CN103015454B - Combined raft foundation of outdoor framework and GIS equipment in transformer substation - Google Patents
Combined raft foundation of outdoor framework and GIS equipment in transformer substation Download PDFInfo
- Publication number
- CN103015454B CN103015454B CN201210582741.6A CN201210582741A CN103015454B CN 103015454 B CN103015454 B CN 103015454B CN 201210582741 A CN201210582741 A CN 201210582741A CN 103015454 B CN103015454 B CN 103015454B
- Authority
- CN
- China
- Prior art keywords
- framework
- foundation
- gis
- raft
- raft foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention provides a combined raft foundation of an outdoor framework and GIS (geographic information system) equipment in a transformer substation. Framework foundations and a GIS raft foundation form a mat foundation, wherein the burial depth of each framework foundation is increased in consideration of the load difference of the GIS equipment and a framework rod, and meanwhile, the top of the framework foundation is slightly higher than a raft so as to facilitate connection between a foundation embedded bolt and each A-shaped rod framework column. According to the invention, the top of the GIS mat foundation is elevated to the position which is as high as minus 0.3 m, and the two framework foundations and the raft foundation of the GIS equipment are arranged in a combined manner to form the mat foundation. Through adoption of the combined raft foundation, the problem of foundation collision between the framework and the GIS equipment is solved, the land occupied by the transformer substation and the foundation capacity are reduced, and the project investment is saved.
Description
Technical field
The present invention relates to be in a kind of transformer station outdoor framework basis with GIS device combine raft foundation, belong to the design arrangement formal technique field of transformer station.
Background technology
Substation Design is after adopting unified general module, in enclosure wall, floor space becomes a unalterable quota and must not break through, but different sizes is taken up an area on the basic arrangement form of various geological conditions demand and basis, under limited space lining is put, the most fat natural ground single footing becomes a stubborn problem.Shown in Fig. 1, transformer station's outlet structure generally adopts A font bent structure, all establishes single footing to two posts of A word bar truss column in the past, bears pressure and pulling force respectively, meet resistance to compression and resistance to plucking requirement during natural ground; Then vertical load is comparatively large, apparatus arrangement is intensive for GIS device, and equipment room does not allow to there is differential settlement, often takes raft foundation arrangement form; In order to allow framework basis throw off completely with GIS foundation, the distance between framework and GIS device need be strengthened, causing transformer station's enclosure wall inner area and square foundation amount to increase all to some extent.If characteristic value of foundation bearing capacity is 100kPa, in standing, place backfill 1.0m is dark, (this method is applicable to basis, 110kV place arrangement form to 220kV outlet structure center pillar equally, every data have change) adopt traditional single footing size to need 3.0m (wide) X3.4m(long) X2.5m(is dark), reserve top A word bar framework root to open, framework center line must with the large plate base of GIS ensure 3731 distance, ensure not collide in each basis of distance guarantee of 4351 with enclosure wall center line, also operation side will be considered simultaneously, about need 9.0m space can ensure framework basis smooth construction, and universal design also only reserves 7.9m space after considering to utilize equipment gap.Once transformer station's enclosure wall line repeatedly need be proved and illustrated and hand over review activities to authorize after breakthrough universal design, program is more loaded down with trivial details, easily delays the transformer substation construction duration.If do not change large enclosure wall inside dimension, the space that framework single footing and GIS raft foundation depart from completely cannot be stopped in narrow and small enclosure wall line, therefore this binomial basis of ingenious reasonable Arrangement is the difficult point of engineering construction, the key of later stage transformer substation power distribution unit safe and reliable operation especially.
Summary of the invention
The object of the invention is to the deficiency overcoming above-mentioned existence, a kind of basic arrangement form optimized in power distribution equipment is provided, reduce transformer station to take up an area and square foundation amount, strengthen the resistance to compression of framework, breakout capacity, reduce embedded depth of foundation, solve the phenomenon that underground in site enclosure wall is narrow, collide in basis, realize investment reduction, reduce expropriation of land, do not break through transformer station that State Grid Corporation of China's universal design takes up an area the objects such as unalterable quota in outdoor framework and GIS device combine raft foundation.
The object of the invention is to have come by following technical solution, it framework basis is formed whole plate base with GIS raft foundation arrange, wherein consider GIS device with truss bar different loading, framework base position buried depth is deepened, slightly exceed raft plate at top simultaneously, facilitate foundation built-in bolt to be connected with A word bar truss column.
The present invention is increased to-0.3m place by high for whole for GIS plate base top mark, and the raft foundation combined layout of two frameworks basis and GIS device is formed whole plate base.
The present invention, by after theory calculate and field practice, simultaneously by both mode process different loading on local deepened basis, solves framework and the basic problem of colliding of GIS device, decreases transformer station and take up an area and square foundation amount, saved construction investment.
Accompanying drawing explanation
Fig. 1 is existing conventional architecture and GIS device foundation layout plan.
Fig. 2 is framework of the present invention combines raft foundation layout plan with GIS device.
Fig. 3 is 220KV outgoing line interval profile of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention will be described in detail: shown in Fig. 2,3, the present invention is increased to-0.3m place by high for whole for GIS plate base 1 top mark, framework basis 2 forms whole plate with GIS raft foundation 3 and arranges, consider GIS device with truss bar different loading, framework base position buried depth is deepened, slightly exceed raft plate at top simultaneously, facilitate foundation built-in bolt to be connected with A word bar truss column 4.After outlet tensioning equipment is in place, mass-type foundation take part in the resistance to plucking of framework and resistance to compression work also assume responsibility for GIS device load.
The invention provides a kind of new approaches, namely employing underground foundation is rationally whole waters on (framework and GIS device basis), solve the structure base of land area when cannot expand to collide problem, framework is adopted to combine after raft foundation with GIS device, enhance the resistance to compression of outlet structure, resistance to plucking, resistance to capsizing, decrease the differential settlement on GIS device basis, reduce the issuable risks of bad nature of soil such as the loss of the basic infrastructure soil body, liquefaction.Raise embedded depth of foundation, saved basic material, reduce foundation excavation face, reach the object reducing transformer station's expropriation of land and reduce basic material.
Claims (2)
1. in a transformer station outdoor framework and GIS device combine raft foundation, it is characterized in that it framework basis is formed whole plate base with GIS raft foundation arrange, wherein consider GIS device and truss bar different loading, framework base position buried depth is deepened, slightly exceed raft plate at top simultaneously, facilitate pre-embedded bolt in framework basis to be connected with A word bar truss column.
2. combine raft foundation according to outdoor framework in the transformer station described in claim 1 and GIS device, it is characterized in that it is increased to-0.3m place by high for whole plate base top mark, two frameworks bases are formed whole plate base with GIS raft foundation combined layout.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210582741.6A CN103015454B (en) | 2012-12-28 | 2012-12-28 | Combined raft foundation of outdoor framework and GIS equipment in transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210582741.6A CN103015454B (en) | 2012-12-28 | 2012-12-28 | Combined raft foundation of outdoor framework and GIS equipment in transformer substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103015454A CN103015454A (en) | 2013-04-03 |
CN103015454B true CN103015454B (en) | 2015-02-11 |
Family
ID=47964516
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210582741.6A Active CN103015454B (en) | 2012-12-28 | 2012-12-28 | Combined raft foundation of outdoor framework and GIS equipment in transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103015454B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106381882A (en) * | 2016-08-30 | 2017-02-08 | 中国能源建设集团安徽电力建设第工程有限公司 | Construction method of substation GIS equipment foundation surface layer |
CN106759450A (en) * | 2016-11-17 | 2017-05-31 | 中国能源建设集团浙江省电力设计院有限公司 | A kind of full cable outlet integral type GIS foundation arrangement |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201232194Y (en) * | 2008-06-13 | 2009-05-06 | 中国矿业大学 | Anti-deformation power transmission tower |
WO2010028762A3 (en) * | 2008-09-09 | 2011-03-03 | Ed. Züblin Aktiengesellschaft | Device for hauling and installing an offshore wind power station arrangement comprising at least one raft foundation, and method for hauling and installing such a raft foundation including a mast |
CN201797259U (en) * | 2010-09-21 | 2011-04-13 | 河南省电力勘测设计院 | GIS (geographic information system) hollow box foundation |
CN201891127U (en) * | 2010-11-23 | 2011-07-06 | 中国矿业大学 | Deformation-resistant main transformer foundation for step-down station of power transmission station in coal subsidence area |
CN202164623U (en) * | 2011-06-29 | 2012-03-14 | 浙江省电力设计院 | Universal foundation structure of 220 kV transformer substation main transformer |
-
2012
- 2012-12-28 CN CN201210582741.6A patent/CN103015454B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201232194Y (en) * | 2008-06-13 | 2009-05-06 | 中国矿业大学 | Anti-deformation power transmission tower |
WO2010028762A3 (en) * | 2008-09-09 | 2011-03-03 | Ed. Züblin Aktiengesellschaft | Device for hauling and installing an offshore wind power station arrangement comprising at least one raft foundation, and method for hauling and installing such a raft foundation including a mast |
CN201797259U (en) * | 2010-09-21 | 2011-04-13 | 河南省电力勘测设计院 | GIS (geographic information system) hollow box foundation |
CN201891127U (en) * | 2010-11-23 | 2011-07-06 | 中国矿业大学 | Deformation-resistant main transformer foundation for step-down station of power transmission station in coal subsidence area |
CN202164623U (en) * | 2011-06-29 | 2012-03-14 | 浙江省电力设计院 | Universal foundation structure of 220 kV transformer substation main transformer |
Also Published As
Publication number | Publication date |
---|---|
CN103015454A (en) | 2013-04-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924795A (en) | Existing building moving underground space structure and construction method | |
CN203594035U (en) | Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction | |
CN103015454B (en) | Combined raft foundation of outdoor framework and GIS equipment in transformer substation | |
CN203200775U (en) | Combined raft-shaped foundation of outdoor framework and geographic information system (GIS) device in transformer substation | |
CN103015444B (en) | Combined foundation of framework compressed column and enclosure in transformer substation | |
CN204311457U (en) | A kind of Metro station excavation excavation construction composite retaining structure system | |
CN204370417U (en) | A kind of for base pit engineering external corner or the road place of going along with sb. to guard him to drawing cable bolting structure | |
CN202989942U (en) | Wall foundation structure for soft soil or high backfill soil area | |
CN206135375U (en) | Arrangement structure that passes by on one's way of GIL pipeline | |
CN214574082U (en) | Foundation structure | |
CN203603162U (en) | Construction elevator load basic system based on foundation pit edge | |
CN203531937U (en) | Surrounding rock supporting yielding anchor rod device | |
CN203200770U (en) | Combined foundation of framework compression column and bounding wall in transformer substation | |
CN203878563U (en) | Suspended single-row scaffold | |
CN203129169U (en) | Independent-column supporting elevator base structure in foundation pit | |
CN205205885U (en) | Steel stand verticality deviation processing unit | |
CN105129636A (en) | Large-basement baseboard tower-crane installation apparatus | |
CN206570712U (en) | The anti-collapse rock-fall assembled rubber energy dissipating plate safeguard structure in canopy cave cave top | |
CN203594252U (en) | Integrated flower bed three-dimensional intelligent garage | |
CN203607801U (en) | Power distribution structure for pipe bus crossing road | |
CN205400173U (en) | Pit type parking stall elevating gear | |
CN203339616U (en) | Aerial frame-type cable platform system | |
CN206721893U (en) | A kind of saw part | |
CN206625239U (en) | A kind of L-shaped part | |
CN204000889U (en) | A kind of two anchors and soil nailing mixed type soil-baffling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: CHINA ENERGY ENGINEERING GROUP ZHEJIANG ELECTRIC P Free format text: FORMER NAME: ZHEJIANG PROV. ELECTRIC POWER DESIGN INST. |
|
CP01 | Change in the name or title of a patent holder |
Address after: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68 Patentee after: Energy source in China construction group Zhejiang Province Power Design Institute Co., Ltd Address before: Hangzhou City, Zhejiang province 310012 GUCUI Road No. 68 Patentee before: Zhejiang Electric Power Design Institute |