CN216475024U - Trestle steel pipe pile sinking construction guide frame - Google Patents

Trestle steel pipe pile sinking construction guide frame Download PDF

Info

Publication number
CN216475024U
CN216475024U CN202122639311.0U CN202122639311U CN216475024U CN 216475024 U CN216475024 U CN 216475024U CN 202122639311 U CN202122639311 U CN 202122639311U CN 216475024 U CN216475024 U CN 216475024U
Authority
CN
China
Prior art keywords
pipe pile
steel pipe
positioning frame
trestle
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122639311.0U
Other languages
Chinese (zh)
Inventor
王安文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202122639311.0U priority Critical patent/CN216475024U/en
Application granted granted Critical
Publication of CN216475024U publication Critical patent/CN216475024U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a trestle steel pipe pile sinking construction guide frame which comprises an upper positioning frame and a lower positioning frame which are arranged in parallel from top to bottom, wherein each positioning frame is provided with a plurality of square steel pipe pile positioning holes, and a guide wheel is arranged in the middle of 4 inner side edges of each steel pipe pile positioning hole; the upper positioning frame and the lower positioning frame are connected by a plurality of connecting rods in a welding way; and a plurality of vertical rods are welded on one side of the two positioning frames. The vertical rod is fixedly connected with the mounted Bailey beam on the trestle span through the pin shaft, the two layers of positioning holes are used for carrying out three-dimensional limiting on the steel pipe pile to be inserted and driven, and the inserting and driving precision is high; after the insertion driving of the one-span steel pipe pile is completed, the one-span steel pipe pile is moved forward to the next-span circular construction, and the erection speed of the trestle can be effectively increased.

Description

Trestle steel pipe pile sinking construction guide frame
Technical Field
The utility model belongs to the technical field of bridge construction, relates to trestle construction for assisting the construction of an underwater bridge, and particularly relates to a trestle steel pipe pile sinking construction guide frame.
Background
The trestle is a temporary structure commonly used in the construction of underwater bridges. The trestle usually adopts a steel pipe pile inserted and driven on a river bed as a lower support. When piling bridge steel-pipe pile is inserted on the riverbed that rivers are less and have thick overburden, generally need not to set up the leading truck, but great at rivers, perhaps when the overburden is thinner, the steel-pipe pile receives water impact or end opening atress uneven, inclines easily when inserting and beating, and the straightness is wayward that hangs down, need adjust repeatedly in the work progress, influences the construction progress.
Disclosure of Invention
The utility model aims to solve the problems and provides a trestle steel pipe pile sinking construction guide frame which can improve the inserting and driving precision and speed of the steel pipe pile.
The technical scheme of the utility model is as follows:
the utility model provides a landing stage steel-pipe pile sinking construction leading truck which characterized in that: the device comprises an upper positioning frame and a lower positioning frame which are arranged in parallel from top to bottom, wherein each positioning frame comprises a first longitudinal rod, a second longitudinal rod and a third longitudinal rod which are arranged in parallel, a plurality of transverse rods are welded among 3 longitudinal rods, the plurality of transverse rods are used for separating a plurality of square steel pipe pile positioning holes between the second longitudinal rod and the third longitudinal rod, the number and the interval of the plurality of steel pipe pile positioning holes are consistent with the number and the interval of each steel pipe pile span of a trestle, and a guide wheel is arranged in the middle of 4 inner side edges of each steel pipe pile positioning hole; a certain distance is reserved between the upper positioning frame and the lower positioning frame and the upper positioning frame and the lower positioning frame are connected through a plurality of connecting rods in a welding mode; the lower end of the vertical rod is welded with the first vertical rod of the lower positioning frame, and the upper end of the vertical rod extends to a certain height above the first vertical rod of the upper positioning frame.
The Bailey beam is connected and fixed with the mounted trestle bridge by the pin shaft, so that the mounting is simple and convenient; the steel pipe pile to be inserted and driven is limited in a three-dimensional mode through the two layers of positioning holes, and the inserting and driving precision is high; after the insertion of the one-span steel pipe pile is finished, the one-span steel pipe pile can be moved forward to the next-span circular construction, and the erection speed of the trestle can be effectively increased.
Drawings
FIG. 1 is a schematic side view of the present invention;
FIG. 2 is a schematic plan view of the present invention;
FIG. 3 is a side view of the present invention in use;
fig. 4 is a plan view of the state of use of the present invention.
Detailed Description
As shown in fig. 1 and 2, the utility model comprises an upper positioning frame 1 and a lower positioning frame 2 which are arranged in parallel up and down, each positioning frame comprises a first longitudinal rod 3, a second longitudinal rod 4 and a third longitudinal rod 5 which are arranged in parallel, a plurality of cross rods 6 are welded among the 3 longitudinal rods, the plurality of cross rods 6 divide a plurality of square steel pipe pile positioning holes 7 between the second longitudinal rod 4 and the third longitudinal rod 5, the number and the interval of the plurality of steel pipe pile positioning holes are consistent with the number and the interval of each steel pipe pile span of a trestle, and a guide wheel 8 is arranged in the middle of 4 inner side edges of each steel pipe pile positioning hole; a certain distance is reserved between the upper positioning frame and the lower positioning frame and the upper positioning frame and the lower positioning frame are connected through a plurality of connecting rods 9 in a welding mode; a plurality of vertical rods 10 vertical to the two positioning frames are welded on the first longitudinal rods 3 of the two positioning frames, the lower ends of the vertical rods 10 are welded with the first longitudinal rods of the lower positioning frame 2, and the upper ends of the vertical rods extend to a certain height above the first longitudinal rods of the upper positioning frame 1.
In the specific implementation of the utility model, the upright rod 10 can be made of channel steel, every two channel steels are in a group, the webs of the two channel steels are opposite in a back-to-back manner and keep a certain distance, two pairs of pin holes are preset between the webs of the two channel steels, and the distance between the two pairs of pin holes is consistent with the distance between the upper chord rod and the lower chord rod of the bailey piece erected on the trestle.
In the specific implementation of the utility model, in order to enhance the connection strength between the positioning frame and the upright rods, a diagonal draw bar 11 can be welded between the upper end of each upright rod and the third longitudinal rod of the upper positioning frame.
As shown in fig. 3 and 4, the trestle adopts the steel pipe piles 12 as a lower supporting structure, one I-steel 13 is erected on each span of the steel pipe piles in the transverse direction as a transverse bearing beam, and a plurality of Bailey pieces 14 are erected on the transverse bearing beam in the bridge direction as a longitudinal bearing beam.
The trestle first-span steel pipe pile is inserted and driven by adopting a common construction method, after the Bailey pieces 14 are erected on the trestle first-span steel pipe pile, each upright 10 of the trestle is connected with the front end of each Bailey piece 14 through a pin shaft, the front ends of the upper chord and the lower chord of the Bailey piece are respectively inserted into the gap of two channel steels during connection, a pin shaft is inserted into the pin holes of the two channel steels and the Bailey piece chord, then the steel pipe pile 12 of the next span is respectively inserted into each steel pipe pile positioning hole 7, each guide wheel 8 in the positioning hole is adjusted to tightly prop against the outer wall of the steel pipe pile, and then the steel pipe pile is inserted and driven. The positioning holes of the upper and lower positioning frames are used for three-dimensional limiting of the steel pipe pile, and the perpendicularity of the steel pipe pile can be guaranteed.
After the insertion driving of the one-span steel pipe pile is completed, the pin shaft connection between the vertical rod and the previous-span Bailey sheet is removed, then the Bailey sheet is erected on the inserted and driven steel pipe pile, the vertical rod of the utility model is connected with the front end of the present-span Bailey sheet through the pin shaft, the insertion driving of the next-span steel pipe pile is carried out, and the circular construction is carried out.

Claims (3)

1. The utility model provides a landing stage steel-pipe pile sinking construction leading truck which characterized in that: the device comprises an upper positioning frame and a lower positioning frame which are arranged in parallel from top to bottom, wherein each positioning frame comprises a first longitudinal rod, a second longitudinal rod and a third longitudinal rod which are arranged in parallel, a plurality of transverse rods are welded among 3 longitudinal rods, the plurality of transverse rods are used for separating a plurality of square steel pipe pile positioning holes between the second longitudinal rod and the third longitudinal rod, the number and the interval of the plurality of steel pipe pile positioning holes are consistent with the number and the interval of each steel pipe pile span of a trestle, and a guide wheel is arranged in the middle of 4 inner side edges of each steel pipe pile positioning hole; a certain distance is reserved between the upper positioning frame and the lower positioning frame and the upper positioning frame and the lower positioning frame are connected through a plurality of connecting rods in a welding mode; the lower end of the vertical rod is welded with the first vertical rod of the lower positioning frame, and the upper end of the vertical rod extends to a certain height above the first vertical rod of the upper positioning frame.
2. The trestle steel pipe pile sinking construction guide frame of claim 1, which is characterized in that: the vertical rods are made of channel steel, every two channel steel are in one group, and the web plates of each group of channel steel are opposite in a back-to-back mode and keep a certain distance.
3. The trestle steel pipe pile sinking construction guide frame of claim 1, which is characterized in that: an inclined pull rod is welded between the upper end of each vertical rod and the third longitudinal rod of the upper positioning frame.
CN202122639311.0U 2021-10-31 2021-10-31 Trestle steel pipe pile sinking construction guide frame Active CN216475024U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122639311.0U CN216475024U (en) 2021-10-31 2021-10-31 Trestle steel pipe pile sinking construction guide frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122639311.0U CN216475024U (en) 2021-10-31 2021-10-31 Trestle steel pipe pile sinking construction guide frame

Publications (1)

Publication Number Publication Date
CN216475024U true CN216475024U (en) 2022-05-10

Family

ID=81444114

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122639311.0U Active CN216475024U (en) 2021-10-31 2021-10-31 Trestle steel pipe pile sinking construction guide frame

Country Status (1)

Country Link
CN (1) CN216475024U (en)

Similar Documents

Publication Publication Date Title
CN108179735B (en) Pebble layer large-scale deep water foundation construction platform and pebble layer large-scale deep water foundation construction method
CN110344412B (en) Positioning device and method for bridge pile foundation steel casing in deep water rapid flow area
CN113403965A (en) Positioning guide frame for steel trestle steel pipe pile construction and construction method
CN215715233U (en) Set up steel-pipe pile landing stage of concrete anchor pile
CN102777050B (en) Assembly type jig frame for longspan pipe truss roof girder
CN216475024U (en) Trestle steel pipe pile sinking construction guide frame
CN114016520A (en) Adjustable steel sheet pile supporting structure
CN114482691A (en) Assembled airport enclosure foundation template and using method thereof
CN206418464U (en) A kind of Bailey bracket support system
CN113216227A (en) Construction method of steel cofferdam in complex turbulent water area
CN107013046A (en) A kind of antidote of heavy in section concrete filled steel tube coupled column
CN213507989U (en) Deepwater steel trestle capable of being constructed quickly
CN205999898U (en) Internal support of foundation pit pile for prestressed pipe vertical supporting structure
CN213538683U (en) Flow blocking structure of river-crossing gantry crane foundation pile
CN115976955A (en) Method for synchronously constructing distribution beam and steel pipe pile of trestle in shallow water area
CN209873759U (en) Portable pile foundation construction platform
CN210368577U (en) Trestle for foundation pit
CN210140833U (en) A single collateral branch mode structure of bailey piece for bridge and culvert engineering
CN217193202U (en) Portal formula welded platform device that can walk and go up and down
CN220099903U (en) Steel protects a pile sinking three-dimensional direction stop device
CN202031107U (en) Piling machine for water surface wooden piles
CN112554038A (en) Bare rock riverbed steel trestle and construction method thereof
CN110924312A (en) Construction method of steel trestle
CN214272033U (en) Steel-pipe pile construction platform and positioner on water
CN210134451U (en) Steel-pipe pile basis of aquatic tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant