CN216379565U - A protection body for highway cutting infiltration slope - Google Patents

A protection body for highway cutting infiltration slope Download PDF

Info

Publication number
CN216379565U
CN216379565U CN202120399904.1U CN202120399904U CN216379565U CN 216379565 U CN216379565 U CN 216379565U CN 202120399904 U CN202120399904 U CN 202120399904U CN 216379565 U CN216379565 U CN 216379565U
Authority
CN
China
Prior art keywords
gabion
net
protection
cuboid
protection body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120399904.1U
Other languages
Chinese (zh)
Inventor
王海林
李晓民
宁蟠龙
张瑢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Province Transportation Planning Survey and Design Institute Co Ltd
Original Assignee
Gansu Province Transportation Planning Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Province Transportation Planning Survey and Design Institute Co Ltd filed Critical Gansu Province Transportation Planning Survey and Design Institute Co Ltd
Priority to CN202120399904.1U priority Critical patent/CN216379565U/en
Application granted granted Critical
Publication of CN216379565U publication Critical patent/CN216379565U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to the field of highway slope protection, in particular to a protection body for a highway cutting seepage slope. The problem of current protective body poor stability and security performance is poor is solved. Including the gabion with fill the building stones in the gabion, the gabion is for but mosaic structure, forms the cuboid structure through assembling the concatenation of spiral hoop by a plurality of net pieces, packs the building stones back in the gabion, and the gabion is cascaded handing-over and places in the gravel bed course, forms the protection body. This device is through the gabion structure that adopts the concatenation formula, packs the building stones in the gabion, has certain fender, antiskid, scour protection effect, can bear the destruction of harsh environment and climatic conditions to have the effect of melting, promoting the view effect mutually with the engineering environment.

Description

A protection body for highway cutting infiltration slope
Technical Field
The utility model relates to the field of highway slope protection, in particular to a protection body for a highway cutting seepage slope.
Background
In recent years, "ecological railways", "low-carbon roads" and "green airports" in China have become the trend of engineering construction, and have made higher requirements on aspects such as technical innovation, environmental protection and ground disaster prevention and control. The novel structure is mainly applied to river revetment at present at home, for example, the dry dike of the Changjiang river of yellow stone, the Jing river section under the Changjiang river, the Yangjiang river revetment section from Guilin to Yangshao, and the wading road section of the landslide control project of the Chongqing Fengjie terrace all adopt the structure form of a gabion retaining wall, and a good effect is achieved. In recent years, the method has also been applied to roadbed support engineering of roads, such as roadbed support of Wu ten roads and glalan roads, roadbed support of tibet highways and the like.
The supporting and protecting of the gabion used for the highway side slope in China has not yet been widely applied, although there are few successful case projects in road engineering, the anticorrosion technology of the reinforcing mesh for the supporting and protecting type in China internationally includes the defects, so that the durability of the gabion is poor, the problems of rusting of iron wires, breakage of check nets, sliding of stones and the like can not occur for a long time in use, the attractiveness of road appearance is influenced, and the stability of the road cutting side slope can not be guaranteed.
In addition, the site construction process of the traditional gabion protection technology is simple and low, the reinforcing mesh is assembled manually mainly by workers on site, stones are carried, time and labor are wasted, the problems of irregularity of the reinforcing mesh, gabion stacking deviation and other details are often caused, and the hidden danger is buried under the protection and retaining action of later engineering entities.
SUMMERY OF THE UTILITY MODEL
The utility model provides a protective body for a road cutting water seepage side slope, which effectively solves the problems of poor stability and poor safety performance of the conventional protective body.
In order to achieve the purpose, the technical scheme adopted by the utility model is as follows:
the utility model provides a protection body for highway cutting infiltration side slope, includes gabion 1 and fills 2, its characterized in that of building stones in gabion 1: gabion 1 is but mosaic structure, forms the cuboid structure through assembling spiral hoop 10 concatenation by a plurality of net pieces, packs the building stones back in gabion 1, and gabion 1 is cascaded handing-over and places in gravel bed course 5, forms the protective body.
And the gravel cushion layer 5 is wrapped with a permeable geotextile 4.
And a kerbstone 3 is fixed at the edge of the gabion 1 at the bottommost layer of the protection body.
Rivets 11 extending out of the bottom of the gabion 1 are placed at the bottom of the gabion 1.
Gabion 1 comprises first net piece 6, second net piece 7 and third net piece 8, and a plurality of second net pieces 7 are the first group of cuboid and correspond two sides through assembling the installation of spiral hoop 10, constitute the cuboid second through two first net pieces 6 and organize and correspond two sides, constitute the cuboid third through two third net pieces 8 and organize and correspond two sides.
And a hoisting reinforcing hoop 9 is arranged at the junction of the second net piece 7.
The kerbstone 3 is provided with water permeable holes 301.
The utility model has the beneficial effects that: 1) the split gabion structure is adopted, the split gabion can be installed on site, and the split gabion is small in transportation volume and convenient to transport.
2) This device adopts the steel reinforcement gabion structure, and during the stone material that will accord with the particle diameter requirement was filled the gabion, had certain fender, antiskid, scour protection effect, can bear the destruction of harsh environment and climatic conditions to have the effect that fuses, promotes the view effect with the engineering environment.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic diagram of a gabion structure;
FIG. 3 is a schematic view of a hoisting reinforcing hoop structure;
FIG. 4 is a schematic view of a split helical band construction;
FIG. 5 is a schematic illustration of a rivet structure;
FIG. 6 is a schematic view of a kerbstone structure;
shown in the figure: the novel stone comprises a gabion 1, stones 2, kerbs 3, permeable geotextiles 4, a gravel cushion 5, a first net piece 6, a second net piece 7, a third net piece 8, a hoisting reinforcing hoop 9, an assembling spiral hoop 10 and rivets 11.
Detailed Description
The technical scheme of the utility model is further explained by specific embodiments in the following with the accompanying drawings:
a protection body for highway cutting infiltration side slope that shows as in fig. 1 ~ 5 aims at providing a reliability, and security and strong protective structure of stability realize the protection to highway cutting infiltration side slope. The specific structure and operation are as follows.
The protection body uses gabion 1 as the carrier, adopts the net piece structure that can splice to form a cuboid structure, packs building stones 2 in the stone cuboid structure. The gabion 1 is made up of a first mesh 6, a second mesh 7 and a third mesh 8. The first net sheet 6 is a net sheet with a top surface and a bottom surface and adopts a single net sheet structure. The second meshes 7 form the front meshes and the rear meshes through the assembled spiral hoops 10. During assembly, the second net piece 7 is butted, and the assembled spiral hoop 10 is rotated to enter, so that fastening is realized. The third net 8 is a left net and a right net, and adopts a single net structure. The structure is integrally formed into a cuboid structure through assembling.
After the gabion 1 is spliced, the rivets 11 are firstly prevented, the rivet is of an inverted cone structure as shown in figure 5, and the rivets 11 extend out of the bottom surface of the gabion 1 after the rivet is placed. The rivets (11) serve to ensure stability of the gabion (1) after placement and prevent movement.
For make stable hoist and mount after placing building stones 2, it has hoist and mount to strengthen hoop 9 to consolidate through assembling spiral hoop 10 in the gabion 1 of cuboid, guarantees the intensity of gabion 1.
After the rivets 11 have been placed, the gabion 1 is filled with stones 2 of a specific size.
After the stone is put into with assembling of gabion 1, form a whole, the parcel has geotechnological cloth 4 that permeates water on the gravel bed course 5, and gabion 1 is placed on geotechnological cloth 4 that permeates water. The water-permeable geotextile 4 is a water-permeable geosynthetic material formed by needling or weaving synthetic fibers. The finished product is in cloth shape. The permeable geotextile 4 has excellent filtering, isolating, reinforcing and protecting effects, high tensile strength, good permeability, high temperature resistance, freezing resistance, aging resistance and corrosion resistance.
After the steps are completed, the gabion 1 is hoisted through hoisting equipment, and the gabion 1 is placed on the gravel cushion 5 in a stepped structure. When 1 hoist and mount of gabion, need hand over the installation each other with the gabion, set up kerbstone 3, the stability of the whole protective body of further assurance simultaneously at 1 border of bottom gabion is fixed.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (6)

1. The utility model provides a protection body for highway cutting infiltration side slope, includes the gabion and fills the building stones in the gabion, its characterized in that: the stone cage is of a splicing structure, a plurality of net sheets are spliced into a cuboid structure through splicing spiral hoops, and the stone cage is placed on a gravel cushion layer in a stepped connection mode after stone is filled in the stone cage to form a protection body;
the gabion comprises first net piece, second net piece and third net piece, and a plurality of second net pieces are the first set of cuboid and correspond the two sides through assembling the installation of spiral hoop, constitute the cuboid second through two first net pieces and organize and correspond the two sides, constitute the cuboid third through two third net pieces and organize and correspond the two sides.
2. A protective body for a road cutting seepage slope according to claim 1, which is characterized in that: and the gravel cushion layer is wrapped with permeable geotextile.
3. A protective body for a road cutting seepage slope according to claim 1, which is characterized in that: and a kerbstone is fixed at the edge of the gabion at the bottommost layer of the protection body.
4. A protective body for a road cutting seepage slope according to claim 3, wherein: rivets extending out of the bottom of the gabion are placed at the bottom of the gabion.
5. A protective body for a road cutting seepage slope according to claim 1, which is characterized in that: and a hoisting reinforcing hoop is arranged at the junction of the second net piece.
6. A protective body for a road cutting seepage slope according to claim 3, wherein: and the kerbstone is provided with water permeable holes.
CN202120399904.1U 2021-02-22 2021-02-22 A protection body for highway cutting infiltration slope Expired - Fee Related CN216379565U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120399904.1U CN216379565U (en) 2021-02-22 2021-02-22 A protection body for highway cutting infiltration slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120399904.1U CN216379565U (en) 2021-02-22 2021-02-22 A protection body for highway cutting infiltration slope

Publications (1)

Publication Number Publication Date
CN216379565U true CN216379565U (en) 2022-04-26

Family

ID=81215230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120399904.1U Expired - Fee Related CN216379565U (en) 2021-02-22 2021-02-22 A protection body for highway cutting infiltration slope

Country Status (1)

Country Link
CN (1) CN216379565U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854262A (en) * 2021-02-22 2021-05-28 甘肃省交通规划勘察设计院股份有限公司 A protection body for highway cutting infiltration slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854262A (en) * 2021-02-22 2021-05-28 甘肃省交通规划勘察设计院股份有限公司 A protection body for highway cutting infiltration slope

Similar Documents

Publication Publication Date Title
KR100350625B1 (en) Reinforced Earth Retaining-Wall for using Sand-Bag
CN216379565U (en) A protection body for highway cutting infiltration slope
CN102444141A (en) Object-accommodating bag group, production method thereof and formed retaining wall
CN1209535C (en) Plastic and earth-work combined retaining wall
CN110984193A (en) Severe cold mountain area highway cutting side slope ecological protection system
CN213805480U (en) Gabion retaining wall
CN103321258A (en) PFF integral composite reversed filtering layer and construction method thereof
CN108951693B (en) Ecological bag stiffening retaining wall and application thereof
CN113073656A (en) Inter-pile soil protection structure of support pile and construction method thereof
CN212270826U (en) Check guest net cage
CN211368308U (en) Water permeability gardens road surface
JPS61155516A (en) Slope stabilization work and reinforcement therefor
CN110080281B (en) Waste tire reinforcement-anchoring combined type ecological retaining wall and construction method
CN112854262A (en) A protection body for highway cutting infiltration slope
CN108894206B (en) Sandbar sewage pipe and well anti-floating system and construction method
CN203452102U (en) Integral composite reversed filtering layer
CN216475115U (en) Recyclable slope lamination green protection grid
CN108560495A (en) A kind of adjustable Ecological Retaining Wall of angular range
CN204849819U (en) Environmental retaining wall
CN213329058U (en) Seepage-proofing structure of geotechnical engineering side slope
CN211773858U (en) Landscape gabion retaining wall
CN210887089U (en) Space-saving interlocking dock type ecological retaining wall structure
CN203129156U (en) High steep reinforcement side slope structure
KR100614907B1 (en) Member for Constructing Breast Wall and Method of Constructing the Breast Wall
CN112411620A (en) Gabion retaining wall and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220426