CN216489772U - Support arrangement for communication pipeline construction based on mobile communication network - Google Patents

Support arrangement for communication pipeline construction based on mobile communication network Download PDF

Info

Publication number
CN216489772U
CN216489772U CN202123252426.0U CN202123252426U CN216489772U CN 216489772 U CN216489772 U CN 216489772U CN 202123252426 U CN202123252426 U CN 202123252426U CN 216489772 U CN216489772 U CN 216489772U
Authority
CN
China
Prior art keywords
adjusting base
mobile communication
communication pipeline
communication network
screw rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123252426.0U
Other languages
Chinese (zh)
Inventor
邓火生
唐小荣
蒋平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Heyi Everything Information Technology Co ltd
Guangxi Technological College of Machinery and Electricity
Original Assignee
Guangxi Heyi Everything Information Technology Co ltd
Guangxi Technological College of Machinery and Electricity
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Heyi Everything Information Technology Co ltd, Guangxi Technological College of Machinery and Electricity filed Critical Guangxi Heyi Everything Information Technology Co ltd
Priority to CN202123252426.0U priority Critical patent/CN216489772U/en
Application granted granted Critical
Publication of CN216489772U publication Critical patent/CN216489772U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a strutting arrangement is used in communication pipeline construction based on mobile communication network, including screw rod adjusting base, screw rod adjusting base's top movable mounting has the bifurcate support arm, and the top movable mounting of bifurcate support arm has the push pipe supporting seat, and the top surface fixed mounting of push pipe supporting seat has the protection cushion, and screw rod adjusting base's bottom fixed mounting has the location cushion. According to the scheme, two cross adjusting arms at two ends of the center positioning shaft are movably installed inside two I-shaped threaded chutes on the top surface of the adjusting base body through two screw thread transmission sliding blocks matched with two-way screws, the tops of the two cross adjusting arms are movably installed inside two I-shaped chutes formed in the bottom surface of the jacking pipe clamping seat through limiting sliding blocks matched with limiting sliding rods, in the working process of the device, a worker synchronously twists two adjusting nuts through an electric wrench, and the height of a novel support piece can be quickly adjusted according to the installation requirement of a communication pipeline, so that the efficiency and convenience for erecting and installing the communication pipeline are improved.

Description

Support arrangement for communication pipeline construction based on mobile communication network
Technical Field
The utility model relates to a communication pipeline construction technical field, more specifically say, the utility model relates to a strutting arrangement is used in communication pipeline construction based on mobile communication network.
Background
In communication engineering, sometimes the cable is often installed underground, in order to protect the communication cable, the communication cable is wrapped in the communication pipeline by a constructor of the communication engineering, most of the communication pipelines need to dig a ditch before filling the pipeline in the installation process, but sometimes the ditch has the problems of uneven height or truncation and the like due to terrain reasons, and at the moment, the communication pipeline needs to be supported by a pipeline supporting device.
At present, the pipeline supporting device commonly used is mostly fixed dimension, can't ensure that the bearing height and the irrigation canals and ditches to the pipeline keep the level, when the pipeline highly has great difference, just need constructor to carry out secondary operation temporarily to pipeline support piece at the construction site, and its quality and fastness can't be guaranteed to the fashioned support piece of interim secondary operation, and has increased constructor's work load, has influenced communication engineering's construction progress.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a strutting arrangement is used in communication pipeline construction based on mobile communication network, be mostly fixed dimension with solving current pipeline strutting arrangement, can't ensure to the holding height and the irrigation canals and ditches of pipeline and keep the level, when the pipeline highly has great difference, just need constructor to carry out secondary operation temporarily at the construction site to pipeline support piece, its quality and fastness can't be guaranteed to fashioned support piece of interim secondary operation, and the problem of constructor work load has been increased.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a strutting arrangement is used in communication pipeline construction based on mobile communication network, includes screw rod adjusting base, screw rod adjusting base's top movable mounting has the bifurcate support arm, the top movable mounting of bifurcate support arm has the push pipe supporting seat, the top surface fixed mounting of push pipe supporting seat has the protection cushion, screw rod adjusting base's bottom fixed mounting has the location cushion.
Preferably, the screw rod adjusting base comprises an adjusting base body, the top surface of the adjusting base body is provided with two I-shaped thread sliding grooves which are distributed side by side, two bidirectional screw rods are fixedly mounted inside the I-shaped thread sliding grooves, and the driving ends of the two bidirectional screw rods are fixedly connected with adjusting nuts located on the outer side surface of the adjusting base body.
Preferably, the bifurcate support arm includes central location axle, the equal movable sleeve in both ends of central location axle is equipped with alternately adjusting arm, two the bottom of alternately adjusting arm all through activity hinge seat fixedly connected with two-way lead screw be the screw thread transmission slider of screw thread transmission connection.
Preferably, the top ends of the two cross adjusting arms are fixedly connected with limit sliders movably connected with the top pipe supporting seat through movable hinge seats, and the top pipe supporting seat is movably mounted right above the screw adjusting base through the double-fork supporting arm.
Preferably, the top pipe supporting seat comprises a top pipe clamping seat, two I-shaped sliding grooves distributed side by side are formed in the bottom surface of the top pipe clamping seat, and a limiting sliding rod movably sleeved with a limiting sliding block is fixedly mounted inside each I-shaped sliding groove.
Preferably, the protection cushion block and the positioning cushion block are both integrally formed high-elasticity rubber components, the top end of the protection cushion block is provided with an arc-shaped pipe clamping groove, and the bottom end of the positioning cushion block is embedded with a plurality of positioning nails with downward pointed ends.
The utility model discloses a technological effect and advantage:
in the scheme, the two cross adjusting arms at the two ends of the central positioning shaft are movably mounted inside the two I-shaped threaded chutes on the top surface of the adjusting base body through the matching of the threaded transmission slide block and the bidirectional lead screw, the top ends of the two cross adjusting arms are movably mounted inside the two I-shaped chutes formed in the bottom surface of the top pipe clamping seat through the matching of the limiting slide block and the limiting slide bar, and in the working process of the device, a worker can quickly adjust the height of the novel supporting piece according to the installation requirement of the communication pipeline by synchronously twisting the two adjusting nuts through the electric wrench, so that the efficiency and the convenience of the communication pipeline erection installation are improved; protection cushion and location cushion are the high elastic rubber matter component of an organic whole formation, and arc card pipe box has been seted up on the top of protection cushion, and the protection cushion passes through arc card pipe box joint between pipe supporting seat and communication pipeline, has avoided the pipeline atress to be hindered impaired problem by pipe supporting seat top, and the bottom of location cushion is embedded to have a plurality of pointed end location nail thorn down simultaneously, and when screw rod adjusting base atress pushed down, the location nail thorn pierces ground, has guaranteed the stability that the pipeline erect.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the screw adjusting base of the present invention;
FIG. 3 is a schematic view of the structure of the dual-pronged support arm of the present invention;
FIG. 4 is a schematic view of the structure of the push pipe support seat of the present invention.
The reference signs are: 1. a screw adjusting base; 2. a bifurcated support arm; 3. a pipe jacking support seat; 4. a protective cushion block; 5. positioning a cushion block; 11. adjusting the base body; 12. an I-shaped threaded chute; 13. a bidirectional lead screw; 14. adjusting the nut; 21. a central positioning shaft; 22. a cross adjustment arm; 23. a threaded drive slide; 24. a limiting slide block; 31. a pipe jacking clamping seat; 32. an I-shaped chute; 33. and limiting the sliding rod.
Detailed Description
In order to make the technical problems, technical solutions and advantages to be solved by the present invention clearer, the following detailed description will be given with reference to the accompanying drawings and specific embodiments.
Like attached drawing 1 to attached drawing 4, the embodiment of the utility model provides a strutting arrangement is used in communication pipeline construction based on mobile communication network, including screw rod adjusting base 1, screw rod adjusting base 1's top movable mounting has bifurcate support arm 2, and the top movable mounting of bifurcate support arm 2 has push pipe supporting seat 3, and push pipe supporting seat 3's top surface fixed mounting has protection cushion 4, and screw rod adjusting base 1's bottom fixed mounting has locating cushion 5.
As shown in fig. 2, fig. 3 and fig. 4, the screw adjusting base 1 includes an adjusting base body 11, two i-shaped threaded chutes 12 distributed side by side are formed in the top surface of the adjusting base body 11, two bidirectional screws 13 are fixedly mounted inside the two i-shaped threaded chutes 12, and the driving ends of the two bidirectional screws 13 are fixedly connected with adjusting nuts 14 located on the outer side surface of the adjusting base body 11; the double-fork supporting arm 2 comprises a central positioning shaft 21, two ends of the central positioning shaft 21 are movably sleeved with cross adjusting arms 22, and the bottom ends of the two cross adjusting arms 22 are fixedly connected with threaded transmission slide blocks 23 which are in threaded transmission connection with the bidirectional screw 13 through movable hinge seats; the top ends of the two cross adjusting arms 22 are fixedly connected with limiting slide blocks 24 which are movably connected with the top pipe supporting seat 3 through movable hinge seats, and the top pipe supporting seat 3 is movably arranged right above the screw adjusting base 1 through the double-fork supporting arm 2; the top pipe supporting seat 3 comprises a top pipe clamping seat 31, two I-shaped sliding grooves 32 distributed side by side are formed in the bottom surface of the top pipe clamping seat 31, and limiting sliding rods 33 movably sleeved with the limiting sliding blocks 24 are fixedly arranged in the two I-shaped sliding grooves 32.
Specifically, two cross regulation arms 22 at two ends of central positioning shaft 21 are movably mounted inside two I-shaped threaded chutes 12 on the top surface of regulation base body 11 through screw transmission sliders 23 in cooperation with two-way lead screws 13, the tops of the two cross regulation arms 22 are movably mounted inside two I-shaped chutes 32 formed in the bottom surface of a jacking pipe clamping seat 31 through limiting sliders 24 in cooperation with limiting slide bars 33, in the working process of the device, a worker synchronously twists two regulating nuts 14 through an electric wrench, the height of a novel support piece can be quickly regulated according to the installation requirement of a communication pipeline, and therefore the efficiency and convenience of communication pipeline erection and installation are improved.
Referring to fig. 2 and 4, the protective cushion block 4 and the positioning cushion block 5 are both integrally formed high-elasticity rubber components, the top end of the protective cushion block 4 is provided with an arc-shaped pipe clamping groove, and the bottom end of the positioning cushion block 5 is embedded with a plurality of positioning nails with downward pointed ends.
It is specific, protection cushion 4 and positioning cushion 5 are the high elastic rubber matter component of an organic whole formation, arc card pipe box has been seted up on protection cushion 4's top, protection cushion 4 passes through arc card pipe box joint between push pipe supporting seat 3 and communication pipeline, avoided the pipeline atress to be wounded impaired problem by push pipe supporting seat 3 top, positioning cushion 5's bottom is embedded to have a plurality of tip nail thorn down simultaneously, when 1 atress of screw rod adjusting base pushes down, the nail thorn pierces ground, the stability of pipeline erection has been guaranteed.
The working process of the utility model is as follows:
two cross adjusting arms 22 at two ends of a central positioning shaft 21 are movably mounted inside two I-shaped threaded chutes 12 on the top surface of an adjusting base body 11 through a threaded transmission slide block 23 in cooperation with a bidirectional screw 13, the top ends of the two cross adjusting arms 22 are movably mounted inside two I-shaped chutes 32 formed in the bottom surface of a top pipe clamping seat 31 through a limiting slide block 24 in cooperation with a limiting slide bar 33, and in the working process of the device, a worker can synchronously twist two adjusting nuts 14 through an electric wrench, so that the height of a novel supporting piece can be quickly adjusted according to the installation requirement of a communication pipeline, and the efficiency and convenience of communication pipeline erection and installation are improved;
protection cushion 4 and location cushion 5 are the high elastic rubber matter component of an organic whole formation, arc card pipe box has been seted up on the top of protection cushion 4, protection cushion 4 passes through arc card pipe box joint between push pipe supporting seat 3 and communication pipeline, avoided the pipeline atress to be wounded impaired problem by push pipe supporting seat 3 top, the bottom of location cushion 5 is embedded to have a plurality of pointed end location nail thorn down simultaneously, when 1 atress of screw rod adjusting base pushes down, the location nail thorn pierces ground, the stability that the pipeline erect has been guaranteed.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a strutting arrangement is used in communication pipeline construction based on mobile communication network, its characterized in that, includes screw rod adjusting base (1), the top movable mounting of screw rod adjusting base (1) has fork support arm (2), the top movable mounting of fork support arm (2) has push pipe supporting seat (3), the top surface fixed mounting of push pipe supporting seat (3) has protection cushion (4), the bottom fixed mounting of screw rod adjusting base (1) has location cushion (5).
2. The supporting device for communication pipeline construction based on the mobile communication network according to claim 1, wherein the screw adjusting base (1) comprises an adjusting base body (11), the top surface of the adjusting base body (11) is provided with two I-shaped threaded chutes (12) which are distributed side by side, two-way screws (13) are fixedly mounted inside the two I-shaped threaded chutes (12), and the driving ends of the two-way screws (13) are fixedly connected with adjusting nuts (14) which are located on the outer side surface of the adjusting base body (11).
3. The supporting device for communication pipeline construction based on the mobile communication network according to claim 2, wherein the bifurcate supporting arm (2) comprises a central positioning shaft (21), cross adjusting arms (22) are movably sleeved at both ends of the central positioning shaft (21), and the bottom ends of the two cross adjusting arms (22) are fixedly connected with a threaded transmission sliding block (23) in threaded transmission connection with the bidirectional lead screw (13) through a movable hinge seat.
4. The supporting device for communication pipeline construction based on the mobile communication network as claimed in claim 3, wherein the top ends of the two cross-adjustment arms (22) are both fixedly connected with a limit slider (24) movably connected with the top pipe supporting seat (3) through a movable hinge seat, and the top pipe supporting seat (3) is movably mounted right above the screw rod adjusting base (1) through the bifurcate supporting arm (2).
5. The supporting device for communication pipeline construction based on the mobile communication network according to claim 4, wherein the top pipe supporting seat (3) comprises a top pipe clamping seat (31), two I-shaped sliding grooves (32) distributed side by side are formed in the bottom surface of the top pipe clamping seat (31), and a limiting sliding rod (33) movably sleeved with the limiting sliding block (24) is fixedly installed inside each of the two I-shaped sliding grooves (32).
6. The supporting device for communication pipeline construction based on the mobile communication network as claimed in claim 1, wherein the protective cushion block (4) and the positioning cushion block (5) are both integrally formed high-elasticity rubber members, an arc-shaped pipe clamping groove is formed at the top end of the protective cushion block (4), and a plurality of positioning nails with downward pointed ends are embedded in the bottom end of the positioning cushion block (5).
CN202123252426.0U 2021-12-23 2021-12-23 Support arrangement for communication pipeline construction based on mobile communication network Active CN216489772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123252426.0U CN216489772U (en) 2021-12-23 2021-12-23 Support arrangement for communication pipeline construction based on mobile communication network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123252426.0U CN216489772U (en) 2021-12-23 2021-12-23 Support arrangement for communication pipeline construction based on mobile communication network

Publications (1)

Publication Number Publication Date
CN216489772U true CN216489772U (en) 2022-05-10

Family

ID=81427469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123252426.0U Active CN216489772U (en) 2021-12-23 2021-12-23 Support arrangement for communication pipeline construction based on mobile communication network

Country Status (1)

Country Link
CN (1) CN216489772U (en)

Similar Documents

Publication Publication Date Title
CN207414759U (en) The strutting assembly of o-ring erecting device
CN209585778U (en) A kind of height-adjustable electric power pylon of stringing
CN216489772U (en) Support arrangement for communication pipeline construction based on mobile communication network
CN209104761U (en) A kind of novel integrated equipment of electric power accident rapid rush-repair
CN210263038U (en) Prestressed anchorage cable installation device
CN212231048U (en) Line support for municipal works
CN212203693U (en) A survey and drawing auxiliary device for geotechnical engineering reconnaissance
CN211496796U (en) Communication cable installation device of being convenient for
CN210241036U (en) Mapping device for on-site construction cost budget of construction cost
CN106253141A (en) A kind of multi-functional cable erector's station
CN105442868A (en) Adjustable steel-structure reticulated shell spliced scaffold
CN215004723U (en) Side slope anchor rod uplift test device
CN211351591U (en) Telescopic support for folding cable trough of electric drilling machine
CN211001284U (en) Mine engineering machinery operation device
CN204151670U (en) Pressure-adjusting type bridge bearing pad
CN208918397U (en) Iron tower of power transmission line main material replacing tool
CN219169271U (en) Power transmission line crimping pipe alignment device
CN219364259U (en) Roadbed leveling auxiliary device
CN216974731U (en) Municipal administration road bridge construction drilling equipment
CN216406873U (en) Supporting component for tunnel construction
CN210195409U (en) Portable electric tool for adjusting high-speed railway contact net supporting and positioning device
CN101956478B (en) Enhancement-able mining deformation resistance device of high-voltage line tower with externally expanded base
CN221718322U (en) Vertical electric pile installation base that fills with adjustable
CN220302332U (en) Positioner for fracturing pump valve box for petroleum exploitation
CN216664266U (en) Building jacking deviation correcting device with large supporting range and stable supporting performance