CN101597887A - Novel combined bridge deck and preparation method thereof - Google Patents

Novel combined bridge deck and preparation method thereof Download PDF

Info

Publication number
CN101597887A
CN101597887A CNA2009100534351A CN200910053435A CN101597887A CN 101597887 A CN101597887 A CN 101597887A CN A2009100534351 A CNA2009100534351 A CN A2009100534351A CN 200910053435 A CN200910053435 A CN 200910053435A CN 101597887 A CN101597887 A CN 101597887A
Authority
CN
China
Prior art keywords
bridge deck
base plate
concrete
novel combined
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009100534351A
Other languages
Chinese (zh)
Inventor
陈艾荣
马如进
王达磊
楼小峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CNA2009100534351A priority Critical patent/CN101597887A/en
Publication of CN101597887A publication Critical patent/CN101597887A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A kind of novel combined bridge deck, it comprises base plate and the layer of concrete of building on base plate, and base plate is provided with first shear connector and connects base plate and layer of concrete, and it can also be provided with stiffening rib on base plate, strengthen the base plate bearing capacity and connect layer of concrete.Described bridge deck are installed on the bridge main beam by first shear connector.The preparation method of described novel combined bridge deck is: it is provided with the first shearing connecting key on base plate; Base plate is installed on the bridge main beam top flange plate, the second shearing connecting key that is connected usefulness with bridge deck is set on the girder top flange plate; Lay the required power of joining muscle of bridge deck and upside main force muscle, fluid concrete.Also can set up stiffening rib on the base plate.The present invention to be serving as the effect of concrete casting injection molded plate, thereby saves setting up and removing of cast template, shortens the construction period.Have high bearing capacity, high-durability is easy to safeguard and studies for a second time courses one has flunked, and can reduce overall life cycle cost.

Description

Novel combined bridge deck and preparation method thereof
Technical field
The present invention relates to a kind of combined bridge deck, is a kind of novel bridge deck form that can be widely used in steel and the combining structure bridge.
Background technology
About combined bridge deck, though the whole thinking of considering end steel plate and steel concrete compound action is arranged at present at home and in the world, as application number is the steel-concrete combined bridge deck that 200710048515.9 patents propose, and it comprises: bridge floor beam, the longeron 11, the crossbeam 21 that are provided with by the interval are fixedly connected to form lattice type fine strain of millet frame; Steel sole plate 30 respectively is provided with one above each grid of bridge floor beam, each steel sole plate 30 is fixedlyed connected with longeron 11, crossbeam 21: shear resisting board 50, and along the longitudinal separation setting of bridge deck, shear resisting board 50 and steel sole plate 30 welding; Reinforced concrete floor 60 is cast on the steel sole plate 30.This steel-concrete combined bridge deck has just merely been considered the compound action of steel-concrete, though improved the supporting capacity of bridge deck itself, its purposes is single, only is applicable to the bridge deck of large bridge and super-huge bridge.
Summary of the invention
The object of the present invention is to provide a kind of novel combined bridge deck and preparation method thereof, in conjunction with the compound action of end steel plate and steel concrete, thereby increased substantially the supporting capacity of bridge deck, and be applicable to different types of rridges.
For reaching above purpose, solution of the present invention is:
A kind of novel combined bridge deck, it comprises base plate and the layer of concrete of building on base plate, base plate is provided with first shear connector and connects base plate and layer of concrete.
Further, it also comprises stiffening rib, and it is located on the base plate, strengthens the base plate bearing capacity and connects layer of concrete.
This base plate is a steel sole plate, and first shear connector is bar steel, bar shaped steel, slab.
This base plate thickness is 8~16mm, and the distribution of first shear connector is spaced apart 100~250mm.
This stiffening rib is slab, slab with holes, T shape slab.
This stiffening rib distributes and is spaced apart 50~90t (t is that end steel plate is thick), and it highly is no more than 2/3 of bridge deck height.
Described bridge deck are installed on the bridge main beam by second shear connector.
A kind of preparation method of novel combined bridge deck, it is provided with the first shearing connecting key on base plate; Base plate is installed on the bridge main beam top flange plate, the second shearing connecting key that is connected usefulness with bridge deck has been set on the girder top flange plate; Lay the required power of joining muscle of bridge deck and upside main force muscle, fluid concrete.
Further, when first shear connector is set on the base plate, stiffening rib can also be set.
Owing to adopted such scheme, the present invention to have following characteristics:
Reduce the bridge deck thickness of slab effectively, reduced the dead loading of design of bridge;
Save setting up and removing of concrete casting injection molded plate, shorten the construction period;
Have favorable durability, fatigue resistance is easy to safeguard.
Description of drawings
Fig. 1 is the steel-concrete assembled panel profile of prior art.
Fig. 2 is a combined bridge deck stereogram of the present invention.
Fig. 3 is a combined bridge deck profile of the present invention.
Figure notation: 11, longeron 21, crossbeam 30, steel sole plate 40, WELDING STUDS 50, shear resisting board
60, reinforced concrete floor 61, modified asphalt concrete layer
The specific embodiment
The present invention is further illustrated below in conjunction with the accompanying drawing illustrated embodiment.
As shown in Figure 1 and Figure 2, bridge main beam 100 (box-girder or i-shaped roof beam) is connected by second shear connector 150 on girder 100 top flange plates with combined bridge deck, and the end steel plate 120 of combined bridge deck is connected with steel concrete by first shear connector 140 and stiffening rib 130.The design of the second shearing connecting key 150 can be with reference to general compound beam shearing connecting key design; First shear connector 140 and stiffening rib 130 mainly are to guarantee being connected of end steel plate 120 and steel concrete in design; Stiffening rib 130 will guarantee that also end steel plate 120 has certain rigidity before hardening of concrete, and can bear weight concrete and construction loading.End steel plate 120 thickness of bridge deck are generally got 8~16mm.According to girder interval, bridge length and construction hoisting ability, can transversely be respectively 120-1,120-2,120-3 as bridge among Fig. 2 end steel plate 120 in axially transversely piecemeal making of bridge, Fig. 1 is the stereogram of bridge direction of principal axis last one minute of module unit.End steel plate 120 can not have bridge deck under the special shape requirement according to the shape arch camber or the bending of bridge deck, and for ease of making, end steel plate also can be made smooth. The shape of end steel plate stiffening rib 130 can be slab, slab with holes, T shape slab etc.Stiffening rib 130 configuration spaces are according to the desirable 50~90t of end steel plate 120 thickness (t is that end steel plate is thick), but must guarantee that answer dynamics and the rigidity of end steel plate 120 when fluid concrete meets the demands.Stiffening rib 130 considers that highly factor such as configuration upside reinforcing bar had better not surpass 2/3 of bridge deck height. The form of the first shearing connecting key 140 can adopt bar steel, bar shaped steel, slab etc.The general identical shearing connecting key form of combined bridge is wanted to guarantee the compound action of end steel plate and steel concrete, but simultaneously concrete poured into a mould smoothly, at interval can not be too little, and the desirable 100~250mm of configuration space. End steel plate stiffening rib connector 160 and end steel plate connecting elements 170 during the piecemeal fabrication and installation can or be welded to connect with high-strength bolt.
The production method of combined bridge deck of the present invention is: at first make end steel plate 120-1,120-2,120-3 at factory's piecemeal, the corresponding stiffening rib 130 and the first shearing connecting key 140 of welding on end steel plate, on-the-spot piecemeal is installed on the girder top flange plate and (has set the second shearing connecting key 150 that connects usefulness this moment on the girder top flange plate), form whole by stiffening rib syndeton 160 and steel plate syndeton of the axial end of bridge 170, steel plate integral body just has certain rigidity and supporting capacity at the end like this, can be used as operation platform and concrete casting injection molded plate.Bridge deck side reinforcing bar 180 and other lacings (not marking among the figure) on the built, fluid concrete thereon again, after the hardening of concrete, end steel plate just can form combined bridge deck by first shear connector 140 and stiffening rib 130 with the steel concrete combination.Combined bridge deck is fixed in bridge main beam by second shear connector 150.
Combined bridge deck of the present invention, utilize end steel plate and concrete compound action, strengthened the supporting capacity of bridge deck to a great extent, thereby reduced the thickness of slab of bridge deck, reduce the dead loading of design of bridge, reduced the integral bridge cost that comprises the bottom worker effectively.
In addition, stiffening rib rationally is set on end steel plate, makes end steel plate before hardening of concrete, just have certain supporting capacity, make end steel plate can become the template of concrete pouring naturally in the construction stage, thereby save setting up and removing of cast template, shorten the construction period.And when bridge deck are studied for a second time courses one has flunked,, can just can easily replace steel concrete, thereby help maintenance without template and safeguard procedures because of end steel plate can bear certain construction loading.
The end steel plate of combined bridge deck of the present invention can be made in factory process, can better guarantee crudy, and the end steel plate after putting more energy into has good rigidity and supporting capacity, also can guarantee the casting quality of on-site concrete.Bridge deck integral body is easy to safeguard and study for a second time courses one has flunked, thereby can saves overall life cycle cost.
Therefore bridge deck form of the present invention has tangible economic effect, can be widely used in the bridge of steel and combining structure.
The above-mentioned description to embodiment is can understand and apply the invention for ease of those skilled in the art.The person skilled in the art obviously can easily make various modifications to these embodiment, and needn't pass through performing creative labour being applied in the General Principle of this explanation among other embodiment.Therefore, the invention is not restricted to the embodiment here, those skilled in the art should be within protection scope of the present invention for improvement and modification that the present invention makes according to announcement of the present invention.

Claims (9)

1, a kind of novel combined bridge deck is characterized in that: it comprises base plate and the layer of concrete of building on base plate, and base plate is provided with first shear connector and connects base plate and layer of concrete.
2, novel combined bridge deck as claimed in claim 1 is characterized in that: it also comprises stiffening rib, and it is located on the base plate.
3, novel combined bridge deck as claimed in claim 1 is characterized in that: this base plate is a steel sole plate, and first shear connector is bar steel, bar shaped steel, slab.
4, novel combined bridge deck as claimed in claim 1 is characterized in that: this base plate thickness is 8~16mm, and the distribution of first shear connector is spaced apart 100~250mm.
5, novel combined bridge deck as claimed in claim 2 is characterized in that: this stiffening rib is slab, slab with holes, T shape slab.
6, novel combined bridge deck as claimed in claim 2 is characterized in that: this stiffening rib distributes and is spaced apart 50~90t, and it highly is no more than 2/3 of bridge deck height.
7, as each described novel combined bridge deck of claim 1-6, it is characterized in that: described bridge deck are installed on the bridge main beam by second shear connector.
8, the preparation method of novel combined bridge deck as claimed in claim 1 is characterized in that: it is provided with the first shearing connecting key on base plate; Base plate is installed on the bridge main beam top flange plate, the second shearing connecting key that is connected usefulness with bridge deck has been set on the girder top flange plate; Lay the required power of joining muscle of bridge deck and upside main force muscle, fluid concrete.
9, the preparation method of novel combined bridge deck as claimed in claim 8 is characterized in that: when first shear connector is set on the base plate, also be provided with stiffening rib.
CNA2009100534351A 2009-06-19 2009-06-19 Novel combined bridge deck and preparation method thereof Pending CN101597887A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009100534351A CN101597887A (en) 2009-06-19 2009-06-19 Novel combined bridge deck and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009100534351A CN101597887A (en) 2009-06-19 2009-06-19 Novel combined bridge deck and preparation method thereof

Publications (1)

Publication Number Publication Date
CN101597887A true CN101597887A (en) 2009-12-09

Family

ID=41419473

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009100534351A Pending CN101597887A (en) 2009-06-19 2009-06-19 Novel combined bridge deck and preparation method thereof

Country Status (1)

Country Link
CN (1) CN101597887A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146658A (en) * 2011-03-04 2011-08-10 清华大学 Locally uncombined suspension bridge steel-concrete combined bridge deck system and construction method of combined bridge deck system
CN102864741A (en) * 2012-10-19 2013-01-09 长安大学 Light structural steel and concrete combined bridge floor structure
CN103643625A (en) * 2013-12-29 2014-03-19 长安大学 Steel truss-concrete plate combined beam based on shear-resisting connecting structure
CN105256890A (en) * 2015-11-11 2016-01-20 北京筑福国际工程技术有限责任公司 Tiled steel plate structure adopting T-shaped ribs and construction method thereof
CN106149540A (en) * 2016-07-19 2016-11-23 长安大学 Assembling steel plate composite beam bridge and construction method thereof based on steel reinforced concrete combined bridge deck
CN107604815A (en) * 2017-09-20 2018-01-19 广东省交通规划设计研究院股份有限公司 A kind of ultra-high performance concrete combined bridge deck plate for carrying template
CN107988905A (en) * 2016-10-27 2018-05-04 成都亚联科科技有限公司 A kind of preparation method of bridge pavement component
CN108342972A (en) * 2017-01-22 2018-07-31 姚晓宁 Full steel structure combines bridge plate urban viaduct and its construction technology
CN110670486A (en) * 2019-10-10 2020-01-10 河北建设集团卓诚路桥工程有限公司 Construction method for steel box arch bridge grid beam concrete cast-in-place bridge deck
CN111321712A (en) * 2020-02-20 2020-06-23 中国电建集团华东勘测设计研究院有限公司 Assembled fishway pool chamber structure and construction method
CN112359722A (en) * 2020-12-18 2021-02-12 福州大学 Steel-concrete combined bridge deck poured by concrete beams in separate bins and construction method thereof
CN113463495A (en) * 2021-07-21 2021-10-01 台州市交通勘察设计院有限公司 Construction method of cast-in-situ steel-concrete composite beam with double main beam longitudinal one-way plates

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146658A (en) * 2011-03-04 2011-08-10 清华大学 Locally uncombined suspension bridge steel-concrete combined bridge deck system and construction method of combined bridge deck system
CN102864741A (en) * 2012-10-19 2013-01-09 长安大学 Light structural steel and concrete combined bridge floor structure
CN103643625A (en) * 2013-12-29 2014-03-19 长安大学 Steel truss-concrete plate combined beam based on shear-resisting connecting structure
CN103643625B (en) * 2013-12-29 2015-08-05 长安大学 A kind of steel truss-concrete slab composite beam based on shear connections structure
CN105256890A (en) * 2015-11-11 2016-01-20 北京筑福国际工程技术有限责任公司 Tiled steel plate structure adopting T-shaped ribs and construction method thereof
CN106149540A (en) * 2016-07-19 2016-11-23 长安大学 Assembling steel plate composite beam bridge and construction method thereof based on steel reinforced concrete combined bridge deck
CN107988905A (en) * 2016-10-27 2018-05-04 成都亚联科科技有限公司 A kind of preparation method of bridge pavement component
CN108342972A (en) * 2017-01-22 2018-07-31 姚晓宁 Full steel structure combines bridge plate urban viaduct and its construction technology
CN107604815A (en) * 2017-09-20 2018-01-19 广东省交通规划设计研究院股份有限公司 A kind of ultra-high performance concrete combined bridge deck plate for carrying template
CN110670486A (en) * 2019-10-10 2020-01-10 河北建设集团卓诚路桥工程有限公司 Construction method for steel box arch bridge grid beam concrete cast-in-place bridge deck
CN111321712A (en) * 2020-02-20 2020-06-23 中国电建集团华东勘测设计研究院有限公司 Assembled fishway pool chamber structure and construction method
CN112359722A (en) * 2020-12-18 2021-02-12 福州大学 Steel-concrete combined bridge deck poured by concrete beams in separate bins and construction method thereof
CN113463495A (en) * 2021-07-21 2021-10-01 台州市交通勘察设计院有限公司 Construction method of cast-in-situ steel-concrete composite beam with double main beam longitudinal one-way plates

Similar Documents

Publication Publication Date Title
CN101597887A (en) Novel combined bridge deck and preparation method thereof
CN101798794B (en) Composite box girder bridge erected in advance by using corrugated steel web steel girders and construction method thereof
CN202131559U (en) Corrugated steel web plate prestressed concrete continuous box girder
CN210507091U (en) Assembled prestressed combined box girder
CN101440598B (en) Steel box-concrete combined box plate arch structure and construction method thereof
CN109024219B (en) Prefabricated ultrahigh-performance concrete-common concrete combined beam bridge structure and construction method
CN110607867A (en) Non-dismantling mold laminated slab
CN103031926B (en) With the double-T compound beam and preparation method thereof of pre-stressed steel pipe concrete plug
CN113123504A (en) Laminated floor slab with detachable additional rigidity device
CN112761289A (en) Local steel bar truss prestressed concrete laminated bottom plate and manufacturing method thereof
CN210636679U (en) Steel-concrete composite beam structure
CN110055874B (en) Corrugated steel web box girder bridge lining concrete structure
CN202007380U (en) Prestressed concrete I beam of wave-shaped steel web plate
KR100634344B1 (en) Composite slab and the joint structure
CN111305439A (en) Laminated slab with disassembly-free die steel frame
CN102051963A (en) Concrete composite beam floor system and pouring method thereof
CN104988843A (en) Bridge combined by steel structural box girder and concrete bridge deck panel
CN211897803U (en) Continuous new structure of composite beam structure adopting UHPC beam-steel end plate with studs
CN209799125U (en) Hidden beam type laminated slab
CN209817214U (en) Connecting structure of floor bearing plate and fabricated concrete beam
CN104563354B (en) Combined long-span ribbed slab structure
CN110924303B (en) Steel beam and built-in steel reinforced concrete slab continuous combination beam and construction method
CN219671803U (en) Continuous beam type double-beam plate superposed floor system
CN215802556U (en) Inverted support-free steel bar truss composite floor slab
CN214364314U (en) Local steel bar truss prestressed concrete coincide bottom plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20091209