CN216643731U - BIM building power equipment wall hanging device - Google Patents

BIM building power equipment wall hanging device Download PDF

Info

Publication number
CN216643731U
CN216643731U CN202122775497.2U CN202122775497U CN216643731U CN 216643731 U CN216643731 U CN 216643731U CN 202122775497 U CN202122775497 U CN 202122775497U CN 216643731 U CN216643731 U CN 216643731U
Authority
CN
China
Prior art keywords
supporting plate
shaped
picture peg
plate
hanging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122775497.2U
Other languages
Chinese (zh)
Inventor
苏沛裕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhuzhen Decoration Design Engineering Co.,Ltd.
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122775497.2U priority Critical patent/CN216643731U/en
Application granted granted Critical
Publication of CN216643731U publication Critical patent/CN216643731U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model discloses a BIM (building information modeling) building power equipment wall hanging device which comprises a supporting plate, a first L-shaped inserting plate, a second L-shaped inserting plate, a first L-shaped supporting plate, a second L-shaped supporting plate and reinforcing steel bars, wherein the first L-shaped inserting plate and the second L-shaped inserting plate are respectively arranged on two sides of the back of the supporting plate, one end of each of the first L-shaped inserting plate and the second L-shaped inserting plate is welded with the back of the supporting plate, the first L-shaped supporting plate and the second L-shaped supporting plate are respectively arranged on one side of the supporting plate, and the first L-shaped supporting plate and the second L-shaped supporting plate are welded with the supporting plate. The wall hanging device for the whole BIM building power equipment has good use stability, good anti-displacement embedded parts and good bearing effect, can help personnel to assemble the power equipment on the wall of the BIM building better, and has higher practicability.

Description

BIM building power equipment wall hanging device
Technical Field
The utility model relates to the technical field of BIM building power equipment installation, in particular to a BIM building power equipment wall-hanging device.
Background
The BIM building is a building constructed by taking various relevant information data of a construction engineering project as a model foundation, building models are built, real information of the building is simulated through digital information simulation, the building constructed by the BIM is generally used as a building of infrastructure, and a complex power system is arranged in the building to meet the supply of huge power facilities in the building.
At present, when the power equipment of a building taking BIM construction as infrastructure is mounted on the wall of a wall body machine box, the power equipment generally uses simple hanging pieces such as expansion bolts, the bearing performance of the power equipment is poor, an embedded mechanism integrated with the wall body is lacked, and the use stability is not high. Therefore, a BIM building power equipment wall hanging device is provided.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a BIM building power equipment wall-mounted device which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides a BIM building power equipment wall hanging device, includes backup pad, first L type picture peg and second L type picture peg, still includes first L type layer board, second L type layer board and reinforcing bar, backup pad back both sides are equipped with first L type picture peg and second L type picture peg respectively, first L type picture peg and second L type picture peg one end all with backup pad back welded connection, backup pad one side is equipped with first L type layer board and second L type layer board respectively, first L type layer board and second L type layer board all with backup pad welded connection.
Furthermore, the first L-shaped inserting plate and the second L-shaped inserting plate are provided with through holes in a distributed mode, reinforcing steel bars are inserted into the through holes of the first L-shaped inserting plate and the through holes of the second L-shaped inserting plate, and the inserting positions of the reinforcing steel bars and the first L-shaped inserting plate and the inserting positions of the second L-shaped inserting plate are connected in a welded mode.
Further, mounting holes are distributed on the first L-shaped supporting plate and the second L-shaped supporting plate.
Furthermore, the top and the bottom of the first L-shaped inserting plate, the second L-shaped inserting plate, the first L-shaped supporting plate and the second L-shaped supporting plate are all triangular.
Compared with the prior art, the utility model has the following beneficial effects:
1. through the backup pad, first L type picture peg, second L type picture peg, first L type layer board, the subassembly that second L type layer board and reinforcing bar are constituteed, realize providing the hanging device of high stability for BIM building power equipment, in use, through first L type layer board, the built-in fitting that second L type layer board and reinforcing bar are constituteed, the realization supports building wall with the backup pad, during the assembly with the first L type picture peg at backup pad back, second L type picture peg and reinforcing bar carry out pre-buried the inserting to building wall's concrete fragment of brick and inlay, treat building wall's concrete fragment of brick dry and firm back, the backup pad can be stabilized and support the wall, personnel can hang the power equipment that needs to hang the building wall and establish or bolt installation assembly afterwards.
2. Through the use of reinforcing bar, can greatly increased backup pad and the inside area of contact of building wall for an organic whole nature between backup pad and the wall body is higher, greatly increased the bearing nature of whole hanging device, whole BIM building power equipment hanging device stability in use is good, possesses the built-in fitting of good displacement of preventing, possesses good bearing effect, can help the better wall body to the BIM building of personnel to assemble power equipment, has higher practicality.
Drawings
Fig. 1 is a schematic view of an overall structure of a wall-mounted device of BIM building electrical equipment according to the present invention.
Fig. 2 is a schematic front view of a support plate of a wall-mounted device of BIM building electrical equipment according to the present invention.
Fig. 3 is a schematic structural view of a second L-shaped inserting plate of a wall hanging device of BIM building electrical equipment according to the present invention.
In the figure: 1. a support plate; 2. a first L-shaped insert plate; 3. a second L-shaped insert plate; 4. perforating; 5. reinforcing steel bars; 6. a first L-shaped pallet; 7. a second L-shaped pallet; 8. and (7) installing holes.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further explained by combining the specific embodiments.
As shown in fig. 1-3, a BIM building power equipment wall hanging device, includes backup pad 1, first L type picture peg 2 and second L type picture peg 3, still includes first L type layer board 6, second L type layer board 7 and reinforcing bar 5, 1 back both sides of backup pad are equipped with first L type picture peg 2 and second L type picture peg 3 respectively, first L type picture peg 2 and 3 one end of second L type picture peg all with 1 back welded connection of backup pad, 1 one side of backup pad is equipped with first L type layer board 6 and second L type layer board 7 respectively, first L type layer board 6 and second L type layer board 7 all with 1 welded connection of backup pad.
The first L-shaped inserting plate 2 and the second L-shaped inserting plate 3 are distributed with through holes 4, reinforcing steel bars 5 are inserted into the through holes 4 of the first L-shaped inserting plate 2 and the second L-shaped inserting plate 3, and the inserting positions of the reinforcing steel bars 5 and the first L-shaped inserting plate 2 and the second L-shaped inserting plate 3 are welded; the reinforcing steel bars 5 improve the anti-pulling effect of the supporting plate 1 on the building wall.
Mounting holes 8 are distributed on the first L-shaped supporting plate 6 and the second L-shaped supporting plate 7; the mounting hole 8 facilitates bolt mounting of the power equipment and the support plate 1.
The top and the bottom of the first L-shaped inserting plate 2, the second L-shaped inserting plate 3, the first L-shaped supporting plate 6 and the second L-shaped supporting plate 7 are all triangular; the top and the bottom of the first L-shaped inserting plate 2 are triangular, the second L-shaped inserting plate 3, the first L-shaped supporting plate 6 and the second L-shaped supporting plate 7 can bear better force.
It should be noted that, the utility model is a BIM building electrical equipment wall hanging device, when in operation, the support plate 1 is used for supporting a building wall through an embedded part composed of a first L-shaped support plate 6, a second L-shaped support plate 7 and a steel bar 5, when in assembly, the first L-shaped inserting plate 2, the second L-shaped inserting plate 3 and the steel bar 5 at the back of the support plate 1 are used for embedding and inserting concrete bricks of the building wall, after the concrete bricks of the building wall are cured, the support plate 1 can stably support the wall, then personnel can hang electrical equipment needing to be hung on the building wall or install and assemble bolts, through the inserting and inserting of the first L-shaped inserting plate 2 and the second L-shaped inserting plate 3, the displacement prevention effect of the support plate 1 can be improved, and the triangular plates at the tops of the first L-shaped inserting plate 2 and the second L-shaped inserting plate 3 can hang on the wall, the triangle-shaped board that 3 sides of first L type picture peg 2 and second L type picture peg were erect can avoid backup pad 1 to appear controlling the displacement phenomenon, and reinforcing bar 5 can the inside area of contact of greatly increased backup pad 1 and building wall for an organic whole nature between backup pad 1 and the wall body is higher, greatly increased whole hanging device's bearing nature.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (4)

1. The utility model provides a BIM building power equipment hanging device, includes backup pad (1), first L type picture peg (2) and second L type picture peg (3), its characterized in that still includes first L type layer board (6), second L type layer board (7) and reinforcing bar (5), backup pad (1) back both sides are equipped with first L type picture peg (2) and second L type picture peg (3) respectively, first L type picture peg (2) and second L type picture peg (3) one end all with backup pad (1) back welded connection, backup pad (1) one side is equipped with first L type layer board (6) and second L type layer board (7) respectively, first L type layer board (6) and second L type layer board (7) all with backup pad (1) welded connection.
2. The BIM building electrical equipment wall hanging device according to claim 1, characterized in that: perforation (4) have been seted up in the distribution on first L type picture peg (2) and second L type picture peg (3), all insert in perforation (4) of first L type picture peg (2) and second L type picture peg (3) and be equipped with reinforcing bar (5), equal welded connection in grafting department of reinforcing bar (5) and first L type picture peg (2) and second L type picture peg (3).
3. The BIM building electrical equipment wall hanging device according to claim 1, characterized in that: and mounting holes (8) are distributed on the first L-shaped supporting plate (6) and the second L-shaped supporting plate (7).
4. The BIM building electrical equipment wall hanging device according to claim 1, characterized in that: the top and the bottom of the first L-shaped inserting plate (2), the second L-shaped inserting plate (3), the first L-shaped supporting plate (6) and the second L-shaped supporting plate (7) are all triangular.
CN202122775497.2U 2021-11-14 2021-11-14 BIM building power equipment wall hanging device Active CN216643731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122775497.2U CN216643731U (en) 2021-11-14 2021-11-14 BIM building power equipment wall hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122775497.2U CN216643731U (en) 2021-11-14 2021-11-14 BIM building power equipment wall hanging device

Publications (1)

Publication Number Publication Date
CN216643731U true CN216643731U (en) 2022-05-31

Family

ID=81736197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122775497.2U Active CN216643731U (en) 2021-11-14 2021-11-14 BIM building power equipment wall hanging device

Country Status (1)

Country Link
CN (1) CN216643731U (en)

Similar Documents

Publication Publication Date Title
CN216643731U (en) BIM building power equipment wall hanging device
CN113882539A (en) External thermal insulation and support integrated structure of building enclosure wall and construction method
CN207160018U (en) A kind of dismountable bracing members Guan Liang Z-shaped support hanging plate
CN109281408B (en) Comprehensive pipe gallery embedded part and fixing method thereof
CN215594116U (en) Cross pivot cabin connected with circular comprehensive pipe gallery
CN207143746U (en) Support beam template system under concrete support trestle plate
CN110725334B (en) Mid-partition wall of subway station group pit and construction method thereof
CN209429136U (en) A kind of concrete enclosure board for being cheated in cheating
CN208950301U (en) A kind of combined type bearing constructed for skyscraper or bridge tower
CN204435421U (en) A kind of assembling manhole
CN103015454B (en) Combined raft foundation of outdoor framework and GIS equipment in transformer substation
CN108487762B (en) Electronic information engineering communication tower connecting device
CN208202423U (en) The horizontal dress panel corner connector in toilet
CN216406004U (en) Energy-concerving and environment-protective building wallboard
CN210151941U (en) Assembled building reinforced concrete member
CN107237509B (en) The reinforcing energy consumption attachment device of prefabrication
CN217269056U (en) Wall body reinforced structure is used in transformation of old district
CN114411798B (en) Fan foundation structure
CN204258090U (en) A kind of power distribution cabinet assembly based on square and arc splice plate
CN211340809U (en) Back is foundation ditch support steel corbel
CN212316980U (en) GFRP assembled looped netowrk basis
CN216641060U (en) Building curtain wall construction pendant
CN213233522U (en) Column base connecting device of steel column applied to underground mechanical garage
CN202450547U (en) Underground large space wall body in residential district
CN204243547U (en) A kind of based on square and power distribution cabinet assembly that is triangle splice plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221206

Address after: No. 18, Lane 65, Huandong 1st Road, Fengjing Town, Jinshan District, Shanghai, 201803 (Fengsheng Economic Community)

Patentee after: Shanghai Zhuzhen Decoration Design Engineering Co.,Ltd.

Address before: 050000 Hebei Construction Engineering Group Co., Ltd., 146 Youyi North Street, Shijiazhuang City, Hebei Province

Patentee before: Su Peiyu