CN109826173A - A kind of pile base construction method using stake top mobile platform - Google Patents

A kind of pile base construction method using stake top mobile platform Download PDF

Info

Publication number
CN109826173A
CN109826173A CN201910063334.6A CN201910063334A CN109826173A CN 109826173 A CN109826173 A CN 109826173A CN 201910063334 A CN201910063334 A CN 201910063334A CN 109826173 A CN109826173 A CN 109826173A
Authority
CN
China
Prior art keywords
pile
carrying platform
auxiliary
construction
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910063334.6A
Other languages
Chinese (zh)
Inventor
薛志武
阮明华
汪文霞
李拔周
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Original Assignee
CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd filed Critical CCCC Wuhan Harbour Engineering Design and Research Institute Co Ltd
Priority to CN201910063334.6A priority Critical patent/CN109826173A/en
Publication of CN109826173A publication Critical patent/CN109826173A/en
Pending legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention relates to Pile Installation Platform technical field of structures, in particular to a kind of pile base construction method using stake top mobile platform.More auxiliary piles of inserting piling near pile foundation construction point, carrying platform is built in auxiliary stake top, pile foundation construction is carried out using carrying platform, it entertains after the completion of the pile foundation construction of carrying platform present position, pushing tow carrying platform exposes the part auxiliary pile in carrying platform rear along pile foundation construction direction a distance of advancing, this part auxiliary pile is extracted to the front progress inserting piling construction for being transported to carrying platform based on carrying platform, alternately until carrying platform is moved to next construction location, then the pile foundation construction of the construction location is carried out, it successively carries out until completing all pile foundation constructions.Carrying platform is supported on auxiliary pile by the present invention, and carrying platform front end carries out the construction of auxiliary pile inserting piling, and rear end carries out auxiliary pile and extracts construction, and auxiliary pile is recycled, considerably reduces coming into operation for auxiliary pile, save material.

Description

A kind of pile base construction method using stake top mobile platform
Technical field
The present invention relates to pile base construction method technical fields, apply in particular to a kind of pile foundation using stake top mobile platform Work method.
Background technique
Yellow Sea Bridge two bridge in PORT OF NANTONG Yangkou Harbor is adjacent with one bridge of Yellow Sea Bridge, connects the port Yang Kou facing-port industry Qu Yuyang Mouth port sunlight island.Two bridge overall length 10035m, the pile foundation of bridge are drill-pouring pilework, full-bridge cast-in-situ bored pile totally 810. Traditional Bridge Pile Foundation Construction is first to set up trestle, then sets up drilling platform in pier location and is connected with trestle, then is being drilled It constructs on platform pile foundation.Since pile foundation quantity is big, cause the interim steel construction dosage for setting up drilling platform very big, the later period removes The project amount of platform is also big, considerably increases construction cost and the construction period of pile foundation.
There is the China of entitled " a kind of mobile piling platform of stake top support walking " of Patent No. " CN105421454B " Patent of invention, the patent describe a kind of piling mobile platform, the steel-pipe pile which is completed using inserting piling is as carrying Basis carries out pile foundation construction, and this operation platform does not need substantially to carry out auxiliary pile, can save a large amount of steel and construction Time.But this structure can in practice be only used for the construction site for being capable of forming multiple rows of piling strtucture, the i.e. steel pipe of inserting piling completion Stake can support operation platform, and otherwise operation platform cannot be installed, therefore be directed to piling strtucture and cannot form operation platform The occasion on basis is carried, this operation platform can not be competent at.
Summary of the invention
The purpose of the present invention is to solve the deficiency of the above background technology, provides a kind of using stake top mobile platform Pile base construction method.
The technical solution of the present invention is as follows: a kind of pile base construction method using stake top mobile platform, it is characterised in that: More auxiliary piles of inserting piling form the pile group of support bearing platform near pile foundation construction point, build carrying platform in auxiliary stake top, Using carrying platform progress pile foundation construction, after the completion of the pile foundation construction of carrying platform present position of entertaining, pushing tow carrying platform is along stake Base construction direction a distance of advancing exposes the part auxiliary pile in carrying platform rear, based on carrying platform by this portion Auxiliary pile is divided to extract the front progress inserting piling construction for being transported to carrying platform, alternately until carrying platform is moved to next apply Station is set, and the pile foundation construction of the construction location is then carried out, and is successively carried out until completing all pile foundation constructions.
Further near pile foundation construction point more auxiliary piles of inserting piling method are as follows: along pile foundation construction direction, inserting piling is multiple rows of Spaced apart auxiliary row of piles, it includes the auxiliary pile of at least two pile foundation construction point both lateral sides that are placed in that every row, which assists row of piles,.
The method for further building carrying platform in auxiliary stake top are as follows: build more in auxiliary stake top and applied along pile foundation The stringer of work direction arrangement, installs crossbeam between adjacent stringer, panel-shaped is laid on crossbeam and stringer into carrying platform, Steel pile casting leading truck and auxiliary pile leading truck are installed on carrying platform.
The method of stringer is further built on auxiliary pile are as follows: distribution beam is being built in the auxiliary stake top with row, The vertically support of support stringer is installed in distribution beam and can vertically jack the mobile jacking cylinder of stringer, stringer is shelved on On the slide plate of support upper end.
The method that further pushing tow carrying platform advances along pile foundation construction direction are as follows: by what is arranged along pile foundation construction direction Pipe bending cylinder one end is fixed, and the other end is connect with the guide rail of stringer lower end on the support, drives stringer in cunning by pipe bending cylinder It is moved on plate along pile foundation construction direction.
The method that further pipe bending cylinder is connect with guide rail are as follows: install connection far from one end of support in pipe bending cylinder Seat, is connect by the bolt being arranged on attachment base with the guide rail for offering multiple through-holes, the position of regulating pin and corresponding through-hole Set the relative positional relationship for changing pipe bending cylinder and stringer.
The method for further being extracted auxiliary pile based on carrying platform are as follows: the auxiliary pile that will be exposed based on carrying platform Distribution beam, support, jacking cylinder and pipe bending cylinder at stake top remove, then by the equipment on carrying platform by this part Auxiliary pile is extracted.
Carrying platform is supported on auxiliary pile by the present invention, carrying platform front end carry out the construction of auxiliary pile inserting piling, rear end into Row auxiliary pile extracts construction, and auxiliary pile is recycled, considerably reduces coming into operation for auxiliary pile, save material.
It is fast on auxiliary pile to be easily carried platform by the way that thrustor is arranged between auxiliary pile and carrying platform by the present invention Speed is advanced, and is reduced the difficulty of entire pile foundation construction, is improved the efficiency of pile foundation construction.
Detailed description of the invention
Fig. 1: main view of the invention;
Fig. 2: carrying platform moving structure schematic diagram of the invention;
Fig. 3: steel pile casting leading truck and auxiliary pile leading truck arragement construction schematic diagram of the invention;
Fig. 4: the arragement construction schematic diagram of pipe bending cylinder of the invention;
Fig. 5: guide rail and attachment base attachment structure schematic diagram of the invention;
Wherein: 1-auxiliary pile;2-steel pile castings;3-auxiliary pile leading trucks;4-steel pile casting leading trucks;5-supports;6— Pipe bending cylinder;7-guide rails;8-side plates;9-attachment bases;10-bolts;11-hooks;12-limit plates;13-slide plates;14— Jacking cylinder;15-distribution beams;16-stringers;17-crossbeams;18-panels.
Specific embodiment
The following further describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
Such as Fig. 1~5, a kind of pile base construction method using stake top mobile platform, the construction carrying platform of the present embodiment The mobile platform being supported on auxiliary pile 1, as shown in Fig. 1~2, the present embodiment the lower section inserting piling of carrying platform have more it is auxiliary Help stake 1, auxiliary pile 1 is placed in, and (the present embodiment is with steel for the both lateral sides of pile foundation construction point (pile foundation of the present embodiment is steel pile casting 2) Casing construction direction is longitudinal direction, and vertical longitudinal direction is that laterally, steel pile casting axial direction is vertical direction, as schemed in horizontal plane Shown in 1, the up and down direction in Fig. 1 is longitudinal direction, and the direction of vertical drawing is that laterally, the left and right directions of Fig. 1 is vertical direction).It holds It is provided with below carrying platform multiple rows of along the spaced auxiliary row of piles in pile foundation construction direction, it includes at least two that every row, which assists row of piles, The auxiliary pile 1 of the steel pile casting 2 that is placed in construction station two sides, 1 stake top of auxiliary pile in same row are equipped with distribution beam 15, and carrying is flat Platform is slidably connected in distribution beam 15.
The auxiliary pile 1 of the present embodiment follows carrying platform mobile, i.e., is provided on carrying platform for plugging auxiliary The inserting piling device of stake 1 is transported to the inserting piling longitudinally forward of carrying platform by extracting the auxiliary pile 1 at carrying platform longitudinal direction rear It fixes, the continuous advance of carrying platform support auxiliary pile 1 can be completed.Therefore, the present embodiment actually only need several it is auxiliary Help stake 1 that can complete the inserting piling construction of all steel pile castings 2.
As shown in Figures 1 to 3, carrying platform is the operation platform for carrying out auxiliary pile 1 plug and 2 inserting piling of steel pile casting.Carrying is flat Platform includes stringer 16, the crossbeam 17 between adjacent stringer 16 and the panel 18 being fixed on stringer 16 and crossbeam 17, is applied Construction equipment is placed on panel 18.As shown in figure 3, being equipped with the steel for being oriented to 2 inserting piling of steel pile casting in the middle part of stringer 16 Casing leading truck 3, the longitudinal front end of stringer 16 are provided with the auxiliary pile leading truck 3 for being oriented to the construction of 1 inserting piling of auxiliary pile.
The carrying platform of the present embodiment can be movably attached in 1 stake top of auxiliary pile along pile foundation construction direction, auxiliary pile 1 with hold The thrustor that driving carrying platform is moved along pile foundation construction direction is provided between carrying platform.As shown in Fig. 1~2, in same Distribution beam 15 along horizontal cross arrangement is installed on the pile cover of the auxiliary pile 1 of row, is provided with support 5 and pushing tow in distribution beam 15 Oil cylinder 6,5 upper end of support are equipped with slide plate 13, and 5 upper end of support is installed restricted support 4 and generated with carrying platform except pile foundation construction The limit plate 12 of relative displacement other than direction, limit plate 12 are located at carrying platform when carrying platform is supported in 5 upper end of support Side.
The carrying platform of the present embodiment is slidably connected to slide plate 13, and 6 one end of pipe bending cylinder is fixed on support 5, the other end It is removably attached on carrying platform along pile foundation construction direction.As shown in Figures 4 and 5,16 lower end of stringer is provided with guide rail 7, leads It is offered on rail 7 multiple along the spaced apart through-hole in pile foundation construction direction, one end setting connection of the pipe bending cylinder 6 far from support 5 Seat 9, attachment base 9 is removably attachable to guide rail 7 by the bolt 10 being arranged in attachment base 9 and through-hole.
7 lower end of guide rail is provided with horizontally extending side plate 8, is provided on attachment base 9 and is vertically hooked on side plate On hook 11, hook 11 is hooked on side plate 8 to limit and generate in addition to pile foundation construction direction between attachment base 9 and guide rail 7 Relative displacement.
In addition, the present embodiment is provided between carrying platform and auxiliary pile 1 adjusts the vertical of carrying platform vertical height Regulating device.Vertical adjustment device includes jacking cylinder 14, and 14 lower end of jacking cylinder is fixed in distribution beam 15, and upper end is supported in The stringer 16 of carrying platform, jacking cylinder 14 are used to carry out vertical displacement adjustment and leveling to carrying platform.
When practice of construction, follow the steps below:
1, after the completion of 1 inserting piling of auxiliary pile, in stake top installation pile cover, support 5 and the jacking cylinder 14 of auxiliary pile 1, lifting point With the installation of carrying platform on beam 15, stringer 16, crossbeam 17 and panel 18 to pile cover, is completed, transhipment construction equipment is flat to carrying On platform;
2, it is constructed by the inserting piling that the steel pile casting leading truck 4 on carrying platform carries out steel pile casting 2, position locating for carrying platform of entertaining After the completion of setting 2 inserting piling of steel pile casting at place, be longitudinally advanced by 6 pushing tow carrying platform of pipe bending cylinder, by conversion bolt 10 with Corresponding through-hole, driving carrying platform along longitudinal direction advance by step-by-step movement;
3, carrying platform of entertaining move longitudinally in carrying platform longitudinally aft end auxiliary pile 1 expose after, by holding Support 5, pipe bending cylinder 6, jacking cylinder 14, pile cover on the auxiliary pile 1 exposed is removed to be transported to carry and be put down by carrying platform The front end of platform extracts equipment by the auxiliary pile on carrying platform and pulls out the auxiliary pile 1 exposed, is transported to carrying platform Front end, inserting piling construction, support 5, the pushing tow that then will be disassembled are carried out by the auxiliary pile leading truck 3 of carrying platform front end Oil cylinder 6, jacking cylinder 14, pile cover are again mounted on the auxiliary pile 1 of inserting piling completion, are successively carried out according to above-mentioned steps, until Carrying platform is moved to next construction location;
4, it is successively carried out according to above-mentioned steps, until all 2 inserting pilings of steel pile casting are completed.
Seen from the above description, the auxiliary pile 1 of the present embodiment is recycling, can by ceaselessly plugging construction The continuous movement of carrying platform is only realized by several auxiliary piles.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, various changes and improvements may be made to the invention without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (7)

1. a kind of pile base construction method using stake top mobile platform, it is characterised in that: inserting piling is more near pile foundation construction point Root auxiliary pile (1) formed support bearing platform pile group, in auxiliary pile (1), stake top builds carrying platform, using carrying platform into Row pile foundation construction, after the completion of the pile foundation construction of carrying platform present position of entertaining, pushing tow carrying platform advances along pile foundation construction direction A distance exposes the part auxiliary pile (1) in carrying platform rear, is based on carrying platform for this part auxiliary pile (1) The front progress inserting piling construction for being transported to carrying platform is extracted, alternately until carrying platform is moved to next construction location, Then the pile foundation construction of the construction location is carried out, is successively carried out until completing all pile foundation constructions.
2. a kind of pile base construction method using stake top mobile platform as described in claim 1, it is characterised in that: in pile foundation The method of the neighbouring inserting piling more auxiliary piles (1) of construction point are as follows: along the multiple rows of spaced apart auxiliary row of piles of pile foundation construction direction inserting piling, It includes the auxiliary pile (1) of at least two pile foundation construction point both lateral sides that are placed in that every row, which assists row of piles,.
3. a kind of pile base construction method using stake top mobile platform as claimed in claim 2, it is characterised in that: assisting The method that stake (1) stake top builds carrying platform are as follows: build the more stringers along pile foundation construction direction arrangement in auxiliary pile (1) stake top (16), crossbeam (17) are installed between adjacent stringer (16), lay panel (18) formation is held on crossbeam (17) and stringer (16) Carrying platform installs steel pile casting leading truck (4) and auxiliary pile leading truck (3) on the carrying platform.
4. a kind of pile base construction method using stake top mobile platform as claimed in claim 3, it is characterised in that: assisting The method of stringer (16) is built in stake (1) are as follows: distribution beam (15) are being built in auxiliary pile (1) stake top with row, in distribution beam (15) support (5) of vertically support stringer (16) is installed on and can vertically jack stringer (16) mobile jacking cylinder (14), Stringer (16) is shelved on the slide plate (13) of support (5) upper end.
5. a kind of pile base construction method using stake top mobile platform as claimed in claim 4, it is characterised in that: pushing tow is held The method that carrying platform advances along pile foundation construction direction are as follows: be fixed on pipe bending cylinder (6) one end arranged along pile foundation construction direction On support (5), the other end is connect with the guide rail (7) of stringer (16) lower end, by pipe bending cylinder (6) driving stringer (16) in slide plate (13) it is moved on along pile foundation construction direction.
6. a kind of pile base construction method using stake top mobile platform as claimed in claim 5, it is characterised in that: pushing tow oil The method that cylinder (6) is connect with guide rail (7) are as follows: attachment base (9) are installed far from the one end of support (5) in pipe bending cylinder (6), by wearing Bolt (10) on attachment base (9) is connect with the guide rail (7) for offering multiple through-holes, regulating pin (10) and corresponding through-hole Position change pipe bending cylinder (6) and stringer (16) relative positional relationship.
7. a kind of pile base construction method using stake top mobile platform as claimed in claim 6, it is characterised in that: based on holding The method that carrying platform extracts auxiliary pile are as follows: based on carrying platform by the auxiliary pile exposed (1) stake top distribution beam (15), Support (5), jacking cylinder (14) and pipe bending cylinder (6) remove, and are then assisted this part by the equipment on carrying platform Stake (1) is extracted.
CN201910063334.6A 2019-01-23 2019-01-23 A kind of pile base construction method using stake top mobile platform Pending CN109826173A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910063334.6A CN109826173A (en) 2019-01-23 2019-01-23 A kind of pile base construction method using stake top mobile platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910063334.6A CN109826173A (en) 2019-01-23 2019-01-23 A kind of pile base construction method using stake top mobile platform

Publications (1)

Publication Number Publication Date
CN109826173A true CN109826173A (en) 2019-05-31

Family

ID=66861907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910063334.6A Pending CN109826173A (en) 2019-01-23 2019-01-23 A kind of pile base construction method using stake top mobile platform

Country Status (1)

Country Link
CN (1) CN109826173A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727146A (en) * 2021-01-26 2021-04-30 上海天演建筑物移位工程股份有限公司 Pile top supporting type walking shifting device and method
CN114991072A (en) * 2022-05-20 2022-09-02 中交第二航务工程局有限公司 Inter-pile mud dredging and stone throwing operation platform for high-pile wharf and operation method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232036A (en) * 2002-02-07 2003-08-19 Nippon Steel Corp Floating driver using jack-up platform
CN106120787A (en) * 2016-06-29 2016-11-16 中交第二航务工程局有限公司 A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN106284348A (en) * 2016-08-25 2017-01-04 中交第二航务工程局有限公司 The construction method of pile sinking is carried out based on assembling mobile platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003232036A (en) * 2002-02-07 2003-08-19 Nippon Steel Corp Floating driver using jack-up platform
CN106120787A (en) * 2016-06-29 2016-11-16 中交第二航务工程局有限公司 A kind of construction method carrying out pile sinking based on pushing tow travelling platform
CN106284348A (en) * 2016-08-25 2017-01-04 中交第二航务工程局有限公司 The construction method of pile sinking is carried out based on assembling mobile platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112727146A (en) * 2021-01-26 2021-04-30 上海天演建筑物移位工程股份有限公司 Pile top supporting type walking shifting device and method
CN114991072A (en) * 2022-05-20 2022-09-02 中交第二航务工程局有限公司 Inter-pile mud dredging and stone throwing operation platform for high-pile wharf and operation method

Similar Documents

Publication Publication Date Title
CN106193054B (en) A kind of support system and its construction method for subway foundation pit
CN103541735B (en) Tunneling machine stepping pushing supporting device and construction method
CN110552709A (en) self-propelled integral station-crossing method and device suitable for large-diameter shield machine
CN109826173A (en) A kind of pile base construction method using stake top mobile platform
JP2012112191A (en) Landing bridge construction method
CN110847185B (en) Stone throwing and tamping integrated ship
CN110924436A (en) Railway frame bridge jacking front guide type steel box shed edge angle and construction method thereof
CN109056534A (en) A kind of movable type bored pile construction platform and method
CN209941704U (en) Side slope or retaining wall construction trolley
CN209873759U (en) Portable pile foundation construction platform
CN109695237A (en) A kind of movable type Pile Installation Platform
CN203531916U (en) Tunnel boring machine step pushing support device
CN217328763U (en) Counter-force support system for pipe jacking construction
CN105421453A (en) Pile block movable platform steel pipe pile driving construction method
CN210152652U (en) Multifunctional trolley suitable for drilling and blasting construction
CN110700299B (en) Deep foundation pit structural beam reinforcement framework modularization rapid construction method
CN114526083A (en) Mine method tunnel segment shield large longitudinal slope air-pushing and translation transition construction method
CN109537897B (en) Jacking type assembling building construction method
CN110844008B (en) Stone throwing device for throwing and tamping integrated ship
CN209443464U (en) Stake top walking Pile Installation Platform
CN110777827A (en) Structure capable of carrying out deep water area hollowing repair in rapid stream state
CN220704323U (en) Integrated bridging equipment
CN216950416U (en) Construction device for jacking box culvert
CN109457700A (en) Stake top walking Pile Installation Platform, its erection method and pile base construction method
CN217233526U (en) Arch lining template trolley is detained to hole stake method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190531

RJ01 Rejection of invention patent application after publication