CN216336142U CN202123099378.6U CN202123099378U CN216336142U CN 216336142 U CN216336142 U CN 216336142U CN 202123099378 U CN202123099378 U CN 202123099378U CN 216336142 U CN216336142 U CN 216336142U
Authority
CN
China
Prior art keywords
support
frame
hanger
front axle
support connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123099378.6U
Other languages
Chinese (zh)
Inventor
孙成国
刘晓君
苟宝迪
刘丰起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Bada Auto Parts Co ltd
Original Assignee
Qingdao Bada Auto Parts Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Bada Auto Parts Co ltd filed Critical Qingdao Bada Auto Parts Co ltd
Priority to CN202123099378.6U priority Critical patent/CN216336142U/en
Application granted granted Critical
Publication of CN216336142U publication Critical patent/CN216336142U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model provides a front axle shot blasting hoisting tool, which comprises: the hanger main body comprises a hanger supporting frame, the front shaft is placed at the top of the hanger supporting frame, a hanger connecting frame is arranged on the hanger supporting frame, a plurality of limiting clamping hooks are arranged on the hanger connecting frame, and the limiting clamping hooks are arranged along the length direction of the hanger connecting frame; the front shaft main body comprises a front shaft support frame, the front shaft support frame is fixedly arranged on one side of the hanger support frame, and the front shaft support frame is arranged in a triangular shape and used for supporting the end head of the front shaft.

Description

Front axle shot blasting hoisting tool
Technical Field
The utility model belongs to the technical field of automobiles, and particularly relates to a front axle shot blasting hoisting tool.
Background
The front axle has a complex structure with long length, large fall and high weight, so that the center of gravity of the front axle is positioned outside the workpiece. When the front axle is shot blast, the equipment is self for reducing the floor area of the shot blasting chamber of the equipment, a vertical shot blasting mode is often adopted, the front axle workpiece needs to be vertically clamped into a machine tool when being clamped, the traditional hoisting directly adopts a steel wire rope to bind one end of the workpiece and is suspended in the shot blasting chamber of the machine tool, and due to the characteristic that the structure of the workpiece is complex, the workpiece is easy to hoist unstably, is easy to overturn and fall off, cannot be clamped onto the tool, and is poor in hoisting reliability.
SUMMERY OF THE UTILITY MODEL
The utility model provides a front axle shot blasting hoisting tool, which solves the problems.
The technical scheme of the utility model is realized as follows: the utility model provides a front axle throws ball hoist and mount frock, includes:
the hanger main body comprises a hanger supporting frame, the front shaft is placed at the top of the hanger supporting frame, a hanger connecting frame is arranged on the hanger supporting frame, a plurality of limiting clamping hooks are arranged on the hanger connecting frame, and the limiting clamping hooks are arranged along the length direction of the hanger connecting frame;
the front shaft main body comprises a front shaft support frame, the front shaft support frame is fixedly arranged on one side of the hanger support frame, and the front shaft support frame is arranged in a triangular shape and used for supporting the end head of a front shaft.
As a preferred embodiment, the spreader support frame comprises a first support link, a second support link and a third support link;
the first support connecting part is arranged in a rectangular shape, the front shaft is placed at the top of the first support connecting part, the lifting appliance connecting frame is arranged at the left end inside the first support connecting part, and the front end and the rear end of the lifting appliance connecting frame are fixedly connected with the front side and the rear side of the first support connecting part respectively;
the second support connecting part is vertically arranged at the bottom of the left end of the first support connecting part, and the top surface of the second support connecting part is fixedly connected with the bottom surface of the first support connecting part;
the third support connecting portion are fixedly arranged on the left side of the second support connecting portion, the top end of the third support connecting portion is higher than the first support connecting portion, and the bottom end of the third support connecting portion is in an arc-shaped arrangement.
In a preferred embodiment, a hanging ring is integrally connected to the top of the third supporting and connecting portion.
As a preferred embodiment, the limiting hooks are arranged in an L shape, and the distance between every two adjacent limiting hooks is smaller than the maximum width of the front shaft.
In a preferred embodiment, a first rib is connected between the bottom surface of the first support connection portion and the side wall of the second support connection portion.
As a preferred embodiment, the front shaft support frame includes a first support fixing portion, a second support fixing portion, and a third support fixing portion;
the second support fixing part is fixedly and vertically arranged at the bottom of the right end of the first support connecting part;
the third support fixing part is fixedly and vertically arranged on the right side of the bottom end of the second support fixing part;
first support fixed part fixed connection the right-hand member of first support connecting portion and the right-hand member of third support fixed part, first support fixed part are the rectangle setting.
In a preferred embodiment, a second rib is connected between the bottom surface of the first support connecting portion and the side wall of the second support fixing portion.
In a preferred embodiment, rollers are disposed at both front and rear ends of the third support fixing portion.
In a preferred embodiment, an elastic collar is disposed outside the roller, and the elastic collar is disposed outside the third supporting and fixing portion.
After the technical scheme is adopted, the utility model has the beneficial effects that:
when clamping the work piece before hoist and mount, the frock is kept flat subaerial, through work piece self gravity balance with the work piece in proper order steadily put in the frock frame, be about to the work piece and place in the top of first support connecting portion, first support fixed portion is the supporting role to the right-hand member of work piece simultaneously for the balance of work piece, the left end of work piece stretches out the hoist main part setting, has placed a work piece between two adjacent spacing trips, the work piece is according to the interval arrangement that sets up of spacing trip.
Lifting hook through independent balanced lifting means connects rings and drives frock main part one end and rises to it is tight to accomplish the work piece auto-lock through work piece dead weight and frock cooperation and press from both sides, it is fixed to realize the work piece, spacing trip is carried on spacingly to the left end of work piece promptly, the effect of fulcrum is played, the possibility that the work piece drops at the in-process that rises has been reduced, the lifting hook drives rings and continuously rises, the frock main part slides and progressively breaks away from ground through the gyro wheel on ground, the realization is by horizontal to vertical conversion, promote to the height of settlement after by independent balanced lifting means conveying income shot-blasting indoor. The tool structure ensures the balance stability when clamping the workpiece, improves the safety when hoisting, and avoids the risk of workpiece falling during clamping and hoisting.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the present invention;
FIG. 3 is a schematic view of a workpiece according to the present invention;
FIG. 4 is a top view of the present invention placed into a workpiece;
fig. 5 is a state diagram of the operational process of the present invention.
In the drawings, 1-a spreader support frame; 2-a hanger connecting frame; 3-limiting clamping hooks; 4-front axle support frame; 5-hoisting rings; 6-a first reinforcing rib; 7-a second reinforcing rib; 8-a roller; 9-a workpiece; 10-a first support connection; 11-a second support connection; 12-a third support connection; 40-a first supporting and fixing part; 41-a second support fixing part; 42-a third support fixture; 80-circlip.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
According to fig. 1 to 5, a front axle shot blasting hoisting tool comprises:
the hanger comprises a hanger main body and a hanger connecting frame, wherein the hanger main body comprises a hanger supporting frame 1, the front shaft is placed at the top of the hanger supporting frame 1, a hanger connecting frame 2 is arranged on the hanger supporting frame 1, a plurality of limiting clamping hooks 3 are arranged on the hanger connecting frame 2, and the limiting clamping hooks 3 are arranged along the length direction of the hanger connecting frame 2;
the front axle main body comprises a front axle support frame 4, the front axle support frame 4 is fixedly arranged on one side of the hanger support frame 1, and the front axle support frame 4 is arranged in a triangular shape and used for supporting the end head of a front axle.
The hanger support frame 1 comprises a first support connection part 10, a second support connection part 11 and a third support connection part 12;
the first support connecting part 10 is arranged in a rectangular shape, the front shaft is placed at the top of the first support connecting part 10, the lifting appliance connecting frame 2 is arranged at the left end inside the first support connecting part 10, and the front end and the rear end of the lifting appliance connecting frame 2 are fixedly connected with the front side and the rear side of the first support connecting part 10 respectively;
the second support connecting part 11 is vertically arranged at the bottom of the left end of the first support connecting part 10, and the top surface of the second support connecting part 11 is fixedly connected with the bottom surface of the first support connecting part 10;
the third support connecting portion 12 is fixedly arranged on the left side of the second support connecting portion 11, the top end of the third support connecting portion 12 is higher than the first support connecting portion 10, and the bottom end of the third support connecting portion 12 is in an arc shape.
The top of the third support connecting part 12 is integrally connected with a hanging ring 5.
Spacing trip 3 is the setting of L type, and the distance between two adjacent spacing trips 3 is less than the maximum width setting of front axle.
A first reinforcing rib 6 is connected between the bottom surface of the first support connection part 10 and the side wall of the second support connection part 11.
The front-shaft support frame 4 includes a first support fixing portion 40, a second support fixing portion 41, and a third support fixing portion 42;
the second support fixing part 41 is fixedly and vertically arranged at the bottom of the right end of the first support connecting part 10;
the third supporting and fixing part 42 is fixedly and vertically arranged at the right side of the bottom end of the second supporting and fixing part 41;
the first supporting and fixing portion 40 is fixedly connected to the right end of the first supporting and connecting portion 10 and the right end of the third supporting and fixing portion 42, and the first supporting and fixing portion 40 is rectangular.
And a second reinforcing rib 7 is connected between the bottom surface of the first support connecting part 10 and the side wall of the second support fixing part.
The front and rear ends of the third support fixing part 42 are provided with rollers 8.
The outer side of the roller 8 is provided with a circlip 80, and the circlip 80 is sleeved on the outer side of the third supporting and fixing portion 42.
When clamping the work piece before hoist and mount, the frock is kept flat subaerial, through work piece self gravity balance with the work piece in proper order steadily put the frock frame, be about to the work piece and place in the top of first supporting connection portion 10, first supporting fixing portion 40 is the supporting role to the right-hand member of work piece simultaneously for the balance of work piece, the left end of work piece stretches out the hoist main part setting, a work piece has been placed between two adjacent spacing trip 3, the work piece is according to spacing trip 3's setting interval arrangement.
Lifting hook through independent balanced lifting device connects rings 5 and drives frock main part one end and rises to accomplish the work piece auto-lock through the work piece dead weight and the frock cooperation and press from both sides tightly, it is fixed to realize the work piece, spacing trip 3 carries on spacingly to the left end of work piece promptly, the effect of fulcrum is played, the possibility that the work piece dropped at the in-process that rises has been reduced, the lifting hook drives rings 5 and lasts to rise, the frock main part slides and progressively breaks away from ground through gyro wheel 8 on ground, the realization is by horizontal to vertical conversion, promote to the height of settlement after by independent balanced lifting device conveying income throw the ball indoor. The tool structure ensures the balance stability when clamping the workpiece, improves the safety when hoisting, and avoids the risk of workpiece falling during clamping and hoisting.
The utility model has the advantages of simple manufacturing process, wide material use, low manufacturing cost and low use cost. Meanwhile, the hoisting device has the advantages of safety, reliability, convenience in use, easiness in operation and high hoisting speed.
The method has wide applicability and popularization to the majority of axle production enterprises, and can be extended to other shaft processing industries. If the utility model is special for shot blasting, solid round bar materials are adopted, if the heat treatment is carried out by a furnace, heat-resistant materials can be used instead, and if the heat treatment is carried out by a material flow line, light square steel tubes and the like can be used, which are not listed.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, are not to be construed as limiting the present invention. In the description of the present invention, unless otherwise specified and limited, it is to be noted that the terms "mounted," "connected," and "connected" are to be interpreted broadly, and may be, for example, a mechanical connection or an electrical connection, a communication between two elements, a direct connection, or an indirect connection via an intermediate medium, and specific meanings of the terms may be understood by those skilled in the art according to specific situations.
The present invention is not limited to the above preferred embodiments, and any modifications, equivalent substitutions, improvements, etc. within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. The utility model provides a front axle throws ball hoist and mount frock which characterized in that includes:
the hanger main body comprises a hanger supporting frame, the front shaft is placed at the top of the hanger supporting frame, a hanger connecting frame is arranged on the hanger supporting frame, a plurality of limiting clamping hooks are arranged on the hanger connecting frame, and the limiting clamping hooks are arranged along the length direction of the hanger connecting frame;
the front shaft main body comprises a front shaft support frame, the front shaft support frame is fixedly arranged on one side of the hanger support frame, and the front shaft support frame is arranged in a triangular shape and used for supporting the end head of a front shaft.
2. The front axle shot blasting hoisting tool according to claim 1, wherein the hanger support frame comprises a first support connection part, a second support connection part and a third support connection part;
the first support connecting part is arranged in a rectangular shape, the front shaft is placed at the top of the first support connecting part, the lifting appliance connecting frame is arranged at the left end inside the first support connecting part, and the front end and the rear end of the lifting appliance connecting frame are fixedly connected with the front side and the rear side of the first support connecting part respectively;
the second support connecting part is vertically arranged at the bottom of the left end of the first support connecting part, and the top surface of the second support connecting part is fixedly connected with the bottom surface of the first support connecting part;
the third support connecting portion are fixedly arranged on the left side of the second support connecting portion, the top end of the third support connecting portion is higher than the first support connecting portion, and the bottom end of the third support connecting portion is in an arc-shaped arrangement.
3. The front axle shot blasting hoisting tool according to claim 2, wherein a hoisting ring is integrally connected to the top of the third support connecting portion.
4. The front axle shot blasting hoisting tool according to claim 1, wherein the limiting hooks are arranged in an L shape, and the distance between two adjacent limiting hooks is smaller than the maximum width of the front axle.
5. The front axle shot blasting hoisting tool according to claim 2, wherein a first reinforcing rib is connected and arranged between the bottom surface of the first support connecting part and the side wall of the second support connecting part.
6. The front axle shot blasting hoisting tool according to claim 2, wherein the front axle support frame comprises a first support fixing part, a second support fixing part and a third support fixing part;
the second support fixing part is fixedly and vertically arranged at the bottom of the right end of the first support connecting part;
the third support fixing part is fixedly and vertically arranged on the right side of the bottom end of the second support fixing part;
first support fixed part fixed connection the right-hand member of first support connecting portion and the right-hand member of third support fixed part, first support fixed part are the rectangle setting.
7. The front axle shot blasting hoisting tool according to claim 6, wherein a second reinforcing rib is connected and arranged between the bottom surface of the first support connecting part and the side wall of the second support fixing part.
8. The front axle shot blasting hoisting tool according to claim 6, wherein rollers are arranged at the front end and the rear end of the third support fixing part.
9. The front axle shot blasting hoisting tool according to claim 8, wherein an elastic retainer ring is arranged on the outer side of the roller, and the elastic retainer ring is sleeved on the outer side of the third support fixing part.
CN202123099378.6U 2021-12-10 2021-12-10 Front axle shot blasting hoisting tool Active CN216336142U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123099378.6U CN216336142U (en) 2021-12-10 2021-12-10 Front axle shot blasting hoisting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123099378.6U CN216336142U (en) 2021-12-10 2021-12-10 Front axle shot blasting hoisting tool

Publications (1)

Publication Number Publication Date
CN216336142U true CN216336142U (en) 2022-04-19

Family

ID=81162583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123099378.6U Active CN216336142U (en) 2021-12-10 2021-12-10 Front axle shot blasting hoisting tool

Country Status (1)

Country Link
CN (1) CN216336142U (en)

Similar Documents

Publication Publication Date Title
CN206188192U (en) Hoist of steel sheet is hung in steelmaking with dress
CN202296842U (en) Hanger special for universal shaft of vertical rolling mill
CN216336142U (en) Front axle shot blasting hoisting tool
CN204529089U (en) A kind of large-size pipe special hanger
CN210133816U (en) Pneumatic lifting appliance for prestressed high-strength concrete pipe pile
CN207243352U (en) A kind of material elevator with auxiliary fixing assembly
CN209702095U (en) A kind of wire rod lifting device
CN206156583U (en) Hoist is used in axle type product hoist and mount
CN207112341U (en) It is a kind of simple and can fast fix the fastener of built-in groove
CN209442510U (en) A kind of suspender for brake hub lifting
CN210944551U (en) Three-clamp excircle sling
CN210558848U (en) Automatic unhooking device for hanging basket
CN213970702U (en) Shot blasting frame of casting shot blasting machine
CN207903770U (en) A kind of self-propelled hoist conveyor line with locating guide device
CN205616437U (en) Device of a hoist and mount graphite heat preservation section of thick bamboo
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN206395703U (en) A kind of steel pipe boom hoisting
CN205802778U (en) A kind of crown block sling for aluminum-alloy wheel heat treatment material rest
CN217102840U (en) Electromagnetic gantry crane for transferring scrap steel
CN203767840U (en) Lifting hook capable of allowing hung article to automatically fall off
CN212356219U (en) Convenient to use's metallurgical hoist
CN213289947U (en) Shot blasting machine with casting posture convenient to adjust
CN220827209U (en) Lifting elevator convenient to transportation
CN218909600U (en) Double-gear-shaping wind power tower section lifting hook
CN209815559U (en) Safe type overhead hoist is used in high-rise building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant