CN211716727U - Vertical fixing device of central air conditioning freezing water pipe - Google Patents

Vertical fixing device of central air conditioning freezing water pipe Download PDF

Info

Publication number
CN211716727U
CN211716727U CN202020363088.4U CN202020363088U CN211716727U CN 211716727 U CN211716727 U CN 211716727U CN 202020363088 U CN202020363088 U CN 202020363088U CN 211716727 U CN211716727 U CN 211716727U
Authority
CN
China
Prior art keywords
water pipe
freezing water
floor
fixing device
central air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020363088.4U
Other languages
Chinese (zh)
Inventor
赵勇
黄鹏
刁文林
琚鸿飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Constar Construction Group Co ltd
Original Assignee
Guangdong Constar Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Constar Construction Group Co ltd filed Critical Guangdong Constar Construction Group Co ltd
Priority to CN202020363088.4U priority Critical patent/CN211716727U/en
Application granted granted Critical
Publication of CN211716727U publication Critical patent/CN211716727U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a vertical fixing device of central air conditioning freezing water pipe, it includes the fixed bolster, be equipped with on the fixed bolster with freezing water pipe matched with spacing hole, the fixed bolster include with floor fixed connection's support frame, the holding surface upper berth of support frame is equipped with the heat insulating board, the mounting panel has been laid to the upper surface of heat insulating board, the outer wall welding of freezing water pipe has the floor, freezing water pipe is vertical to be passed spacing hole, the floor with mounting panel fixed connection, fixed mounting has the sleeve on the floor, fire prevention ring is installed at telescopic both ends, freezing water pipe passes through the sleeve passes the floor. The vertical fixing device of the freezing water pipe of central air conditioning of this application simple structure, simple to operate, the fastness is high, and stability is strong, freezing water pipe pass through the floor with fixed bolster connects, can prevent freezing water pipe landing from spacing hole to can avoid the potential safety hazard that causes because of freezing water pipe landing in the construction.

Description

Vertical fixing device of central air conditioning freezing water pipe
Technical Field
The utility model relates to a freezing water pipe installation technical field, in particular to vertical fixing device of freezing water pipe of central air conditioning.
Background
Nowadays, with the continuous development of building engineering, air conditioners are used more and more extensively in building engineering as an important component of heating and ventilating engineering, and the installation of air conditioner freezing water pipes is a big difficulty in building construction. The existing freezing water pipe mounting frame is a transverse placing frame generally, the freezing water pipe is transversely mounted, when the freezing water pipe is vertically mounted, an annular pipe sleeve is mounted on the freezing water pipe and fixed on a floor, and by using the structure, the mounting is not firm, and the overhaul is inconvenient.
Therefore, it is necessary to develop a vertical fixing device for a central air-conditioning chilled water pipe according to actual field conditions, and the vertical stability of the chilled water pipe and the heat insulation performance can be improved through the fixing device.
SUMMERY OF THE UTILITY MODEL
Defect to prior art existence, the utility model aims to provide a vertical fixing device of central air conditioning freezing water pipe can avoid the potential safety hazard that causes because of freezing water pipe landing in the construction, and simple structure, simple to operate overhauls the convenience.
The utility model provides a vertical fixing device of central air conditioning freezing water pipe, including the fixed bolster, be equipped with on the fixed bolster with freezing water pipe matched with spacing hole, the fixed bolster include with floor fixed connection's support frame, the holding surface upper berth of support frame is equipped with the heat insulating board, the mounting panel has been laid to the upper surface of heat insulating board, the outer wall welding of freezing water pipe has the floor, freezing water pipe is vertical to be passed spacing hole, the floor with mounting panel fixed connection.
Preferably, the mounting plate and the heat insulation plate are fixedly mounted on the supporting surface of the supporting frame through bolts.
Preferably, the supporting legs of the supporting frame are fixedly connected with supporting steel plates, and the supporting steel plates are connected with the floor slab through bolts or welding.
Preferably, the support frame is formed by welding channel steel.
Preferably, the floor is fixedly provided with a sleeve, two ends of the sleeve are provided with fireproof rings, and the freezing water pipe penetrates through the floor through the sleeve.
Preferably, the surface of the freezing water pipe is wrapped with an insulating layer.
Preferably, the heat insulation plate is a wood plate with the thickness of 10mm-50 mm.
Preferably, the heat-insulating layer is a rubber plastic pipe, a glass wool heat-insulating pipe or a cotton felt pipe.
The utility model has the advantages that:
1. the utility model provides a vertical fixing device of central air conditioning freezing water pipe simple structure, freezing water pipe pass through the floor with the fixed bolster is connected, can prevent freezing water pipe landing from spacing hole to can avoid the potential safety hazard that causes because of freezing water pipe landing in the construction.
2. The utility model provides a vertical fixing device of central air conditioning freezing water pipe's simple to operate, the fastness is high, and stability is strong, the needs of satisfying construction safety and construction civilization that can be better.
Drawings
Fig. 1 is a schematic structural view of the vertical fixing device for the freezing water pipe of the central air conditioner of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, the utility model provides a vertical fixing device of central air conditioning freezing water pipe, including fixed bolster 1, be equipped with on the fixed bolster 1 with freezing water pipe 3 matched with spacing hole, fixed bolster 1 includes the support frame 11 with 2 fixed connection of floor, the holding surface upper berth of support frame 11 is equipped with heat insulating board 12, mounting panel 13 has been laid to the upper surface of heat insulating board 12, the outer wall welding of freezing water pipe 3 has floor 31, freezing water pipe 3 is vertical to be passed spacing hole, floor 31 with mounting panel 13 fixed connection. In more detail, the rib plates 31 are four and symmetrically connected to the periphery of the outer wall of the freezing water pipe 3, the bottom of the rib plate 31 is welded to the mounting plate 13, and the mounting plate 13 is preferably a steel plate.
In addition, in this embodiment, the mounting plate 13 and the heat insulation plate 12 are fixedly mounted on the supporting surface of the supporting frame 11 through bolts, the bottom of the supporting frame 11 is provided with four supporting legs, the supporting legs of the supporting frame 11 are fixedly connected with supporting steel plates 14, and the supporting steel plates 14 are connected with the floor slab 2 through bolts. The height of the support frame 11 is 300mm-800mm, preferably 500 mm.
In order to reduce the mass of the support frame 11 and ensure the structural stability of the support frame 11, the support frame 11 is formed by welding channel steel. The heat insulation plate 12 is a wood plate with the thickness of 10mm-50mm, the wood plate can well play a heat insulation effect, and the wood plate has good rigidity, so that the structural stability and the supporting capacity of the fixing support 1 can be guaranteed.
The floor 2 is fixedly provided with a sleeve 32, two ends of the sleeve 32 are provided with fireproof rings 33, and the freezing water pipe 3 passes through the sleeve 32 and penetrates through the floor 2. In more detail, the sleeve 32 is a galvanized steel sleeve, and the height of the sleeve 32 is 1.5 mm.
In order to effectively improve the heat insulation effect and prevent the generation of cold bridge, the surface of the freezing water pipe 3 is further wrapped with a heat insulation layer 34, and the heat insulation layer 34 is a rubber plastic pipe, a glass wool heat insulation pipe or a cotton felt pipe. In this embodiment, the insulation layer 34 is preferably a rubber tube.
The vertical fixing device for the freezing water pipe of the central air conditioner has a simple structure, the freezing water pipe is connected with the fixing bracket through the rib plate, and the freezing water pipe can be prevented from sliding from the limiting hole, so that potential safety hazards caused by sliding of the freezing water pipe in construction can be avoided; moreover, the whole device is convenient to install, high in firmness and strong in stability, and can better meet the requirements of construction safety and construction civilization.
The foregoing is a more detailed description of the present invention, taken in conjunction with the specific preferred embodiments thereof, and it is not intended that the invention be limited to the specific embodiments shown and described. To the utility model belongs to the technical field of ordinary technical personnel, do not deviate from the utility model discloses under the prerequisite of design, can also make a plurality of simple deductions or replacement, all should regard as belonging to the utility model discloses a protection scope.

Claims (8)

1. The utility model provides a vertical fixing device of central air conditioning freezing water pipe, its characterized in that, includes fixed bolster (1), be equipped with on fixed bolster (1) with freezing water pipe (3) matched with spacing hole, fixed bolster (1) include with floor (2) fixed connection's support frame (11), the holding surface upper berth of support frame (11) is equipped with heat insulating board (12), mounting panel (13) have been laid to the upper surface of heat insulating board (12), the outer wall welding of freezing water pipe (3) has floor (31), freezing water pipe (3) are vertical to be passed spacing hole, floor (31) with mounting panel (13) fixed connection.
2. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 1, wherein: the mounting plate (13) and the heat insulation plate (12) are fixedly mounted on the supporting surface of the supporting frame (11) through bolts.
3. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 1, wherein: the supporting legs of support frame (11) fixedly connected with supporting steel plate (14), supporting steel plate (14) through bolt or welding with floor (2) are connected.
4. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 1, wherein: the support frame (11) is formed by welding channel steel.
5. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 1, wherein: fixed mounting has sleeve (32) on floor (2), fire prevention ring (33) are installed at the both ends of sleeve (32), freezing water pipe (3) pass through sleeve (32) pass floor (2).
6. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 1, wherein: the surface of the freezing water pipe (3) is wrapped with an insulating layer (34).
7. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 1, wherein: the heat insulation plate (12) is a wood plate with the thickness of 10mm-50 mm.
8. The vertical fixing device of the freezing water pipe of the central air conditioner as claimed in claim 6, wherein: the heat-insulating layer (34) is a rubber plastic pipe, a glass wool heat-insulating pipe or a cotton felt pipe.
CN202020363088.4U 2020-03-20 2020-03-20 Vertical fixing device of central air conditioning freezing water pipe Active CN211716727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020363088.4U CN211716727U (en) 2020-03-20 2020-03-20 Vertical fixing device of central air conditioning freezing water pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020363088.4U CN211716727U (en) 2020-03-20 2020-03-20 Vertical fixing device of central air conditioning freezing water pipe

Publications (1)

Publication Number Publication Date
CN211716727U true CN211716727U (en) 2020-10-20

Family

ID=73396481

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020363088.4U Active CN211716727U (en) 2020-03-20 2020-03-20 Vertical fixing device of central air conditioning freezing water pipe

Country Status (1)

Country Link
CN (1) CN211716727U (en)

Similar Documents

Publication Publication Date Title
CN202709411U (en) Lift type air conditioner bracket
CN211716727U (en) Vertical fixing device of central air conditioning freezing water pipe
CN215522468U (en) Fire-fighting smoke-discharging heat-insulating air pipe
CN212004595U (en) Lateral anti-seismic support and hanger for ventilating duct
CN102556329B (en) Marine air-conditioner mounting method
CN216407920U (en) Support device for roof pipeline setting
CN209262419U (en) Rectangular air duct para-seismic support
CN215106650U (en) Structure of arc metal roof
CN103572924B (en) Detachable perforated sound-absorbing ceiling board capable of refrigerating and heating
CN205259481U (en) Limit binding off structure is received to metal roofing fan
CN210240808U (en) Fire-resistant ventilation tuber pipe
CN210801478U (en) Cold radiation partition
CN210196672U (en) Reinforced composite air pipe
CN208430648U (en) Passive type builds parapet heat-preserving cover plate
CN208138604U (en) A kind of air conditioner water standpipe through-flooring slide-and-guide bracket
CN116576304B (en) Multifunctional combined support system for bedding
CN206918399U (en) A kind of water pump water outlet pipe bend vibration isolation support
CN212745551U (en) Fixing frame structure for transverse air conditioner pipeline
CN216984239U (en) Venue seat air supply combined static pressure box structure
CN217329045U (en) Be applied to support column of integrated tuber pipe of finished product heat preservation
CN216244632U (en) Installation and construction node of metal support heat-insulation bridge structure of outdoor unit of air conditioner
CN113864648B (en) Wide-temperature-range large-section straight-through type air valve pipeline for airplane test
CN216382828U (en) Heat-insulating pipeline bracket
CN218348858U (en) Air conditioner water riser landing leg prefabricating sleeve
CN220747766U (en) Half-floor household structure with elevator corridor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant