instruct ball 10, conveniently instruct the position in hole 8 that vibrates under the effect of instructing ball 10, be convenient for when vibrating the staff adjust the angle of the stick that vibrates and then fully vibrate the concrete through rotatory this device that prevents that post concrete from leaking and shake.
Please refer to fig. 1 in the drawings of the specification: the bottom position of bottom tube 9 is fixed with pyramid 7, is favorable to this device that prevents post concrete leakage vibration to insert in the concrete column under the effect of pyramid 7.
Please refer to fig. 1 and 3 in the drawings of the specification: the top position of the outer wall of the bottom pipe 9 is fixedly sleeved with a second threaded sleeve 4, the upper end of the inner wall of the second threaded sleeve 4 is connected with the bottom position of the outer wall of the connecting pipe 3 through threads, the top position of the outer wall of the connecting pipe 3 is fixedly sleeved with a first threaded sleeve 2, the upper end of the inner wall of the first threaded sleeve 2 is connected with the bottom position of the outer wall of the top pipe 1 through threads, the inner diameter and the outer diameter of the top pipe 1, the connecting pipe 3 and the bottom pipe 9 are the same, and the outer diameter and the inner diameter of the first threaded sleeve 2 and the second threaded sleeve 4 are the same, the height of the device for preventing concrete leakage vibration of the column can be adjusted by selecting a proper number of connecting pipes 3 according to the height of the concrete column when in use, when the device for preventing the column concrete from leaking vibration is disassembled, the top pipe 1 is screwed to be separated from the first threaded sleeve 2, and then the connecting pipe 3 is screwed to be separated from the second threaded sleeve 4.
The working principle is as follows: when using this device that prevents post concrete and leak and shake, when this device that prevents post concrete and leak and shake meets the reinforcing bar at the insertion in-process, thereby make this device that prevents post concrete and leak and shake under eight sets of connecting rod 5's arc structural action avoid the reinforcing bar when contacting with the reinforcing bar automatic displacement, the convenience is gone on inside the concrete column and need not insert in advance in the concrete column when needs vibrate.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a prevent device that post concrete leaked vibration, includes bottom tube (9), the top position of bottom tube (9) is provided with connecting pipe (3), the top position of connecting pipe (3) is provided with push pipe (1), the top and the bottom position of push pipe (1) and connecting pipe (3) all set up to the opening form, the top position of bottom tube (9) sets up to the opening form, its characterized in that: the vibrating hole (8) is formed in the lower end position of the outer wall of one side of the bottom pipe (9), eight groups of connecting rods (5) are fixed to the upper end position of the outer wall of the bottom pipe (9) at equal angles, the structure of each connecting rod (5) is arched, and the connecting rods (5) arch in the direction away from the bottom pipe (9).
2. The apparatus for preventing leakage vibration of column concrete according to claim 1, wherein: the side wall of the inner cavity of the bottom tube (9) is obliquely fixed with a guide plate (6), and the bottom position of the guide plate (6) is connected with the bottom position of the vibrating hole (8).
3. The apparatus for preventing leakage vibration of column concrete according to claim 1, wherein: the top of the outer wall of the bottom pipe (9) is fixedly sleeved with a second threaded sleeve (4), and the upper end of the inner wall of the second threaded sleeve (4) is connected with the bottom of the outer wall of the connecting pipe (3) through threads.
4. A device for preventing leakage of vibration of column concrete according to claim 3, wherein: the connecting pipe (3) is fixedly sleeved with a first threaded sleeve (2) at the top of the outer wall, and the upper end of the inner wall of the first threaded sleeve (2) is connected with the bottom of the outer wall of the top pipe (1) through threads.
5. The apparatus for preventing leakage vibration of column concrete according to claim 4, wherein: the inner diameter and the outer diameter of the top pipe (1), the connecting pipe (3) and the bottom pipe (9) are the same, and the outer diameter and the inner diameter of the first threaded sleeve (2) and the second threaded sleeve (4) are the same.
6. The apparatus for preventing leakage vibration of column concrete according to claim 1, wherein: a hand-shaking mechanism is fixedly sleeved at the middle position of the outer wall of the jacking pipe (1), and an indicating ball (10) is fixed at one end of the hand-shaking mechanism close to the vibrating hole (8).
7. The apparatus for preventing leakage vibration of column concrete according to claim 6, wherein: the hand shaking mechanism comprises a lantern ring (12), the lantern ring (12) is fixedly sleeved at the middle position of the outer wall of the top pipe (1), hand shaking rods (11) are fixed to the positions of the two sides of the outer wall of the lantern ring (12), and the indication ball (10) is fixed to the hand shaking rod (11) close to one side of the indication ball (10).
8. The apparatus for preventing leakage vibration of column concrete according to claim 1, wherein: the bottom of the bottom tube (9) is fixed with a pyramid (7).
CN202220228820.6U 2022-01-27 2022-01-27 Device for preventing column concrete from leaking and vibrating Active CN216766812U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220228820.6U CN216766812U (en) 2022-01-27 2022-01-27 Device for preventing column concrete from leaking and vibrating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220228820.6U CN216766812U (en) 2022-01-27 2022-01-27 Device for preventing column concrete from leaking and vibrating

Publications (1)

Publication Number Publication Date
CN216766812U true CN216766812U (en) 2022-06-17

Family

ID=81978443

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220228820.6U Active CN216766812U (en) 2022-01-27 2022-01-27 Device for preventing column concrete from leaking and vibrating

Country Status (1)

Country Link
CN (1) CN216766812U (en)

Similar Documents

Publication Publication Date Title
CN105170836B (en) Portable many bending straighteners of function high tensile reinforcement at most and its operating method
CN105781104A (en) Top plate reserved hole construction form and construction method thereof
CN216766812U (en) Device for preventing column concrete from leaking and vibrating
CN110735651A (en) through-hole pipe self-compacting concrete pouring construction method
CN212002323U (en) Telescopic string cylinder for pouring super-thick concrete
CN205669314U (en) A kind of top board preformed hole construction mould
CN109610878B (en) Multifunctional wall body correcting instrument and wall body correcting method
CN217174711U (en) Tamping tool for filling soil in chest part of axillary corner of pipeline
CN207633342U (en) A kind of bridge pile foundation pile crown abolishes device
CN201896313U (en) Pipe pile hole forming device for multi-section dual protection casing
CN206883565U (en) Socket type pipeline counterpart installation tool
CN109555125A (en) Submersible type concreting sealing telescopic pipe
CN206844665U (en) Concrete filled steel tube pours instrument
CN210550865U (en) Die drawing auxiliary tool for die manufacturing
CN208618781U (en) A kind of adjustable bricklayer foot prop of house ornamentation
CN214574731U (en) Fair-faced concrete wall split bolt hole repairing device
CN217977777U (en) Interim plugging device of underground outdoor wall sleeve pipe
CN204531424U (en) A kind of self-control foam concrete pouring head
CN207863413U (en) A kind of jointing tool
CN218326530U (en) Cement pump slip casting pipe locator
CN215561716U (en) Fixed tie rod structure of road bridge construction template
CN207160016U (en) Underwater grouting pile leader vibrator
CN216640166U (en) Novel support of pavement concrete construction template device
CN202315167U (en) Portable badminton racket
CN207003968U (en) A kind of dismountable scaffold of architectural engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant