CN216407920U - Support device for roof pipeline setting - Google Patents

Support device for roof pipeline setting Download PDF

Info

Publication number
CN216407920U
CN216407920U CN202123057498.XU CN202123057498U CN216407920U CN 216407920 U CN216407920 U CN 216407920U CN 202123057498 U CN202123057498 U CN 202123057498U CN 216407920 U CN216407920 U CN 216407920U
Authority
CN
China
Prior art keywords
roof
support device
layer
steel plate
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123057498.XU
Other languages
Chinese (zh)
Inventor
李坤坤
李保彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Engineering Group Co Ltd
Original Assignee
China Aerospace Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Engineering Group Co Ltd filed Critical China Aerospace Construction Engineering Group Co Ltd
Priority to CN202123057498.XU priority Critical patent/CN216407920U/en
Application granted granted Critical
Publication of CN216407920U publication Critical patent/CN216407920U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model belongs to the field of building construction, and particularly relates to a support device for setting a roof pipeline, which comprises a reinforced concrete layer, an angle iron and a connecting piece fixed inside the reinforced concrete layer, wherein the bottom of the angle iron is fixed with the connecting piece in a bolt connection mode, the connecting piece comprises two steel plates, a steel plate and an asphalt wood block, the two steel plates are respectively installed at the top and the bottom of the asphalt wood block, the steel bar is fixed on the steel plate at the top of the asphalt wood block, the connecting piece is embedded inside the reinforced concrete layer in advance, the top of the reinforced concrete layer is provided with a leveling layer, the top of the leveling layer is provided with a heat-insulating layer, and the top of the heat-insulating layer is provided with a waterproof layer. The utility model can effectively fix the arrangement of the roof pipeline and the like, and avoid the damage of the arrangement of the wind pipeline and the large-diameter water pipeline and the like caused by severe weather.

Description

Support device for roof pipeline setting
Technical Field
The utility model relates to the technical field of building construction, in particular to a support device for arranging a roof pipeline.
Background
Nowadays, a large public building mostly adopts a central air conditioning system to meet various requirements of ventilation, heating, cooling and the like in the building, so that the roof of the building is inevitably used for placing various air pipelines, water pipelines and the like required by the central air conditioning system. The arrangement of the pipelines and the like is exposed to the outdoor environment, and if no fixing measures are taken, the pipelines are easily damaged in severe weather, even casualties are caused, and the daily maintenance cost is also increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a support device for a roof pipeline.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a support device for roof pipeline sets up, includes reinforced concrete layer, angle bar and is fixed in the inside connecting piece of reinforced concrete layer, bolted connection mode is passed through to the bottom of angle bar and the connecting piece is fixed, the connecting piece is including reinforcing bar, steel sheet and pitch billet, the steel sheet is two, and two steel sheets are installed respectively in the top and the bottom of pitch billet, and the reinforcing bar is fixed on the steel sheet at pitch billet top, inside the pre-buried reinforced concrete layer of connecting piece, reinforced concrete layer's top is provided with the screed-coat, and the top of screed-coat is provided with the heat preservation, and the top of heat preservation is provided with the waterproof layer.
Preferably, the two angle irons support and fix two sides of the air pipeline and the large-diameter water pipeline respectively, and flat steel is connected between the two angle irons through bolts.
Preferably, the angle iron is connected with the steel bar of the connecting piece in a welding mode.
Preferably, the distance between the angle iron and the waterproof layer is 70mm-80 mm.
Preferably, the steel plate at the bottom of the asphalt wood block is provided with a hook, the length of the hook is 6.25d, d is the diameter of the steel bar selected by the connecting piece, and the distance between the hook and the bottom of the concrete layer of the floor is 20 mm.
Preferably, the number of the hooks is four, and the four hooks are positioned at four corners of the steel plate at the bottom of the asphalt wood block and connected in a welding mode.
Preferably, the asphalt wood blocks and the steel plates are positioned inside the heat-insulating layer of the roof.
Preferably, the steel plate has a length of 150mm, a width of 150mm and a thickness of 3-6 mm.
Preferably, the asphalt wood block has the dimensions of 150mm in length, 150mm in width and 100mm in height.
Preferably, the steel plate is connected with the asphalt wood block through screws, the number of the screws is eight, the length of each screw is 40mm, the diameter of each screw is 6mm, and the screws are located at four corners of the steel plate respectively.
According to the support device for the roof pipeline arrangement, the roof pipeline arrangement and the like can be effectively fixed, and the wind pipeline, the large-diameter water pipeline arrangement and the like are prevented from being damaged due to severe weather.
Drawings
Fig. 1 is a schematic structural view of a support device for a roof ducting arrangement according to the present invention;
FIG. 2 is a schematic top view of a steel plate and asphalt block of a bracket assembly for a rooftop duct installation according to the present invention;
fig. 3 is a schematic side view of a connector of a bracket device for a roof pipe arrangement according to the present invention.
In the figure: 1. the concrete wall comprises flat steel, 2 parts of angle iron, 3 parts of reinforcing steel bars, 4 parts of steel plates, 5 parts of asphalt wood blocks, 6 parts of hooks, 7 parts of waterproof layers, 8 parts of heat insulation layers, 9 parts of leveling layers, 10 parts of reinforced concrete layers, 11 parts of screws.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-3, a support device for roof pipeline sets up, including reinforced concrete layer 10, angle bar 2 and be fixed in the inside connecting piece of reinforced concrete layer 10, bolted connection mode is passed through to the bottom of angle bar 2 and the connecting piece is fixed, the connecting piece is including reinforcing bar 3, steel sheet 4 and pitch billet 5, steel sheet 4 is two, two steel sheets 4 are installed respectively at the top and the bottom of pitch billet 5, reinforcing bar 3 is fixed on the steel sheet 4 at pitch billet 5 top, the connecting piece is pre-buried inside into reinforced concrete layer 10, the top of reinforced concrete layer 10 is provided with screed-coat 9, the top of screed-coat 9 is provided with heat preservation 8, the top of heat preservation 8 is provided with waterproof layer 7.
In the utility model, two angle irons 2 are arranged, the two angle irons 2 respectively support and fix two sides of the air pipeline and the large-diameter water pipeline, and the flat steel 1 is connected between the two angle irons 2 through bolts.
In the utility model, the angle iron 2 is connected with the steel bar 3 of the connecting piece in a welding mode.
In the utility model, the distance between the angle iron 2 and the waterproof layer 7 is 70-80 mm.
According to the utility model, a hook 6 is arranged on a steel plate 4 positioned at the bottom of an asphalt wood block 5, the length of the hook 6 is 6.25d, d is the diameter of a steel bar selected by a connecting piece, and the distance between the hook 6 and the bottom of a floor concrete layer is 20 mm.
In the utility model, the number of the hooks 6 is four, and the four hooks 6 are positioned at the four corners of the steel plate 4 at the bottom of the asphalt wood block 5 and connected in a welding mode.
In the utility model, the asphalt wood block 5 and the steel plate 4 are positioned inside the heat-insulating layer 8 of the roof.
In the present invention, the steel plate 4 has a length of 150mm, a width of 150mm and a thickness of 3 to 6 mm.
In the present invention, the asphalt block 5 has a length of 150mm, a width of 150mm and a height of 100 mm.
In the utility model, the steel plate 4 and the asphalt wood block 5 are connected by adopting eight screws, the length of each screw is 40mm, the diameter of each screw is 6mm, and the screws are respectively positioned at four corners of the steel plate 4.
In the utility model, the upper part of the angle iron is used for supporting and fixing an air pipeline, a large-diameter water pipeline and the like, and the lower part of the angle iron is fixed with a connecting piece in a bolt connection mode; the connecting piece mainly is reinforcing bar, steel sheet and pitch billet, buries the inside root of taking root of floor during the floor pouring, and at the transmission of the cold and hot volume of non-structural layer with pitch billet bridge cut-off, the connecting piece is two, buries respectively inside the roof floor and inside the heat preservation, and the distance is confirmed according to the tuber pipe size between two connecting pieces, can effectively fix roof pipeline setting etc. avoids wind pipeline and major diameter water pipeling to set up etc. and suffers the damage because of bad weather.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (10)

1. A support device for arranging a roof pipeline is characterized by comprising a reinforced concrete layer (10), angle irons (2) and connecting pieces fixed inside the reinforced concrete layer (10), the bottom of the angle iron (2) is fixed with a connecting piece in a bolt connection mode, the connecting piece comprises a steel bar (3), a steel plate (4) and an asphalt wood block (5), the two steel plates (4) are respectively arranged at the top and the bottom of the asphalt wood block (5), the steel bar (3) is fixed on the steel plate (4) at the top of the asphalt wood block (5), the connecting piece is embedded into a reinforced concrete layer (10) in a pre-buried mode, a leveling layer (9) is arranged at the top of the reinforced concrete layer (10), a heat preservation layer (8) is arranged at the top of the leveling layer (9), and a waterproof layer (7) is arranged at the top of the heat preservation layer (8).
2. The support device for the arrangement of the roof pipes according to claim 1, characterized in that the angle iron (2) is two, the two angle irons (2) support and fix the two sides of the wind pipe and the large diameter water pipe, respectively, and the flat steel (1) is connected between the two angle irons (2) through bolts.
3. A support device for a roof ducting arrangement according to claim 1, characterized in that the angle iron (2) is connected to the reinforcement (3) of the connector by welding.
4. A support device for a roof ducting arrangement according to claim 1, characterized in that the distance between the angle iron (2) and the waterproof layer (7) is 70-80 mm.
5. A support device for a roof ducting arrangement according to claim 1, characterized in that the steel plate (4) at the bottom of the asphalt block (5) is provided with a hook (6), the length of the hook (6) being 6.25d, d being the diameter of the steel reinforcement selected for the connection, the hook (6) being 20mm from the bottom of the concrete layer of the floor.
6. A support device for a roof ducting arrangement according to claim 5, characterized in that the number of hooks (6) is four and that four hooks (6) are located at the four corners of the steel plate (4) at the bottom of the asphalt block (5) and are connected by welding.
7. A support device for a roof ducting arrangement according to claim 1, characterized in that the asphalt block (5) and the steel plate (4) are located inside the roof insulation (8).
8. A support device for a roof ducting arrangement according to claim 1, characterized in that the steel plates (4) have dimensions of length 150mm, width 150mm and thickness 3-6 mm.
9. A support device for a roof ducting arrangement according to claim 1, characterized in that the asphalt block (5) has dimensions of 150mm length, 150mm width and 100mm height.
10. The support device for the arrangement of the roof pipeline according to claim 1, wherein the steel plate (4) is connected with the asphalt wood block (5) by adopting eight screws, the length of each screw is 40mm, the diameter of each screw is 6mm, and the screws are respectively positioned at four corners of the steel plate (4).
CN202123057498.XU 2021-12-08 2021-12-08 Support device for roof pipeline setting Active CN216407920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123057498.XU CN216407920U (en) 2021-12-08 2021-12-08 Support device for roof pipeline setting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123057498.XU CN216407920U (en) 2021-12-08 2021-12-08 Support device for roof pipeline setting

Publications (1)

Publication Number Publication Date
CN216407920U true CN216407920U (en) 2022-04-29

Family

ID=81283234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123057498.XU Active CN216407920U (en) 2021-12-08 2021-12-08 Support device for roof pipeline setting

Country Status (1)

Country Link
CN (1) CN216407920U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114110259A (en) * 2021-12-08 2022-03-01 中航天建设工程集团有限公司 Support device for roof pipeline setting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114110259A (en) * 2021-12-08 2022-03-01 中航天建设工程集团有限公司 Support device for roof pipeline setting

Similar Documents

Publication Publication Date Title
CN216407920U (en) Support device for roof pipeline setting
CN209604683U (en) Multi-pipeline fixes bracket
CN212927058U (en) Bulky concrete double-deck template presss from both sides outer heat preservation maintenance structure of rock wool board
CN114110259A (en) Support device for roof pipeline setting
CN206189702U (en) Connected node of roof boarding and wallboard
CN106368358A (en) Modular integrated slabs and house
CN211923271U (en) Ultralow energy consumption architectural decoration structure of cornicing
CN113502988B (en) Double-layer waterproof gutter system and construction method thereof
CN206530771U (en) Detachable large-scale upstanding tube support meanss
CN213747080U (en) Prefabricated plate air conditioner board
CN207160361U (en) Steel bar truss floor support plate and combination floor support plate
CN204899021U (en) Put prefabricated superimposed sheet of formula ceiling under radiant tube and shaping method thereof
CN206398180U (en) A kind of heavy grade thermal pipeline support pipe portion structure
CN111456220A (en) Single-face formwork supporting system for basement exterior wall and application method
CN211716727U (en) Vertical fixing device of central air conditioning freezing water pipe
CN212407933U (en) Novel low built on stilts low pressure steam conduit compensator
CN219510410U (en) Protection architecture for water supply and drainage pipeline
CN204940693U (en) The prefabricated superimposed sheet of Back Word type radiant tube underneath type ceiling
CN212914327U (en) Set up in damping type fire pump station of roofing
CN210289003U (en) Big cross-section structure piping lane heat preservation tuber pipe structure
CN219386922U (en) Large-span color plate awning mounting structure of factory building
CN211257631U (en) Aluminum plate connecting structure
CN221031044U (en) Neighboring factory building fixing structure
CN210196649U (en) Fast-assembling type pipeline reinforcing device suitable for small-diameter steam pipeline
CN219263853U (en) Heavy equipment hanging bracket suitable for store rapid transformation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant