Double-deck concrete shear force wall construction structures in fire pond Download PDFInfo
- Publication number
- CN216517181U CN216517181U CN202122954160.8U CN202122954160U CN216517181U CN 216517181 U CN216517181 U CN 216517181U CN 202122954160 U CN202122954160 U CN 202122954160U CN 216517181 U CN216517181 U CN 216517181U
- Authority
- CN
- China
- Prior art keywords
- wall
- wall body
- construction
- fire
- double
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a construction structure of a double-layer concrete shear wall of a fire pool, which comprises a peripheral wall body, inner and outer side frame bodies and an inner layer wall body, wherein the inner and outer side frame bodies are bound and fixed with steel bars of the inner layer wall body, and an extruded polystyrene board is arranged between the peripheral wall body and the inner layer wall body. The steel bar net shear wall is characterized by further comprising a shear wall, and ladder bars are arranged between the two rows of steel bar nets of the shear wall. The support body that utilizes interior outer wall to set up carries out setting up and consolidating of wall muscle and template to interior wall single face wall body, and inside wall body reinforcement, template are propped up and are established, add the interval that ladder muscle and location muscle guaranteed interior wall construction in the wall, and progress, quality, the safety of construction are guaranteed to a series of measures such as stagnant water bolt and bracing reinforcement inside wall body.
Description
Technical Field
The utility model relates to the technical field of fire pool construction, in particular to a construction structure of a double-layer concrete shear wall of a fire pool.
Background
Traditional wall, plate structure are individual layer concrete structure, and the reinforcement that involves during the construction, the construction process is all more ripe when the multiple processes construction such as template setting reinforcement and concrete placement, but to the fire-fighting basin be double-deck wall, board reinforced concrete structure, this structure is different from general individual layer reinforced concrete structure construction, and the construction process is complicated, and the requirement for quality is high, requires high very much to the waterproof performance of construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a construction structure of a double-layer concrete shear wall of a fire pool.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a double-deck concrete shear force wall construction structures of fire pond, includes peripheral wall body, inside and outside support body and inlayer wall body, and the reinforcement of inside and outside support body and inlayer wall body is fixed, sets up the extruded polystyrene board between peripheral wall body and the inlayer wall body.
Furthermore, the shear wall is further included, and ladder bars are arranged between the two rows of reinforcing mesh of the shear wall.
Furthermore, positioning ribs are welded in the shear wall body.
Further, the inside and outside support body includes interior row support body and arranges the support body outward, and interior row support body is 500mm apart from the wall, and interior row and outer arranging support body 800mm are wide, support body step 1800 mm.
Furthermore, the floor sweeping device also comprises a floor sweeping rod, and the floor sweeping rod is 200mm away from the ground.
Furthermore, the inner surface of the wall template of the peripheral wall body is supported on the bottom plate by a movable steel pipe top support.
Furthermore, a steel bar stay bar is arranged in the shear wall.
Furthermore, the length of the stay rod is the gap between the inner wall of the fire-fighting water tank and the construction seam, one side of the steel bar stay rod is propped against the outer wall concrete wall, and the other side of the steel bar stay rod is fixed on the inner wall template.
Furthermore, the wall formwork comprises a whole wall formwork, and the wall formwork, the peripheral wall body and the inner wall body are fixedly connected through water stop bolts.
Furthermore, one section of the water stop bolt with the water stop sheet is arranged inside the wall body of the fire pool, and the other end of the water stop bolt penetrates through the peripheral wall body for reinforcement.
The utility model has the following technical effects:
this structure is at whole double-deck wall, to construction organization optimization scheme in the construction of board concrete structure, external enclosure wall body wall muscle ligature and the setting up of wall form, inside wall body reinforcement, the template is set up, add the interval that ladder muscle and location muscle guaranteed the interior wall construction in the wall, the water-stop bolt strengthens the measures of the key technological problem that inside wall body etc. involved, not only guaranteed that the time limit for a project is accomplished according to the primary schedule, and simultaneously, on the basis of guaranteeing construction quality and safety, double-deck wall concrete construction provides the technique for now on, the solution thinking in the construction. The structure is simple in construction and strong in operability, the whole construction progress of a project is accelerated, and the method has a wide application prospect.
The structure meets the requirements of design and construction quality, shortens the construction period, saves labor and material cost in construction and reduces the construction cost of engineering. The quality of double-layer wall body steel bar binding, formwork erection, reinforcement and concrete forming is well solved, the significance of innovation is achieved, meanwhile, the requirement of structural design on construction is met in a high-standard mode, the engineering quality is improved, the construction progress is accelerated, and good economic benefits and social benefits are achieved.
The reinforcing difficulty that traditional template was established is big, the reinforcement degree of difficulty is big, the concrete shaping quality is poor, there are quality defects such as shrinkage crack, have the meaning of reform innovation, high standard's completion structural design to the requirement of construction simultaneously, improved engineering quality for the construction progress has ensured water-proof effects.
Drawings
FIG. 1 is a plan view of a fire pool in an embodiment;
FIG. 2 is a schematic view illustrating the reinforcement of the inner and outer wall templates of the fire-fighting water pool in the embodiment;
FIG. 3 is a schematic view of the reinforcement of an elongated water stop bolt in the embodiment;
FIG. 4 is a schematic view of wall form support in the example.
Reference numerals: 1. a peripheral wall; 2. inner and outer frame bodies; 3. an inner wall; 4. extruded polystyrene board; 5. and (7) a water stopping bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
As shown in fig. 1-4, a construction structure of a double-layer concrete shear wall of a fire pool comprises a peripheral wall body 1, inner and outer side frame bodies 2 and an inner wall body 3, wherein the inner and outer side frame bodies 2 and the inner wall body 3 are bound and fixed by steel bars, and an extruded polystyrene board 4 is arranged between the peripheral wall body 1 and the inner wall body 3. The shear wall is characterized by further comprising a shear wall, and ladder bars are arranged between the two rows of reinforcing steel bar nets of the shear wall. And welding positioning ribs in the shear wall body. And a steel bar stay bar is arranged in the shear wall. The length of the stay bar is the gap between the inner wall thickness of the fire-fighting water pool and the construction seam, one side of the steel bar stay bar is propped against the outer wall concrete wall, and the other side is fixed on the inner wall template.
The inner side and the outer side of the frame body 2 comprise an inner row of frame bodies and an outer row of frame bodies, wherein the distance between the inner row of frame bodies and the wall is 500mm, the width between the inner row of frame bodies and the outer row of frame bodies is 800mm, and the step distance between the frame bodies is 1800 mm. The floor sweeping device further comprises a floor sweeping rod, and the floor sweeping rod is 200mm away from the ground.
The inner surface of the wall template of the peripheral wall body 1 is supported on the bottom plate by a movable steel pipe top support. The wall formwork is characterized by further comprising a whole wall formwork, and the wall formwork, the peripheral wall and the inner wall are fixedly connected through water stop bolts 5. One section of the water stop bolt 5 with the water stop sheet is arranged inside the fire pool wall body, and the other end of the water stop bolt penetrates through the peripheral wall body 2 for reinforcement.
The structure is characterized as follows:
after the construction of the peripheral wall body 1 is finished, the reinforcing steel bars of the inner wall body are bound and reinforced by utilizing the inner and outer side frame bodies which are erected in advance, and the templates of the inner wall body are integrally erected and reinforced by utilizing the inner and outer side frame bodies. Therefore, the original construction efficiency is greatly improved, the construction environment of operators is relatively safer, the technical quality requirements of wall rib binding and formwork erection are met, and the technical difficulties that after the construction of an outer wall is finished, the wall ribs of the single-sided wall body of the inner wall are difficult to bind and fix, and the formwork is difficult to erect and reinforce are solved. The disposable erection frame body can be used for multiple times, so that the construction quality and efficiency are guaranteed, and the environmental safety of construction operators is greatly improved.
After the outer wall concrete is poured and the reinforcing steel bars of the inner wall are bound, the extruded polystyrene board with the thickness of 100mm is placed between the walls and is fixed by the iron wires by means of the wall reinforcing steel bars, so that the problem that separation seams with the width of 100mm are reserved between the walls is solved, and the construction efficiency is greatly improved; after the outer wall concrete is poured and the reinforcing steel bars of the inner wall are bound, ladder bars are arranged between the two rows of reinforcing steel bar meshes of the shear wall to ensure the space, the position and the protective layer of the two rows of reinforcing steel bars of the shear wall, improve the rigidity of the wall and reduce the deformation. Positioning ribs are welded in the wall body, so that the thickness of the wall body can be ensured due to the thick installation of the template; the construction process of the underground fire-fighting pool wall and plate is simple and feasible, the adaptability and the operability are strong, the construction procedures are closely connected, and the efficiency is high.
The structure is not only suitable for the concrete construction of the double-layer concrete shear wall structure of the fire pool, but also suitable for the concrete construction of the common double-layer wall structure of other buildings. The double-layer structure can be constructed in various forms, for example, a plurality of double-layer walls can be constructed, and a three-side wall can be a double-layer structure, which can be referred to.
The operating principle is as follows:
the construction of the inner and outer double-layer reinforced concrete fire pool is that some quality and safety guarantee measures are additionally arranged on the basis of original common wall, beam and plate concrete pouring, so that the construction quality, safety specification and requirements are guaranteed to be met while the double-layer wall is constructed, and the progress of the project is guaranteed.
The structure is optimized through the arrangement of construction organization before construction, the frame body erected by the inner wall and the outer wall is utilized to erect and reinforce wall ribs and templates on the single-sided wall body of the inner wall, the reinforcement of the inner wall body and the templates are erected, the ladder ribs and the positioning ribs are added in the wall to ensure the distance between the inner wall construction, and the water stop bolts and the inclined struts reinforce the inner wall body and other measures to ensure the progress, quality and safety of construction.
The operation flow is as follows:
the method comprises the steps of main building raft foundation upper line laying → acceptance → wall rib binding → peripheral wall formwork support, reinforcement → formwork acceptance → wall concrete pouring, maintenance → peripheral wall inner formwork dismantling (peripheral wall outer formwork and reinforcement pipe fitting reserving), bottom plate elevation line laying → bottom plate steel bar and wall rib binding, reinforcement → formwork hanging, reinforcement → bottom plate concrete pouring, maintenance → inner wall line laying, acceptance → wall rib binding → inner wall single face formwork supporting, reinforcement → formwork acceptance → wall concrete pouring, maintenance → top plate bottom plate formwork elevation → top plate bottom plate formwork supporting, reinforcement → acceptance → top plate steel bar binding → acceptance → top plate concrete pouring and maintenance.
The erection of outside support body in the outer wall not only can use when workman's ligature reinforcing bar, can be used for fixed reinforcing bar simultaneously, ensures that the reinforcing bar can not the off normal. The erected frame body can be used for closing the die plate and reinforcing the wall body. The erected frame body can be used for multiple times, and the construction efficiency and safety performance are improved. The distance between the inner row of the frame bodies and the wall is 500mm, the width between the inner row of the frame bodies and the outer row of the frame bodies is 800mm, the distance between the sweeping rods and the ground is 200mm, and the step distance between the frame bodies is 1800 mm.
Binding peripheral wall body reinforcing steel bars: according to the well-bounced wall position line, the peripheral wall steel bars are arranged according to the following ratio of 1: and 6, when the horizontal displacement is 1, the length of the vertical bending section is 6, the vertical bending section is adjusted in place, the requirement of a protective layer is met, and the peripheral wall body steel bars are ensured to be vertical, not inclined, not toppled and not displaced. When the wall body reinforcing steel bars are bound, the wall body vertical positioning ladder bars are bound firstly, the space between the vertical positioning ladder bars is 1200mm, and the arrangement is uniform.
After the outer wall ribs are bound, the frame bodies on two sides of the wall are erected tightly, the frame bodies are used for reinforcing inclined struts of the wall body reinforcing steel bars at intervals of 2 meters and with steel pipes with the length of phi 48 being 2 meters, and during reinforcement, a plurality of opposite-top steel pipes are additionally arranged above and below the wall body to prevent the wall body from deviating during pouring.
The wall template is made of 12-thick blockboard, the back balk is 40 multiplied by 90mm balk, the distance is 150mm, the main keel is composed of 2 phi 48 steel pipes and phi 14 screw rods, the distance between the upper and lower channels of the main keel is 250mm from the floor, the middle of the main keel is 500mm, the two surfaces of the main keel are clamped by the phi 14 screw rods, and the horizontal distance between the screw rods is 500 mm. In order to ensure the lateral rigidity and integrity of the wall form, the inner surface of the form is supported on the bottom plate by a movable steel pipe top support.
The support body still can effectively utilize when pouring the outer wall, has not only guaranteed personnel's safety, the construction quality of construction, has less setting up once more of support body simultaneously, has improved the efficiency of construction.
The construction of the inner wall body comprises the construction treatment of the dividing joints with the thickness of 100mm, the binding of the bottom plate and the reinforcing steel bars of the inner wall body, and the erection of the single-sided wall body template of the inner wall body. And after the outer wall concrete is cured to meet the strength requirement, completely removing all the templates on the inner side of the outer wall.
Construction treatment of a 100mm wide dividing joint in a guide wall with the height of 300 mm: before the bottom plate and the inner wall are bound by reinforcing steel bars, an extruded sheet with the thickness of 100mm is fixed on the bottom plate and between the inner wall and the outer wall by iron wires in advance.
After the bottom plate is bound, the guide wall is 300-inch high, 300-x 3 water stop steel plates are welded in the guide wall, the water stop steel plates are exposed for 100mm and 150mm, the foundation and the guide wall are poured by adopting C30p6 concrete, and the vibration is dense.
The engineering is a reinforced concrete structure and aims to ensure the construction quality of the shear wall. And a ladder rib is arranged on the shear wall with the length of more than 3 meters. The ladder bars are arranged between the two rows of reinforcing mesh of the shear wall and used for ensuring the space, the position and the protective layer of the two rows of reinforcing meshes of the shear wall, improving the rigidity of the wall body and reducing the deformation. The ladder rib replaces the main rib and the drag hook. The distance between the two main ribs is the thickness of the wall minus the thickness of 2 protective layers minus the thickness of 2 horizontal ribs (the horizontal ribs are externally arranged). The horizontal rib spacing between two main ribs of the ladder rib is equal to the horizontal rib spacing of the wall body, and the length is the thickness of the wall body. Minus 20mm at each end (e.g., 250 thick shear wall, ladder bar horizontal bar length 210 mm). And set up the steel bar spreader bar (adopting 12 steel bars) in the wall body, the length of the spreader bar is the clearance that the interior wall thickness of fire-fighting water pool adds the construction joint, and one side is on the outer wall concrete wall body, and the opposite side is fixed on the interior wall template, can guarantee its wall thickness when making the template installation.
After the wall ribs are checked and accepted, the whole wall formwork is hoisted by a tower crane, and water stop bolts are arranged at intervals of 500mm x 500mm for reinforcement. The lengthened water stop bolt needs to reinforce two walls, so the processing length of the phi 14 screw is 950 mm. And (4) arranging one section with the water stop sheet in the wall body of the fire pool, and penetrating the other end into the outer wall body for reinforcement.
Although only the preferred embodiments of the present invention have been described in detail, the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art, and all changes are encompassed in the scope of the present invention.
Claims (5)
1. A construction structure of a double-layer concrete shear wall of a fire pool is characterized by comprising a peripheral wall body (1), inner and outer side frame bodies (2) and an inner wall body (3), wherein the inner and outer side frame bodies (2) are bound and fixed with reinforcing steel bars of the inner wall body (3), and an extruded polystyrene board (4) is arranged between the peripheral wall body and the inner wall body; the shear wall is characterized by also comprising ladder bars arranged between the two rows of reinforcing mesh; welding positioning ribs in the shear wall body; the inner surface of a wall template of the peripheral wall body (1) is supported on the bottom plate by a movable steel pipe top support; a steel bar stay bar is arranged in the shear wall; the wall formwork is characterized by further comprising a whole wall formwork, and the wall formwork, the peripheral wall and the inner wall are fixedly connected through water stop bolts (5).
2. The double-layer concrete shear wall construction structure for the fire water pond according to claim 1, wherein the inner side frame body and the outer side frame body (2) comprise an inner row of frame bodies and an outer row of frame bodies, the inner row of frame bodies is 500mm away from the wall, the inner row of frame bodies and the outer row of frame bodies are 800mm wide, and the frame body step distance is 1800 mm.
3. The double-layer concrete shear wall construction structure for the fire water pond according to claim 2, further comprising a sweeping rod, wherein the sweeping rod is 200mm away from the ground.
4. A fire-fighting water pool double-layer concrete shear wall construction structure as claimed in claim 1, wherein the length of the stay bar is the gap between the inner wall thickness of the fire-fighting water pool and the construction seam, one side of the steel bar stay bar is supported on the outer wall concrete wall, and the other side is fixed on the inner wall formwork.
5. A fire-fighting water pool double-layer concrete shear wall construction structure as claimed in claim 1, wherein one section of the water-stopping bolt (5) with the water-stopping sheet is arranged inside the fire-fighting water pool wall body, and the other end penetrates into the peripheral wall body (1) for reinforcement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122954160.8U CN216517181U (en) | 2021-11-29 | 2021-11-29 | Double-deck concrete shear force wall construction structures in fire pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122954160.8U CN216517181U (en) | 2021-11-29 | 2021-11-29 | Double-deck concrete shear force wall construction structures in fire pond |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216517181U true CN216517181U (en) | 2022-05-13 |
Family
ID=81462863
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122954160.8U Active CN216517181U (en) | 2021-11-29 | 2021-11-29 | Double-deck concrete shear force wall construction structures in fire pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216517181U (en) |
-
2021
- 2021-11-29 CN CN202122954160.8U patent/CN216517181U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110777983A (en) | Synchronous construction structure and method for concrete filled wall and cast-in-place structure | |
CN108166531B (en) | Foundation post-cast strip template and construction method for casting post-cast strip | |
CN102979304A (en) | Construction method of double shear wall formworks at deformation joint of high-rise building | |
CN203514570U (en) | Square bar keel partition wall | |
CN109025295A (en) | A kind of high-altitude long-span steel reinforced concrete corridor construction method | |
CN107893529A (en) | Suitable for deep basal pit outer wall of basement PC template systems and its construction method | |
CN102587663A (en) | Concrete construction process of steel tube columns of super-high-rise building | |
CN108951840B (en) | Method for constructing arc-shaped outer wall of basement based on single-side formwork support of shaped support | |
CN114427258B (en) | High-altitude large-span cantilever concrete member disassembly-free construction system and construction method | |
CN114482375A (en) | Integral joint type reinforced concrete laminated slab and construction method | |
CN108086674A (en) | A kind of roof boarding hangs the construction method of mould and roof boarding | |
CN111395745A (en) | Basement outer wall single-face formwork supporting system and construction method thereof | |
CN207700680U (en) | A kind of roof boarding hangs mould | |
CN211228607U (en) | Integrally formed construction structure of outer wall and bottom plate of cast-in-place concrete structure of structure | |
CN111535628B (en) | Construction method for upper structure of C-shaped stock ground | |
CN216517181U (en) | Double-deck concrete shear force wall construction structures in fire pond | |
CN201190408Y (en) | Tool type exterior scaffolding of section steel fastening tube | |
CN211499326U (en) | Synchronous construction structures of concrete infilled wall and cast-in-place structure | |
CN108035470A (en) | A kind of big plate of flooring and its manufacture method | |
CN108951643B (en) | Super high-rise deep foundation pit basement core tube large-span large-area support changing construction method | |
CN108130889B (en) | Manufacturing method of stepped construction joint between main bottom plate of pump brake and side wall of runner layer | |
CN216616865U (en) | High-efficient construction system of super high-rise structure of encorbelmenting | |
CN214530768U (en) | Cast-in-place utility tunnel template bearing structure | |
CN115262811A (en) | Construction method of transverse section steel concrete combined shear wall | |