CN217538597U - Drilling auxiliary device used with scaffold - Google Patents
Drilling auxiliary device used with scaffold Download PDFInfo
- Publication number
- CN217538597U CN217538597U CN202221095596.4U CN202221095596U CN217538597U CN 217538597 U CN217538597 U CN 217538597U CN 202221095596 U CN202221095596 U CN 202221095596U CN 217538597 U CN217538597 U CN 217538597U
- Authority
- CN
- China
- Prior art keywords
- drilling
- rig
- locating lever
- scaffold
- drilling machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model provides a drilling auxiliary device with scaffold cooperation is used, including setting up preceding locating lever and the back locating lever of setting between the scaffold frame pole setting of keeping away from excavation body one side of setting up being close to between the scaffold frame pole setting of excavation body one side, the rig bottom is equipped with the rig support, and the one end that the rig support is close to the rig front end is connected with preceding locating lever, and the other end is connected with the back locating lever. The device and the scaffold are matched to complete the in-place work of the drilling machine, so that the control of drilling hole positions and drilling angles is realized, the working efficiency is improved, and the stability of the drilling machine in the drilling construction process is ensured.
Description
Technical Field
The utility model relates to a drilling operation auxiliary assembly equipment field, in particular to drilling auxiliary device who uses with scaffold frame cooperation.
Background
In general, in slope protection and drainage construction, a hand-held hand drill is often used to complete drilling operation after a scaffold is erected, or a chain block is used to lift a drilling machine and complete drilling in a manual holding mode.
The above prior art solutions have the following drawbacks: no matter use hand-held type hand pneumatic drill or hang up the rig with chain block and assist the mode of artifical holding up and accomplish the drilling, all have higher intensity of labour, and drilling construction hole site needs repeatedly to fix a position at every turn, and the operating efficiency is handed down, and drilling accuracy is also not high.
Disclosure of Invention
The utility model aims to solve the technical problem that a drilling auxiliary device who uses with scaffold cooperation is provided, accomplishes the work of taking one's place of rig with scaffold cooperation, has realized the control of drilling hole site and drilling angle, improves work efficiency, has guaranteed the stability of rig in the drilling work progress.
In order to solve the technical problem, the utility model discloses a technical scheme does: the utility model provides a drilling auxiliary device with scaffold cooperation use, is including setting up preceding locating lever and the back locating lever of setting between the scaffold frame pole setting of keeping away from excavation body one side near the scaffold frame pole setting of excavation body one side, and the rig bottom is equipped with the rig support, and the one end that the rig support is close to the rig front end is connected with preceding locating lever, and the other end is connected with the back locating lever.
In the preferred scheme, the drilling machine hanging rod device further comprises a plurality of drilling machine hanging rods, and the drilling machine hanging rods are connected with the scaffold cross rods.
In a preferred scheme, the drilling machine support comprises drilling machine support legs arranged at the bottom of a drilling machine, the drilling machine support legs are connected with support main beams, and the number of the support main beams is at least two.
In a preferred scheme, a support reinforcing rod is arranged between the support main beams.
The utility model provides a pair of drilling auxiliary device with scaffold frame cooperation is used has following beneficial effect:
1. the drilling hole position and drilling angle control device has the advantages that the drilling hole position and drilling hole angle are controlled by adjusting the height difference between the front positioning rod and the rear positioning rod, adjusting the drilling angle and determining the drilling height by determining the heights of the front positioning rod and the rear positioning rod, and the drilling hole position and drilling hole position control device has the advantages of being simple in positioning calculation, high in positioning efficiency and wide in application range.
2. Through setting up the rig jib, conveniently accomplish the work of taking one's place of rig through cooperating with chain block, reduce the artifical consumption of the in-process of taking one's place, reduced operation intensity.
3. The original scaffold is cooperated to be refitted, the processing cost is low, and the installation and the disassembly are convenient.
4. The drilling machine support welded at the bottom of the drilling machine is firmly connected with the front positioning rod and the rear positioning rod, so that the stability of the drilling machine in the drilling construction process is ensured.
Drawings
The invention is further described below with reference to the accompanying drawings and examples:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a side view of the present invention;
in the figure: scaffold pole setting 1, preceding locating lever 2, back locating lever 3, rig 4, rig support 5, rig jib 6, scaffold horizontal pole 7, rig landing leg 501, support girder 502, support stiffener 503.
Detailed Description
As shown in 1~2, a drilling auxiliary device used with scaffold cooperation, including setting up preceding locating lever 2 and the back locating lever 3 of setting between the scaffold frame pole setting 1 of keeping away from excavation body one side between being close to the scaffold frame pole setting 1 of excavation body one side, preceding locating lever 2 and the parallel horizontal setting of back locating lever 3, preceding locating lever 2 and back locating lever 3 pass through the scaffold fastener and are connected with scaffold frame pole setting 1. Preceding locating lever 2 and back locating lever 3 are for fixing a position in advance and be fixed in the steel pipe on scaffold frame pole setting 1, and its interval is scaffold frame pole setting interval.
The elevations of the front positioning rod 2 and the rear positioning rod 3 are determined according to the hole site design elevation and the hole site angle so as to ensure the accuracy of drilling, and the positioning device has the characteristics of simple positioning calculation, high positioning efficiency and wide application range. The drilling angle is adjusted by adjusting the height difference between the front positioning rod 2 and the rear positioning rod 3, and the drilling elevation is determined by determining the elevations of the front positioning rod 2 and the rear positioning rod 3.
The bottom of the drilling machine 4 is provided with a drilling machine support 5, the drilling machine support 5 is welded and fixed with the drilling machine 4, one end of the drilling machine support 5, which is close to the front end of the drilling machine 4, is connected with the front positioning rod 2, and the other end of the drilling machine support 5 is connected with the rear positioning rod 3.
Preferably, the drilling machine support 5 comprises drilling machine support legs 501 arranged at the bottom of the drilling machine 4, the drilling machine support legs 501 are connected with support main beams 502, and the number of the support main beams 502 is at least two.
A support reinforcing rod 503 is arranged between the support main beams 502. The stability of the drill stand 5 is improved.
Through setting up rig support 5, accomplish the location of rig 4, get up rig 4 and preceding locating lever 2 and the firm connection of back locating lever 3, guaranteed drilling operation in the stability of rig 4.
Preferably, a plurality of drill booms 6 are included, the drill booms 6 being connected to the scaffold rails 7.
The drill suspender 6 is a steel pipe which is positioned in advance and fixed on the scaffold cross rod 7, the distance and the horizontal projection position of the drill suspender are determined according to a hole site arrangement diagram, and the drill suspender 6 corresponds to the drilling position.
The drill rod 6 is arranged, so that the drill can be conveniently arranged in place by being matched with the chain block, the labor consumption in the arranging process is reduced, and the operation intensity is reduced.
During the specific use, according to the height and the angle of drilling before locating lever 2 and back locating lever 3 are confirmed, fix preceding locating lever 2 and back locating lever 3 in scaffold frame pole setting 1 through the fastener, interval and the position according to drilling, installation rig jib 6, cooperation chain block accomplishes taking one's place of rig 4 and rig support 5, rig support 5 passes through the fastener with preceding locating lever 2 and back locating lever 3 and is connected, start rig 4, accomplish the drilling in this position, then cooperation chain block removes rig 4 along the length direction of scaffold frame horizontal pole 7, accomplish the drilling in other positions of same elevation in proper order.
Through calculation and measurement, the elevations of the front positioning rod 2 and the rear positioning rod 3 are accurately controlled, and accurate control of the hole position of the drilling hole and the angle of the drilling hole is realized. By combining the design hole site elevation and the design drilling angle, the elevation calculation of the front positioning rod 2 and the rear positioning rod 3 can be rapidly completed, and the working efficiency and the application range are high. After the front positioning rod 2 and the rear positioning rod 3 are positioned, the positioning of the drilling machine with a plurality of hole sites at the same elevation can be completed, and the efficiency of single positioning operation is higher.
Claims (4)
1. The utility model provides a drilling auxiliary device who uses with scaffold frame cooperation which characterized in that: including setting up preceding locating lever (2) between scaffold frame pole setting (1) near excavation body one side and setting up back locating lever (3) between scaffold frame pole setting (1) of keeping away from excavation body one side, rig (4) bottom is equipped with rig support (5), and rig support (5) are close to the one end of rig (4) front end and are connected with preceding locating lever (2), and the other end is connected with back locating lever (3).
2. A drilling aid for use with scaffolding according to claim 1, wherein: the drilling machine lifting rod device is characterized by further comprising a plurality of drilling machine lifting rods (6), wherein the drilling machine lifting rods (6) are connected with the scaffold cross rods (7).
3. A drilling aid for use with scaffolding according to claim 1, wherein: the drilling machine support (5) comprises drilling machine support legs (501) arranged at the bottom of the drilling machine (4), the drilling machine support legs (501) are connected with support main beams (502), and the number of the support main beams (502) is at least two.
4. A drilling aid for use with scaffolding according to claim 3, wherein: and a support reinforcing rod (503) is arranged between the support main beams (502).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221095596.4U CN217538597U (en) | 2022-05-09 | 2022-05-09 | Drilling auxiliary device used with scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221095596.4U CN217538597U (en) | 2022-05-09 | 2022-05-09 | Drilling auxiliary device used with scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217538597U true CN217538597U (en) | 2022-10-04 |
Family
ID=83433632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221095596.4U Active CN217538597U (en) | 2022-05-09 | 2022-05-09 | Drilling auxiliary device used with scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217538597U (en) |
-
2022
- 2022-05-09 CN CN202221095596.4U patent/CN217538597U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209636847U (en) | A kind of adjustable tower crane built-in fitting accurate positioning tool | |
CN109025286A (en) | A kind of construction method of large span high-altitude three-dimensional canopy of the heavens steel construction | |
CN112900858A (en) | Adjustable beam bottom template supporting device | |
CN102785243B (en) | Multi-directional regulating mechanical hand | |
CN217538597U (en) | Drilling auxiliary device used with scaffold | |
CN205777412U (en) | Roof flower is set a roof beam in place and exterior wall finishing construction mobile operating platform | |
CN215670131U (en) | Device capable of quickly and accurately adjusting steel structure embedded part | |
CN212388363U (en) | A auxiliary device for construction of hollow mound cross slab of bridge | |
CN213142727U (en) | Adjustable bracing structure for building engineering design | |
CN212003048U (en) | Slope anchoring drilling construction support | |
CN211171938U (en) | Quick distance instrument of stake owner muscle | |
CN209779627U (en) | Steel-pipe pile construction positioner | |
CN203905423U (en) | Novel door frame beam supporting system | |
CN208815876U (en) | A kind of fixed device of detachable suspended scaffold upright rod load | |
CN209211486U (en) | The fixed bracket of recyclable pre-embedded anchoring bolts | |
CN206376564U (en) | A kind of counterforce device for adjusting Tall Frameworks post installation accuracy | |
CN215658003U (en) | Civil engineering is with removing drilling equipment | |
CN214272033U (en) | Steel-pipe pile construction platform and positioner on water | |
CN217518226U (en) | Turbo generator base direct-burried sleeve adjusting device | |
CN215829669U (en) | Steel column adjustment butt joint installation device | |
CN217733863U (en) | Concrete anticollision barrier reinforcing bar positioner | |
CN218581181U (en) | Movable formwork for large-channel construction | |
CN211200009U (en) | Adjustable road side form accurate supporting device | |
CN210648657U (en) | Top drilling auxiliary frame | |
CN220099754U (en) | Portable positioning mechanism for construction of steel pipe guardrail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |