CN210263038U - Prestressed anchorage cable installation device - Google Patents
Prestressed anchorage cable installation device Download PDFInfo
- Publication number
- CN210263038U CN210263038U CN201920746306.XU CN201920746306U CN210263038U CN 210263038 U CN210263038 U CN 210263038U CN 201920746306 U CN201920746306 U CN 201920746306U CN 210263038 U CN210263038 U CN 210263038U
- Authority
- CN
- China
- Prior art keywords
- cover
- rod
- adjustment
- adjusting
- anchor rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a prestressed anchorage cable installation device, concretely relates to architectural equipment field, including the hydraulic stem, the top demountable installation of hydraulic stem has the transverse adjustment cover, the fixed surface of transverse adjustment cover installs the adjustment handle, the bull stick is installed at the top of transverse adjustment cover, the bottom of bull stick surface is equipped with horizontal scale, the top fixed mounting of bull stick has the fixed block, the top fixed mounting of fixed block has the extension piece, and the top of extending the piece is equipped with the adjusting lever through screw rod screw thread cover, and the outside screw thread cover of screw rod is equipped with the vertical adjustment cover that is located the adjusting lever side. The utility model discloses a whole installation device's of hydraulic stem adjustment height, through the longitudinal angle of lateral adjustment cover adjustment roof, through the lateral angle of longitudinal adjustment cover adjustment roof, when consequently utilizing the device installation prestressed anchorage cable, the manpower of very big reduction, and accommodation is very wide, very big improvement the efficiency of prestressed anchorage cable installation.
Description
Technical Field
The utility model relates to a architectural equipment technical field, more specifically say, the utility model relates to a prestressed anchorage cable installation device.
Background
The anchor cable is fixed on the slope surface through the outer end, the prestressed steel strand which passes through the sliding surface of the side slope in the stable rock mass with the other end anchored in the sliding surface directly generates anti-sliding resistance on the sliding surface, increases the anti-sliding friction resistance, and makes the structural surface in a compact state to improve the integrity of the side slope rock mass, thereby fundamentally improving the mechanical property of the rock mass, effectively controlling the displacement of the rock mass, promoting the stability of the rock mass and achieving the purpose of renovating bedding, landslides, dangerous rocks.
The installation of current prestressed anchorage cable needs very accurate, just can guarantee prestressed anchorage cable pulling force and reach the optimization, in case one the deviation appears, just probably cause whole steel strand wires to collapse, prestressed anchorage cable all carries out once only accurate installation through artifical subassembly mounting bracket at present, the accuracy of installation can be guaranteed to such treatment mode, but whole installation need consume a large amount of artifical material resources, and install prestressed anchorage cable at every turn and all need reinstallate the support, long-term operation, the installation effectiveness is also very low.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a prestressed anchorage cable installation device, through the height of the whole installation device of hydraulic stem adjustment, through the vertical angle of horizontal adjusting sleeve adjustment roof, through the horizontal angle of vertical adjusting sleeve adjustment roof, when consequently utilizing the device installation prestressed anchorage cable, the manpower of very big reduction, and accommodation is very wide, very big improvement the efficiency of prestressed anchorage cable installation.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a prestressed anchorage cable installation device, includes the hydraulic stem, the top demountable installation of hydraulic stem has the lateral adjustment cover, the fixed surface of lateral adjustment cover installs the adjustment handle, the bull stick is installed at the top of lateral adjustment cover, the bottom of bull stick surface is equipped with horizontal scale, the top fixed mounting of bull stick has the fixed block, the top fixed mounting of fixed block has the extension piece, the top of extension piece is equipped with the adjusting lever through screw rod screw thread cover, the outside screw thread cover of screw rod is equipped with the vertical adjusting sleeve that is located the adjusting lever side, the top fixed mounting of adjusting lever has the roof, the top fixed mounting of roof has a plurality of to connect the supporting shoe, the top fixed mounting of connecting the supporting shoe has the collar.
In a preferred embodiment, an observation pointer matched with the transverse scale is fixedly installed at the top of the front face of the transverse adjusting sleeve.
In a preferred embodiment, the outer surface of the longitudinal adjusting sleeve is provided with longitudinal scales.
In a preferred embodiment, the top thread of the mounting ring is sleeved with a pressing rod, the top thread of the pressing rod is sleeved with an adjusting nut positioned on the outer surface of the mounting ring, and the bottom of the pressing rod extends into the mounting ring and is fixedly provided with a pressing plate.
In a preferred embodiment, the pressing plate is in a shape of a semicircular curved surface, and a locking block located outside the pressing rod is fixedly installed on the top surface of the pressing plate.
In a preferred embodiment, a steel pipe is welded at the bottom of the rotating rod, and the steel pipe is fixedly clamped on the transverse adjusting sleeve.
In a preferred embodiment, the bottom of the adjusting rod is provided with a movable groove matched with the extending block, and the width of the movable groove is five to ten millimeters wider than the thickness of the extending block.
In a preferred embodiment, the surface of the adjusting handle is provided with a thread matched with a common wrench.
The utility model discloses a technological effect and advantage:
1. the utility model discloses a height of whole installation device is adjusted to the hydraulic stem, through the longitudinal angle of horizontal adjusting sleeve adjustment roof, through the horizontal angle of vertical adjusting sleeve adjustment roof, therefore when utilizing the device to install prestressed anchorage cable, the manpower of very big reduction, and accommodation is very wide, very big improvement prestressed anchorage cable installation's efficiency;
2. the utility model can fix the anchor cable placed inside the mounting ring by rotating the adjusting nut to drive the pressing plate to move up and down, thereby leading the device to be practical and the anchor cables with different diameters, and greatly increasing the application range of the device;
3. the utility model discloses a be equipped with the observation scale on horizontal scale and vertical adjustment cover surface, increased the reference thing for manual adjustment is more accurate, has guaranteed the necessary accurate effect of installation.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of a partial structure of the present invention.
Fig. 3 is a schematic structural diagram of a position a of the present invention.
Fig. 4 is a schematic diagram of the structure at B of the present invention.
FIG. 5 is a schematic view of the structure of the lateral adjustment sleeve of the present invention
The reference signs are: the device comprises a hydraulic rod 1, a transverse adjusting sleeve 2, an adjusting handle 21, an observation pointer 22, a rotating rod 3, a transverse scale 31, a fixed block 32, an extending block 4, an adjusting rod 41, a screw rod 42, a longitudinal adjusting sleeve 43, a top plate 5, a connecting and supporting block 51, a mounting ring 52, a pressing rod 53, a pressing plate 54 and an adjusting nut 55.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The prestressed anchor cable installation device shown in fig. 1-5 comprises a hydraulic rod 1, wherein a transverse adjusting sleeve 2 is detachably installed at the top of the hydraulic rod 1, an adjusting handle 21 is fixedly installed on the outer surface of the transverse adjusting sleeve 2, a rotating rod 3 is installed at the top of the transverse adjusting sleeve 2, transverse scales 31 are arranged at the bottom of the outer surface of the rotating rod 3, a fixed block 32 is fixedly installed at the top of the rotating rod 3, an extending block 4 is fixedly installed at the top of the fixed block 32, an adjusting rod 41 is sleeved at the top of the extending block 4 through a screw 42 in a threaded manner, a longitudinal adjusting sleeve 43 positioned on the side surface of the adjusting rod 41 is sleeved at the external thread of the screw 42, a top plate 5 is fixedly installed at the top of the adjusting rod 41, a plurality of connecting support blocks 51 are fixedly installed at the top of the top plate 5, and an installation ring 52 is fixedly installed at, the top of the front surface of the transverse adjusting sleeve 2 is fixedly provided with an observation pointer 22 matched with the transverse scale 31, and the outer surface of the longitudinal adjusting sleeve 43 is provided with longitudinal scales.
The top thread of the mounting ring 52 is sleeved with a pressing rod 53, the top thread of the pressing rod 53 is sleeved with an adjusting nut 55 positioned on the outer surface of the mounting ring 52, and the bottom of the pressing rod 53 extends into the mounting ring 52 and is fixedly provided with a pressing plate 54.
The pressing plate 54 is in a shape of a semicircular curved surface, and a locking block located outside the pressing rod 53 is fixedly installed on the top surface of the pressing plate 54.
The bottom of the rotating rod 3 is welded with a steel pipe, and the steel pipe is fixedly clamped on the transverse adjusting sleeve 2.
The bottom of the adjusting rod 41 is provided with a movable groove matched with the extending block 4, and the width of the movable groove is five to ten millimeters wider than the thickness of the extending block 4.
The surface of the adjusting handle 21 is provided with a thread matched with a common wrench.
The implementation mode is specifically as follows: the height of the whole installation device is adjusted through the hydraulic rod 1, the longitudinal angle of the top plate 5 is adjusted through the transverse adjusting sleeve 2, and the transverse angle of the top plate 5 is adjusted through the longitudinal adjusting sleeve 43, so that when the device is used for installing the prestressed anchor cable, manpower is greatly reduced, the application range is wide, and the installation efficiency of the prestressed anchor cable is greatly improved; the anchor cables placed in the mounting ring 52 can be fixed by rotating the adjusting screw cap 55 to drive the pressing plate 54 to move up and down, so that the device is practical for anchor cables with different diameters, and the application range of the device is greatly enlarged; through the observation scale that is equipped with horizontal scale 31 and vertical adjusting sleeve 43 surface, increased the reference object for manual adjustment is more accurate, has guaranteed the necessary accurate effect of installation.
The utility model discloses the theory of operation:
firstly, inserting a prestressed anchor cable into a mounting ring 52, driving a pressing plate 54 to move up and down by rotating an adjusting nut 55, fixing the anchor cable placed in the mounting ring 52, and then embedding the bottom of a hydraulic rod 1 in soil at a corresponding position; then the hydraulic rod 1 is installed, then the hydraulic rod 1 is started to drive the superstructure to a desired elevation, then the wrench is used to observe the transverse scale 31 to rotate the adjusting handle 21 and the longitudinal adjusting sleeve 43, the position of the connecting supporting block 51 is aligned to a preset position, finally the installation ring 52 is loosened, so that the anchor cable is inserted into the installation hole which is excavated in advance, finally concrete is poured into the hole, and the device is removed.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. A prestressed anchorage cable installation device comprises a hydraulic rod (1), and is characterized in that: the top demountable installation of hydraulic stem (1) has horizontal adjustment cover (2), the outer fixed surface of horizontal adjustment cover (2) installs adjustment handle (21), bull stick (3) is installed at the top of horizontal adjustment cover (2), the bottom of bull stick (3) surface is equipped with horizontal scale (31), the top fixed mounting of bull stick (3) has fixed block (32), the top fixed mounting of fixed block (32) has extension piece (4), the top of extension piece (4) is through screw rod (42) screw thread cover adjusting lever (41) is equipped with, the outside screw thread cover of screw rod (42) is equipped with vertical adjustment cover (43) that are located adjusting lever (41) side, the top fixed mounting of adjusting lever (41) has roof (5), the top fixed mounting of roof (5) has a plurality of connection supporting shoe (51), and the top of the connecting support block (51) is fixedly provided with a mounting ring (52).
2. The prestressed anchor rope installation structure as claimed in claim 1, wherein: and an observation pointer (22) matched with the transverse scale (31) is fixedly arranged at the top of the front surface of the transverse adjusting sleeve (2).
3. The prestressed anchor rope installation structure as claimed in claim 1, wherein: the outer surface of the longitudinal adjusting sleeve (43) is provided with longitudinal scales.
4. The prestressed anchor rope installation structure as claimed in claim 1, wherein: the top thread of the mounting ring (52) is sleeved with a pressing rod (53), the top thread of the pressing rod (53) is sleeved with an adjusting nut (55) located on the outer surface of the mounting ring (52), and the bottom of the pressing rod (53) extends into the mounting ring (52) and is fixedly provided with a pressing plate (54).
5. The prestressed anchor rope installation apparatus as claimed in claim 4, wherein: the pressing plate (54) is in a semicircular curved surface shape, and a locking block positioned outside the pressing rod (53) is fixedly installed on the top surface of the pressing plate (54).
6. The prestressed anchor rope installation structure as claimed in claim 1, wherein: the bottom of the rotating rod (3) is welded with a steel pipe, and the steel pipe is fixedly clamped on the transverse adjusting sleeve (2).
7. The prestressed anchor rope installation structure as claimed in claim 1, wherein: the bottom of the adjusting rod (41) is provided with a movable groove matched with the extending block (4), and the width of the movable groove is five to ten millimeters wider than the thickness of the extending block (4).
8. The prestressed anchor rope installation structure as claimed in claim 1, wherein: the surface of the adjusting handle (21) is provided with a thread matched with a common wrench.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920746306.XU CN210263038U (en) | 2019-05-23 | 2019-05-23 | Prestressed anchorage cable installation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920746306.XU CN210263038U (en) | 2019-05-23 | 2019-05-23 | Prestressed anchorage cable installation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210263038U true CN210263038U (en) | 2020-04-07 |
Family
ID=70026153
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920746306.XU Active CN210263038U (en) | 2019-05-23 | 2019-05-23 | Prestressed anchorage cable installation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210263038U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113512953A (en) * | 2021-07-07 | 2021-10-19 | 中国建筑第八工程局有限公司 | Anchor cable construction auxiliary device and auxiliary method |
CN113652968A (en) * | 2021-08-03 | 2021-11-16 | 中国建筑第八工程局有限公司 | Anchor cable construction auxiliary equipment and anchor cable installation method |
-
2019
- 2019-05-23 CN CN201920746306.XU patent/CN210263038U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113512953A (en) * | 2021-07-07 | 2021-10-19 | 中国建筑第八工程局有限公司 | Anchor cable construction auxiliary device and auxiliary method |
CN113652968A (en) * | 2021-08-03 | 2021-11-16 | 中国建筑第八工程局有限公司 | Anchor cable construction auxiliary equipment and anchor cable installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110206493B (en) | Construction process of full-sleeve full-rotation bored pile | |
CN104234385B (en) | Construction method of installation after a kind of terrace heavy steel plate built-in fitting | |
CN210263038U (en) | Prestressed anchorage cable installation device | |
CN111851565B (en) | Steel structure stand column alignment structure with cup-mouth type foundation and construction method thereof | |
CN201339336Y (en) | Adjustable tower baseboard for electric transmission line pole tower | |
CN103643637B (en) | Original position construction method for lifting whole after the first vertical transfer of Long-Span Concrete Filled Steel Tubular Arch Bridges | |
US11976431B2 (en) | Methods for constructing tensionless concrete pier foundations and foundations constructed thereby | |
CN109518980B (en) | Device for adjusting hoisting elevation and verticality of fabricated concrete structure column and construction method thereof | |
CN108239990A (en) | A kind of construction method using second pouring streetlamp foundation | |
CN113833027A (en) | Construction method of manhole cover | |
CN113863166B (en) | Reverse order construction method for swivel-first and mounting support | |
CN101838986B (en) | Disassembling tool type lattice column and construction method thereof | |
CN105696796A (en) | Cantilever scaffold steel girder anchoring method | |
CN202252699U (en) | Elevating rotary installation frame | |
CN104047228B (en) | The prepared hole die of bridge stone bolt | |
CN204080793U (en) | Hoisting device for reinforcement cage | |
CN105442868A (en) | Adjustable steel-structure reticulated shell spliced scaffold | |
CN215107496U (en) | Transition joint for hoisting lattice column and adjusting verticality | |
CN212927858U (en) | Concrete pouring device for shield starting base | |
CN215052897U (en) | Assembled guide wall supporting structure | |
KR101538909B1 (en) | Construction method for poles moving of electric-wire-stringing using pole holding divice | |
CN209909301U (en) | Auxiliary pipeline installation device | |
CN210766398U (en) | Be used for support base stone to reserve bolt hole construction equipment | |
CN210224904U (en) | Tunnel cable trench template mounting support | |
CN111945790A (en) | Installation device and installation method of well lid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 550081 No. 1-8, floor 15, unit 1, building 1, 2,3,4,5, group x, Guiyang Century City, No. 6, Jinyang South Road, guanshanhu District, Guiyang City, Guizhou Province Patentee after: Guizhou Baisheng Suyuan Engineering Technology Management Co.,Ltd. Address before: 550081 No. 1-8, floor 15, unit 1, building 1, 2,3,4,5, group x, Guiyang Century City, No. 6, Jinyang South Road, guanshanhu District, Guiyang City, Guizhou Province Patentee before: Guizhou Yusheng Engineering Construction Consulting Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |