CN216379866U - Concrete escape canal expansion joint cystosepiment fixing device - Google Patents

Concrete escape canal expansion joint cystosepiment fixing device Download PDF

Info

Publication number
CN216379866U
CN216379866U CN202122688295.4U CN202122688295U CN216379866U CN 216379866 U CN216379866 U CN 216379866U CN 202122688295 U CN202122688295 U CN 202122688295U CN 216379866 U CN216379866 U CN 216379866U
Authority
CN
China
Prior art keywords
foam board
foam
drainage ditch
concrete
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122688295.4U
Other languages
Chinese (zh)
Inventor
黄茂兴
饶明文
谢志杰
杨鹏尊
陈运彬
甄祖玲
刘忠干
刘志军
唐武兴
吴作增
罗海腾
王君杰
张丹
王殷杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuantian Engineering Co Ltd
Original Assignee
Guangdong Yuantian Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yuantian Engineering Co Ltd filed Critical Guangdong Yuantian Engineering Co Ltd
Priority to CN202122688295.4U priority Critical patent/CN216379866U/en
Application granted granted Critical
Publication of CN216379866U publication Critical patent/CN216379866U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a drainage ditch construction technology of constructional engineering, and provides a foam plate fixing device for a concrete drainage ditch expansion joint, which comprises a foam plate fixing frame, wherein the foam plate fixing frame comprises 1 rectangular panel, the back surface of the rectangular panel is longitudinally provided with 1 or 2 triangular rib plates, and the foam plate fixing frame is integrally prefabricated and molded by using special cement mortar for a test mold; the 2 foam board fixing frames are vertically arranged in an opposite mode, and the foam boards are arranged between the 2 foam board fixing frames and are fixed to form a foam board fixing device. When the device is used, marks are made at positions where expansion joints are to be arranged, and cement mortar is used for grouting the foam board fixing device, so that the foam board is accurately positioned at the marked positions of the expansion joints; after the cement mortar strength meets the requirements, the formwork is installed, then the drainage ditch is poured by concrete, the foam board fixing device is poured and covered together, and the drainage ditch with the expansion joint foam board is formed after concrete is condensed. The utility model solves the problems that the foam board can not be fixed and is easy to deviate in the concrete pouring process, not only ensures the concrete construction quality of the drainage ditch, but also enhances the leakage resistance of the expansion joint of the drainage ditch.

Description

Concrete escape canal expansion joint cystosepiment fixing device
Technical Field
The utility model relates to a drainage ditch construction technology for constructional engineering.
Background
In the construction of a common drainage ditch, a plain concrete structure is mostly used, the drainage ditch is provided with expansion joints in a certain length to avoid cracks, foam boards are filled between the expansion joints during construction, two methods are mostly adopted for fixing the foam boards in the current construction method, one method is directly bound on a side mold, but the foam boards have low rigidity, so that the fixing measures for the foam boards in the field construction are not in place, the drainage ditch is easy to deviate in the pouring process and even break and damage, and the phenomena of axial deviation and partial section size reduction of the drainage ditch structure are caused; the other method is to cut a small template with the same size as the foam plate, fix the foam plate on the small template after the small template and the drainage ditch side mold are fixed, and the small template is taken out after the drainage ditch is poured by the method, so that the operation is very difficult, the structural appearance quality of the expansion joint is not ideal, and even the anti-leakage performance of the drainage ditch is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a concrete drainage ditch expansion joint foam plate fixing device which not only facilitates the construction of the drainage ditch expansion joint, but also ensures the construction quality of the drainage ditch.
The purpose of the utility model is realized by the following technical scheme:
the utility model provides a concrete escape canal expansion joint cystosepiment fixing device, includes the cystosepiment mount, the cystosepiment mount adopts cement mortar preparation, and it includes 1 rectangle panel, and the back of rectangle panel vertically is equipped with 1 or 2 triangle-shaped floor, uses the whole prefabricated molding of the special examination mould of system.
The optimization scheme is as follows: the 2 foam board mounts are erected and are oppositely placed, the foam board is arranged between the 2 foam board mounts, the upper edge of the foam board is 50-100 mm higher than the rectangular panel, the lower edge of the foam board is 100-200 mm away from the bottom edge of the rectangular panel, and the front surface of the rectangular panel is abutted to the foam board and fixed by transparent adhesive tapes or iron wires.
During use, before concrete of the drainage ditch is poured, marks are made at positions where expansion joints are ready to be arranged, and the foam board fixing device is subjected to mortar sitting by cement mortar to form a temporary fixing seat so that the foam board is accurately located at the marked positions of the expansion joints.
After the strength of the cement mortar of the temporary fixing seat meets the requirement, the template installation is started, then the drainage ditch is poured by concrete, the foam board fixing device is poured and covered together, the vibration is dense, and the drainage ditch with the expansion joint foam board is formed after the concrete is condensed.
The utility model has the following substantive characteristics and progresses:
1. the foam board fixing device is simple in structure and convenient to manufacture;
2. the utility model effectively solves the problems of axial line offset and section size reduction of the drainage ditch structure caused by serious deviation caused by incapability of fixing the foam plate under the impact of concrete or vibration of the vibrating rod in the pouring process, and simultaneously enhances the leakage resistance of the expansion joint;
3. by adopting the utility model, the gaps between the expansion joints of the drainage ditch do not need to be secondarily filled and the appearance of the expansion joints is repaired in the later period, the construction period is saved, and the engineering cost is reduced.
Drawings
Fig. 1 is a schematic structural view of a foam board fixing frame according to the present invention.
FIG. 2 is a schematic structural view of a foam board fixing device according to the present invention.
Fig. 3 is a schematic view of the temporary fixing seat fixing the foam board fixing device.
FIG. 4 is a schematic view of the completion of casting of a drainage ditch in accordance with the present invention.
Detailed Description
The utility model is further illustrated by the following specific examples:
examples
Referring to figures 1, 2, 3 and 4,
the utility model provides a concrete escape canal expansion joint cystosepiment fixing device, includes the cystosepiment mount (as shown in figure 1), the cystosepiment mount adopts cement mortar to make, and it includes 1 rectangular panel 1, and the back limit portion of rectangular panel 1 vertically is equipped with triangle-shaped floor 11, uses the whole prefabricated shaping of purpose-made examination mould.
The 2 foam board fixing frames are vertically and oppositely arranged, the foam board 2 is arranged between the 2 foam board fixing frames (as shown in figure 2), the upper edge of the foam board 2 is 100mm higher than the rectangular panel, the lower edge of the foam board 2 is 200mm away from the bottom edge of the rectangular panel 1, and the front surface of the rectangular panel 1 abuts against the foam board 2 and is fixed by transparent adhesive tapes.
Before concrete of the drainage ditch is poured, the position where the expansion joint is to be arranged is marked by paint or spray paint, the foam board fixing device is grouted by cement mortar to form a temporary fixing seat 3, and the foam board 2 is accurately positioned at the marked position of the expansion joint (as shown in figure 3).
After the strength of the cement mortar of the temporary fixing seat 3 meets the requirement, the template installation, the transparent adhesive tape removal of the foam plate fixing device, the concrete pouring drainage ditch, the concrete pouring and covering of the foam plate fixing device, the vibration compaction and the concrete condensation form the drainage ditch 4 with the expansion joint foam plate 2 (as shown in figure 4).

Claims (2)

1. The utility model provides a concrete escape canal expansion joint cystosepiment fixing device which characterized in that: the foam board is characterized by comprising a foam board fixing frame, wherein the foam board fixing frame is made of cement mortar and comprises 1 rectangular panel (1), 1 or 2 triangular rib plates (11) are longitudinally arranged on the back surface of the rectangular panel (1), and the foam board fixing frame is integrally prefabricated and molded by using a special test mold.
2. The concrete drainage ditch expansion joint foam plate fixing device of claim 1, wherein: the 2 foam board fixing frames are vertically arranged in opposite directions, the foam board (2) is arranged between the 2 foam board fixing frames, the upper edge of the foam board (2) is higher than the rectangular panel by 50-100 mm, the lower edge of the foam board (2) is 100-200 mm away from the bottom edge of the rectangular panel (1), and the front surface of the rectangular panel (1) abuts against the foam board (2) and is fixed by transparent adhesive tapes or iron wires.
CN202122688295.4U 2021-11-04 2021-11-04 Concrete escape canal expansion joint cystosepiment fixing device Active CN216379866U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122688295.4U CN216379866U (en) 2021-11-04 2021-11-04 Concrete escape canal expansion joint cystosepiment fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122688295.4U CN216379866U (en) 2021-11-04 2021-11-04 Concrete escape canal expansion joint cystosepiment fixing device

Publications (1)

Publication Number Publication Date
CN216379866U true CN216379866U (en) 2022-04-26

Family

ID=81250709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122688295.4U Active CN216379866U (en) 2021-11-04 2021-11-04 Concrete escape canal expansion joint cystosepiment fixing device

Country Status (1)

Country Link
CN (1) CN216379866U (en)

Similar Documents

Publication Publication Date Title
CN110509396B (en) Laminated slab, laminated slab production equipment and laminated slab production method
CN111677275A (en) Adjustable column template
CN112921821B (en) Capping beam subsection prefabrication and assembly wet joint construction structure and construction method thereof
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN216379866U (en) Concrete escape canal expansion joint cystosepiment fixing device
CN111501849A (en) Waterproof structure adopting combined steel-edged rubber water stop and construction method thereof
CN214785929U (en) Template structure of constructional column is built in room
CN214364434U (en) Assembled constructional column suitable for prefabricated wallboard of frame construction
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN211498965U (en) Structure for fixing embedded water stop
CN212223971U (en) Post-cast strip side-fixing inner-supporting steel plate combined template
CN108843016B (en) Shear wall template internal stay and tie bar combined type component and method
CN113914438A (en) Method for fixing concrete drainage ditch expansion joint foam plate
CN112796513A (en) Formwork supporting structure for post-cast strip and construction method
CN209891374U (en) Supporting structure at assembled structure conversion layer
CN109629696B (en) Connection node and bamboo building structure of former bamboo combination wallboard of assembled and floor
CN108442698B (en) Deformation joint split bolt pvc sleeve plugging method and plugging fixing sleeve
CN217027182U (en) Reinforced integrated plate and template device
CN117738339B (en) Concrete basement outer wall crack induction structure and construction method thereof
CN220789860U (en) Advanced water-stop concrete structure of basement shear wall post-cast strip
CN111155553A (en) Back-pasting type rubber water stop structure and construction method of pipe gallery deformation joint
CN214696112U (en) Connecting joint of prefabricated stand plate and steel beam
CN109025277A (en) Secondary frame and its pre-buried structure and method
CN215395869U (en) Novel precast concrete superimposed sheet's preparation mould
CN217500317U (en) Utility tunnel roof water proof coating side forms preparation instrument

Legal Events

Date Code Title Description
GR01 Patent grant