CN216474535U - Movable construction platform for bridge inter-span construction - Google Patents

Movable construction platform for bridge inter-span construction Download PDF

Info

Publication number
CN216474535U
CN216474535U CN202122663178.2U CN202122663178U CN216474535U CN 216474535 U CN216474535 U CN 216474535U CN 202122663178 U CN202122663178 U CN 202122663178U CN 216474535 U CN216474535 U CN 216474535U
Authority
CN
China
Prior art keywords
platform
welded
construction
beams
frame beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122663178.2U
Other languages
Chinese (zh)
Inventor
黄振威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202122663178.2U priority Critical patent/CN216474535U/en
Application granted granted Critical
Publication of CN216474535U publication Critical patent/CN216474535U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a movable construction platform for construction between bridge beams, which comprises a frame beam and an operation platform positioned below the frame beam, wherein the frame beam is connected with the operation platform through a suspender; the frame beam comprises two upper longitudinal beams which are arranged in parallel, two upper cross beams are welded between the two ends of the two upper longitudinal beams, and the bottoms of the two ends of each upper longitudinal beam are respectively provided with a roller; the operating platform comprises two lower beams which are arranged in parallel, a plurality of platform supporting rods are welded between the two lower beams, and a platform panel is laid on the platform supporting rods; two upper cross beams of the frame beam are respectively welded with two lower cross beams of the operating platform by two suspenders, and a ladder climbing step bar is welded between the two suspenders welded on each upper cross beam and the lower cross beam at certain intervals. The utility model can be hung between two bridges without being limited by the passing condition under the bridge, and has high construction efficiency and safety when constructors construct on the operation platform.

Description

Movable construction platform for bridge inter-span construction
Technical Field
The utility model belongs to the technical field of bridge construction, relates to construction of a double-width bridge or a multi-width bridge, and particularly relates to a movable construction platform for construction between bridge widths.
Background
The beam body of a bridge usually comprises a main body and cantilevers on both sides of the main body. When the bridge is constructed, a bridge main body is generally installed or poured firstly, and then cantilever construction is carried out on two sides. For a steel structure bridge, welding of a cantilever and a main box girder needs to be carried out under the bridge, and for a cast-in-place concrete beam, cantilever pouring templates need to be placed and installed on two sides of the main box girder. In general, a vehicle such as a lift car or a crane is used as a construction platform under a bridge for cantilever construction. For a double-amplitude bridge or a plurality of bridges, certain gaps are usually reserved among the bridges, but the gaps are narrow and limited by traffic conditions, so that vehicles are inconvenient to move under the bridges, and the construction progress is influenced.
Disclosure of Invention
The utility model aims to solve the problems and provides a movable construction platform for construction between bridge panels, so that the construction efficiency of a bridge cantilever is improved.
The technical scheme of the utility model is as follows:
the utility model provides a movable construction platform that is used for construction between bridge width of cloth which characterized in that: the device comprises a frame beam and an operating platform positioned below the frame beam, wherein the frame beam is connected with the operating platform through a hanging rod; the frame beam comprises two upper longitudinal beams which are arranged in parallel, two upper cross beams which are arranged in parallel are welded between the two ends of the two upper longitudinal beams, and the bottoms of the two ends of each upper longitudinal beam are respectively provided with a roller; the operating platform comprises two lower cross beams which are arranged in parallel and have a distance smaller than the width distance of the two bridges, a plurality of platform supporting rods are welded between the two lower cross beams, and a platform panel is laid on the platform supporting rods; two upper crossbeams of the frame beam are respectively welded with two lower crossbeams of the operation platform, and a ladder climbing step bar is welded between the two upper crossbeams and the two lower crossbeams welded with the lower crossbeams at certain intervals.
The utility model is hung between two bridges, can move longitudinally along the bridge span and is not limited by the passing condition under the bridge; constructors construct on the operation platform, and the construction efficiency and the safety are high. The utility model can be used for the construction between the steel structure bridge and the concrete bridge; also can be used to the inspection maintenance in bridge later stage, the practicality is strong.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a side view of the present invention;
fig. 3 is a schematic plan view of the frame beam;
FIG. 4 is a schematic plan view of the operation platform;
FIG. 5 is a schematic view of the present invention lowered between two bridges;
fig. 6 is a schematic view of the present invention suspended between two bridges.
Detailed Description
As shown in fig. 1 and 2, the present invention comprises a frame beam 1 and an operation platform 2 located below the frame beam, wherein the frame beam and the operation platform are connected by a suspension rod 3.
The structure of the frame beam 1 is shown in fig. 3, and comprises two upper longitudinal beams 11 arranged in parallel, two upper transverse beams 12 arranged in parallel are welded between two ends of the two upper longitudinal beams, and the bottom of two ends of each upper longitudinal beam 12 is respectively provided with a roller 13.
The structure of the operating platform 2 is shown in fig. 4, and comprises two lower beams 21 which are arranged in parallel and have a distance smaller than the width distance between the two bridges, a plurality of platform support rods 22 are welded between the two lower beams, and platform panels 23 are laid on the platform support rods.
Two suspenders 3 are respectively welded between two upper crossbeams 12 of the frame beam 1 and two lower crossbeams 21 of the operating platform 2, and a ladder climbing step bar 4 is welded between the two suspenders 3 welded on each upper crossbeam and each lower crossbeam at certain intervals.
In the specific implementation of the utility model, in order to ensure the balance of the operation platform, the centers of the upper beam 12 and the lower beam 21 of the two suspenders 3 welded on each upper beam and each lower beam are symmetrically arranged.
In the specific implementation of the utility model, a plurality of connecting rods 14 can be welded between the two upper cross beams 11 of the frame beam for reinforcing the structure of the frame beam.
In the specific implementation of the utility model, in order to ensure the construction safety, a platform guardrail 5 can be welded on the periphery of the operating platform 2.
In the specific implementation of the utility model, in order to ensure the connection strength of the operating platform and the hanger rods, a diagonal brace 6 can be welded between each hanger rod 3 and the lower cross beam 21.
When the utility model is implemented, the length of the frame beam is larger than the distance between the two bridge main body box beams.
As shown in fig. 5 and 6, when the utility model is used, a crane is used for hoisting the operation platform 2 between two bridges, the operation platform is firstly placed under the bridge along the gap between the two bridges 7, when the frame beam 1 approaches the bridge surface, the whole construction platform is rotated by 90 degrees, then the rollers 13 at the two ends of the frame beam 1 are respectively supported on the main box beams of the two bridges, and constructors can descend from the bridge to the operation platform 2 through the ladder climbing step bars 4. For the steel structure bridge, the bottom welding construction can be carried out on the cantilevers of the two bridges on the operation platform; for the construction of the concrete cantilever of the cast-in-place beam, a lower template of the cantilever can be installed and disassembled on the operating platform. After one station construction is completed, the construction platform is pushed to move to the next construction position on the bridge.

Claims (5)

1. The utility model provides a movable construction platform that is used for construction between bridge width of cloth which characterized in that: the device comprises a frame beam and an operating platform positioned below the frame beam, wherein the frame beam is connected with the operating platform through a hanging rod; the frame beam comprises two upper longitudinal beams which are arranged in parallel, two upper cross beams which are arranged in parallel are welded between the two ends of the two upper longitudinal beams, and the bottoms of the two ends of each upper longitudinal beam are respectively provided with a roller; the operating platform comprises two lower cross beams which are arranged in parallel and have a distance smaller than the width distance of the two bridges, a plurality of platform supporting rods are welded between the two lower cross beams, and a platform panel is laid on the platform supporting rods; two upper crossbeams of the frame beam are respectively welded with two lower crossbeams of the operation platform, and a ladder climbing step bar is welded between the two upper crossbeams and the two lower crossbeams welded with the lower crossbeams at certain intervals.
2. The movable construction platform for construction between bridge girders according to claim 1, characterized in that: the centers of the cross beams and the lower cross beams above the two suspenders welded on each upper cross beam and each lower cross beam are symmetrically arranged.
3. The movable construction platform for construction between bridge girders according to claim 1, characterized in that: a plurality of connecting rods are welded between the two upper cross beams of the frame beam.
4. The movable construction platform for construction between bridge girders according to claim 1, characterized in that: and a platform guardrail is welded on the periphery of the operating platform.
5. The movable construction platform for construction between bridge girders according to claim 1, characterized in that: an inclined stay bar is welded between each suspender and the lower cross beam.
CN202122663178.2U 2021-11-02 2021-11-02 Movable construction platform for bridge inter-span construction Active CN216474535U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122663178.2U CN216474535U (en) 2021-11-02 2021-11-02 Movable construction platform for bridge inter-span construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122663178.2U CN216474535U (en) 2021-11-02 2021-11-02 Movable construction platform for bridge inter-span construction

Publications (1)

Publication Number Publication Date
CN216474535U true CN216474535U (en) 2022-05-10

Family

ID=81447675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122663178.2U Active CN216474535U (en) 2021-11-02 2021-11-02 Movable construction platform for bridge inter-span construction

Country Status (1)

Country Link
CN (1) CN216474535U (en)

Similar Documents

Publication Publication Date Title
CN101603288B (en) Three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and installation method thereof
CN106149576B (en) On removed and construction method of installation across both wired bridge whole groups
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN106284109B (en) On across both wired bridge main beam method for dismounting
KR20140084107A (en) Self-Launching Movable Scaffolding System
CN212052327U (en) Movable type dismounting and hoisting tool for temporary supporting system of small box girder type hidden cover beam of road and bridge prefabrication
CN107401125B (en) Traveling device of mobile trolley and using method
CN112726411B (en) Integral dragging construction method for single-hole large cantilever steel truss girder
CN114164772A (en) Rhombic hanging basket for viaduct cantilever pouring construction and mounting method
CN216474535U (en) Movable construction platform for bridge inter-span construction
CN201588172U (en) Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template
CN212315371U (en) Cable installation lifting device for cable-stayed bridge
CN212404859U (en) Auxiliary device for falling of bottom die of bent cap
CN112482241A (en) Walking type hanging bracket for post-pouring section of box girder flange plate and construction method thereof
CN219384698U (en) Novel movable operation platform for bridge reinforcement and maintenance
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN207646620U (en) The movable construction platform of prefabricated wide cut beam slab
CN217629466U (en) Corrugated steel web plate lifting system for bridge
CN111533003A (en) Cable installation lifting device for cable-stayed bridge
CN111851301A (en) Bridge erecting machine
CN217579805U (en) Cantilever is pour with hoisting device that wholly pushes away behind hanging basket
CN217499974U (en) Device for bridge closure construction
CN218757029U (en) Bridge girder erection machine for large-span pi-shaped beam
CN220013394U (en) Cantilever arm suspension platform for steel box girder