CN209429136U - A kind of concrete enclosure board for being cheated in cheating - Google Patents

A kind of concrete enclosure board for being cheated in cheating Download PDF

Info

Publication number
CN209429136U
CN209429136U CN201822213588.5U CN201822213588U CN209429136U CN 209429136 U CN209429136 U CN 209429136U CN 201822213588 U CN201822213588 U CN 201822213588U CN 209429136 U CN209429136 U CN 209429136U
Authority
CN
China
Prior art keywords
support plate
cheating
protection mechanism
coordinating block
briquetting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822213588.5U
Other languages
Chinese (zh)
Inventor
来剑航
田伟春
张国平
朱仁奎
沈志江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Original Assignee
ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd filed Critical ZHEJIANG XINSHENG CONSTRUCTION GROUP CO Ltd
Priority to CN201822213588.5U priority Critical patent/CN209429136U/en
Application granted granted Critical
Publication of CN209429136U publication Critical patent/CN209429136U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a kind of concrete enclosure board for cheating in cheating.The concrete enclosure board for cheating in cheating includes protection mechanism, and first protection mechanism includes the first support plate, and the top surface of first support plate is provided with the first fitting groove;Clamp system, the clamp system include fixed plate, the second coordinating block, pressing plate and briquetting, and the surface of the fixed plate is provided with clamping slot;The top side detachable of second coordinating block is connected with the pressing plate, and briquetting is equipped at the bottom surface of the pressing plate and the clamping slot relative position;The briquetting is embedded in the inside of the clamping slot;Protecting film;The top of the protecting film is placed between the briquetting, the clamping slot;And the bottom end of the protecting film is placed in the bottom end of first support plate.Concrete enclosure board provided by the utility model for cheating in cheating can be avoided concrete directly and template contacts, to protecting film good limit effect.

Description

A kind of concrete enclosure board for being cheated in cheating
Technical field
The utility model relates to construction equipment technical field more particularly to a kind of concrete maintenances for cheating in cheating Plate.
Background technique
During being equipped with the engineering construction of basement, the big foundation pit construction of basement is excavated to design hole bottom absolute altitude Afterwards, continue to excavate the small dell for forming part downwards at the position of elevator pit, sump, be to be cheated in hole;It cheats and applies in hole The placing concrete into hole is needed in work.
Current Concrete Filled method is to install maintenance template in surrounding, and concrete forms in template, and this Mode concrete is directly more troublesome with template contacts, later period demoulding, is easy to influence the subsequent recycling of template.
Therefore, it is necessary to provide a kind of new concrete enclosure board solution above-mentioned technical problem for cheating in cheating.
Utility model content
It is good, mixed for what is cheated in cheating easily to operate that the technical issues of the utility model solves is to provide a kind of protection effect Solidifying soil enclosure board.
In order to solve the above technical problems, the concrete enclosure board provided by the utility model for cheating in cheating includes: first Protection mechanism, first protection mechanism includes the first support plate, and the top surface of first support plate is provided with the first fitting groove; Clamp system, the clamp system includes fixed plate, the second coordinating block, pressing plate and briquetting, and second coordinating block is embedded in In the inside of first fitting groove;Second coordinating block is set to the bottom surface of the fixed plate, and the surface of the fixed plate It is provided with clamping slot;The top side detachable of second coordinating block is connected with the pressing plate, and the bottom surface of the pressing plate and the folder Briquetting is equipped at tight slot relative position;The briquetting is embedded in the inside of the clamping slot;Protecting film, the protecting film fit in The medial surface of first protection mechanism;The top of the protecting film is placed between the briquetting, the clamping slot;And it is described anti- The bottom end of cuticula is placed in the bottom end of first support plate.
Preferably, the pressing plate, the briquetting are in convex, and the length of the pressing plate and first support plate It is of same size.
Preferably, the side of first support plate is connected with multiple first fastening anchor bolts, and first fastening anchor bolt End and first support plate side flush with each other.
Preferably, the top of first protection mechanism is connected with the second protection mechanism, and second protection mechanism with The first protection mechanism assembly connection;Second protection mechanism is to increase pretective acreage.
Preferably, second protection mechanism includes the second support plate, the second fastening anchor bolt and the first coordinating block, and institute The first coordinating block is stated to be embedded in first fitting groove;First coordinating block is set to the bottom surface of second support plate, and Second support plate connects the second fastening anchor bolt;The top surface of second support plate is provided with the second fitting groove.
Preferably, structure is identical between the structure of second support plate and first support plate, and described first Fagging, second support plate are vertically arranged.
Preferably, first coordinating block is connected by screw to first fitting groove, and first fitting groove with The structure of second fitting groove is identical;Second fitting groove is connected by screw to second coordinating block.
Compared with the relevant technologies, the concrete enclosure board provided by the utility model for cheating in cheating has following beneficial Effect:
The utility model provides a kind of concrete enclosure board for cheating in cheating, and is fixed with protection in the inner wall of support plate Film, the clamped mechanism clamping in the top of protecting film, bottom end are placed in the bottom of support plate, may make that the outer wall of concrete can be with protection Film contact, without directly being contacted with support plate;In demoulding, can be quickly drawn out support plate carry out recycling reuse, reduce Construction cost, and protecting film is sticked to cement structures outer wall, carries out waterproofing protection.
Detailed description of the invention
Fig. 1 is that a kind of structure of preferred embodiment of the concrete enclosure board provided by the utility model for cheating in cheating is shown It is intended to;
Fig. 2 is enlarged structure schematic diagram at A shown in FIG. 1;
Fig. 3 is integrated connection cross section structure schematic diagram shown in FIG. 1;
Fig. 4 is enlarged structure schematic diagram at B shown in Fig. 3.
Figure label: 1, first protection mechanism, the 11, first support plate, the 111, first fitting groove, the 12, first fastening anchor bolt, 2, the second protection mechanism, the 21, second support plate, the 211, second fitting groove, the 22, second fastening anchor bolt, the 23, first coordinating block, 3, Clamp system, 31, fixed plate, 311, clamping slot, the 32, second coordinating block, 33, pressing plate, 34, briquetting, 4, protecting film.
Specific embodiment
The utility model is described in further detail with embodiment with reference to the accompanying drawing.
Please refer to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, wherein Fig. 1 is provided by the utility model mixed for what is cheated in cheating A kind of structural schematic diagram of preferred embodiment of solidifying soil enclosure board;Fig. 2 is enlarged structure schematic diagram at A shown in FIG. 1;Fig. 3 is Integrated connection cross section structure schematic diagram shown in FIG. 1;Fig. 4 is enlarged structure schematic diagram at B shown in Fig. 3.For what is cheated in cheating Concrete enclosure board includes: the first protection mechanism 1, and first protection mechanism 1 includes the first support plate 11, and described first The top surface of fagging 11 is provided with the first fitting groove 111;Clamp system 3, the clamp system 3 include fixed plate 31, the second coordinating block 32, pressing plate 33 and briquetting 34, and second coordinating block 32 is embedded in the inside of first fitting groove 111;Described second Coordinating block 32 is set to the bottom surface of the fixed plate 31, and the surface of the fixed plate 31 is provided with clamping slot 311;Second cooperation The top side detachable of block 32 is connected with the pressing plate 33, and at the bottom surface of the pressing plate 33 and 311 relative position of clamping slot Equipped with briquetting 34;The briquetting 34 is embedded in the inside of the clamping slot 311;Protecting film 4, the protecting film 4 fit in described The medial surface of first protection mechanism 1;The top of the protecting film 4 is placed between the briquetting 34, the clamping slot 311;And institute The bottom end for stating protecting film 4 is placed in the bottom end of first support plate 11.
As a kind of technical optimization scheme of the utility model, the pressing plate 33, the briquetting 34 are in convex, and institute State the of same size of the length of pressing plate 33 and first support plate 11;It can be realized by pressing plate 33, briquetting 34 for protection Effective clamping of film 4 limits.
As a kind of technical optimization scheme of the utility model, the side of first support plate 11 is connected with multiple first Fastening anchor bolt 12, and the side flush with each other of the end of first fastening anchor bolt 12 and first support plate 11;Pass through One fastening anchor bolt 12 can be realized for the first support plate 11 and the connection in hole, improve support plate stability.
As a kind of technical optimization scheme of the utility model, it is anti-that the top of first protection mechanism 1 is connected with second Protect mechanism 2, and second protection mechanism 2 and 1 assembly connection of the first protection mechanism;Second protection mechanism 2 to Increase pretective acreage;Second protection mechanism 2 includes the second support plate 21, the second fastening anchor bolt 22 and the first coordinating block 23, and first coordinating block 23 is embedded in first fitting groove 111;First coordinating block 23 is set to described second The bottom surface of fagging 21, and second support plate 21 connects the second fastening anchor bolt 22;The top surface of second support plate 21 is provided with Second fitting groove 211;It can be improved protection face by the second protection mechanism 2, so that better protecting effect, use scope is wider.
As a kind of technical optimization scheme of the utility model, the structure of second support plate 21 and first support Structure is identical between plate 11, and first support plate 11, second support plate 21 are vertically arranged;The support being vertically arranged Plate can be improved stability.
As a kind of technical optimization scheme of the utility model, first coordinating block 32 and first fitting groove 211 It is connected by screw to, and first fitting groove 111 is identical as the structure of second fitting groove 211;Second fitting groove 211 are connected by screw to second coordinating block 32;The mode being connected by screw to enables to connection disassembling more convenient.
The working principle of concrete enclosure board provided by the utility model for cheating in cheating is as follows:
According to the height cheated in hole, the second support plate 21 of suitable number is selected, then by first the second support plate 21 The first coordinating block 23 be embedded into the first fitting groove 111, fixing screws are then screwed on, so that the second support plate 21 is mounted on Then second the second support plate 21 is mounted on the top of first the second support plate 21, such as by the top of one support plate 11 again This is repeated, and realizes the laying of supporting plate structure;Finally the second coordinating block 23 is embedded into the second fitting groove 211, screws on fixation Screw;The first support plate 11, the second support plate 21 are fixed on the inner wall cheated in hole by fastening anchor bolt, and protecting film 4 is pasted The medial surface in all support plates is closed, the bottom of protecting film 4 is embedded into 11 bottom of the first support plate, under support plate gravity 4 bottom of protecting film is limited, then the top of protecting film 4 is embedded in clamping slot 311, pressing plate 33 is then passed through into spiral shell Nail is fixed on the top surface of fixed plate 31, and briquetting 34 is embedded into clamping slot 311, so that the top of protecting film 4 is closely embedded into pressure Between block 34 and clamping slot 311;When to casting concrete is cheated in hole, the outer wall of concrete can be contacted with protecting film 4, without It is directly contacted with support plate, the final coagulation forming in support plate enclosed space of concrete;After to be formed, it can back out on pressing plate 33 Screw can make protecting film 4 to separate with support plate so that briquetting 34 is separated with clamping slot 311, then above propose support plate, Extraction in can cheating support plate from hole, and protecting film 4 is sticked to cement structures outer wall, carries out waterproofing protection, separates first Fagging 11 and each second support plate 21 can realize quickly recycling storage, can be recycled.
Compared with the relevant technologies, the concrete enclosure board provided by the utility model for cheating in cheating has following beneficial Effect:
The utility model provides a kind of concrete enclosure board for cheating in cheating, and is fixed with protecting film in the inner wall of support plate 4, the top of protecting film 4 is clamped the clamping of mechanism 3, bottom end is placed in the bottom of support plate, may make concrete outer wall can with it is anti- Cuticula 4 contacts, without directly contacting with support plate;In demoulding, can be quickly drawn out support plate carry out recycling reuse, drop Low construction cost, and protecting film 4 is sticked to cement structures outer wall, carries out waterproofing protection.
The above description is only the embodiments of the present invention, and therefore it does not limit the scope of the patent of the utility model, all Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is applied directly or indirectly in Other relevant technical fields, are also included in the patent protection scope of the utility model.

Claims (7)

1. a kind of concrete enclosure board for being cheated in cheating characterized by comprising
First protection mechanism, first protection mechanism includes the first support plate, and the top surface of first support plate is provided with the One fitting groove;
Clamp system, the clamp system include fixed plate, the second coordinating block, pressing plate and briquetting, and second coordinating block It is embedded in the inside of first fitting groove;Second coordinating block is set to the bottom surface of the fixed plate, and the fixed plate Surface is provided with clamping slot;The top side detachable of second coordinating block is connected with the pressing plate, and the bottom surface of the pressing plate and institute It states and is equipped with briquetting at clamping slot relative position;The briquetting is embedded in the inside of the clamping slot;
Protecting film, the protecting film fit in the medial surface of first protection mechanism;The top of the protecting film is placed in described Between briquetting, the clamping slot;And the bottom end of the protecting film is placed in the bottom end of first support plate.
2. the concrete enclosure board according to claim 1 for being cheated in cheating, which is characterized in that the pressing plate, the pressure Block is in falling convex, and the length of the pressing plate and first support plate is of same size.
3. the concrete enclosure board according to claim 1 for being cheated in cheating, which is characterized in that first support plate Side is connected with multiple first fastening anchor bolts, and the end of first fastening anchor bolt and the side of first support plate are mutual Concordantly.
4. the concrete enclosure board according to claim 1 for being cheated in cheating, which is characterized in that first protection mechanism Top be connected with the second protection mechanism, and second protection mechanism and the first protection mechanism assembly connection;Described Two protection mechanisms are to increase pretective acreage.
5. the concrete enclosure board according to claim 4 for being cheated in cheating, which is characterized in that second protection mechanism Including the second support plate, the second fastening anchor bolt and the first coordinating block, and first coordinating block is embedded in first assembly In slot;First coordinating block is set to the bottom surface of second support plate, and second support plate connects the second fastening anchor bolt; The top surface of second support plate is provided with the second fitting groove.
6. the concrete enclosure board according to claim 5 for being cheated in cheating, which is characterized in that second support plate Structure is identical between structure and first support plate, and first support plate, second support plate are vertically arranged.
7. the concrete enclosure board according to claim 5 for cheating in cheat, which is characterized in that first coordinating block and First fitting groove is connected by screw to, and first fitting groove is identical as the structure of second fitting groove;Described Two fitting grooves are connected by screw to second coordinating block.
CN201822213588.5U 2018-12-27 2018-12-27 A kind of concrete enclosure board for being cheated in cheating Active CN209429136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822213588.5U CN209429136U (en) 2018-12-27 2018-12-27 A kind of concrete enclosure board for being cheated in cheating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822213588.5U CN209429136U (en) 2018-12-27 2018-12-27 A kind of concrete enclosure board for being cheated in cheating

Publications (1)

Publication Number Publication Date
CN209429136U true CN209429136U (en) 2019-09-24

Family

ID=67974059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822213588.5U Active CN209429136U (en) 2018-12-27 2018-12-27 A kind of concrete enclosure board for being cheated in cheating

Country Status (1)

Country Link
CN (1) CN209429136U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926825A (en) * 2020-08-07 2020-11-13 合肥昊昂信息科技服务有限公司 Civil construction foundation ditch support device that prevents collapsing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111926825A (en) * 2020-08-07 2020-11-13 合肥昊昂信息科技服务有限公司 Civil construction foundation ditch support device that prevents collapsing
CN111926825B (en) * 2020-08-07 2022-07-19 山东省机械施工有限公司 Civil construction foundation ditch support device that prevents collapsing

Similar Documents

Publication Publication Date Title
CN211368740U (en) A foundation ditch supporting construction for construction
CN108842623A (en) A kind of hydraulic self-creeping formwork construction method of Bridge High-pier column
CN106522079A (en) Prefabricated assembled combination concrete trestle system and construction method thereof
CN209429136U (en) A kind of concrete enclosure board for being cheated in cheating
CN206784392U (en) The horizontal inner supporting body system of deep basal pit assembled combination steel construction
CN206650477U (en) A kind of charger fixed underpan
CN103938755B (en) The isolation structure of hanging conversion beam and construction method thereof under a kind of hoistway
CN206571156U (en) Detached column formwork erection and concrete placing installation
CN211851166U (en) But reuse's light-duty assembled flag platform
CN211278929U (en) Novel forming die of prefabricated core thermal insulation wall test block of pressing from both sides
CN203684643U (en) Fixing component for fixing cantilever beam
CN106437290B (en) A kind of assembling enclosure, Fence structure and its construction method
CN108131530B (en) Installation method of equipment installation platform
CN208310185U (en) A kind of aluminum alloy pattern plate connecting elements for wall internal corner and collar tie beam intersection
CN220100164U (en) Combined steel structure corridor
CN209837377U (en) Detachable view wall structure
CN206693604U (en) A kind of supporting plate structure for building being easily installed
CN204940296U (en) A kind of horizontal struts system
CN210797615U (en) Building engineering lifting device
CN107893667A (en) A kind of the fixation implementation method and component of the rear-mounted conduit in tunnel
CN218091432U (en) Assembled high safe type prefabricated outer shear wall
CN216643731U (en) BIM building power equipment wall hanging device
CN216380255U (en) High-stability support column for underground space
CN214939359U (en) Anchoring device for hydraulic climbing formwork hanging boots
CN217897438U (en) Mounting structure of circular coal yard heat insulation trough plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant