CN216689065U - Construction channel for construction of cantilever number block of separated continuous rigid frame bridge - Google Patents

Construction channel for construction of cantilever number block of separated continuous rigid frame bridge Download PDF

Info

Publication number
CN216689065U
CN216689065U CN202123364828.XU CN202123364828U CN216689065U CN 216689065 U CN216689065 U CN 216689065U CN 202123364828 U CN202123364828 U CN 202123364828U CN 216689065 U CN216689065 U CN 216689065U
Authority
CN
China
Prior art keywords
construction
bailey beam
cross
bailey
number block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123364828.XU
Other languages
Chinese (zh)
Inventor
陈发文
王楷银
杨永
乔虎军
王孝生
白海珠
马敏嘉
杨兴杰
赵江平
陈瑞龙
李国俊
陈超源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment No5 Construction Co ltd
Original Assignee
Yunnan Construction Investment No5 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment No5 Construction Co ltd filed Critical Yunnan Construction Investment No5 Construction Co ltd
Priority to CN202123364828.XU priority Critical patent/CN216689065U/en
Application granted granted Critical
Publication of CN216689065U publication Critical patent/CN216689065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a construction channel for construction of a cantilever number block of a separate continuous rigid frame bridge, which comprises a Bailey beam, a cross beam, a diagonal draw bar, angle steel and a patterned steel plate; the number of the cross beams is multiple, and the cross beams are fixed on a bottom bracket of the Bailey beam at intervals of 3 m; two ends of the cross beam are respectively connected with a diagonal draw bar, and the other ends of the diagonal draw bars are connected to the Bailey beam; an angle steel is welded at the joint of the Bailey beam and the cross beam; and the patterned steel plate is welded on the cross beam and the angle steel in the Bailey beam. The utility model is fully combined with the Bailey beam for use, and has simple and reliable structure; the construction channel can effectively lead workers to the right frame from the left frame (or the right frame to the left frame) safely and conveniently, and the use cost of the construction elevator of the bridge cantilever number block in the later period can be saved.

Description

Construction channel for construction of cantilever number block of separated continuous rigid frame bridge
Technical Field
The utility model belongs to the technical field of bridge engineering construction, and particularly relates to a construction channel for construction of a separated continuous rigid frame bridge cantilever number block.
Background
As highways develop in height, more and more bridges often span large gullies in the manner of high bridges and large spans; during construction and installation working hours, the number of bridge types of continuous rigid frame bridges is often selected, and the bridge plane is often arranged in a separated structure in the building mode; in the construction process, a construction elevator needs to be installed on each pier on the left and right sides, and the piers can be removed until the bridge construction is finished, so that the cost of the construction elevator is high.
Disclosure of Invention
Based on the defects of the prior art, the utility model provides a construction channel for the construction of the separated continuous rigid frame bridge cantilever number block, and the problem that the elevator cost is high in the later construction of the separated bridge type cantilever number block with the left-right width spacing smaller than 30 m is solved.
The utility model is realized by the following technical scheme.
The construction channel for the construction of the separated continuous rigid frame bridge cantilever number block comprises a Bailey beam, a cross beam, a diagonal draw bar, angle steel and a patterned steel plate; wherein,
the number of the cross beams is multiple, and the cross beams are fixed on a bottom bracket of the Bailey beam at intervals of 3 m; two ends of the cross beam are respectively connected with a diagonal draw bar, and the other ends of the diagonal draw bars are connected to the Bailey beam; an angle steel is welded at the joint of the Bailey beam and the cross beam; and the patterned steel plate is welded on the cross beam and the angle steel in the Bailey beam.
Preferably, a stiffening beam parallel to the cross beam is welded on the bottom bracket of the Bailey beam and between two adjacent cross beams.
Preferably, the included angle between the cross beam and the diagonal draw bar is 63.5 degrees.
Preferably, anti-falling nets are arranged on two sides of the Bailey beam.
The utility model is fully combined with the Bailey beam for use, has simple and reliable structure, and is easy to purchase and process the components; the construction channel can effectively lead workers to the right frame from the left frame (or the right frame to the left frame) safely and conveniently, and the use cost of the construction elevator of the bridge cantilever number block in the later period can be saved.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a side view of the present invention.
Detailed Description
Embodiments of the present invention will now be described with reference to the accompanying drawings, and those skilled in the art will understand that the following embodiments are illustrative of the present invention only, and should not be construed as limiting the scope of the present invention. The specific techniques, connections, conditions, or the like, which are not specified in the examples, are performed according to the techniques, connections, conditions, or the like described in the literature in the art or according to the product specification. The materials, instruments or equipment are not indicated by manufacturers, and are conventional products which can be obtained by purchasing.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "provided" are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. To those of ordinary skill in the art, the specific meanings of the above terms in the present invention are understood according to specific situations.
Referring to fig. 1 and 2, the construction channel for the construction of the separated continuous rigid frame bridge cantilever number block provided by the utility model comprises a beret beam 1, a cross beam 2, a diagonal draw bar 3, angle steel 4 and a patterned steel plate 5; the Bailey beam 1 is arranged on a No. 1 block which is constructed; a plurality of cross beams 2 are arranged, and the cross beams 2 are fixed on a bottom bracket of the Bailey beam 1 at intervals of 3 m; the two ends of the cross beam 2 are respectively connected with a diagonal draw bar 3, the other end of the diagonal draw bar 3 is connected to the Bailey beam 1, specifically, the diagonal draw bar 3 is fixedly connected with the Bailey beam 1 and the cross beam 2 through bolts, and the included angle between the cross beam 2 and the diagonal draw bar 3 is 63.5 degrees; an angle steel 4 is welded at the joint of the Bailey beam 1 and the cross beam 2; the patterned steel plate 5 is welded on the cross beam 2 and the angle steel 4 in the Bailey beam 1, and the thickness of the patterned steel plate 5 is 3 mm; anti-falling nets are arranged on two sides of the Bailey beam 1 for protection; after the construction channel is installed, the construction channel can be formed by hoisting the tower crane in place.
Further, a stiffening beam 6 parallel to the cross beams 2 is welded on the bottom bracket of the Bailey beam 1 and between two adjacent cross beams 2, so that the stability of the construction channel is improved. In the utility model, the cross beam and the stiffening beam are both made of channel steel.
According to the utility model, the Bailey beam construction channel is arranged on the block No. 1 which is constructed to connect the left frame and the right frame, so that a constructor can lead from the left frame to the right frame and from the right frame to the left frame, and the purpose of removing the construction elevator on a high pier in advance is achieved, thereby saving the later-stage use cost of the construction elevator.
In the construction of a certain bridge engineering, the utility model is adopted to construct on the cantilever number blocks within 30 meters of the left-right width space of the separated rigid frame bridge; by providing this construction passage, (the elevator service time of) 14 pieces can be saved, and the total service cost of the service time of the construction elevator of 196 days can be saved.
The above disclosure is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the scope of the present invention, therefore, the present invention is not limited by the appended claims.

Claims (4)

1. The construction channel for the construction of the separated continuous rigid frame bridge cantilever number block is characterized by comprising a Bailey beam (1), a cross beam (2), a diagonal draw bar (3), angle steel (4) and a patterned steel plate (5); wherein,
a plurality of cross beams (2) are arranged, and the cross beams (2) are fixed on a bottom bracket of the Bailey beam (1) at intervals of 3 m; two ends of the cross beam (2) are respectively connected with a diagonal draw bar (3), and the other end of the diagonal draw bar (3) is connected to the Bailey beam (1); an angle steel (4) is welded at the joint of the Bailey beam (1) and the cross beam (2); the patterned steel plate (5) is welded on the cross beam (2) and the angle steel (4) in the Bailey beam (1).
2. The construction channel for the separated continuous rigid frame bridge cantilever number block construction according to claim 1, wherein a stiffening beam (6) parallel to the cross beam (2) is welded on the bottom bracket of the Bailey beam (1) and between two adjacent cross beams (2).
3. The construction channel for the separated continuous rigid frame bridge cantilever number block construction according to claim 1, wherein the included angle between the cross beam (2) and the diagonal draw bar (3) is 63.5 degrees.
4. The construction channel for the separated continuous rigid frame bridge cantilever number block construction according to claim 1, wherein anti-falling nets are arranged on two sides of the Bailey beam (1).
CN202123364828.XU 2021-12-29 2021-12-29 Construction channel for construction of cantilever number block of separated continuous rigid frame bridge Active CN216689065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123364828.XU CN216689065U (en) 2021-12-29 2021-12-29 Construction channel for construction of cantilever number block of separated continuous rigid frame bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123364828.XU CN216689065U (en) 2021-12-29 2021-12-29 Construction channel for construction of cantilever number block of separated continuous rigid frame bridge

Publications (1)

Publication Number Publication Date
CN216689065U true CN216689065U (en) 2022-06-07

Family

ID=81844368

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123364828.XU Active CN216689065U (en) 2021-12-29 2021-12-29 Construction channel for construction of cantilever number block of separated continuous rigid frame bridge

Country Status (1)

Country Link
CN (1) CN216689065U (en)

Similar Documents

Publication Publication Date Title
CN110409319B (en) Bracket for large-span steel-concrete composite beam cast-in-place bridge deck and construction method
CN208121541U (en) In across the steel reinforced concrete composite beam bridge constructed using no mount approach
CN201447669U (en) Road bridge after reinforcement construction by removing beam and adding rib
CN210066504U (en) Large-span cantilever truss type bent cap support system
CN106284845A (en) A kind of post-cast strip reinforced concrete structural column independence support system construction method
CN216689065U (en) Construction channel for construction of cantilever number block of separated continuous rigid frame bridge
KR101243777B1 (en) Rahmen bridge using composite structure of corrugated steel web and concrete member and constructing method thereof
KR101180989B1 (en) Curved prestress concrete girder and bridge with the same
CN203684061U (en) Steel pedestrian overcrossing fast to disassemble or assemble
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
KR101058906B1 (en) Composite deckplate for bridge maintenance and composite slab construction method using the same
KR100975539B1 (en) Steel box continuous bridge with irruglar span or regular span and this construction technique
KR100691664B1 (en) Method of construction for girder bridge
CN111172856B (en) Middle-bearing type longitudinal block prefabricated box girder
CN211201112U (en) Sectional steel tower mounted assembly type construction platform
CN220685186U (en) Platform structure for blast furnace cast house
CN104532743A (en) Tower girder fixed-connection mechanism, corresponding cable-stayed bridge and building method of cable-stayed bridge
CN216641381U (en) Regularization scaffold frame work platform of ascending a height
CN214462344U (en) Assembled operating platform for high-altitude in-situ assembly of large-span steel truss
CN215164810U (en) Assembled hanging basket bottom support protection device
CN218175577U (en) Comb tooth type assembled module unit bridge expansion device
CN219808245U (en) Continuous rigid frame bridge midspan steel-concrete composite beam Duan Jiegou
CN220013394U (en) Cantilever arm suspension platform for steel box girder
CN212452303U (en) A overhanging type operation platform for girder steel installation
CN215516436U (en) Tower crane connecting channel capable of being used in turnover mode

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant