CN218909600U - Double-gear-shaping wind power tower section lifting hook - Google Patents

Double-gear-shaping wind power tower section lifting hook Download PDF

Info

Publication number
CN218909600U
CN218909600U CN202223253971.6U CN202223253971U CN218909600U CN 218909600 U CN218909600 U CN 218909600U CN 202223253971 U CN202223253971 U CN 202223253971U CN 218909600 U CN218909600 U CN 218909600U
Authority
CN
China
Prior art keywords
gear shaping
hanging
tower section
beam frame
hanging beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223253971.6U
Other languages
Chinese (zh)
Inventor
李欢平
张桂珍
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Tbea Energy Equipment Co ltd
Original Assignee
Inner Mongolia Tbea Energy Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Tbea Energy Equipment Co ltd filed Critical Inner Mongolia Tbea Energy Equipment Co ltd
Priority to CN202223253971.6U priority Critical patent/CN218909600U/en
Application granted granted Critical
Publication of CN218909600U publication Critical patent/CN218909600U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to the technical field of lifting slings, in particular to a double-gear-shaping wind power tower section lifting hook. The wind power tower section lifting device solves the problems that the wind power tower section generates stretching deformation during lifting and avoids collision between a lifting appliance and a rolling device and safety. The novel gear shaping hanging beam comprises two gear shaping hanging beam frames, wherein a first connecting rod, a hanging lug and a second connecting rod are fixedly connected between the two gear shaping hanging beam frames, the first connecting rod is provided with two hanging lugs, the hanging lug is positioned between the two first connecting rods, the second connecting rod is positioned at the right end of the gear shaping hanging beam frame, and a protective layer is fixedly connected to the inner wall of the gear shaping hanging beam frame. According to the utility model, by arranging the two gear shaping hanging beam frames, the first connecting rod, the second connecting rod, the hanging lugs and the protective layer, compared with a simple plate hook hanging tower section and a single beam C-shaped hook, the safety problem that the hanging hook is easy to slide and the problem that the tower section is easy to stretch and deform are solved, and the hanging hook manufactured by the two gear shaping hanging beam frames is used for hanging the tower section, so that the deformation of the tower section is reduced to the greatest extent.

Description

Double-gear-shaping wind power tower section lifting hook
Technical Field
The utility model relates to the technical field of lifting slings, in particular to a double-gear-shaping wind power tower section lifting hook.
Background
The existing lifting slings for wind power tower sections at home and abroad are mostly simple steel plate lifting hooks or single-beam C-shaped lifting slings. The simple steel plate lifting hook is easy to slide during lifting, and has great potential safety hazard. When the single-beam C-shaped lifting appliance is used for lifting the tower section, the tower section can be stretched and deformed, the ovality requirement of the tower section is affected, and collision damage can be caused to the supporting upright post of the plate rolling equipment.
Disclosure of Invention
The utility model provides a double-gear-shaping wind power tower section lifting hook which is beneficial to stable transportation of the tower section and reduces the deformation of the tower section.
In order to solve the technical problems, the utility model adopts the following technical scheme:
the utility model provides a two gear shaping wind-powered electricity generation tower festival handling hooks, includes gear shaping hanging beam frame, gear shaping hanging beam frame is provided with two, two fixedly connected with head rod, hangers and second connecting rod between the gear shaping hanging beam frame, the head rod is provided with two, the hangers is located between two head rods, the second connecting rod is located gear shaping hanging beam frame right-hand member, gear shaping hanging beam frame inner wall fixedly connected with protective layer.
Further, the gear shaping hanging beam frame is U type shape, gear shaping hanging beam frame left end upper portion fixedly connected with balancing weight, the inclined plane has been seted up to gear shaping hanging beam frame left end lower part.
Further, gear shaping hanging beam frame upper end fixedly connected with first gusset plate, first gusset plate and balancing weight fixed connection.
Further, the left side and the right side of the hanging lug are fixedly connected with second reinforcing plates, and the second reinforcing plates are fixedly connected with the gear shaping hanging beam frame.
Further, the protective layer is made of polyurethane materials.
The utility model has the beneficial effects that:
through setting up two gear shaping hanging beam frames, head rod, second connecting rod, hangers and protective layer, with using simple and easy board hook handling tower festival contrast, solved the easy safety problem of landing of lifting hook and the easy stretch deformation's of tower festival problem, carry out handling tower festival with the lifting hook that two gear shaping hanging beam frames were made, increased two contact surfaces, furthest reduced the deformation of tower festival.
Drawings
FIG. 1 is a schematic view of the overall structure of the present utility model from the front view;
FIG. 2 is an enlarged view of portion A of FIG. 1 in accordance with the present utility model;
FIG. 3 is a front view of the present utility model;
FIG. 4 is a top view of the present utility model;
fig. 5 is a left side view of the present utility model.
Reference numerals illustrate:
1. a gear shaping hanging beam frame; 2. hanging lugs; 3. balancing weight; 4. a first reinforcing plate; 5. a second reinforcing plate; 6. a first connecting rod; 7. a second connecting rod; 8. and (3) a protective layer.
Detailed Description
The utility model will be further described with reference to examples and drawings, to which reference is made, but which are not intended to limit the scope of the utility model.
As shown in fig. 1-5, the utility model provides a double-gear shaping wind power tower section lifting hook, which comprises two gear shaping lifting beam frames 1, wherein a first connecting rod 6, two hanging lugs 2 and a second connecting rod 7 are fixedly connected between the two gear shaping lifting beam frames 1, the first connecting rod 6 is provided with two hanging lugs 2 and is positioned between the two first connecting rods 6, the second connecting rod 7 is positioned at the right end of the gear shaping lifting beam frame 1, and a protective layer 8 is fixedly connected with the inner wall of the gear shaping lifting beam frame 1.
Specifically, two gear shaping hanging beam frames 1 link together through head rod 6 and second connecting rod 7, at this moment can strengthen the stability of lifting hook under head rod 6 and second connecting rod 7's effect, and the existence of hangers 2 is also convenient for be handling simultaneously, when handling the tower festival, hangs gear shaping hanging beam frame 1 on the tower festival, owing to be provided with two gear shaping hanging beam frames 1, just so increased two contact surfaces, furthest reduced the deformation of tower festival.
The gear shaping hanging beam frame 1 is U type shape, gear shaping hanging beam frame 1 left end upper portion fixedly connected with balancing weight 3, and the inclined plane has been seted up to gear shaping hanging beam frame 1 left end lower part, and during operation, the existence of balancing weight 3 is convenient for take off gear shaping hanging beam frame 1 from the tower festival, simultaneously because gear shaping hanging beam frame 1 lower extreme is the inclined plane, the tower festival is hung to gear shaping hanging beam frame 1 of also being convenient for like this.
The gear shaping hanging beam frame 1 upper end fixedly connected with first gusset plate 4, first gusset plate 4 and balancing weight 3 fixed connection, during operation can make the balancing weight 3 more stable with being connected between the gear shaping hanging beam frame 1 under the effect of first gusset plate 4.
The equal fixedly connected with second gusset plate 5 of hangers 2 left and right sides, fixed connection between second gusset plate 5 and the gear shaping hanging beam frame 1, during operation is under the effect of second gusset plate 5 for be connected between lug and the gear shaping hanging beam frame 1 more stably.
The protection layer 8 is made of polyurethane material, and the protection layer 8 can protect the tower section and reduce abrasion between the gear shaping hanging beam frame 1 and the tower section.
Working principle:
when the lifting tower is used, the two gear shaping lifting beam frames 1 are connected together through the first connecting rod 6 and the second connecting rod 7, at this time, the stability of the lifting hook can be enhanced under the action of the first connecting rod 6 and the second connecting rod 7, the suspension loop 2 is convenient to lift, when the tower section is lifted, the gear shaping lifting beam frames 1 are hung on the tower section, due to the fact that the two gear shaping lifting beam frames 1 are arranged, two contact surfaces are increased, deformation of the tower section is reduced to the greatest extent, meanwhile, the protection layer 8 can protect the tower section, and abrasion between the gear shaping lifting beam frames 1 and the tower section is reduced.
All technical features in the embodiment can be freely combined according to actual needs.
The foregoing embodiments are preferred embodiments of the present utility model, and other embodiments are included, without departing from the spirit of the present utility model.

Claims (5)

1. Double-gear shaping wind power tower section lifting hooks, a serial communication port, including gear shaping hanging beam frame (1), gear shaping hanging beam frame (1) is provided with two, two fixedly connected with head rod (6), hangers (2) and second connecting rod (7) between gear shaping hanging beam frame (1), head rod (6) are provided with two, hangers (2) are located between two head rods (6), second connecting rod (7) are located gear shaping hanging beam frame (1) right-hand member, gear shaping hanging beam frame (1) inner wall fixedly connected with protective layer (8).
2. The double-gear shaping wind power tower section lifting hook according to claim 1, wherein the gear shaping lifting beam frame (1) is in a U-shaped shape, a balancing weight (3) is fixedly connected to the upper portion of the left end of the gear shaping lifting beam frame (1), and an inclined plane is formed in the lower portion of the left end of the gear shaping lifting beam frame (1).
3. The double-gear shaping wind power tower section lifting hook according to claim 2, wherein a first reinforcing plate (4) is fixedly connected to the upper end of the gear shaping lifting beam frame (1), and the first reinforcing plate (4) is fixedly connected with the balancing weight (3).
4. A double-gear shaping wind power tower section lifting hook according to claim 3, wherein the left side and the right side of the hanging lug (2) are fixedly connected with second reinforcing plates (5), and the second reinforcing plates (5) are fixedly connected with the gear shaping hanging beam frame (1).
5. Double-gear-shaping wind power tower section lifting hook according to claim 4, characterized in that the protective layer (8) is made of polyurethane material.
CN202223253971.6U 2022-12-06 2022-12-06 Double-gear-shaping wind power tower section lifting hook Active CN218909600U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223253971.6U CN218909600U (en) 2022-12-06 2022-12-06 Double-gear-shaping wind power tower section lifting hook

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223253971.6U CN218909600U (en) 2022-12-06 2022-12-06 Double-gear-shaping wind power tower section lifting hook

Publications (1)

Publication Number Publication Date
CN218909600U true CN218909600U (en) 2023-04-25

Family

ID=86011745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223253971.6U Active CN218909600U (en) 2022-12-06 2022-12-06 Double-gear-shaping wind power tower section lifting hook

Country Status (1)

Country Link
CN (1) CN218909600U (en)

Similar Documents

Publication Publication Date Title
CN201176370Y (en) Electric generator stator combination sling
CN203255914U (en) Unit-typed curtain wall lifting device
CN201261685Y (en) Tunnel segment demoulding sling
CN206065298U (en) A kind of suspension type reinforcement cage processing device
CN218909600U (en) Double-gear-shaping wind power tower section lifting hook
CN108946542A (en) A kind of small gun carriage and its construction method
CN220376298U (en) Hanging basket lifting device
CN105540414A (en) Telescopic lifting frame for box transformer substation
CN212151341U (en) Quick hoisting tool for battery module
CN212127236U (en) Symmetrical lifting point conversion steel bushing box lifting appliance
CN214615764U (en) Four-loop strain tower with three ground wires meeting lightning protection requirements
CN208797067U (en) A kind of lifting lug and the battery case for being equipped with this lifting lug
CN203439921U (en) Insertion tool for band steel loading and unloading operation
CN208308253U (en) A kind of erecting by overhang of adjustable uneven weight bridge member
CN215326425U (en) Hoisting tool for generator set
CN210558995U (en) Movable hydraulic lifting device
CN222204487U (en) Cross hoist and mount hoist
CN207738355U (en) A kind of derrick crane zoom auxiliary device
CN206244275U (en) The lifting tooling of wind electricity blade web
CN219860108U (en) Hanging bracket for lifting high-low voltage cabinet
CN216971732U (en) Spring grabbing device in middle of enameled wire shaft
CN220393057U (en) Tool for overturning round tube plate
CN216377167U (en) Lifting hook for lifting pipe
CN221396964U (en) Simple unhooking device
CN216038153U (en) Ultra-wide blank cloth discharging device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant