CN216616803U CN202122462824.9U CN202122462824U CN216616803U CN 216616803 U CN216616803 U CN 216616803U CN 202122462824 U CN202122462824 U CN 202122462824U CN 216616803 U CN216616803 U CN 216616803U
Authority
CN
China
Prior art keywords
hanging basket
curtain wall
wall construction
support
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122462824.9U
Other languages
Chinese (zh)
Inventor
牟法强
李科敏
郭卓声
李刚
熊伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Original Assignee
China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Decoration Engineering Co Ltd filed Critical China Construction Eighth Engineering Division Decoration Engineering Co Ltd
Priority to CN202122462824.9U priority Critical patent/CN216616803U/en
Application granted granted Critical
Publication of CN216616803U publication Critical patent/CN216616803U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a hanging basket for curtain wall construction, which comprises a support, wherein a balance beam is fixed on the support, the first end of the balance beam extends out of a main building structure when in use and is connected with a carrying frame, the second end of the balance beam is connected with a pull anchor piece for connecting to the main building structure, and a lifting device is also fixed on the support and is connected with the carrying frame. The hanging basket solves the technical problem that the hanging basket in the prior art is difficult to erect and use when the frame beams on the inner side of the roof are irregularly distributed in a mode of fixing the back beam on the second frame beam. The hanging basket is applicable to construction sites and is limited, the inner frame beams of a building main body are irregularly distributed, the space between the inner beam and the outer beam and the height between the inner beam and the outer beam are different, and the hanging basket can provide safe and reliable operation space for operators.

Description

Hanging basket for curtain wall construction
Technical Field
The utility model relates to the field of building construction, in particular to a hanging basket for curtain wall construction.
Background
The high-altitude operation hanging basket in the prior art has certain requirement on the construction environment, a balance weight frame needs to be erected, the balance of the hanging basket during lifting can be guaranteed, when frame beams on the inner side of a roof are irregularly distributed, the distance and the height between an inner beam and an outer beam are different, a support behind the hanging basket does not have a reliable placing position, the construction operation environment is limited, and therefore the conventional high-altitude operation hanging basket structure is difficult to erect and use.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects existing in the prior art, the utility model provides the hanging basket for curtain wall construction, and solves the technical problem that the hanging basket in the prior art is difficult to erect and use when the frame beams on the inner side of the roof are irregularly distributed.
The hanging basket for curtain wall construction comprises a support, wherein a plurality of frame beams are arranged in a building main body structure, the support is fixedly provided with a balance beam, the first end of the balance beam extends out of the building main body structure when in use and is connected with a carrying frame, the second end of the balance beam is connected with a pulling anchor piece used for being connected to the building main body structure, the support is also fixedly provided with a lifting device, and the lifting device is connected with the carrying frame.
The hanging basket for curtain wall construction is further improved in that the balance beam is horizontally arranged and comprises a front beam and a rear beam, the front beam is connected with the carrying frame, and the rear beam is connected with the pull anchor piece.
The hanging basket for curtain wall construction is further improved in that the anchor pulling piece comprises a plurality of hinge seats for fixing to the building main body structure, one end of a fixed rod is hinged to each hinge seat, and the other end of the fixed rod is hinged to the rear beam.
The hanging basket for curtain wall construction is further improved in that a plurality of groups of tying ropes are tied between the rear beam and the hinged seats.
The hanging basket for curtain wall construction is further improved in that each group of the pulling ropes is distributed on two sides of the rear beam in a splayed shape.
The hanging basket for curtain wall construction is further improved in that the hinged seat comprises a fixing plate fixed to the building main body structure, two lug plates are fixed on the fixing plate, threaded rods penetrate through the two lug plates, and the pulling rope and the fixing rod are respectively sleeved on the threaded rods.
The hanging basket for curtain wall construction is further improved in that the fixing plate is fixed on the building main body structure through a chemical anchor bolt.
The hanging basket for curtain wall construction is further improved in that the lifting device comprises a first pull rope, and the first pull rope is connected with the carrying frame and the front beam respectively.
The hanging basket for curtain wall construction is further improved in that the front beam and the rear beam are fixed in the middle of the support, and a second pull rope is tied between the top of the support and the front beam and the rear beam.
Compared with the prior art, the utility model has positive and obvious effect. The hanging basket solves the technical problem that the hanging basket in the prior art is difficult to erect and use when the frame beams on the inner side of the roof are irregularly distributed in a mode of fixing the back beam on the second frame beam. This hanging flower basket is applicable to construction site limited, and the frame roof beam distributes irregularly in the building subject, and interval and height between the inside and outside twice roof beam are all equal operation environment that can't install the counter weight, can provide safe and reliable's operation space for operating personnel, and this hanging flower basket has reduced the counter weight, simple structure, simple to operate, and it is short to set up the cycle, practices thrift the cost, and the installation is simple.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a structural schematic view of an embodiment of a hanging basket for curtain wall construction of the utility model.
Fig. 2 is a schematic structural diagram of a hanging basket for curtain wall construction according to a second embodiment of the utility model.
FIG. 3 is a schematic structural diagram of a hanging basket for curtain wall construction according to an embodiment of the utility model.
Fig. 4 is a front view of a node a in fig. 1 to 3.
Fig. 5 is a side view of the node a in fig. 1 to 3.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
As shown in fig. 1 to 3, the utility model provides a hanging basket for curtain wall 13 construction, comprising a support 3, when a first frame beam 1 at the outermost side of a building main structure is in a slope shape, a leveling support 11 is required to be erected at the top of the frame beam, then the support 3 of the hanging basket is fixed on the leveling support 11, a balance beam is fixed on the support 3, the first end of the balance beam extends out of the building main structure when in use and is connected with a carrying frame 10, when a constructor is in the carrying frame 10, further, a double 12 is adopted to connect the constructor and the building main structure, the double 12 is required to pay attention to sharp edge protection to avoid serious abrasion, one end fixed with the building main structure is required to be fixed firmly, the second end of the balance beam is connected with a pull anchor piece used for connecting to the building main structure, the pull anchor piece determines the fixed positions and the number on the building main structure according to the field requirement, in this embodiment, the anchor is fixed to the second frame beam 2 adjacent to the first frame beam 1, the pull anchor is fixed on the side close to the first frame beam 1 or on the side remote from the first frame beam 1 as required in the field, when the frame beams in the main structure of the building are irregularly distributed, the space and the height between the inner frame beam and the outer frame beam are different, and the rear bracket of the hanging basket has no reliable placing position, the counterweight bracket is cancelled, the support 3 is also fixed with a lifting device which is connected with the carrying frame 10, the lifting device provides power for the hanging basket, the lifting device can adopt the common equipment in the prior art, is generally driven by an electromagnetic braking three-phase asynchronous motor, and drives a steel wire rope conveying mechanism to enable a lifter to move up and down along a working steel wire rope after being decelerated by a worm gear and a pair of gears, thereby driving the carrying frame 10 to ascend or descend.
Preferably, the balance beam is horizontally arranged to balance the upper part of the hanging basket, the balance beam comprises a front beam 4 and a rear beam 5, the front beam 4 is connected with the carrying frame 10, the rear beam 5 is connected with the pulling anchor piece, the pulling anchor piece is fixed with the building body, and the integral structure of the hanging basket still has strong anti-overturning capacity under the condition that no balancing weight is arranged.
Further, as shown in fig. 4, the anchor member includes a plurality of hinge seats for fixing to the building main structure, one end of the fixing rod 6 is hinged to the hinge seat, the other end of the fixing rod 6 is hinged to the back beam 5, in this embodiment, the fixing rod 6 is fixed in a form of a 5# angle steel hinge support,
furthermore, a plurality of groups of tying ropes 7 are tied between the rear beam 5 and the hinged seats, and the tying ropes 7 are steel wire ropes, so that the rear beam 5 is fixed more stably.
Still further, this drawknot rope 7 of every group is splayed and distributes in the both sides of this back beam 5, and in this embodiment, every group drawknot rope 7 is two, and the distribution of splayed makes back beam 5 more stable, is difficult for rocking.
Preferably, as shown in fig. 5, the hinge base includes a fixing plate 14 for fixing to the building main structure, two lug plates 15 are fixed on the fixing plate 14, a screw 17 is arranged through the two lug plates 15, the pulling rope 7 and the fixing rod 6 are respectively sleeved on the screw 17, a nut is screwed on the end of the screw 17, and the lug plates 15 and the screw 17 are in a form that the fixing rod 6 and the fixing plate 14 are easy to mount and dismount.
Preferably, the anchor plate 14 is secured to the building host structure by chemical anchors 17. In this embodiment, the chemical anchor bolt 17 of M12 × 160mm is adopted, and the chemical anchor bolt 17 has no expansion extrusion stress to the base material, is suitable for heavy load and various vibration loads, and is more suitable for fixing the back beam 5 after the balancing weight is cancelled.
Preferably, the lifting device comprises a first pull rope 8, the first pull rope 8 is respectively connected with the carrier frame 10 and the front beam 4, and the pull rope is a steel wire rope.
Preferably, the front beam 4 and the rear beam 5 are fixed in the middle of the support 3, a second pull rope 9 is tied between the top of the support 3 and the front beam 4 and the rear beam 5, and the second pull rope 9 keeps the front beam 4 and the rear beam 5 horizontal, so that the stability of the whole hanging basket is maintained.
In the embodiment, the maximum distance between the finished surface of the curtain wall 13 and the outer side of the structure is 2190mm, and the length of the hanging basket front beam 4 extends to 2600 mm. In order to prevent the front beam 4 from bending downwards, double 12 safety measures for fixing constructors and lowering the load to 300kg are adopted for guaranteeing. Because the frame beam is in a slope shape, the tripod can not be directly fixed on the top of the frame beam and needs to be leveled, the maximum slope of the frame beam is 6 degrees, the distance between two support legs at the bottom of the standard tripod is 1000mm, the anchoring type leveling supports 11 are respectively arranged below the two support legs, the heights of the supports 3 are 185mm and 80mm respectively, and the tripod is used
The 80mm 4mm square tube is cut into the bevel connection and is buckled on the frame beam top, two sides of the square tube are welded and fixed with two corner connectors, then the M12 mm 160mm (the screw diameter is 12mm, the length is 160mm) chemical anchor bolts 17 are fixed on the top surface of the first frame beam 1, and the planting depth of the chemical anchor bolts 17 is 110 mm.
The hanging basket solves the technical problem that the hanging basket in the prior art is difficult to erect and use when the frame beams on the inner side of the roof are irregularly distributed in a mode of fixing the back beam on the second frame beam. This hanging flower basket is applicable to construction site limited, and the frame roof beam distributes irregularly in the building subject, and interval and height between the inside and outside twice roof beam are all equal operation environment that can't install the counter weight, can provide safe and reliable's operation space for operating personnel, and this hanging flower basket has reduced the counter weight, simple structure, simple to operate, and it is short to set up the cycle, practices thrift the cost, and the installation is simple.
The parts not involved in the present invention are the same as or can be implemented by the prior art. Although the present invention has been described with reference to a preferred embodiment, it should be understood that various changes, substitutions and alterations can be made herein without departing from the spirit and scope of the utility model as defined by the appended claims.

Claims (9)

1. The utility model provides a hanging flower basket for curtain construction which characterized in that: the lifting device comprises a support, be fixed with the compensating beam on the support, the first end of compensating beam stretches out building major structure and is connected with and carries the thing frame when using, the second end of compensating beam is connected with and is used for being connected to building major structure draws the anchor spare, still be fixed with hoisting device on the support, hoisting device with it connects to carry the thing frame.
2. The hanging basket for curtain wall construction according to claim 1, wherein the balance beam is horizontally arranged and comprises a front beam and a rear beam, the front beam is connected with the carrying frame, and the rear beam is connected with the anchor pieces.
3. The basket for curtain wall construction as claimed in claim 2, wherein the pulling anchors comprise a plurality of hinged seats for fixing to the building body structure, on which one end of a fixing rod is hinged, the other end of the fixing rod being hinged to the back beam.
4. The hanging basket for curtain wall construction as claimed in claim 3, wherein a plurality of groups of tie ropes are tied between the rear beam and the hinge seats.
5. The hanging basket for curtain wall construction as claimed in claim 4, wherein each set of the tying ropes is distributed on both sides of the back beam in a splayed shape.
6. The hanging basket for curtain wall construction as claimed in claim 4, wherein the hinged seat comprises a fixing plate for fixing to the building main structure, two lug plates are fixed on the fixing plate, a screw rod is arranged on the two lug plates in a penetrating manner, and the pulling rope and the fixing rod are respectively sleeved on the screw rod.
7. The basket for curtain wall construction as claimed in claim 6, wherein the fixing plate is fixed to the building main structure by chemical anchors.
8. The basket for curtain wall construction as claimed in claim 2, wherein the lifting device comprises a first pulling rope, and the first pulling rope is connected with the carrying frame and the front beam respectively.
9. The hanging basket for curtain wall construction as claimed in claim 2, wherein the front beam and the rear beam are fixed in the middle of the support, and a second pull rope is tied between the top of the support and the front beam and the rear beam.
CN202122462824.9U 2021-10-13 2021-10-13 Hanging basket for curtain wall construction Active CN216616803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122462824.9U CN216616803U (en) 2021-10-13 2021-10-13 Hanging basket for curtain wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122462824.9U CN216616803U (en) 2021-10-13 2021-10-13 Hanging basket for curtain wall construction

Publications (1)

Publication Number Publication Date
CN216616803U true CN216616803U (en) 2022-05-27

Family

ID=81691636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122462824.9U Active CN216616803U (en) 2021-10-13 2021-10-13 Hanging basket for curtain wall construction

Country Status (1)

Country Link
CN (1) CN216616803U (en)

Similar Documents

Publication Publication Date Title
CN205777425U (en) A kind of scalable hanging basket support means
CN112049405A (en) Hanging basket wall-penetrating type overhanging structure and method for erecting hanging basket on inclined roof
CN112411994A (en) Embrace arc roof beam and do not have counter weight hanging flower basket suspension mechanism
CN205892588U (en) Hoisting equipment
CN114753611A (en) Curtain wall construction platform
CN214195484U (en) All-steel attached lifting scaffold
CN204643757U (en) Anchor ear type vestibule truss Steel Structure lifting bracket
CN204702474U (en) Inclined-pulling type vestibule truss Steel Structure hoisting hanger
CN216616803U (en) Hanging basket for curtain wall construction
CN217500985U (en) Curtain wall construction platform
CN214531835U (en) External hanging type operation device for large storage tank
CN110453836B (en) Oblique glass curtain wall mounting system and mounting method
CN214785847U (en) Be applied to hanging flower basket device of single structure concrete beam
CN211172563U (en) Inclined glass curtain wall mounting system
CN213326443U (en) Quick unloading platform
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN210713753U (en) Hanging basket system for special-shaped curtain wall building construction platform
CN209957241U (en) Steel hanger
CN203531413U (en) Auxiliary structure hoisting whole steel structure wire frame
CN110185250A (en) A kind of nacelle construction device
CN212387689U (en) Lifting device for assembly type building
CN220620996U (en) Prevent hanging flower basket support that overturns
CN221053138U (en) Hanging basket suspension structure with epitaxial cantilever beam structural design building
CN218976652U (en) Photovoltaic module installs hanging beam