CN106522079A - Prefabricated assembled combination concrete trestle system and construction method thereof - Google Patents

Prefabricated assembled combination concrete trestle system and construction method thereof Download PDF

Info

Publication number
CN106522079A
CN106522079A CN201611004442.9A CN201611004442A CN106522079A CN 106522079 A CN106522079 A CN 106522079A CN 201611004442 A CN201611004442 A CN 201611004442A CN 106522079 A CN106522079 A CN 106522079A
Authority
CN
China
Prior art keywords
trestle
prefabricated
plate
cast
connector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611004442.9A
Other languages
Chinese (zh)
Other versions
CN106522079B (en
Inventor
蒋文龙
张忠良
郭志勇
侯静
李磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201611004442.9A priority Critical patent/CN106522079B/en
Publication of CN106522079A publication Critical patent/CN106522079A/en
Application granted granted Critical
Publication of CN106522079B publication Critical patent/CN106522079B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention discloses a prefabricated assembled combination concrete trestle system and a construction method thereof. The trestle system comprises a cast-in-place trestle foundation and an assembled trestle deck. Trestle connectors are arranged on the cast-in-place trestle foundation, the assembled trestle deck comprises a plurality of prefabricated trestle panels which are laid on the cast-in-place trestle foundation and are mutually spliced, and the bottoms of the prefabricated trestle panels are provided with trestle abutment structures corresponding to the trestle connectors. The prefabricated assembled combination concrete trestle system and the construction method thereof are provided for overcoming the defects of the traditional concrete trestle panels. The system adopts the modular design, and the combination and arrangement can be realized according to the requirement, so that the number of the trestle panels arranged on-site is decreased; the system can be put into construction after hoisting is completed, so that the construction period is shortened; and the trestle panel system can be reused, so that resources are saved.

Description

A kind of prefabricated assembled combination concrete trestle system and its construction method
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of prefabricated assembled combination concrete trestle system and its apply Work method.
Background technology
As social development, urban underground space are utilized, particularly Large Underground space is more and more universal.In Large Underground Space earth excavation and construction stage pass through to ensure construction machinery, need to arrange concrete trestle in basic top surface.Mix in construction There is following defect in solidifying soil trestle plate:
1st, line arrangement is dumb, affects production efficiency.Trestle circuit can not be changed after determining, for large area excavates base Plinth, needs repeatedly to transport by digging machine etc. from the remote earthwork with a distance from trestle plate, and production and construction efficiency is low.
2nd, under trestle plate, earth excavation is difficult.Trestle plate before foundation excavation with basic one-piece casting, in the foundation excavation phase Between trestle printed line road fix, cause trestle plate bottom earth excavation difficult.
3rd, can not come into operation immediately after the completion of trestle plate is poured.The trestle plate later stage bears construction loads greatly, is pouring Cheng Houxu organizes special messenger to conserve, and can just come into operation after reaching design strength.
4th, after trestle plate is damaged, repairing efficiency is long, affects site operation progress.Trestle plate needs entirety once ftractureing or damaging Casting concrete again is abolished, normally could be used after concrete strength reaches requirement.
5th, the wasting of resources.The current construction machinery weight of trestle plate is big, and structure design arrangement of reinforcement is more, and overall volume is big, but only supplies Construction stage uses, and directly abolishes, waste of materials after the completion of construction.
The content of the invention
For the disadvantages described above of concrete trestle plate, the present invention proposes a kind of prefabricated assembled combination concrete trestle body System and its construction method.The system adopts modularized design, can combine arrangement as needed, reduces live trestle plate arrangement number Amount;Construction, reduction of erection time can be put into after the completion of lifting;Trestle plate body system is repeatable to be utilized, and economizes on resources.Meanwhile, the present invention Suitable for basic earthwork excavate during and the construction stage trestle, be mainly used in large area basic earthwork excavate and the construction stage Engineering.
To realize above-mentioned technique effect, the invention discloses a kind of prefabricated assembled combination concrete trestle system, including:
Cast-in-place Conveyor belt, the cast-in-place Conveyor belt are provided with trestle connector;
Assembled trestle bridge floor, including being layed on the cast-in-place Conveyor belt and the mutual prefabricated trestle of polylith of split Plate;The bottom of the prefabricated trestle plate is provided with the trestle docking structure corresponding to the trestle connector.
The prefabricated assembled combination concrete trestle system is further improved by, and the cast-in-place Conveyor belt is to apply The beam column basis of synchronous construction during work trestle rectangular structure.
The prefabricated assembled combination concrete trestle system is further improved by, and the trestle connector is pre-buried Vertical reinforcement at the top of the cast-in-place Conveyor belt, the trestle docking structure are to be opened on the prefabricated trestle plate, supply The reserved opening that the vertical reinforcement wears.
The prefabricated assembled combination concrete trestle system is further improved by, also including the first interim positioning Part, in the vertical reinforcement through the reserved opening rear enclosure is on the vertical reinforcement and presses against the prefabricated trestle plate Plate face.
The prefabricated assembled combination concrete trestle system is further improved by, the adjacent prefabricated trestle plate Edge joint position is coated with trestle connecting plate;The edge joint position of the prefabricated trestle plate is embedded with vertical connector, the trestle connecting plate On offer the connecting hole worn for the vertical connector.
The prefabricated assembled combination concrete trestle system is further improved by, also including the second interim positioning Part, in the vertical connector through the connecting hole rear enclosure is on the vertical connector and presses against the trestle connection The plate face of plate.
The prefabricated assembled combination concrete trestle system is further improved by, the piece of the prefabricated trestle plate Place is formed with and is recessed for the splicing that the prefabricated trestle plate is shelved, and the height and the trestle connecting plate of the splicing depression Thickness is identical.
The prefabricated assembled combination concrete trestle system is further improved by, and the prefabricated trestle plate is coagulation Prefabrication and lifting part is embedded with native trestle plate, and the concrete trestle plate.
The invention also discloses a kind of construction method of prefabricated assembled combination concrete trestle system, including step:
Construct cast-in-place Conveyor belt, and trestle connector is set on the cast-in-place Conveyor belt;
Prefabricated trestle plate is made, the reserved trestle corresponding to the trestle connector is to binding on the prefabricated trestle plate Structure, in the pre-buried vertical connector in the place to be spliced of prefabricated trestle plate;
Prefabricated trestle plate is lifted to construction on the described cast-in-place Conveyor belt for completing, the stack on prefabricated trestle plate is made Bridge docking structure is docked with the trestle connector, carries out the laying of prefabricated trestle plate;
Trestle connecting plate is lifted to the stitching portion of the adjacent prefabricated trestle plate, connected using the vertical connector Connect.
The construction method of the prefabricated assembled combination concrete trestle system is further improved by, in construction bridge Cast-in-place Conveyor belt described in synchronous construction during rectangular structure, the cast-in-place Conveyor belt are synchronously applied when being construction bridge rectangular structure The beam column basis of work.
The present invention is as a result of above technical scheme so as to have the advantages that:
1st, prefabricated trestle plate and trestle connecting plate can be reused, and reduce operating expenses, increase economic efficiency, Jing measuring and calculating Concrete more than 50% can be saved using the present invention in foundation construction;
2nd, prefabricated trestle plate and cast-in-place Conveyor belt can adopt the concrete for making of recycling, save concrete money Source, reduces solid waste, environmental protection;
3rd, trestle system adopts modulated dimension, strong applicability, simple structure, easy construction to shorten the construction period;
4th, prefabricated trestle plate is spliced at scene as needed, forms different transportation routes, flexible and changeable, improves construction effect Rate;
5th, the seam crossing of prefabricated trestle plate is connected using trestle connecting plate, effectively prevent prefabricated trestle plate by mechanical vibration Damage by pressure;
6th, in particular cases, there is destruction sign in prefabricated trestle plate, can be simple and convenient to the single replacing of component of destruction, It is time-consuming.
Description of the drawings
Fig. 1 is the schematic perspective view of the prefabricated assembled combination concrete trestle system of the present invention.
Fig. 2 is the elevational schematic view of the prefabricated assembled combination concrete trestle system of the present invention.
Fig. 3 is the schematic top plan view of the prefabricated assembled combination concrete trestle system of the present invention.
Fig. 4 is the side schematic view of the prefabricated assembled combination concrete trestle system of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment the present invention is further detailed explanation.
Refering to shown in Fig. 1~4, the prefabricated assembled combination concrete trestle system of the present invention is mainly by cast-in-place Conveyor belt 11st, assembled trestle bridge floor 12 and trestle connecting plate 13 are constituted, wherein, cast-in-place Conveyor belt is construction bridge rectangular structure, such as During underground structure, the beam column basis of the underground structure of synchronous construction.Directly using the beam column basis of underground structure as trestle base Plinth, compares traditional trestle system, it is not necessary to abolish, and material can be all of the engineering for greatly accelerating trestle system is applied Work.
In construction, at the top of which, pre-plugged has trestle connector 14 to cast-in-place Conveyor belt 11, for the formula of being linked and packed Trestle bridge floor 12.
Assembled trestle bridge floor 12 includes being layed on cast-in-place Conveyor belt 11 and the mutual prefabricated trestle plate of polylith of split 121, prefabricated trestle plate 121 adopts concrete trestle plate, is provided with corresponding to trestle connector 13 in the bottom of prefabricated trestle plate 121 Trestle docking structure (trestle docking structure is not shown in figure), for connecting the trestle connector on cast-in-place Conveyor belt 11 14。
In the present embodiment, trestle connector 14 is using the vertical reinforcement being embedded at the top of cast-in-place Conveyor belt 11 in advance, trestle Docking structure is using the reserved opening for being opened on prefabricated trestle plate 121, wearing for the vertical reinforcement.In cast-in-place Conveyor belt 11 Every side arrange no less than three trestle connectors 14, arrange on every side of prefabricated trestle plate and be no less than three reserved openings, with Ensure being connected firmly for cast-in-place Conveyor belt and prefabricated trestle plate.Further, it is additionally provided with first on the vertical reinforcement to face When keeper (in figure, not showing the first interim keeper), in vertical reinforcement through after the reserved opening on prefabricated trestle plate, The first interim keeper is sheathed on vertical reinforcement and makes which press against the plate face of prefabricated trestle plate, and then by prefabricated trestle Plate is fixed at vertical reinforcement, and prefabricated trestle plate and cast-in-place Conveyor belt are fixed temporarily.After trestle is using finishing, take Lower first interim keeper, releases the fixation between prefabricated trestle plate and cast-in-place Conveyor belt, removes prefabricated trestle plate, carry out back Receive and recycle.It is easy to use and be easy to dismounting, the first interim keeper adopt external diameter more than pre- on prefabricated trestle plate 121 Box out the abutment sleeve in hole, or other can be set on vertical reinforcement and be provided with the rolled-up stock for forcing down prefabricated trestle plate Product.
Trestle connecting plate 13 is made using steel plate, and steel plate thickness is at least 10mm.Trestle connecting plate 13 is covered in adjacent The edge joint position of prefabricated trestle plate 121, for strengthening the integrated connection between prefabricated trestle plate, it is to avoid prefabricated trestle plate is shaken by machinery Dynamic pressure is bad.In the present embodiment, the edge joint position in prefabricated trestle plate 121 is embedded with vertical connector 15, on trestle connecting plate 13 Offer the connecting hole (connecting hole is not shown in figure) worn for vertical connector 15.The edge joint position of prefabricated trestle plate 121 is every Side arranges four vertical connectors 15, to ensure the connection to trestle connecting plate 13.Further, on the vertical connector also It is this to have the second interim keeper (the second interim keeper is not shown in figure), in vertical connector through on trestle connecting plate Connecting hole after, the second interim keeper is sheathed on vertical connector and makes which press against the plate face of trestle connecting plate, And then trestle connecting plate is fixed at vertical connector, trestle connecting plate and prefabricated trestle plate are fixed temporarily.Treat stack After bridge is using finishing, the second interim keeper is removed, release the fixation between trestle connecting plate and prefabricated trestle plate, remove trestle Connecting plate, carries out recycling.It is easy to use and be easy to dismounting, the second interim keeper can using external diameter more than trestle company The abutment sleeve of the connecting hole on fishplate bar, or other can be set on vertical connector and be provided with for force down trestle connection The product of the rolled-up stock of plate.Such as vertical connector adopts threaded connector (such as bolt, screw rod), then the second interim keeper can Using female thread cylinder or nut, the external diameter of female thread cylinder or nut is made more than the aperture of the connecting hole on trestle connecting plate, Or rolled-up stock is set in the outer diameter face of the female thread cylinder or nut, press against the plate face of trestle connecting plate.
As the better embodiment of the present invention, it is formed with for prefabricated trestle plate 13 in the edge joint position of prefabricated trestle plate 121 The splicing depression 122 shelved, and the height of the splicing depression 122 is identical with the thickness of trestle connecting plate 13, it is further, prefabricated The height of the vertical connector of 121 seam crossing of trestle plate is also as far as possible consistent with the thickness of trestle connecting plate 13, so can be with trestle Connecting plate is flushed with prefabricated trestle plate plate face after mounting, the flutter failure for preventing seam crossing machinery current, it is ensured that trestle plate makes With the globality of period, stability.
In addition, prefabrication and lifting part 16 is embedded with prefabricated trestle plate 121, in order to lift.In the present embodiment, it is prefabricated to hang Piece installing 16 adopts ball-type rivet, and surface is round and smooth, current to machinery will not cause excessive vibration.In the prefabricated trestle plate 121 per block Four angles of top surface be respectively provided with a ball-type rivet, for level lifting use;Arrange on the long side of the prefabricated trestle plate per block Three ball-type rivets, use for vertical lifting.
Trestle construction is carried out using the prefabricated assembled combination concrete trestle system of the present invention, which mainly includes following construction Step:
1st, the cast-in-place Conveyor belt of construction, and trestle connector is set on cast-in-place Conveyor belt;
2nd, prefabricated trestle plate is made, the trestle docking structure corresponding to trestle connector is reserved on prefabricated trestle plate, in The pre-buried vertical connector in place to be spliced of prefabricated trestle plate;
3rd, prefabricated trestle plate is lifted to construction on the cast-in-place Conveyor belt for completing, docks the trestle on prefabricated trestle plate Structure is docked with trestle connector, carries out the laying of prefabricated trestle plate;
4th, trestle connecting plate is lifted to the stitching portion of the adjacent prefabricated trestle plate, is connected using vertical connector Connect.
Wherein, the cast-in-place Conveyor belt of synchronous construction in construction bridge rectangular structure, the cast-in-place Conveyor belt are construction stack The beam column basis of synchronous construction during bridge rectangular structure.
The present invention for conventional concrete trestle plate defect, propose it is prefabricated assembled combination concrete trestle system and its Construction method.The system adopts modularized design, can combine arrangement as needed, reduces live trestle plate arrangement quantity;Lifting After the completion of can input construction, the reduction of erection time;Trestle plate body system is repeatable to be utilized, and economizes on resources.
The present invention it is prefabricated assembled combination concrete trestle system and its construction method as a result of above technical scheme, Make it have following beneficial effect:
1st, prefabricated trestle plate and trestle connecting plate can be reused, and reduce operating expenses, increase economic efficiency, Jing measuring and calculating Concrete more than 50% can be saved using the present invention in foundation construction;
2nd, prefabricated trestle plate and cast-in-place Conveyor belt can adopt the concrete for making of recycling, save concrete money Source, reduces solid waste, environmental protection;
3rd, trestle system adopts modulated dimension, strong applicability, simple structure, easy construction to shorten the construction period;
4th, prefabricated trestle plate is spliced at scene as needed, forms different transportation routes, flexible and changeable, improves construction effect Rate;
5th, the seam crossing of prefabricated trestle plate is connected using trestle connecting plate, effectively prevent prefabricated trestle plate by mechanical vibration Damage by pressure;
6th, in particular cases, there is destruction sign in prefabricated trestle plate, can be simple and convenient to the single replacing of component of destruction, It is time-consuming.
The present invention is described in detail above in association with drawings and Examples, those skilled in the art can basis Described above makes many variations example to the present invention.Thus, some of embodiment details should not constitute limitation of the invention, The present invention is by the scope defined using appended claims as protection scope of the present invention.

Claims (10)

1. one kind is prefabricated assembled combines concrete trestle system, it is characterised in that include:
Cast-in-place Conveyor belt, the cast-in-place Conveyor belt are provided with trestle connector;
Assembled trestle bridge floor, including being layed on the cast-in-place Conveyor belt and the mutual prefabricated trestle plate of polylith of split;Institute The bottom for stating prefabricated trestle plate is provided with the trestle docking structure corresponding to the trestle connector.
It is 2. prefabricated assembled as claimed in claim 1 to combine concrete trestle system, it is characterised in that:The cast-in-place trestle base The beam column basis of synchronous construction when plinth is construction bridge rectangular structure.
It is 3. prefabricated assembled as claimed in claim 2 to combine concrete trestle system, it is characterised in that:The trestle connector For the vertical reinforcement being embedded at the top of the cast-in-place Conveyor belt in advance, the trestle docking structure is to be opened in the prefabricated trestle plate Reserved opening that is upper, wearing for the vertical reinforcement.
It is 4. prefabricated assembled as claimed in claim 3 to combine concrete trestle system, it is characterised in that:It is also interim including first Keeper, in the vertical reinforcement through the reserved opening rear enclosure is on the vertical reinforcement and presses against the prefabricated stack The plate face of bridge plate.
It is 5. prefabricated assembled as claimed in claim 1 to combine concrete trestle system, it is characterised in that:The adjacent prefabricated stack The edge joint position of bridge plate is coated with trestle connecting plate;The edge joint position of the prefabricated trestle plate is embedded with vertical connector, the trestle The connecting hole worn for the vertical connector is offered on connecting plate.
It is 6. prefabricated assembled as claimed in claim 5 to combine concrete trestle system, it is characterised in that:It is also interim including second Keeper, in the vertical connector through the connecting hole rear enclosure is on the vertical connector and presses against the trestle The plate face of connecting plate.
It is 7. prefabricated assembled as claimed in claim 5 to combine concrete trestle system, it is characterised in that:The prefabricated trestle plate Edge joint position be formed with the splicing shelved for the prefabricated trestle plate and be recessed, and the height of the splicing depression is connected with the trestle The thickness of fishplate bar is identical.
It is 8. prefabricated assembled as claimed in claim 1 to combine concrete trestle system, it is characterised in that:The prefabricated trestle plate To be embedded with prefabrication and lifting part on concrete trestle plate, and the concrete trestle plate.
9. it is a kind of it is prefabricated assembled combination concrete trestle system construction method, it is characterised in that including step:
Construct cast-in-place Conveyor belt, and trestle connector is set on the cast-in-place Conveyor belt;
Prefabricated trestle plate is made, the trestle docking structure corresponding to the trestle connector is reserved on the prefabricated trestle plate, In the pre-buried vertical connector in the place to be spliced of prefabricated trestle plate;
Prefabricated trestle plate is lifted to construction on the described cast-in-place Conveyor belt for completing, the trestle pair on prefabricated trestle plate is made Binding structure is docked with the trestle connector, carries out the laying of prefabricated trestle plate;
Trestle connecting plate is lifted to the stitching portion of the adjacent prefabricated trestle plate, be attached using the vertical connector.
10. the construction method of prefabricated assembled combination concrete trestle system as claimed in claim 9, it is characterised in that: Cast-in-place Conveyor belt described in synchronous construction during construction bridge rectangular structure, the cast-in-place Conveyor belt are construction bridge rectangular structure When synchronous construction beam column basis.
CN201611004442.9A 2016-11-15 2016-11-15 The prefabricated assembled combination concrete trestle system of one kind and its construction method Active CN106522079B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611004442.9A CN106522079B (en) 2016-11-15 2016-11-15 The prefabricated assembled combination concrete trestle system of one kind and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611004442.9A CN106522079B (en) 2016-11-15 2016-11-15 The prefabricated assembled combination concrete trestle system of one kind and its construction method

Publications (2)

Publication Number Publication Date
CN106522079A true CN106522079A (en) 2017-03-22
CN106522079B CN106522079B (en) 2019-02-26

Family

ID=58351818

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611004442.9A Active CN106522079B (en) 2016-11-15 2016-11-15 The prefabricated assembled combination concrete trestle system of one kind and its construction method

Country Status (1)

Country Link
CN (1) CN106522079B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265615A (en) * 2018-04-12 2018-07-10 马鞍山瑞马钢构材料有限公司 A kind of assembled H profile steel trestle plate
CN108842597A (en) * 2018-08-01 2018-11-20 四川兴昌建设工程有限公司 A kind of municipal construction temporary concrete steel structure bridge and its installation method
CN111719406A (en) * 2020-06-04 2020-09-29 安徽博晟亿电力科技有限公司 Assembled trestle for passenger station and use method thereof
CN111945571A (en) * 2020-08-11 2020-11-17 北京易威安电器科技有限公司 Method for modular construction of road bridge by adopting assembled road and bridge frame
CN112376390A (en) * 2020-10-26 2021-02-19 上海市政工程设计研究总院(集团)有限公司 Assembly type hydrophilic footpath and construction method
CN112921783A (en) * 2021-01-26 2021-06-08 江西龙正科技发展有限公司 Novel ultra-high strength concrete UHPC foot bridge
CN114016380A (en) * 2021-11-15 2022-02-08 上海市政工程设计研究总院(集团)有限公司 Prefabricated assembled concrete trestle and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235649A (en) * 2008-02-22 2008-08-06 上海市政工程设计研究总院 Covered digging system for pit
CN201574494U (en) * 2010-01-05 2010-09-08 中国建筑第八工程局有限公司 Connecting apparatus of adjacent two precast concrete plates
KR20110023334A (en) * 2009-08-31 2011-03-08 연세대학교 산학협력단 Steel roof frame combined with girder and temporary bridge
CN103334359A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Fabricated precast reinforced concrete pavement slab and pavement construction method
CN105604091A (en) * 2016-02-04 2016-05-25 石家庄铁道大学 Construction method of cover-excavation-method covering system
CN206233087U (en) * 2016-11-15 2017-06-09 中国建筑第八工程局有限公司 A kind of prefabricated assembled combination concrete trestle system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101235649A (en) * 2008-02-22 2008-08-06 上海市政工程设计研究总院 Covered digging system for pit
KR20110023334A (en) * 2009-08-31 2011-03-08 연세대학교 산학협력단 Steel roof frame combined with girder and temporary bridge
CN201574494U (en) * 2010-01-05 2010-09-08 中国建筑第八工程局有限公司 Connecting apparatus of adjacent two precast concrete plates
CN103334359A (en) * 2013-06-26 2013-10-02 中国建筑股份有限公司 Fabricated precast reinforced concrete pavement slab and pavement construction method
CN105604091A (en) * 2016-02-04 2016-05-25 石家庄铁道大学 Construction method of cover-excavation-method covering system
CN206233087U (en) * 2016-11-15 2017-06-09 中国建筑第八工程局有限公司 A kind of prefabricated assembled combination concrete trestle system

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265615A (en) * 2018-04-12 2018-07-10 马鞍山瑞马钢构材料有限公司 A kind of assembled H profile steel trestle plate
CN108842597A (en) * 2018-08-01 2018-11-20 四川兴昌建设工程有限公司 A kind of municipal construction temporary concrete steel structure bridge and its installation method
CN111719406A (en) * 2020-06-04 2020-09-29 安徽博晟亿电力科技有限公司 Assembled trestle for passenger station and use method thereof
CN111719406B (en) * 2020-06-04 2021-11-12 安徽博晟亿电力科技有限公司 Assembled trestle for passenger station and use method thereof
CN111945571A (en) * 2020-08-11 2020-11-17 北京易威安电器科技有限公司 Method for modular construction of road bridge by adopting assembled road and bridge frame
CN112376390A (en) * 2020-10-26 2021-02-19 上海市政工程设计研究总院(集团)有限公司 Assembly type hydrophilic footpath and construction method
CN112921783A (en) * 2021-01-26 2021-06-08 江西龙正科技发展有限公司 Novel ultra-high strength concrete UHPC foot bridge
CN114016380A (en) * 2021-11-15 2022-02-08 上海市政工程设计研究总院(集团)有限公司 Prefabricated assembled concrete trestle and construction method thereof

Also Published As

Publication number Publication date
CN106522079B (en) 2019-02-26

Similar Documents

Publication Publication Date Title
CN106522079A (en) Prefabricated assembled combination concrete trestle system and construction method thereof
CN104866659B (en) Steel construction integral hoisting method based on BIM
CN206233087U (en) A kind of prefabricated assembled combination concrete trestle system
CN107030874A (en) Precast lattice beam for slope reinforcement and preparation method thereof and construction method
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN101939492B (en) Precast temporary facility structure and construction method for the same
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN110145124A (en) A kind of control shear wall level connects the reinforcement tools and its construction method of batch quality
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN107964966A (en) Slope reinforcement system for foundation construction engineering
CN101949215A (en) Mounting construction method of steel structure support seat
CN110306396A (en) A kind of assembly concrete road surface and construction method
CN2777047Y (en) Combination type supporting composite means
CN103243722B (en) The construction method of novel inner support of foundation trench
CN209353364U (en) A kind of assembled case change basis
CN105970969A (en) Assembly type cushion structure used for foundation pit project and application method of assembly type cushion structure
CN206625584U (en) It is located at the lattice column accurate positioning device of existing below ground for designing capital
CN116005565A (en) Trestle construction process
CN102605945B (en) Manufacturing method of big wood formwork
CN105442855A (en) High-precision burying method for large-size pre-buried board
CN108951643A (en) The big region support replacement construction method of Super High deep basal pit basement Core Walls Structure large span
CN206220461U (en) A kind of packaged type I-steel hoistway operation platform
CN210105450U (en) Be used for transmission line to salvage shaft tower basis fast
CN210482352U (en) Assembled main basis that becomes of high voltage mortise-tenon joint structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant