CN206844665U - steel pipe concrete pouring tool - Google Patents

steel pipe concrete pouring tool Download PDF

Info

Publication number
CN206844665U
CN206844665U CN201720406466.0U CN201720406466U CN206844665U CN 206844665 U CN206844665 U CN 206844665U CN 201720406466 U CN201720406466 U CN 201720406466U CN 206844665 U CN206844665 U CN 206844665U
Authority
CN
China
Prior art keywords
downcomer
concrete
centrum
steel tube
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720406466.0U
Other languages
Chinese (zh)
Inventor
武俊
李大桂
林师慧
刘曦
孙佳星
陈伟吉
张鹏
蔡灿仲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201720406466.0U priority Critical patent/CN206844665U/en
Application granted granted Critical
Publication of CN206844665U publication Critical patent/CN206844665U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model relates to a concrete construction appurtenance technical field discloses a steel pipe concrete placement instrument. The utility model discloses insert and establish in the perfusion hole of concrete steel pipe lateral wall, including special-shaped funnel, special-shaped funnel includes the last centrum and the downcomer of slope intercommunication, the axis of going up the centrum is 145 with the contained angle of downcomer and supplyes 155, the height of going up the centrum is 1 with the length ratio of downcomer: 1.7-2.2; the length of the lower guide pipe is 1/2-3/4 of the inner diameter of the concrete steel pipe. The utility model discloses it is convenient to use, can effectively improve the efficiency of construction, reduces the construction degree of difficulty, avoids the concrete to leak thick liquid.

Description

Concrete filled steel tube pours instrument
Technical field
Concrete construction auxiliary Tools Technology is the utility model is related to, is poured more particularly to a kind of concrete filled steel tube Instrument.
Background technology
With the continuous development of modern project, steel construction is more and more applied in architectural engineering, and concrete filled steel tube Structure is widely used in frame structure due to having excellent bending resistance and compression strength concurrently simultaneously.Existing steel pipe The perfusion of concrete column, mainly there is two modes, and one is from the construction method of high dropping not vibrated concrete, using pumping The process that concrete simplifies pouring concrete in-situ, easy construction, but concrete formation is second-rate in this mode, quality Stability is difficult to control;Another way is to open up interim fill orifice in the side wall of steel pipe, is layered from bottom to top with concrete pump Casting concrete successively, pouring construction quality is can effectively ensure that, but speed of application is slower, and filled from the fill orifice of side Note, the charging aperture of material distributing machine are not easy to adjust, and difficulty of construction is larger, not easy to operate, the situation of concrete spillage easily occurs.
Utility model content
The utility model provides a kind of application conveniently, can effectively improve efficiency of construction, reduces difficulty of construction, avoids concrete The concrete filled steel tube of spillage pours instrument.
Technical problems to be solved are:The speed of application of existing concrete filled steel tube is slow, and difficulty of construction is big, coagulation easily occurs The situation of native spillage.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:
The utility model concrete filled steel tube pours instrument, is plugged in the fill orifice of concrete steel pipe side wall, including abnormity Funnel, special-shaped funnel includes tilting the upper centrum of connection and downcomer, the axis of the upper centrum and the angle of downcomer are 145-155 °, the height of the upper centrum and the length ratio of downcomer are 1:1.7-2.2;The length of the downcomer is coagulation The 1/2-3/4 of native pipe diameter.
The utility model concrete filled steel tube pours instrument, and further, the cone angle of the upper centrum is 60-90 °.
The utility model concrete filled steel tube pours instrument, and further, the internal diameter of the downcomer is 27-45mm.
The utility model concrete filled steel tube pours instrument, and further, the upper centrum and downcomer are using steel one It is made.
The utility model concrete filled steel tube pours instrument, and further, in addition to holding firmware, the holding firmware are arranged on Centrum and the junction of downcomer, one end of holding firmware are fixed on downcomer in the side wall of upper centrum side, the other end to Export direction extension and the downcomer side wall of downcomer form clamping part.
The utility model concrete filled steel tube pours instrument, and further, holding firmware is elastic clip.
The utility model concrete filled steel tube pours instrument and had the advantages that compared with prior art:
The utility model concrete filled steel tube pours that tool construction is simple, and in light weight, small volume, manufacture difficulty is small, cost is low, Easy to use, turnover is flexible, is not easy to be limited and influenceed by environment.The utility model is plugged in concrete steel pipe using funnel In side wall fill orifice, greatly reduce concrete pours difficulty, without the charging aperture of especially rotation adjustment material distributing machine, reduces The operation difficulty of worker, and the spillage in filling process is avoided, effectively raise efficiency of construction.Vertebra on the utility model Body is obliquely installed with downcomer, is realized the fixing for the instrument that pours using angle of inclination and the deadweight for pouring instrument, is avoided and pour Build the inclination or movement of instrument;Holding firmware is provided with the junction of upper centrum and downcomer simultaneously, can further realize and pour Fixation between instrument and concrete steel pipe, it is simple in construction, it is easy to use.
Instrument is poured to concrete filled steel tube of the present utility model below in conjunction with the accompanying drawings to be described further.
Brief description of the drawings
Fig. 1 is the structural representation that the utility model concrete filled steel tube pours instrument;
Fig. 2 is the use state diagram that the utility model concrete filled steel tube pours instrument.
Reference:
The upper centrums of 1-;2- downcomers;3- holding firmwares;4- concrete steel pipes.
Embodiment
As depicted in figs. 1 and 2, the utility model concrete filled steel tube pours instrument, is plugged in the filling of the side wall of concrete steel pipe 4 In orifice, including special-shaped funnel and holding firmware 3, special-shaped funnel include upper centrum 1 and the downcomer 2 for tilting connection, upper centrum 1 The angle of axis and downcomer 2 is 145-155 °, and upper centrum 1 and downcomer 2 are made into integration using steel, the cone angle of upper centrum 1 For 60-90 °, the internal diameter of downcomer 2 is 27-45mm, and the height of upper centrum 1 is 1 with the length ratio of downcomer 2:1.7-2.2; The length of downcomer 2 is the 1/2-3/4 of the internal diameter of concrete steel pipe 4;Upper centrum 1 and the junction of downcomer 2 are provided with holding firmware 3, holding firmware 3 is elastic clip, and one end of holding firmware 3 is fixed on downcomer 2 in the side wall of the upper side of centrum 1, the other end Export direction extension to downcomer 2 forms clamping part with the side wall of downcomer 2.
The application method that the utility model concrete filled steel tube pours instrument is specific as follows:
Fill orifice is opened up in the steel pipe side wall of steel core concrete column according to construction demand, general fill orifice opens up position and is higher than The designed elevation of concrete structure, one can be opened up in the eminence of concrete steel pipe 4, coagulation is carried out by the way of high-altitude leaves Soil pours, and also can successively be segmented and open up fill orifice, carries out layering perfusion, and every layer of influx height is not higher than 3m.
The downcomer 2 that concrete filled steel tube is poured to instrument inserts fill orifice, when supreme centrum 1 and the junction of downcomer 2, Be rotated down so that downcomer 2 straight down, and using holding firmware 3 by the side wall of concrete steel pipe 4 be clamped in holding firmware 3 with Between downcomer 2, the fixation for the instrument that pours is realized, then from the opening concrete perfusion of upper centrum 1, concrete is carried out and pours Build.
After the completion of concreting, it is reusable to remove the instrument of pouring.
Embodiment described above is only that preferred embodiment of the present utility model is described, not to this practicality New scope is defined, and on the premise of the utility model design spirit is not departed from, those of ordinary skill in the art are to this The various modifications and improvement that the technical scheme of utility model is made, the protection of the utility model claims book determination all should be fallen into In the range of.

Claims (6)

1. concrete filled steel tube pours instrument, it is characterised in that:It is plugged in concrete steel pipe(4)In the fill orifice of side wall, including it is different Shape funnel, the special-shaped funnel include tilting the upper centrum of connection(1)And downcomer(2), the upper centrum(1)Axis with Conduit(2)Angle be 145-155 °, the upper centrum(1)Height and downcomer(2)Length ratio be 1:1.7-2.2; The downcomer(2)Length be concrete steel pipe(4)The 1/2-3/4 of internal diameter.
2. concrete filled steel tube according to claim 1 pours instrument, it is characterised in that:The upper centrum(1)Cone angle be 60-90°。
3. concrete filled steel tube according to claim 2 pours instrument, it is characterised in that:The downcomer(2)Internal diameter be 27-45mm。
4. concrete filled steel tube according to claim 3 pours instrument, it is characterised in that:The upper centrum(1)And downcomer (2)It is made into integration using steel.
5. concrete filled steel tube according to claim 1 pours instrument, it is characterised in that:Also include holding firmware(3), the card Firmware(3)It is arranged on centrum(1)With downcomer(2)Junction, holding firmware(3)One end be fixed on downcomer(2)It is close Upper centrum(1)In the side wall of side, the other end is to downcomer(2)Export direction extension and downcomer(2)Side wall forms clamping Portion.
6. concrete filled steel tube according to claim 5 pours instrument, it is characterised in that:The holding firmware(3)For elastic clip Piece.
CN201720406466.0U 2017-04-18 2017-04-18 steel pipe concrete pouring tool Expired - Fee Related CN206844665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720406466.0U CN206844665U (en) 2017-04-18 2017-04-18 steel pipe concrete pouring tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720406466.0U CN206844665U (en) 2017-04-18 2017-04-18 steel pipe concrete pouring tool

Publications (1)

Publication Number Publication Date
CN206844665U true CN206844665U (en) 2018-01-05

Family

ID=60793009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720406466.0U Expired - Fee Related CN206844665U (en) 2017-04-18 2017-04-18 steel pipe concrete pouring tool

Country Status (1)

Country Link
CN (1) CN206844665U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561157A (en) * 2020-04-30 2020-08-21 中国五冶集团有限公司 Structure and method for pouring concrete into grouting hole of high-altitude steel column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111561157A (en) * 2020-04-30 2020-08-21 中国五冶集团有限公司 Structure and method for pouring concrete into grouting hole of high-altitude steel column

Similar Documents

Publication Publication Date Title
CN206971732U (en) A kind of doubly-linked beam forms pouring structure
CN206844665U (en) steel pipe concrete pouring tool
CN105332511B (en) A kind of huge steel core concrete column filling core, which pours, smashes device and method
CN215564462U (en) Steel construction box type column concrete perfusion ware
CN207295460U (en) A kind of vertical prestressing pipeline connects squeezing unit
CN206397513U (en) A kind of lining trolley
CN207686300U (en) Reinforcement type aluminum alloy pattern plate diagonal brace mechanism
CN204551173U (en) Pull bar locating support
CN217054039U (en) Steel reinforcement cage for bored concrete pile with edge limit structure
CN208857817U (en) A kind of pore type soil layer Foundation Pit Pouring quick treatment device
CN209228032U (en) Regularization formwork inside-corner reinforcing device
CN208105887U (en) A kind of auxiliary concrete filled steel tube pours device
CN204531424U (en) Self-made foam concrete pouring head
CN209011845U (en) A kind of tunnel grouting structure
CN208329593U (en) Aluminum alloy mould plate one corner back cord
CN206986896U (en) A kind of concrete is received storehouse and wiped one's face sample rack
CN215210412U (en) Road surface grouting pouring device for building construction
CN207348470U (en) Tamping instrument at the top of a kind of foam concrete lightgage steel joist wall
CN205906922U (en) Pipeline drawing of patterns gallows
CN205917654U (en) Waterstop fixing device for hydraulic engineering
CN221321809U (en) Auxiliary vibrating device for bare concrete shear wall
CN106088656B (en) A kind of bottom provisions for grouting and bottom grouting method for being used to increase slab thickness
CN204691078U (en) Jacking method for pouring concrete steel pipe
CN221810728U (en) Air conditioner hole device is reserved in major structure construction
CN214658282U (en) Full grouting sleeve capable of facilitating grouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180105

Termination date: 20180418