CN109025277A - Secondary frame and its pre-buried structure and method - Google Patents

Secondary frame and its pre-buried structure and method Download PDF

Info

Publication number
CN109025277A
CN109025277A CN201810987962.9A CN201810987962A CN109025277A CN 109025277 A CN109025277 A CN 109025277A CN 201810987962 A CN201810987962 A CN 201810987962A CN 109025277 A CN109025277 A CN 109025277A
Authority
CN
China
Prior art keywords
frame
secondary frame
wall
window opening
window
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810987962.9A
Other languages
Chinese (zh)
Other versions
CN109025277B (en
Inventor
赵坤阳
彭秋林
曹超亚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Aluminum New Material Co Ltd
China Construction Aluminum New Material Chengdu Co Ltd
Original Assignee
China Construction Aluminum New Material Chengdu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Aluminum New Material Chengdu Co Ltd filed Critical China Construction Aluminum New Material Chengdu Co Ltd
Priority to CN201810987962.9A priority Critical patent/CN109025277B/en
Publication of CN109025277A publication Critical patent/CN109025277A/en
Application granted granted Critical
Publication of CN109025277B publication Critical patent/CN109025277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/02Forms or shutterings for making openings, cavities, slits, or channels for windows, doors, or the like
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/02Base frames, i.e. template frames for openings in walls or the like, provided with means for securing a further rigidly-mounted frame; Special adaptations of frames to be fixed therein
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B1/00Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
    • E06B1/56Fastening frames to the border of openings or to similar contiguous frames
    • E06B1/60Fastening frames to the border of openings or to similar contiguous frames by mechanical means, e.g. anchoring means
    • E06B1/6015Anchoring means
    • E06B1/6038Anchoring means specially adapted for being embedded in the wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Door And Window Frames Mounted To Openings (AREA)

Abstract

The present invention relates to a kind of secondary frames and its pre-buried structure and method, the pair frame is embedded on the wall at window hole in advance, and the pair frame includes: square frame in long strip, and inner hollow forms cavity;It is erected on the square frame bottom and for being embedded in the intracorporal anchor plate of the wall;And it is vertically connected at the square frame both sides and the positioning baffle extended to the square frame outside, the lower surface flush of the upper surface of the positioning baffle and the square frame bottom is arranged.Secondary frame of the invention can construct together with wall, it can be with the window opening template location and installation at window hole by positioning baffle, secondary frame is clamped by window opening template, the template of secondary frame and window opening template together as window hole, it realizes and just completes secondary frame location and installation in template erection stage, it solves the problems, such as that the scene of traditional secondary frame carries out hole measurement and installation, reduces the workload of working procedure and cross-operation.

Description

Secondary frame and its pre-buried structure and method
Technical field
The present invention relates to window construction engineering field, a kind of secondary frame and its pre-buried structure and method are refered in particular to.
Background technique
In building field, it is a more scabrous common quality defect and owner that external wall seepage and window, which are damaged, pollute, Complain more one of quality problems.To avoid window from being damaged, pollute, present window installation mostly uses dry method to install, that is, exists Secondary installing pair frame after the molding of hole wall, and hole surface waterproofing, heat preservation and decoration processing are carried out, after the completion again on secondary frame Window is installed.
Although such installation method facilitates the installation of window, improve hole installation accuracy, avoids finished win-dow quilt Construction pollution.But the secondary frame of secondary installing increases the leakage problems between secondary frame and wall, and secondary installing increases operation Process increases the occurrence rate of quality problems.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, a kind of secondary frame and its pre-buried structure and method, solution are provided Secondary frame bring flow chart is installed after certainly existing wall of first constructing to increase, is easy to produce leakage and increases going out for quality problems Now the problem of rate.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides a kind of secondary frames, are embedded on the wall at window hole in advance, and the pair frame includes:
Square frame in long strip, inner hollow form cavity;
It is erected on the square frame bottom and for being embedded in the intracorporal anchor plate of the wall;And
It is vertically connected at the square frame both sides and the positioning baffle extended to the square frame outside, institute The lower surface flush of the upper surface and the square frame bottom of stating positioning baffle is arranged, the positioning baffle, the anchoring Plate and the square frame are integrally formed.
Secondary frame of the invention can be embedded on wall in advance, to construct together with wall, and secondary frame can by positioning baffle With the window opening template location and installation at window hole, and secondary frame is clamped by window opening template, secondary frame and window opening template are together as window The template at hole realizes and just completes secondary frame location and installation in template erection stage, and the scene for solving traditional secondary frame carries out hole The problem of mouth measurement and installation, reduce the workload of working procedure and cross-operation.Secondary frame is by being embedded in the intracorporal anchor of wall Solid plate and wall connecting, and anchor plate is vertically arranged, can play waterproof action, realizes no-leakage structure, solves and first construct The problem of installing secondary frame after wall and being easy to produce leakage.Secondary frame of the invention realizes the rapid construction of window installation, is promoted Site operation efficiency, accelerates construction progress, and reduces construction cost.
Pair frame of the invention further improvement lies in that, the anchor plate is two, and the two sides of the corresponding square frame Portion's setting, the anchor plate are also fixedly connected with corresponding positioning baffle.
Pair frame of the invention further improvement lies in that, the bottom end of the anchor plate is vertically connected with bottom plate.
The present invention also provides a kind of pre-buried structures of secondary frame, comprising:
Pair frame as described in claim 1, is placed at window hole to be formed;And
Window opening template at window hole to be formed, a side of the window opening template are attached at corresponding secondary frame Side, the other side of the window opening template are connected and fixed with corresponding wall form;The base portion of the window opening template is split In on corresponding positioning baffle, the window opening template positioned at the secondary frame two sides is fastenedly connected by pin and selling sheet and is clamped described Secondary frame, to be enclosed window hole by the window opening template and the secondary frame, and the anchor plate of the secondary frame be placed in it is described In casting space between wall form.
The pre-buried structure of pair frame of the invention further improvement lies in that, the bottom end of the anchor plate is vertically connected with bottom plate, And the bottom plate is attached at the reinforcing bar on the inside of the wall form.
The pre-buried structure of pair frame of the invention further improvement lies in that, casting concrete forms wall in the casting space Body, and corresponding window hole, the square frame bottom are formed with by the secondary frame and the window opening template in the wall It is in contact with the surface of wall at the window hole, the positioning baffle and the anchor plate are embedded in corresponding wall.
The present invention also provides a kind of built-in process of secondary frame, include the following steps:
Construction wall form, and opening corresponding with window hole to be formed is set in staying on the wall form;
Secondary frame as described in claim 1 is provided, the secondary frame is placed at window hole to be formed;
Window opening template is provided, the window opening template is set at window hole to be formed, and by the one of the window opening template Side is attached at the side of corresponding secondary frame and the bottom part of the window opening template is placed on corresponding positioning baffle, will be described The other side of window opening template is connected and fixed with corresponding wall form;
Two window opening templates for being located at the secondary frame two sides are fastenedly connected to clamp the pair by pin and selling sheet Frame;
The window opening template for being located at window hole periphery to be formed is successively connected, window hole week to be formed will be located at The secondary frame of edge is successively connected, so that the window opening template and the secondary frame are enclosed window hole;And
Casting concrete is in casting space between the wall form to form wall, and the anchor plate is embedded in In the wall.
Built-in process of the present invention further improvement lies in that, will be located at window hole periphery to be formed secondary frame successively dock Connection, comprising:
The end cut of the secondary frame is formed into an angle;
Connecting corner yard is provided, the connecting corner yard is set to the junction of adjacent two secondary frames, and by the joint angle The end of code is inserted in corresponding secondary frame;
Into the cavity of the secondary frame, injecting glue, and will be adjacent with the end of the fixation connecting corner yard from the angle The angle docking of two secondary frames, so as to complete the connection of adjacent two secondary frames.
Built-in process of the present invention further improvement lies in that, further includes:
A bottom plate is vertically connected in the bottom end of the anchor plate, when secondary frame is arranged, the bottom plate is attached at the wall Corresponding reinforcing bar in body template.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the secondary frame of the present invention.
Fig. 2 is the structural schematic diagram of the pre-buried structure of the secondary frame of the present invention.
Fig. 3 is that the secondary frame of the present invention is applied at window hole and installs the structural schematic diagram of window.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Refering to fig. 1, the present invention provides a kind of secondary frame and its pre-buried structure and method, secondary frame is by method of clamping in window opening Splice between window opening template at mouthful and fix, the template at window hole, after pouring wall, window opening are constituted together with window opening template Then secondary frame is embedded on wall in advance for form removable.Secondary frame is securely connect by being embedded in the intracorporal anchor plate of wall with wall, and secondary frame is also It is convenient to carry out positioning clamping with window opening template in assembly provided with positioning baffle.The chamber formed inside the square frame of secondary frame Body can facilitate the corner between adjacent secondary frame to connect, in addition subsequent window also be facilitated to be connected and fixed by self threading pin, integrally be mentioned The high installation accuracy of window, shortens installation period.With reference to the accompanying drawing to secondary frame of the invention and its pre-buried structure and method It is illustrated.
Refering to fig. 1, it is shown that the structural schematic diagram of present invention pair frame.Below with reference to Fig. 1, to the structure of secondary frame of the invention into Row explanation.
As shown in Figure 1, secondary frame 20 of the invention is embedded in advance on the wall at window hole, which includes square frame 21, anchor plate 22 and positioning baffle 23, square frame 21 is in long strip, and the inner hollow of square frame 21 forms cavity 211, The length of the square frame 21 depends on the length and width of constructed window hole.Anchor plate 22 is erected on square frame 21 Bottom, the anchor plate 22 is for being embedded in wall, so that the direction framework 21 of secondary frame 20 is fixedly mounted on wall. Positioning baffle 23 is vertically connected at the both sides of square frame 21 and is extended on the outside of square frame 21, positioning baffle 23 The lower surface flush of upper surface and the bottom of square frame 21 is arranged, i.e. bottom of the positioning baffle 23 set on 21 side of square frame At portion, positioning baffle 23, anchor plate 22 and square frame 21 are integrally formed.
Preferably, secondary frame 20 is made of extrusion forming process, thus positioning baffle 23, anchor plate 22 and square frame 21 are made integral structure.
Secondary frame 20 of the invention erects anchor plate 22 in the bottom of square frame 21, and in fixed joint frame 20, will anchor Plate 22 is embedded in wall, so that 22 one side of anchor plate is that secondary frame 20 provides firm connection basis, it is on the other hand pair Frame 20 provides water-proof function, forms no-leakage structure, avoids the problem of installation place production of secondary frame 20 is at leak.
Positioning baffle 23 is arranged in the two sides of square frame 21 in secondary frame 20 of the invention, the side for positioning clamping pair frame 20 The window opening template of shape framework 21, secondary frame 20 is installed together with wall form, and after having poured wall, which has been left in wall On body, so that the installation for just completing secondary frame 20 is fixed.The square frame 21 of secondary frame 20 is clamped using window opening template, and rectangular For framework 21 also as the template of window hole, the stabilization so that secondary frame 20 can be connected firmly with template improves the embedded effect of secondary frame 20 Fruit and quality also reduce the existing rear multiple tracks working procedure for installing secondary frame, reduce the workload of cross-operation.
It is formed with cavity 211 in the square frame 21 of secondary frame 20 of the invention, on the one hand facilitates the secondary frame 20 of adjacent two Square frame 21 between by connecting corner yard connect, on the other hand can also facilitate the installation of window.
Secondary frame 20 of the invention realizes the rapid construction of window, promotes site operation efficiency, accelerates construction progress, and reduces Construction cost.
As a better embodiment of the invention, anchor plate 22 is two, and the both sides of corresponding square frame 21 are set It sets, anchor plate 22 is also fixedly connected with corresponding positioning baffle 23.Preferably, the anchor plate 22 vertically connects corresponding positioning gear Plate 23, anchor plate 22 and the side plate of corresponding square frame 21 align setting, the outer surface of anchor plate 22 and square frame 21 Side plate outer surface flush setting.
Further, the bottom end of anchor plate 22 is vertically connected with bottom plate 221.Preferably, middle part and the anchor plate of bottom plate 221 22 bottom end vertically connects.The stability that secondary frame 20 is arranged can be improved using the bottom plate 221 of setting, the bottom plate 221 is secondary in setting It when frame 20, can be resisted against on corresponding wall steel bar, provide certain support force for secondary frame 20.Again goodly, bottom plate 221 with it is corresponding Wall steel bar be fixedly connected.
Preferably, secondary frame 20 is made of aluminium alloy.The length of the anchor plate 22 of secondary frame 20 is 15mm, and bottom plate 221 stretches out The length of 22 side of anchor plate is 2mm, and the length that positioning baffle 23 stretches out 21 side of square frame is 5mm.
Secondary frame 20 of the invention when in use, is constructed together with wall form, and when installing wall form, secondary frame 20 is spelled Secondary frame 20 is clamped at corresponding window hole, and using the window opening template at window hole, it can be quick using positioning baffle 23 Window opening template and square frame 21 are positioned, after formwork erection is good, the anchor plate 22 of secondary frame 20 is located in the casting space of wall, to Casting concrete reaches dismounting to wall and requires, remove wall form and window opening template, secondary frame in casting space to form wall 20 are secured at the window hole of wall by anchor plate 22, to also complete secondary frame 20 while completing wall construction Installation.
The present invention also provides a kind of pre-buried structures of secondary frame.Below to a kind of pre-buried structure of secondary frame provided by the invention It is illustrated
As shown in Fig. 2, the pre-buried structure of secondary frame of the invention includes secondary frame 20 and window opening template 30, window opening template 30 include Die face plate 31 and the frame 32 being vertical at 31 outboard end of die face plate are carried out when window opening template 30 is assembled by frame 32 Splicing connects, and the casting space of wall is formed at the inner surface of die face plate 31.
Secondary frame 20 is placed at window hole to be formed, and the setting position of secondary frame 20 carries out positioning measurement as needed.Window Hole template 30 is set at window hole to be formed, and a side of window opening template 30 is attached at the side of corresponding secondary frame 21, window opening The other side of template 30 is connected and fixed with corresponding wall form, and wall form is not shown in Fig. 2, and window hole is that setting exists The hole for installing window on wall, window opening template 30 and secondary frame 20 be set to the top of window hole to be formed, bottom and Both sides, to form corresponding window hole pouring to be formed on wall using window opening template 30 and secondary frame 20.Window opening template 30 bottom part is placed on corresponding positioning baffle 23, by positioning baffle 23 can quick location and installation window opening template 30, position Window opening template 30 in secondary 20 two sides of frame is fastenedly connected and clamps secondary frame 20 by pin 51 and selling sheet 52, to pass through window opening mould Plate 30 and secondary frame 20 are enclosed window hole, and the anchor plate 22 of secondary frame 20 is placed in the casting space between wall form.
Preferably, window opening template 30 uses aluminum alloy pattern plate, the pin hole passed through for pin 51 is provided on frame 32, by two The both sides of the corresponding square frame 21 for being attached at secondary frame 21 of a window opening template 30, and the bottom part of window opening template 30 is placed in and determines On the baffle 23 of position, the positioning of window opening template 30 and secondary frame 20 is just completed, pin 51 is then passed through to the window opening of 20 two sides of secondary frame Pin hole on the frame 32 of template 30, then selling sheet 52 is inserted into the selling sheet hole on pin 51, thus by two window opening moulds The connection fastening of plate 30, and corresponding secondary frame 20 is fixedly clamped by two window opening templates 30.
Such pre-buried structure makes the fixation of secondary frame 20, install convenient, and pollution and damage will not be wound etc. Problem.
As a better embodiment of the invention, the bottom end of anchor plate 22 is vertically connected with bottom plate 221.Preferably, bottom The middle part of plate 221 is vertical with the bottom end of anchor plate 22 to be connect.Bottom plate 221 is attached at the reinforcing bar on the inside of wall form, thus for pair Frame 20 provides support force, so that the installation of secondary frame 20 is more stable securely.
As another better embodiment of the invention, casting concrete forms wall in the casting space in wall form Body, and corresponding window hole is formed with by secondary frame 20 and window opening template 30 in wall, at 21 bottom of square frame and window hole Surface of wall be in contact, positioning baffle 23 and anchor plate 22 are embedded in corresponding wall.Using being exposed to the rectangular of wall Installation foundation of the framework 21 as window, facilitates the installation of window.
As another better embodiment of the invention, when secondary frame 20 and window opening template 30 being arranged at window hole, by window It is successively connected between the secondary frame 20 of hole side, top and bottom, by the window opening of window hole side, top and bottom It is successively connected between template 30, in the settable ruggedized construction in the junction of window opening template 30, to prevent from generating leakage at docking Slurry.Being connected between secondary frame 20 can be realized by connecting corner yard, and the end of secondary frame 20 chamfers to form one 45 ° of angle, will Connecting corner yard is set to the junction of two secondary frames 20, and one end of connecting corner yard is enabled to be inserted into the cavity 211 in corresponding secondary frame 20 It is interior, and the end of connecting corner yard and secondary frame 20 are linked together by the glue of injection, infused to 211 injecting glue of cavity from angle The angle of two secondary frames 20 is docked after glue, so as to complete being connected for two secondary frames 20.
The built-in process of secondary frame provided by the invention is illustrated below.
As shown in figure 3, the built-in process of present invention pair frame, includes the following steps:
Construction wall form, and opening corresponding with window hole to be formed 12 is set in staying on wall form;
Above-mentioned secondary frame 20 is provided, secondary frame 20 is placed at window hole 12 to be formed;
As shown in connection with fig. 2, window opening template 30 is provided, window opening template 30 is set at window hole to be formed, and by window opening One side of template 30 is attached at the side of corresponding secondary frame 20 and the bottom part of window opening template 30 is placed in corresponding positioning gear On plate 23, the other side of window opening template 30 is connected and fixed with corresponding wall form;
Two window opening templates 30 for being located at 20 two sides of secondary frame are fastenedly connected to clamp pair by pin 51 and selling sheet 52 Frame 20;
The window opening template 30 for being located at 12 periphery of window hole to be formed is successively connected, window opening to be formed will be located at The secondary frame 20 of 12 peripheries of mouth is successively connected, so that window opening template 30 and secondary frame 20 are enclosed window hole;And
Casting concrete is in casting space between wall form to form wall 11, and anchor plate 22 is embedded in wall In 11.
22 one side of anchor plate in built-in process of the invention is that secondary frame 20 provides firm connection basis, another party Face is that secondary frame 20 provides water-proof function, forms no-leakage structure, avoids the problem of installation place production of secondary frame 20 is at leak.It is fixed Position baffle 23, the window opening template of the square frame 21 for positioning clamping pair frame 20, secondary frame 20 are installed together with wall form, After having poured wall, which has been left on wall, so that the installation for just completing secondary frame 20 is fixed.Utilize window opening template The square frame 21 of secondary frame 20 is clamped, and square frame 21 is also as the template of window hole, so that secondary frame 20 can connect with template Firm stable is connect, the embedded effect and quality of secondary frame 20 are improved, also reduces the existing rear multiple tracks working procedure for installing secondary frame, Reduce the workload of cross-operation.211 one side of cavity passes through company between facilitating the square frames 21 of adjacent two secondary frames 20 Corner brace connection is connect, the installation of window on the other hand can also be facilitated.
As a better embodiment of the invention, the secondary frame of window hole periphery to be formed will be located at successively in succession It connects, comprising:
The end cut of secondary frame 20 is formed into an angle;
Connecting corner yard is provided, connecting corner yard is set to the junction of adjacent two secondary frames 20, and by the end of connecting corner yard Portion is inserted in corresponding secondary frame 20;
Into the cavity 211 of secondary frame 20, injecting glue is to be fixedly connected with the end of corner brace from angle, and by two adjacent pairs The angle of frame 20 docks, so as to complete the connection of adjacent two secondary frames.
As another better embodiment of the invention, further includes:
A bottom plate 221 is vertically connected in the bottom end of anchor plate 22, when secondary frame 20 is arranged, bottom plate 221 is attached at wall Corresponding reinforcing bar in template.
The stability that secondary frame 20 is arranged can be improved using the bottom plate 221 of setting, which supports when secondary frame 20 is arranged It is against on corresponding wall steel bar, provides certain support force for secondary frame 20.Again goodly, bottom plate 221 and corresponding wall steel bar It is fixedly connected.
Built-in process of the invention further include: after wall reaches design strength, wall form and window opening template are removed, it is secondary Frame 20 stays on wall 11.Window 41 is then installed on the square frame 21 of secondary frame 20, the main frame of window 41 passes through self threading pin 42 are fastenedly connected on the square frame 21 of secondary frame 20, fill out between main frame and secondary frame 20 equipped with polyurethane foam agent 43.Then Coat of plaster 13 and insulating layer 14 are set on the wall 11 of 12 surrounding of window hole, coat of plaster 13 is set to the indoor of wall 11, Insulating layer 14 is set to the room of wall 11 on the wall 11 of the top of window hole 12, bottom and side by the coat of plaster 13 Outside, on the wall 11 of the top of window hole 12, bottom and side, insulating layer 14 is done at the waterproof gradient insulating layer 14 Reason.The thickness of coat of plaster 13 and insulating layer 14 is all larger than the thickness of the square frame of secondary frame 20, in the company of coat of plaster 13 and main frame The place's of connecing setting sealant is sealed, and in the junction of insulating layer 14 and main frame, setting sealant is sealed.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (9)

1. it is a kind of pair frame, be embedded on the wall at window hole in advance, which is characterized in that it is described pair frame include:
Square frame in long strip, inner hollow form cavity;
It is erected on the square frame bottom and for being embedded in the intracorporal anchor plate of the wall;And
It is vertically connected at the square frame both sides and the positioning baffle extended to the square frame outside, it is described fixed Position baffle upper surface and the square frame bottom lower surface flush be arranged, the positioning baffle, the anchor plate with And the square frame is integrally formed.
2. pair frame as described in claim 1, which is characterized in that the anchor plate is two, and the corresponding square frame Both sides setting, the anchor plate are also fixedly connected with corresponding positioning baffle.
3. pair frame as claimed in claim 1 or 2, which is characterized in that the bottom end of the anchor plate is vertically connected with bottom plate.
4. a kind of pre-buried structure of pair frame characterized by comprising
Pair frame as described in claim 1, is placed at window hole to be formed;And
Window opening template at window hole to be formed, a side of the window opening template are attached at the side of corresponding secondary frame Portion, the other side of the window opening template are connected and fixed with corresponding wall form;The bottom part of the window opening template is placed in On corresponding positioning baffle, the window opening template positioned at the secondary frame two sides is fastenedly connected by pin and selling sheet and clamps the pair Frame, to be enclosed window hole by the window opening template and the secondary frame, and the anchor plate of the secondary frame is placed in the wall In casting space between body template.
5. the pre-buried structure of pair frame as claimed in claim 4, which is characterized in that the bottom end of the anchor plate is vertically connected with bottom Plate, and the bottom plate is attached at the reinforcing bar on the inside of the wall form.
6. the pre-buried structure of pair frame as claimed in claim 4, which is characterized in that casting concrete is formed in the casting space Wall, and corresponding window hole, the square frame bottom are formed with by the secondary frame and the window opening template in the wall Portion is in contact with the surface of wall at the window hole, and the positioning baffle and the anchor plate are embedded in corresponding wall.
7. a kind of built-in process of pair frame, which comprises the steps of:
Construction wall form, and opening corresponding with window hole to be formed is set in staying on the wall form;
Secondary frame as described in claim 1 is provided, the secondary frame is placed at window hole to be formed;
Window opening template is provided, the window opening template is set at window hole to be formed, and by a side of the window opening template The bottom part of the side and the window opening template that are attached at corresponding secondary frame is placed on corresponding positioning baffle, by the window opening The other side of template is connected and fixed with corresponding wall form;
Two window opening templates for being located at the secondary frame two sides are fastenedly connected to clamp the secondary frame by pin and selling sheet;
The window opening template for being located at window hole periphery to be formed is successively connected, window hole periphery to be formed will be located at Secondary frame is successively connected, so that the window opening template and the secondary frame are enclosed window hole;And
Casting concrete to be in casting space between the wall form to form wall, and the anchor plate be embedded in it is described In wall.
8. built-in process as claimed in claim 7, which is characterized in that the secondary frame of window hole periphery to be formed will be located at successively It is connected, comprising:
The end cut of the secondary frame is formed into an angle;
Connecting corner yard is provided, the connecting corner yard is set to the junction of adjacent two secondary frames, and by the connecting corner yard End is inserted in corresponding secondary frame;
Into the cavity of the secondary frame, injecting glue is with the end of the fixation connecting corner yard from the angle, and by adjacent two The angle of secondary frame docks, so as to complete the connection of adjacent two secondary frames.
9. built-in process as claimed in claim 7, which is characterized in that further include:
A bottom plate is vertically connected in the bottom end of the anchor plate, when secondary frame is arranged, the bottom plate is attached at the wall mould Corresponding reinforcing bar in plate.
CN201810987962.9A 2018-08-28 2018-08-28 Auxiliary frame and pre-buried structure and method thereof Active CN109025277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810987962.9A CN109025277B (en) 2018-08-28 2018-08-28 Auxiliary frame and pre-buried structure and method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810987962.9A CN109025277B (en) 2018-08-28 2018-08-28 Auxiliary frame and pre-buried structure and method thereof

Publications (2)

Publication Number Publication Date
CN109025277A true CN109025277A (en) 2018-12-18
CN109025277B CN109025277B (en) 2021-08-10

Family

ID=64624835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810987962.9A Active CN109025277B (en) 2018-08-28 2018-08-28 Auxiliary frame and pre-buried structure and method thereof

Country Status (1)

Country Link
CN (1) CN109025277B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196406A (en) * 2020-11-18 2021-01-08 中铁十四局集团建筑工程有限公司 Aluminum alloy door and window with embedded square cushion frame and construction method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1108725A (en) * 1994-01-11 1995-09-20 庄永川 Die for integratly pouring concrete to make fixed-closed window frame and construction method
KR200402211Y1 (en) * 2005-09-13 2005-11-29 박준석 Gate guide fabrication synthetic resin door frame structure
CN203879215U (en) * 2014-05-21 2014-10-15 江苏省华建建设股份有限公司 Aluminium alloy door-window frame component with auxiliary frame
CN204590355U (en) * 2015-05-11 2015-08-26 中亿丰建设集团股份有限公司 LED flood lighting and curtain wall integral system
CN204850891U (en) * 2015-03-23 2015-12-09 杭州美市门窗科技有限公司 Door and window for exempt from nail installation
CN106088927A (en) * 2016-08-02 2016-11-09 武汉中建幕墙有限公司 Integrated door and window system and installation method thereof on prefabricated buildings PC component
CN106837060A (en) * 2017-04-05 2017-06-13 上海中建东孚投资发展有限公司 A kind of auxiliary frame combined system of bridge insulation thermal resistance window frame
CN206477740U (en) * 2017-01-20 2017-09-08 江苏远翔装饰工程有限公司 Assembled architecture door and window installation structure
CN107620543A (en) * 2017-11-20 2018-01-23 中建二局第二建筑工程有限公司 A kind of door-window opening waterproofing node structure and outer door and window pre-buried steel pair frame construction method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1108725A (en) * 1994-01-11 1995-09-20 庄永川 Die for integratly pouring concrete to make fixed-closed window frame and construction method
KR200402211Y1 (en) * 2005-09-13 2005-11-29 박준석 Gate guide fabrication synthetic resin door frame structure
CN203879215U (en) * 2014-05-21 2014-10-15 江苏省华建建设股份有限公司 Aluminium alloy door-window frame component with auxiliary frame
CN204850891U (en) * 2015-03-23 2015-12-09 杭州美市门窗科技有限公司 Door and window for exempt from nail installation
CN204590355U (en) * 2015-05-11 2015-08-26 中亿丰建设集团股份有限公司 LED flood lighting and curtain wall integral system
CN106088927A (en) * 2016-08-02 2016-11-09 武汉中建幕墙有限公司 Integrated door and window system and installation method thereof on prefabricated buildings PC component
CN206477740U (en) * 2017-01-20 2017-09-08 江苏远翔装饰工程有限公司 Assembled architecture door and window installation structure
CN106837060A (en) * 2017-04-05 2017-06-13 上海中建东孚投资发展有限公司 A kind of auxiliary frame combined system of bridge insulation thermal resistance window frame
CN107620543A (en) * 2017-11-20 2018-01-23 中建二局第二建筑工程有限公司 A kind of door-window opening waterproofing node structure and outer door and window pre-buried steel pair frame construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196406A (en) * 2020-11-18 2021-01-08 中铁十四局集团建筑工程有限公司 Aluminum alloy door and window with embedded square cushion frame and construction method

Also Published As

Publication number Publication date
CN109025277B (en) 2021-08-10

Similar Documents

Publication Publication Date Title
JP2019533098A (en) Joint groove integrated form and method of using the same
CN108000689B (en) Combined template for concrete member with window frame, pouring method of combined template and concrete member
CN210622306U (en) Assembly type floor post-cast strip template splicing structure
CN109025277A (en) Secondary frame and its pre-buried structure and method
CN109868923B (en) Construction method of bare concrete of loose-spliced wood formwork
CN111335358A (en) Immersed tube tunnel end mold, end mold supporting platform and construction method thereof
CN214942388U (en) Frame post template structure
CN214220178U (en) Prefabricated disassembly-free side mold and adjustable supporting system for one-step molding of floor water retaining strip
CN209990152U (en) Opening-closing type pouring opening structure
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN208949921U (en) Water stop fixing die
CN214995933U (en) Scaffold wall connecting piece wood formwork structure
CN207597862U (en) Special-shaped wall pours tooling
CN105696631B (en) A kind of erection method of post-cast strip baffle plate, baffle plate support system and support system
CN219825119U (en) Aqueduct pouring construction template
CN220747651U (en) Column template mounting structure
CN218758706U (en) A template system of consolidating for superimposed sheet post-cast strip construction
CN219622259U (en) Formwork structure of special-shaped column
CN220266645U (en) Can turnover formula basis raft post-cast strip template design mould and use pre-support subassembly thereof
CN217000883U (en) Adjustable floor reserved hole supporting device
CN108643562A (en) A kind of template system and construction method for the cast-in-place collar tie beam of assembled engineering
CN220133500U (en) Shear wall template bottom groove structure
CN220814887U (en) Contain waterstop side wall end wall structure template
CN216379866U (en) Concrete escape canal expansion joint cystosepiment fixing device
CN219548274U (en) Window closing-in mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant