CN210241036U - Mapping device for on-site construction cost budget of construction cost - Google Patents

Mapping device for on-site construction cost budget of construction cost Download PDF

Info

Publication number
CN210241036U
CN210241036U CN201921261765.5U CN201921261765U CN210241036U CN 210241036 U CN210241036 U CN 210241036U CN 201921261765 U CN201921261765 U CN 201921261765U CN 210241036 U CN210241036 U CN 210241036U
Authority
CN
China
Prior art keywords
piece
wall
block
connecting block
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921261765.5U
Other languages
Chinese (zh)
Inventor
Xuan Wang
汪璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921261765.5U priority Critical patent/CN210241036U/en
Application granted granted Critical
Publication of CN210241036U publication Critical patent/CN210241036U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a mapping device that on-spot cost of engineering cost budgets, concretely relates to survey and drawing technical field, which comprises a fixed base, the top surface mounting of fixing base has the spirit level, and the bottom surface middle part position of fixing base is provided with the mobile jib, mobile jib circumference side outer wall cover is equipped with the lagging, and the circumference side outer wall of mobile jib is close to the fixed dog that is provided with in bottom of lagging, the both sides of mobile jib all are equipped with the spout. The utility model discloses set up the collets, the slider, spout and three auxiliary support pole, can fix the collets, can adjust the angle between auxiliary support pole and the mobile jib through round pin axle and movable rod, solved the problem of three auxiliary support pole regulating direction simultaneously, set up and drawn piece, axis of rotation and roll axostylus axostyle, realized the fixed mounting of roll axostylus axostyle and connecting block to realized the installation to the axis of rotation, auxiliary support pole's installation is dismantled simply, is convenient for to the change of single auxiliary support pole.

Description

Mapping device for on-site construction cost budget of construction cost
Technical Field
The utility model relates to a mapping technology field, more specifically says, the utility model relates to a mapping device of on-spot cost budget of engineering cost.
Background
In the process of starting construction of the building project, firstly, the construction cost of the building project needs to be estimated, generally, a field mapping mode is adopted for estimating the construction cost, and a mapping device is required in the mapping process, wherein the mapping device is mainly used for measuring the length and the width of a building field and the topography and features, and designing and manufacturing instruments and devices for data acquisition, processing, output and the like for mapping operation.
The utility model patent of patent application publication No. CN 208704743U discloses a mapping device for on-site cost budget of construction cost, which comprises a first mapping body, a second mapping body, a lifting shaft, a transverse shaft, a mapping instrument, a sighting device and an objective lens; this mapping device of on-spot cost budget of engineering cost can rotate the rotation that drives the carousel through shaking to drive the rotation of screw rod, and then rise or fall the thread bush, and rise or fall the first mapping device who places on the board, conveniently adjust mapping device's height.
But in actual use, still have more shortcomings, such as the angle deviation problem that appears easily when the angle is adjusted to the auxiliary stay pole.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above-mentioned defect of prior art, the embodiment of the utility model provides a mapping device that engineering cost's on-the-spot cost budgets, through having set up the cover piece, the slider, spout and three auxiliary stay pole, the screw thread rotates between screw rod and the locating hole, the screw rod can promote installation piece and cushion, the cushion contacts with the inner wall of fixed slot, can fix the cover piece, can adjust the angle between auxiliary stay pole and the mobile jib through round pin axle and movable rod, in order to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a surveying and mapping device for on-site cost budget of engineering cost comprises a fixed seat, wherein a level gauge is installed on the surface of the top end of the fixed seat, a main rod is arranged in the middle of the surface of the bottom end of the fixed seat, a sleeve block is sleeved on the outer wall of the circumferential side of the main rod, a stop block is fixedly arranged on the outer wall of the circumferential side of the main rod, close to the bottom of the sleeve block, and sliding grooves are formed in two sides of the main rod;
the utility model discloses a fixing device for a motor vehicle, including fixed slot, cushion, cover piece, locating hole, slider, fixed slot, mounting block, the internally mounted of fixed slot has the installation piece, the one end of installation piece is provided with the cushion, and the other end swing joint of installation piece has the screw rod, the cushion is laminated with the inner wall of fixed slot, the locating hole has been seted up to the front surface of cover piece, and the inner wall of cover piece is provided with the slider, threaded connection between.
In a preferred embodiment, the circumferential side outer wall of the sleeve block is provided with a U-shaped block, a movable rod is arranged inside the U-shaped block, and the U-shaped block is movably connected with the movable rod.
In a preferred embodiment, one end of the movable rod is movably connected with three auxiliary supporting rods through a pin shaft, and the bottom ends of the three auxiliary supporting rods are provided with pointed ends.
In a preferred embodiment, the bottom end surface of the fixing seat is provided with a connecting block, the connecting block is arranged in an annular shape and is movably connected with the auxiliary supporting rod, and a rolling shaft rod is arranged inside the connecting block and is arranged in a cavity structure.
In a preferred embodiment, a groove is formed in a side wall of the connecting block, a pulling block is arranged inside the groove, an extrusion block is fixedly arranged on the outer wall of the circumferential side of the pulling block, a spring is sleeved on one side, close to the extrusion block, of the outer wall of the circumferential side of the pulling block, the pulling block and the rolling shaft rod are horizontally arranged in a collinear manner, one end of the spring is fixedly connected with the extrusion block, and the other end of the spring is fixedly connected with the groove.
In a preferred embodiment, a rotating shaft is arranged inside the U-shaped block, the outer wall of the circumferential side of the tail end of the rotating shaft is threaded, a nut is sleeved at the tail end of the rotating shaft, and the nut is in threaded connection with the rotating shaft.
The utility model discloses a technological effect and advantage:
1. compared with the prior art, the utility model has the advantages that the sleeve block, the sliding groove and the three auxiliary supporting rods are arranged, the screw thread between the screw rod and the positioning hole rotates, the screw rod can push the mounting block and the rubber pad, the rubber pad is contacted with the inner wall of the fixing groove, the sleeve block can be fixed, the angle between the auxiliary supporting rods and the main rod can be adjusted through the pin shaft and the movable rod, and the problem that the directions of the three auxiliary supporting rods are adjusted simultaneously is solved;
2. the utility model discloses a set up and drawn piece, axis of rotation and roll axostylus axostyle, drawn the piece and entered into the cavity of roll axostylus axostyle, realized the fixed mounting of roll axostylus axostyle and connecting block, threaded connection between the end of axis of rotation and the nut has realized the installation to the axis of rotation, and the installation of auxiliary stay pole is dismantled simply, and easily operation is convenient for to the change of single auxiliary stay pole.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the mounting structure of the sleeve block of the present invention.
Fig. 3 is an enlarged view of a portion a in fig. 2.
Fig. 4 is a schematic view of the mounting structure of the auxiliary support rod of the present invention.
Fig. 5 is an enlarged schematic view of the structure of part B in fig. 4.
Fig. 6 is a schematic view of the connection structure of the movable rod of the present invention.
The reference signs are: 1. a fixed seat; 2. a main rod; 3. fixing grooves; 4. sleeving blocks; 5. a stopper; 6. a U-shaped block; 7. a movable rod; 8. an auxiliary support bar; 9. a level gauge; 10. a slider; 11. a chute; 12. positioning holes; 13. a screw; 14. mounting blocks; 15. a rubber pad; 16. connecting blocks; 17. a rolling shaft rod; 18. a groove; 19. pulling the block; 20. extruding the block; 21. a spring; 22. a rotating shaft; 23. and a nut.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model relates to a mapping device that engineering cost's on-spot cost budgets, including fixing base 1, the top surface mounting of fixing base 1 has surveyor's level 9, and the bottom surface middle part position of fixing base 1 is provided with mobile jib 2, 2 circumference side outer wall covers of mobile jib are equipped with nested piece 4, and the circumference side outer wall of mobile jib 2 is close to the fixed dog 5 that is provided with in bottom of nested piece 4, the both sides of mobile jib 2 all are equipped with spout 11.
Referring to the attached drawings 1-3 in the specification, the mapping device for the on-site construction cost budget of the construction cost of the embodiment comprises an installation block 14, the installation block 14 is installed inside the fixing groove 3, a rubber cushion 15 is arranged at one end of the installation block 14, a screw 13 is movably connected to the other end of the installation block 14, the rubber cushion 15 is attached to the inner wall of the fixing groove 3, a positioning hole 12 is formed in the front surface of the sleeve block 4, a sliding block 10 is arranged on the inner wall of the sleeve block 4, the positioning hole 12 is in threaded connection with the screw 13, and the sliding block 10 is in sliding connection with the sliding groove 11.
Further, U type piece 6 is installed to the circumference side outer wall of cover block 4, the internally mounted of U type piece 6 has movable rod 7, and U type piece 6 and movable rod 7 swing joint, there is auxiliary stay bar 8 one end of movable rod 7 through round pin axle swing joint, auxiliary stay bar 8 is provided with threely altogether, and three auxiliary stay bar 8's bottom all is provided with most advanced.
The implementation scenario is specifically as follows: in the in-service use process, the sliding is the cover block 4, slider 10 on the cover block 4 can slide in the inside of spout 11, cushion 15 does not contact with fixed slot 3 this moment, when cover block 4 is when removing, can drive screw rod 13 and remove, and the distance between three auxiliary stay pole 8 and mobile jib 2 changes, when the sliding distance of selecting cover block 4, screw rod 13 can be stirred, screw thread rotation between screw rod 13 and the locating hole 12, screw rod 13 can promote installation piece 14 and cushion 15, cushion 15 and the inner wall contact of fixed slot 3, can fix cover block 4, can adjust the angle between auxiliary stay pole 8 and the mobile jib 2 through round pin axle and movable rod 7, this embodiment has specifically solved the problem of three auxiliary stay pole 8 simultaneous control directions.
Referring to the attached drawings 1, 4, 5 and 6 of the specification, the mapping device for the on-site construction cost budget of the construction cost of the embodiment comprises a connecting block 16, wherein the connecting block 16 is arranged on the bottom end surface of the fixed seat 1, the connecting block 16 is arranged annularly, the connecting block 16 is movably connected with the auxiliary support rod 8, a rolling shaft rod 17 is arranged inside the connecting block 16, and the rolling shaft rod 17 is arranged in a cavity structure.
Further, a groove 18 is formed in the side wall of one side of the connecting block 16, a pulling block 19 is arranged inside the groove 18, an extrusion block 20 is fixedly arranged on the outer wall of the circumferential side of the pulling block 19, a spring 21 is sleeved on one side, close to the extrusion block 20, of the outer wall of the circumferential side of the pulling block 19, the pulling block 19 and the rolling shaft rod 17 are horizontally arranged in a collinear mode, one end of the spring 21 is fixedly connected with the extrusion block 20, and the other end of the spring 21 is fixedly connected with the groove 18.
Further, the inside of U type piece 6 is provided with axis of rotation 22, the terminal circumference side outer wall of axis of rotation 22 is seted up threadedly, and the terminal cover of axis of rotation 22 is equipped with nut 23, threaded connection between nut 23 and the axis of rotation 22.
The implementation scenario is specifically as follows: during the use, pulling and pulling piece 19, spring 21 is under the two-way extrusion of extrusion piece 20 and recess 18, can drive and pull piece 19 and enter into recess 18, can pass auxiliary stay 8 with rolling shaft 17 this moment and put into connecting block 16, loosen and pull piece 19 afterwards, the elastic deformation that spring 21 received resumes, pull piece 19 and enter into rolling shaft 17's cavity, rolling shaft 17 and connecting block 16's fixed mounting has been realized, put into the inside of U type piece 6 with axis of rotation 22, threaded connection between axis of rotation 22's end and nut 23, the installation to axis of rotation 22 has been realized, auxiliary stay 8's installation dismantlement is simple, easy to operate, be convenient for to the change of single auxiliary stay 8.
The utility model discloses a theory of operation:
referring to the attached drawings 1-3 of the specification, the sleeve block 4, the sliding block 10, the sliding groove 11 and the three auxiliary supporting rods 8 are arranged, the screw 13 and the positioning hole 12 rotate in a threaded mode, the screw 13 can push the mounting block 14 and the rubber pad 15, the rubber pad 15 is in contact with the inner wall of the fixing groove 3 and can fix the sleeve block 4, the angle between the auxiliary supporting rods 8 and the main rod 2 can be adjusted through the pin shaft and the movable rod 7, and the problem that the directions of the three auxiliary supporting rods 8 are adjusted simultaneously is solved.
Referring to the attached drawings 1, 4, 5 and 6 of the specification, the pulling block 19, the rotating shaft 22 and the rolling shaft rod 17 are arranged, the pulling block 19 enters the cavity of the rolling shaft rod 17, the rolling shaft rod 17 and the connecting block 16 are fixedly installed, the tail end of the rotating shaft 22 is in threaded connection with the nut 23, the rotating shaft 22 is installed, the auxiliary supporting rod 8 is simple to install and disassemble, the operation is easy, and the replacement of a single auxiliary supporting rod 8 is convenient.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a mapping device that on-spot cost of engineering cost budgets, includes fixing base (1), its characterized in that: a leveling instrument (9) is mounted on the top end surface of the fixing seat (1), a main rod (2) is arranged in the middle of the bottom end surface of the fixing seat (1), a sleeve block (4) is sleeved on the outer wall of the circumferential side of the main rod (2), a stop block (5) is fixedly arranged on the outer wall of the circumferential side of the main rod (2) close to the bottom of the sleeve block (4), and sliding grooves (11) are formed in two sides of the main rod (2);
the utility model discloses a fixing device for a shoe, including fixed slot (3), the internally mounted of fixed slot (3) has installation piece (14), the one end of installation piece (14) is provided with cushion (15), and the other end swing joint of installation piece (14) has screw rod (13), cushion (15) and the inner wall laminating of fixed slot (3), locating hole (12) have been seted up to the front surface of cover piece (4), and the inner wall of cover piece (4) is provided with slider (10), threaded connection between locating hole (12) and screw rod (13), slider (10) and spout (11) sliding connection.
2. A mapping apparatus for on-site construction cost budget for construction costs according to claim 1, wherein: u type piece (6) are installed to the circumference side outer wall of cover piece (4), the internally mounted of U type piece (6) has movable rod (7), and U type piece (6) and movable rod (7) swing joint.
3. A mapping apparatus for on-site construction cost budget for construction costs according to claim 2, wherein: one end of the movable rod (7) is movably connected with an auxiliary supporting rod (8) through a pin shaft, the auxiliary supporting rods (8) are arranged in a three-way mode, and tip ends are arranged at the bottom ends of the three auxiliary supporting rods (8).
4. A mapping apparatus for on-site construction cost budget for construction costs according to claim 3, wherein: the bottom surface of fixing base (1) is provided with connecting block (16), connecting block (16) are the annular setting, and connecting block (16) and auxiliary stay pole (8) swing joint, the internally mounted of connecting block (16) has rolling axle pole (17), rolling axle pole (17) set up to the cavity structure.
5. An apparatus for mapping a construction cost on-site cost budget according to claim 4, wherein: the utility model discloses a rolling shaft, including connecting block (16), recess (18) are seted up to one side lateral wall of connecting block (16), the inside of recess (18) is provided with draws piece (19), draw the fixed extrusion piece (20) that is provided with of circumference side outer wall of piece (19), and draw one side cover that the circumference side outer wall of piece (19) is close to extrusion piece (20) to be equipped with spring (21), draw piece (19) and rolling shaft pole (17) level collineation setting, the one end and the extrusion piece (20) fixed connection of spring (21), and the other end and recess (18) fixed connection of spring (21).
6. A mapping apparatus for on-site construction cost budget for construction costs according to claim 2, wherein: the inside of U type piece (6) is provided with axis of rotation (22), the terminal circumference side outer wall of axis of rotation (22) is seted up threadedly, and the terminal cover of axis of rotation (22) is equipped with nut (23), threaded connection between nut (23) and axis of rotation (22).
CN201921261765.5U 2019-08-06 2019-08-06 Mapping device for on-site construction cost budget of construction cost Expired - Fee Related CN210241036U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921261765.5U CN210241036U (en) 2019-08-06 2019-08-06 Mapping device for on-site construction cost budget of construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921261765.5U CN210241036U (en) 2019-08-06 2019-08-06 Mapping device for on-site construction cost budget of construction cost

Publications (1)

Publication Number Publication Date
CN210241036U true CN210241036U (en) 2020-04-03

Family

ID=69964950

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921261765.5U Expired - Fee Related CN210241036U (en) 2019-08-06 2019-08-06 Mapping device for on-site construction cost budget of construction cost

Country Status (1)

Country Link
CN (1) CN210241036U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111578084A (en) * 2020-06-08 2020-08-25 兰金美 High-efficient intelligence environment detection device convenient to installation
CN111895232A (en) * 2020-07-09 2020-11-06 国网浙江省电力有限公司嘉兴供电公司 Video monitoring equipment for power transformation capital construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111578084A (en) * 2020-06-08 2020-08-25 兰金美 High-efficient intelligence environment detection device convenient to installation
CN111578084B (en) * 2020-06-08 2021-09-07 山东益源环保科技有限公司 High-efficient intelligence environment detection device convenient to installation
CN111895232A (en) * 2020-07-09 2020-11-06 国网浙江省电力有限公司嘉兴供电公司 Video monitoring equipment for power transformation capital construction

Similar Documents

Publication Publication Date Title
CN210241036U (en) Mapping device for on-site construction cost budget of construction cost
CN215722028U (en) Supplementary mapping device based on three-dimensional topography in city is used
CN211076367U (en) Survey and drawing unmanned aerial vehicle of conveniently adjusting probe
CN102896562A (en) Follow-up sharpening device for diamond grating notching knife tool
CN102937423B (en) A kind of survey round belting
CN110465843B (en) Ceiling polishing robot
CN209820470U (en) But height-adjusting's architectural surveying appearance
CN214618840U (en) Mapping device for municipal works
CN107780325B (en) Leveling instrument and milling machine with same
CN104677339A (en) Portable and multifunctional spirit level for measuring plane and vertical plane
CN217273163U (en) Supplementary mapping device of three-dimensional topography in city
CN214332100U (en) Engineering cost mapping device
CN214331983U (en) Surveying instrument support with connect stable structure
CN210375034U (en) Building engineering quality flatness detection device
CN210486903U (en) Vertical measuring device for building construction
CN206787795U (en) Optical mirror slip detects support frame
CN106012785A (en) Intelligent road construction device
CN218819108U (en) Pipe network non-excavation restoration multi-range detection device
CN211519265U (en) Pantograph for subway rail vehicle
CN215929101U (en) Leveling connector
CN115164838B (en) Wall perpendicularity detection device and detection method thereof
CN221593856U (en) Level gauge for engineering survey and drawing
CN204727567U (en) Feed screw nut's array configuration lifting mechanism floating structure frame used
CN217816036U (en) Environment monitoring device suitable for construction site
CN216717232U (en) Hydraulic ring geological crack measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200403