CN214272033U - Steel-pipe pile construction platform and positioner on water - Google Patents

Steel-pipe pile construction platform and positioner on water Download PDF

Info

Publication number
CN214272033U
CN214272033U CN202023268136.0U CN202023268136U CN214272033U CN 214272033 U CN214272033 U CN 214272033U CN 202023268136 U CN202023268136 U CN 202023268136U CN 214272033 U CN214272033 U CN 214272033U
Authority
CN
China
Prior art keywords
frame
positioning
positioning frame
lower positioning
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023268136.0U
Other languages
Chinese (zh)
Inventor
王巨腾
欧阳禄龙
苏井高
王梽名
肖志诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Civil Engineering Co Ltd
Original Assignee
China Construction Civil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Civil Engineering Co Ltd filed Critical China Construction Civil Engineering Co Ltd
Priority to CN202023268136.0U priority Critical patent/CN214272033U/en
Application granted granted Critical
Publication of CN214272033U publication Critical patent/CN214272033U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

A construction platform and a positioning device for an overwater steel pipe pile comprise a lower positioning frame, a ladder stand and an upper positioning frame; the horizontal section of the lower positioning frame is rectangular and comprises a front side frame, a rear side frame and a connecting rod; the bottoms of the front side and the rear side of the lower positioning frame are provided with horizontal operation platform frames, and the top of the lower positioning frame is provided with hanging rings at intervals; the crawling ladder is arranged at one end of the top of the lower positioning frame, and bolt fixing pieces are arranged on two sides of the crawling ladder at intervals along the vertical direction; an inclined strut is connected between the crawling ladder and the lower positioning frame; the upper positioning frame is connected to the upper part of the ladder stand and is positioned above the lower positioning frame; the upper positioning frame comprises a transverse positioning rod and a longitudinal positioning rod; two transverse positioning rods are respectively connected to the vertical side edges of the two sides of the ladder stand; the longitudinal positioning rods are arranged in a group and are arranged between the two transverse positioning rods at intervals in a transverse parallel mode, and the longitudinal positioning rods are connected with the transverse positioning rods in a sliding mode. The utility model provides a traditional construction method location difficulty, influence the technical problem of construction quality and efficiency.

Description

Steel-pipe pile construction platform and positioner on water
Technical Field
The utility model belongs to the technical field of the building engineering construction, especially a steel-pipe pile construction platform and positioner on water.
Background
In the construction of the steel temporary bridge, the steel pipe column is often required to be driven by a vibration hammer so as to be inserted into the ground. In order to prevent the steel pipe column from being deviated during driving, it is necessary to ensure that the steel pipe column is accurately and vertically positioned at the start of driving. At present, the operation is mostly carried out through equipment such as a crane and manual naked eyes, the time and the labor are consumed, and the positioning effect is poor. Especially, when the construction is carried out on water, the positioning is more difficult and the construction quality and efficiency are influenced due to the fact that the underwater situation is complex and the direct observation is not easy.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel-pipe pile construction platform and positioner on water will solve traditional construction mode location difficulty, influences the technical problem of construction quality and efficiency.
In order to achieve the above purpose, the utility model adopts the following technical scheme.
A construction platform and a positioning device for an overwater steel pipe pile comprise a lower positioning frame, a ladder stand and an upper positioning frame; the horizontal section of the lower positioning frame is rectangular and comprises a front side frame, a rear side frame and a connecting rod connected between the two ends of the front side frame and the rear side frame; horizontal operation platform frames are arranged at the bottoms of the front side and the rear side of the lower positioning frame at intervals, and hanging rings are arranged at the top of the lower positioning frame at intervals; the crawling ladder is arranged at one end of the top of the lower positioning frame, and bolt fixing pieces are arranged on two sides of the crawling ladder at intervals along the vertical direction; an inclined strut is connected between the crawling ladder and the lower positioning frame; the upper positioning frame is connected to the upper part of the ladder stand and is positioned above the lower positioning frame; the upper positioning frame comprises a transverse positioning rod and a longitudinal positioning rod; the two transverse positioning rods are respectively connected to the vertical side edges of the two sides of the crawling ladder; the longitudinal positioning rods are arranged in a group and are arranged between the two transverse positioning rods at intervals in a transverse parallel mode, and the longitudinal positioning rods are connected with the transverse positioning rods in a sliding mode.
Preferably, the front end and the rear end of the longitudinal positioning rod are respectively connected with a sleeve; the sleeve is correspondingly sleeved on the transverse positioning rod.
Preferably, the operation platform frame is welded and connected to the bottom edges of the front side and the rear side of the lower positioning frame, the length of the operation platform frame is not less than 800mm, and the width of the operation platform frame is not less than 500 mm; and a platform plate is paved on the operation platform frame.
Preferably, the length of the lower positioning frame is 6-8 m; the width of the lower positioning frame is 0.8-1.2 m; the height of the lower positioning frame is 1.5 m-2.5 m.
Preferably, the length of the upper positioning frame is adapted to the length of the lower positioning frame, and the length of the upper positioning frame is adapted to the width of the lower positioning frame.
Compared with the prior art, the utility model has the following characteristics and beneficial effect.
1. The utility model aims at providing a construction platform and a positioning device for an overwater steel pipe pile aiming at the problems encountered in the construction process of driving the steel pipe pile by a vibration hammer, which is provided with a bolt fixing piece and has the advantage of simple installation and disassembly; additionally, the utility model discloses a locating frame fixes a position with last locating frame down, can ensure the degree of accuracy and the straightness that hangs down of steel-pipe column location, creates the advantage for improving construction quality and efficiency.
2. The utility model discloses a steel-pipe pile construction platform and positioner on water can be through using bolted connection after the location, and the loose bolt is demolishd after the construction is accomplished, and positioner ann tears the process open comparatively nimble, has the characteristics of accelerating construction progress and safe and reliable, satisfies the requirement of site operation.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a schematic side structure view of the above-water steel pipe pile construction platform and positioning device of the present invention.
Fig. 2 is a schematic structural view of the upper positioning frame of the present invention.
Fig. 3 is a schematic plan view of the above-water steel pipe pile construction platform and the positioning device of the present invention.
Fig. 4 is a schematic structural view of the above-water steel pipe pile positioning device of the present invention.
Reference numerals: 1-lower positioning frame, 1.1-front side frame, 1.2-rear side frame, 1.3-connecting rod, 2-ladder stand, 3-upper positioning frame, 3.1-transverse positioning rod, 3.2-longitudinal positioning rod, 4-operation platform frame, 5-lifting ring, 6-bolt fixing piece, 7-diagonal brace, 8-sleeve, 9-platform plate, 10-water steel pipe pile, 10.1-steel pipe column and 10.2-connecting frame body.
Detailed Description
As shown in fig. 1-4, the overwater steel pipe pile construction platform and positioning device comprises a lower positioning frame 1, a ladder stand 2 and an upper positioning frame 3; the horizontal section of the lower positioning frame 1 is rectangular and comprises a front side frame 1.1, a rear side frame 1.2 and a connecting rod 1.3 connected between the two ends of the front side frame 1.1 and the rear side frame 1.2; horizontal operation platform frames 4 are arranged at the bottoms of the front side and the rear side of the lower positioning frame 1 at intervals, and hanging rings 5 are arranged at the top of the lower positioning frame 1 at intervals; the ladder stand 2 is arranged at one end of the top of the lower positioning frame 1, and bolt fixing pieces 6 are arranged on two sides of the ladder stand 2 at intervals along the vertical direction; an inclined strut 7 is connected between the crawling ladder 2 and the lower positioning frame 1; the upper positioning frame 3 is connected to the upper part of the ladder stand 2 and is positioned above the lower positioning frame 1; the upper positioning frame 3 comprises a transverse positioning rod 3.1 and a longitudinal positioning rod 3.2; two transverse positioning rods 3.1 are respectively connected to the vertical side edges on the two sides of the ladder stand 2; the longitudinal positioning rods 3.2 are provided with a group and are arranged between the two transverse positioning rods 3.1 at intervals along the transverse direction in parallel, and the longitudinal positioning rods 3.2 are connected with the transverse positioning rods 3.1 in a sliding mode.
In this embodiment, the front end and the rear end of the longitudinal positioning rod 3.2 are respectively connected with a sleeve 8; the sleeve 8 is correspondingly sleeved on the transverse positioning rod 3.1.
In this embodiment, the work platform frame 4 is welded and connected to the bottom edges of the front and rear sides of the lower positioning frame 1, the length of the work platform frame 4 is not less than 800mm, and the width of the work platform frame 4 is not less than 500 mm; and a platform plate 9 is paved on the working platform frame 4.
In the embodiment, the length of the lower positioning frame 1 is 6-8 m; the width of the lower positioning frame 1 is 0.8-1.2 m; the height of the lower positioning frame 1 is 1.5 m-2.5 m.
In this embodiment, the length of the upper positioning frame 3 is adapted to the length of the lower positioning frame 1, and the length of the upper positioning frame 3 is adapted to the width of the lower positioning frame 1.
In the embodiment, the distance between the longitudinal positioning rods 3.2 is adapted to the size of the overwater steel pipe pile 10 to be constructed; the overwater steel pipe pile 10 comprises a steel pipe column 10.1 and a connecting frame body 10.2; the connecting frame body 10.2 is connected between the adjacent steel pipe columns 10.1; the distance between the longitudinal positioning rods 3.2 is adapted to the length of the overwater steel pipe pile 10.
When the utility model is used, the movable frame is erected, and the structure of the frame body is selected to be erected according to the conditions of site construction; the method comprises the following steps: inspecting the field situation → blanking according to the width of the steel temporary bridge and the diameter of the steel pipe column 10.1 → manufacturing the construction platform and the positioning device → installing and using the construction platform and the positioning device → completing, dismantling and moving to the next construction area of the steel pipe column 10.1; the use can move longitudinal positioning pole 3.2 control support body, carries out accurate counterpoint to steel-pipe pile 10 on water.
The above embodiments are not exhaustive of the specific embodiments, and other embodiments are possible, and the above embodiments are intended to illustrate, but not limit the scope of the present invention, and all applications coming from the simple changes of the present invention fall within the scope of the present invention.

Claims (5)

1. The utility model provides a steel-pipe pile construction platform and positioner on water which characterized in that: comprises a lower positioning frame (1), a ladder stand (2) and an upper positioning frame (3); the horizontal section of the lower positioning frame (1) is rectangular and comprises a front side frame (1.1), a rear side frame (1.2) and a connecting rod (1.3) connected between the two ends of the front side frame (1.1) and the rear side frame (1.2); horizontal operation platform frames (4) are arranged at the bottoms of the front side and the rear side of the lower positioning frame (1) at intervals, and lifting rings (5) are arranged at the top of the lower positioning frame (1) at intervals; the ladder stand (2) is arranged at one end of the top of the lower positioning frame (1), and bolt fixing pieces (6) are arranged on two sides of the ladder stand (2) at intervals along the vertical direction; an inclined strut (7) is connected between the ladder stand (2) and the lower positioning frame (1); the upper positioning frame (3) is connected to the upper part of the ladder stand (2) and is positioned above the lower positioning frame (1); the upper positioning frame (3) comprises a transverse positioning rod (3.1) and a longitudinal positioning rod (3.2); two transverse positioning rods (3.1) are respectively connected to the vertical side edges on the two sides of the ladder stand (2); the longitudinal positioning rods (3.2) are provided with one group and are arranged between the two transverse positioning rods (3.1) at intervals along the transverse direction in parallel, and the longitudinal positioning rods (3.2) are connected with the transverse positioning rods (3.1) in a sliding mode.
2. The overwater steel pipe pile construction platform and positioning device according to claim 1, wherein: the front end and the rear end of the longitudinal positioning rod (3.2) are respectively connected with a sleeve (8); the sleeve (8) is correspondingly sleeved on the transverse positioning rod (3.1).
3. The overwater steel pipe pile construction platform and positioning device according to claim 1, wherein: the operation platform frame (4) is welded and connected to the bottom edges of the front side and the rear side of the lower positioning frame (1), the length of the operation platform frame (4) is not less than 800mm, and the width of the operation platform frame (4) is not less than 500 mm; and a platform plate (9) is paved on the operation platform frame (4).
4. The overwater steel pipe pile construction platform and positioning device according to claim 1, wherein: the length of the lower positioning frame (1) is 6-8 m; the width of the lower positioning frame (1) is 0.8-1.2 m; the height of the lower positioning frame (1) is 1.5 m-2.5 m.
5. The overwater steel pipe pile construction platform and positioning device according to claim 1, wherein: the length of the upper positioning frame (3) is adapted to the length of the lower positioning frame (1), and the length of the upper positioning frame (3) is adapted to the width of the lower positioning frame (1).
CN202023268136.0U 2020-12-30 2020-12-30 Steel-pipe pile construction platform and positioner on water Active CN214272033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023268136.0U CN214272033U (en) 2020-12-30 2020-12-30 Steel-pipe pile construction platform and positioner on water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023268136.0U CN214272033U (en) 2020-12-30 2020-12-30 Steel-pipe pile construction platform and positioner on water

Publications (1)

Publication Number Publication Date
CN214272033U true CN214272033U (en) 2021-09-24

Family

ID=77785472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023268136.0U Active CN214272033U (en) 2020-12-30 2020-12-30 Steel-pipe pile construction platform and positioner on water

Country Status (1)

Country Link
CN (1) CN214272033U (en)

Similar Documents

Publication Publication Date Title
CN210766774U (en) Positioning device for steel reinforcement cage and lattice column
CN210976662U (en) Steel-pipe column transfers device that hangs down
CN106436718B (en) A kind of subway foundation pit large span support system and its construction method
CN113403965A (en) Positioning guide frame for steel trestle steel pipe pile construction and construction method
CN110106881A (en) A kind of steel-pipe pile construction guidance locating rack and construction method
CN113148893A (en) Hydraulic jacking load-bearing support and mounting method thereof
CN214272033U (en) Steel-pipe pile construction platform and positioner on water
CN214055807U (en) Push-pull type hollow slab reinforcement jig frame capable of being accurately positioned
CN211646406U (en) Steel pipe column inserts accurate positioning structure
CN215160567U (en) Hydraulic jacking bearing support
CN109826173A (en) A kind of pile base construction method using stake top mobile platform
CN210238492U (en) Crown beam type miniature pile construction formwork capable of being circulated
CN210684665U (en) Device for ensuring vertical hoisting of underground continuous wall reinforcement cage
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN114411699A (en) Auxiliary device for steel pipe pile construction and construction method
CN212958643U (en) Simple tunnel working platform capable of lifting and laterally extending
CN216475024U (en) Trestle steel pipe pile sinking construction guide frame
CN219772968U (en) Cantilever guiding and positioning frame for trestle steel pipe pile
CN204591280U (en) A kind of mobile platform structure for pipe curtain jacking construction
CN217193202U (en) Portal formula welded platform device that can walk and go up and down
CN217538597U (en) Drilling auxiliary device used with scaffold
CN211446945U (en) Steel constructs straightness auxiliary control device that hangs down of post
CN215105196U (en) Simple and easy platform of marine movable rig construction
CN216807770U (en) Installation tool for well beam of launching chute
CN221052585U (en) Installation system of full sand layer geological oversized-diameter composite pile steel pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant