CN209815559U - Safe type overhead hoist is used in high-rise building construction - Google Patents

Safe type overhead hoist is used in high-rise building construction Download PDF

Info

Publication number
CN209815559U
CN209815559U CN201920761605.0U CN201920761605U CN209815559U CN 209815559 U CN209815559 U CN 209815559U CN 201920761605 U CN201920761605 U CN 201920761605U CN 209815559 U CN209815559 U CN 209815559U
Authority
CN
China
Prior art keywords
counterweight
reel
building construction
rise building
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920761605.0U
Other languages
Chinese (zh)
Inventor
李清富
王赛赛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University
Original Assignee
Zhengzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University filed Critical Zhengzhou University
Priority to CN201920761605.0U priority Critical patent/CN209815559U/en
Application granted granted Critical
Publication of CN209815559U publication Critical patent/CN209815559U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了高层建筑施工用安全型吊运装置,包括底架,底架下方设置有配重板,配重板上方设置有第一配重物,底架一侧设置有第二配重物,第二配重物一侧设置有卷筒支撑架,卷筒支撑架一端设置有卷筒,卷筒表面设置有钢丝绳,卷筒一侧设置有电机座,电机座上方设置有卷扬电机,卷扬电机一侧设置有立柱,立柱顶部设置有第一凹槽。本实用新型结构简单,使用方便,设置有顶杆、立柱、吊杆,呈三角形设置,防止因吊起物品重量过大而使吊杆折断,使吊杆使用寿命更加长;设置有卷扬电机、卷筒,可以使玻璃幕墙搬运安装更加简便,缩短安装时间,提高工作效率。

The utility model discloses a safe hoisting device for high-rise building construction, which comprises an underframe, a counterweight plate is arranged under the underframe, a first counterweight is arranged above the counterweight plate, and a second counterweight is arranged on one side of the underframe. One side of the second counterweight is provided with a reel support frame, one end of the reel support frame is provided with a reel, the surface of the reel is provided with a steel wire rope, one side of the reel is provided with a motor seat, and a hoisting motor is provided above the motor seat A column is arranged on one side of the winch motor, and a first groove is arranged on the top of the column. The utility model is simple in structure and easy to use. It is provided with ejector rods, upright columns, and suspenders in a triangular shape to prevent the suspenders from being broken due to the heavy weight of the hoisted objects, so that the service life of the suspenders is longer; it is provided with a hoisting motor , Reel, can make the handling and installation of the glass curtain wall easier, shorten the installation time, and improve work efficiency.

Description

高层建筑施工用安全型吊运装置Safety hoisting device for high-rise building construction

技术领域technical field

本实用新型涉及建筑技术领域,具体为高层建筑施工用安全型吊运装置。The utility model relates to the technical field of buildings, in particular to a safe lifting device for high-rise building construction.

背景技术Background technique

玻璃幕墙是指由支承结构体系与玻璃组成的、可相对主体结构有一定位移能力、不分担主体结构所受作用的建筑外围护结构或装饰结构。墙体有单层和双层玻璃两种。玻璃幕墙是一种美观新颖的建筑墙体装饰方法,是现代主义高层建筑时代的显著特征。Glass curtain wall refers to the building envelope structure or decorative structure composed of supporting structure system and glass, which can have a certain displacement capacity relative to the main structure and does not share the effect of the main structure. The walls are available in single and double glazing. Glass curtain wall is a kind of beautiful and novel building wall decoration method, and it is a remarkable feature in the era of modernism high-rise buildings.

由于玻璃幕墙尺寸大,重量大,导致高层玻璃幕墙搬运安装成为难题。Due to the large size and weight of the glass curtain wall, it is difficult to transport and install the high-rise glass curtain wall.

实用新型内容Utility model content

本实用新型提供高层建筑施工用安全型吊运装置,可以解决上述问题中的高层玻璃幕墙搬运安装的问题。The utility model provides a safe lifting device for high-rise building construction, which can solve the problem of high-rise glass curtain wall handling and installation in the above problems.

为实现上述目的,本实用新型提供如下技术方案:高层建筑施工用安全型吊运装置,包括底架,所述底架下方设置有配重板,所述配重板上方设置有第一配重物,所述底架一侧设置有第二配重物,所述第二配重物一侧设置有卷筒支撑架,所述卷筒支撑架一端设置有卷筒,所述卷筒表面设置有钢丝绳,所述卷筒一侧设置有电机座,所述电机座上方设置有卷扬电机,所述卷扬电机型号为YZZ132L1-4,所述卷扬电机一侧设置有立柱,所述立柱顶部设置有第一凹槽,所述第一凹槽内部设置有第一转筒,所述立柱中部设置有吊杆,所述吊杆靠近所述第二配重物的一端设置有第二凹槽,所述第二凹槽内部设置有第二转筒,所述吊杆另一端设置有第三凹槽,所述第三凹槽内部设置有第三转筒,所述立柱底部设置有顶杆,所述钢丝绳一端设置有吊钩,所述第二配重物前端设置有控制器,所述控制器型号为SF06E。In order to achieve the above purpose, the utility model provides the following technical solutions: a safe lifting device for high-rise building construction, including an underframe, a counterweight plate is arranged below the underframe, and a first counterweight is arranged above the counterweight plate object, the bottom frame is provided with a second counterweight, one side of the second counterweight is provided with a reel support frame, one end of the reel support frame is provided with a reel, and the surface of the reel is provided There is a steel wire rope, a motor seat is arranged on one side of the reel, and a hoisting motor is arranged above the motor seat. The model of the hoisting motor is YZZ132L1-4. The top is provided with a first groove, the inside of the first groove is provided with a first drum, the middle of the column is provided with a boom, and the end of the boom near the second counterweight is provided with a second concave A second drum is arranged inside the second groove, a third groove is arranged at the other end of the boom, a third drum is arranged inside the third groove, and a top is arranged at the bottom of the column. A hook is provided at one end of the steel wire rope, and a controller is provided at the front end of the second counterweight, and the model of the controller is SF06E.

优选的,所述配重板与所述底架铆接,所述第二配重物与所述底架通过螺栓连接。Preferably, the weight plate is riveted to the chassis, and the second weight is connected to the chassis by bolts.

优选的,所述卷筒支撑架与所述底架通过螺栓连接,所述卷筒支撑架设置有2个,设置在所述卷筒两端,所述卷筒与所述卷筒支撑架通过轴承连接。Preferably, the reel support frame is connected to the bottom frame by bolts, and there are two reel support frames arranged at both ends of the reel, and the reel and the reel support frame pass through Bearing connection.

优选的,所述电机座与所述底架通过螺栓连接,所述电机座与所述卷扬电机通过螺栓固定连接,所述卷筒与所述卷扬电机通过减速器连接。Preferably, the motor base is connected to the base frame by bolts, the motor base is fixedly connected to the hoisting motor by bolts, and the reel is connected to the hoisting motor by a reducer.

优选的,所述立柱与所述底架通过螺栓连接,所述第一转筒与所述立柱通过轴承连接。Preferably, the column is connected to the underframe by bolts, and the first drum is connected to the column by bearings.

优选的,所述吊杆穿过所述立柱与所述第二配重物通过螺栓连接,所述第二转筒与所述吊杆通过轴承连接,所述第三转筒与所述吊杆通过轴承连接。Preferably, the boom passes through the column and is connected to the second counterweight by bolts, the second drum is connected to the boom by bearings, and the third drum is connected to the boom connected by bearings.

优选的,所述顶杆一端与所述立柱通过螺栓连接,所述顶杆另一端与所述吊杆通过螺栓连接。Preferably, one end of the push rod is connected to the column by bolts, and the other end of the push rod is connected to the suspension rod by bolts.

优选的,所述卷扬电机与所述控制器电性连接。Preferably, the hoisting motor is electrically connected to the controller.

与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the utility model are as follows:

设置有顶杆、立柱、吊杆,呈三角形设置,防止因吊起物品重量过大而使吊杆折断,使吊杆使用寿命更加长;设置有卷扬电机、卷筒,可以使玻璃幕墙搬运安装更加简便,缩短安装时间,提高工作效率。There are ejector rods, columns, and suspenders, which are arranged in a triangle to prevent the suspenders from being broken due to the heavy weight of the hoisted items, so that the service life of the suspenders is longer; it is equipped with hoisting motors and reels, which can make the glass curtain wall transport The installation is easier, the installation time is shortened, and the work efficiency is improved.

附图说明Description of drawings

附图用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与本实用新型的实施例一起用于解释本实用新型,并不构成对本实用新型的限制。The accompanying drawings are used to provide a further understanding of the utility model, and constitute a part of the description, and are used to explain the utility model together with the embodiments of the utility model, and do not constitute a limitation to the utility model.

在附图中:In the attached picture:

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是本实用新型前视图;Fig. 2 is a front view of the utility model;

图3是本实用新型右视图;Fig. 3 is a right view of the utility model;

图4是本实用新型后视图;Fig. 4 is a rear view of the utility model;

图5是本实用新型俯视图。Fig. 5 is a top view of the utility model.

图中标号:1、底架;2、配重板;3、第一配重物;4、第二配重物;5、电机座;6、卷扬电机;7、卷筒支撑架;8、卷筒;9、立柱;10、第一凹槽;11、第一转筒;12、吊杆;13、第二凹槽;14、第二转筒;15、第三凹槽;16、第三转筒;17、钢丝绳;18、顶杆;19、吊钩;20、控制器。Labels in the figure: 1, underframe; 2, counterweight plate; 3, first counterweight; 4, second counterweight; 5, motor base; 6, winch motor; 7, reel support frame; 8 , reel; 9, column; 10, first groove; 11, first drum; 12, boom; 13, second groove; 14, second drum; 15, third groove; 16, The third drum; 17, wire rope; 18, ejector rod; 19, suspension hook; 20, controller.

具体实施方式Detailed ways

以下结合附图对本实用新型的优选实施例进行说明,应当理解,此处所描述的优选实施例仅用于说明和解释本实用新型,并不用于限定本实用新型。The preferred embodiments of the present utility model are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described here are only used to illustrate and explain the present utility model, and are not intended to limit the present utility model.

实施例:如图1-5所示,本实用新型提供如下技术方案:高层建筑施工用安全型吊运装置,包括底架1,底架1下方设置有配重板2,给第一配重物3提供支撑,配重板2上方设置有第一配重物3,给装置提供压力,底架1一侧设置有第二配重物4,防止吊运时重力过大使装置吊运不起来,第二配重物4一侧设置有卷筒支撑架7,给卷筒8提供支撑,卷筒支撑架7一端设置有卷筒8,卷筒8表面设置有钢丝绳17,卷筒8一侧设置有电机座5,给卷扬电机6提供支撑,电机座5上方设置有卷扬电机6,带动卷筒,卷扬电机6一侧设置有立柱9,给吊杆12提供支撑,立柱9顶部设置有第一凹槽10,第一凹槽10内部设置有第一转筒11,立柱9中部设置有吊杆12,吊杆12靠近第二配重物4的一端设置有第二凹槽13,第二凹槽13内部设置有第二转筒14,吊杆12另一端设置有第三凹槽15,第三凹槽15内部设置有第三转筒16,立柱9底部设置有顶杆18,给吊杆12提供支撑,钢丝绳17一端设置有吊钩19,吊运物品,第二配重物4前端设置有控制器20,控制设备启动与停止。Embodiment: as shown in Fig. 1-5, the utility model provides following technical proposal: high-rise building construction is used safety type hoisting device, comprises chassis 1, and chassis 1 is provided with counterweight plate 2 below, for the first counterweight Object 3 provides support, a first counterweight 3 is arranged above the counterweight plate 2 to provide pressure to the device, and a second counterweight 4 is arranged on one side of the chassis 1 to prevent the device from being unable to be lifted due to excessive gravity during hoisting , one side of the second counterweight 4 is provided with a reel support frame 7 to provide support for the reel 8, one end of the reel support frame 7 is provided with a reel 8, the surface of the reel 8 is provided with a steel wire rope 17, and one side of the reel 8 A motor base 5 is provided to provide support for the hoisting motor 6. A hoisting motor 6 is arranged above the motor base 5 to drive the reel. A column 9 is provided on one side of the hoisting motor 6 to provide support for the boom 12. The top of the column 9 A first groove 10 is provided, a first drum 11 is arranged inside the first groove 10, a boom 12 is arranged in the middle of the column 9, and a second groove 13 is arranged at the end of the boom 12 close to the second counterweight 4 , the second drum 14 is arranged inside the second groove 13, the third groove 15 is arranged at the other end of the boom 12, the third drum 16 is arranged inside the third groove 15, and the top rod 18 is arranged at the bottom of the column 9 , to provide support for the boom 12, a hook 19 is provided at one end of the steel wire rope 17 for lifting items, and a controller 20 is provided at the front end of the second counterweight 4 to control the start and stop of the equipment.

优选的:配重板2与底架1铆接,第二配重物4与底架1通过螺栓连接,卷筒支撑架7与底架1通过螺栓连接,卷筒支撑架7设置有2个,设置在卷筒8两端,卷筒8与卷筒支撑架7通过轴承连接,电机座5与底架1通过螺栓连接,电机座5与卷扬电机6通过螺栓固定连接,卷筒8与卷扬电机6通过减速器连接,立柱9与底架1通过螺栓连接,第一转筒11与立柱9通过轴承连接,吊杆12穿过立柱9与第二配重物4通过螺栓连接,第二转筒14与吊杆12通过轴承连接,第三转筒16与吊杆12通过轴承连接,顶杆18一端与立柱9通过螺栓连接,顶杆18另一端与吊杆12通过螺栓连接,卷扬电机6与控制器20电性连接。Preferably: the counterweight plate 2 is riveted with the underframe 1, the second counterweight 4 is connected with the underframe 1 by bolts, the reel support frame 7 is connected with the underframe 1 by bolts, and there are two reel support frames 7, Set at both ends of the reel 8, the reel 8 and the reel support frame 7 are connected by bearings, the motor seat 5 and the bottom frame 1 are connected by bolts, the motor seat 5 and the winch motor 6 are fixedly connected by bolts, the reel 8 and the reel The lifting motor 6 is connected through a reducer, the upright column 9 is connected with the bottom frame 1 through bolts, the first drum 11 is connected with the upright column 9 through bearings, the boom 12 passes through the upright column 9 and is connected with the second counterweight 4 through bolts, and the second The drum 14 is connected to the boom 12 through a bearing, the third drum 16 is connected to the boom 12 through a bearing, one end of the ejector rod 18 is connected to the column 9 through a bolt, and the other end of the ejector rod 18 is connected to the boom 12 through a bolt. The motor 6 is electrically connected to the controller 20 .

本实用新型的工作原理及使用流程:将玻璃幕墙整理好,挂到吊钩19上,打开控制器20,启动卷扬电机6,带动卷筒8与钢丝绳17,使钢丝绳17通过第二转筒14、第一转筒11、第三转筒16,带动吊钩19,使玻璃幕墙被吊起。The working principle and application process of the utility model: tidy up the glass curtain wall, hang it on the hook 19, open the controller 20, start the winch motor 6, drive the reel 8 and the steel wire rope 17, and make the steel wire rope 17 pass through the second drum 14. The first drum 11 and the third drum 16 drive the hook 19 to lift the glass curtain wall.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device.

最后应说明的是:以上所述仅为本实用新型的优选实例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that: the above is only a preferred example of the utility model, and is not intended to limit the utility model. Although the utility model has been described in detail with reference to the foregoing embodiments, for those skilled in the art, It is still possible to modify the technical solutions described in the foregoing embodiments, or to perform equivalent replacements for some of the technical features. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.

Claims (8)

1. Safe type overhead hoist is used in high-rise building construction, including chassis (1), its characterized in that: a counterweight plate (2) is arranged below the chassis (1), a first counterweight (3) is arranged above the counterweight plate (2), a second counterweight (4) is arranged on one side of the chassis (1), a winding drum support frame (7) is arranged on one side of the second counterweight (4), a winding drum (8) is arranged at one end of the winding drum support frame (7), a steel wire rope (17) is arranged on the surface of the winding drum (8), a motor base (5) is arranged on one side of the winding drum (8), a winding motor (6) is arranged above the motor base (5), an upright post (9) is arranged on one side of the winding motor (6), a first groove (10) is arranged at the top of the upright post (9), a first rotating drum (11) is arranged inside the first groove (10), a hanging rod (12) is arranged in the middle of the upright post (9), and a second groove (13) is arranged at one end, close to the second counterweight (4), of, the inside second rotary drum (14) that is provided with of second recess (13), jib (12) other end is provided with third recess (15), the inside third rotary drum (16) that is provided with of third recess (15), stand (9) bottom is provided with ejector pin (18), wire rope (17) one end is provided with lifting hook (19), second counter weight (4) front end is provided with controller (20).
2. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: the counterweight plate (2) is riveted with the underframe (1), and the second counterweight (4) is connected with the underframe (1) through a bolt.
3. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: reel support frame (7) with chassis (1) passes through bolted connection, reel support frame (7) are provided with 2, set up and are in reel (8) both ends, reel (8) with reel support frame (7) pass through the bearing and are connected.
4. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: the motor base (5) is connected with the bottom frame (1) through bolts, the motor base (5) is fixedly connected with the hoisting motor (6) through bolts, and the winding drum (8) is connected with the hoisting motor (6) through a speed reducer.
5. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: the upright post (9) is connected with the underframe (1) through a bolt, and the first rotary drum (11) is connected with the upright post (9) through a bearing.
6. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: the suspension rod (12) penetrates through the upright post (9) to be connected with the second counterweight (4) through a bolt, the second rotary drum (14) is connected with the suspension rod (12) through a bearing, and the third rotary drum (16) is connected with the suspension rod (12) through a bearing.
7. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: one end of the ejector rod (18) is connected with the upright post (9) through a bolt, and the other end of the ejector rod (18) is connected with the suspender (12) through a bolt.
8. The safe lifting device for the high-rise building construction according to claim 1, which is characterized in that: the winding motor (6) is electrically connected with the controller (20).
CN201920761605.0U 2019-05-24 2019-05-24 Safe type overhead hoist is used in high-rise building construction Expired - Fee Related CN209815559U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920761605.0U CN209815559U (en) 2019-05-24 2019-05-24 Safe type overhead hoist is used in high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920761605.0U CN209815559U (en) 2019-05-24 2019-05-24 Safe type overhead hoist is used in high-rise building construction

Publications (1)

Publication Number Publication Date
CN209815559U true CN209815559U (en) 2019-12-20

Family

ID=68883891

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920761605.0U Expired - Fee Related CN209815559U (en) 2019-05-24 2019-05-24 Safe type overhead hoist is used in high-rise building construction

Country Status (1)

Country Link
CN (1) CN209815559U (en)

Similar Documents

Publication Publication Date Title
CN106995186A (en) Building materials transporting equipment for building and its method of work provided with pressure sensor
CN111847267A (en) A cantilever crane
CN111287441B (en) Suspended anti-shaking construction platform and construction method thereof
CN210313191U (en) Electric single-beam suspension crane
CN201264877Y (en) Small-sized material hoisting machine for building fitment
CN206427945U (en) A kind of adjustable hanging apparatus for building
CN211034964U (en) Hoisting mechanism of steel reinforcement cage
CN209815559U (en) Safe type overhead hoist is used in high-rise building construction
CN210340141U (en) House building engineering lifting device
CN218174396U (en) Special gantry crane for metallurgy
CN208103776U (en) Building materials boom hoisting
CN206646836U (en) A kind of exterior wall, inner partition plate movement lifting frame
CN107628543A (en) A kind of multi-faceted lifting machine
CN211496638U (en) Multi-lifting-point balance beam device
CN103058072A (en) Introduction mechanism of a large boom tower crane
CN210065000U (en) Roof hoisting tool
CN213622837U (en) Catenary hook-free side plate lifting appliance
CN201380286Y (en) Special lifting tool for entirely hoisting bale rotary table
CN210710474U (en) Prefabricated plate hoist and mount conveyer
CN220467385U (en) Cantilever hanging bracket device for vertical transportation
CN213294483U (en) Novel portable high-rise hoisting machine
CN211998556U (en) Rotary lifting machine tool on balcony beam
CN222743940U (en) A crane hook structure for lifting equipment
CN218088592U (en) A hoisting and positioning device for prefabricated laminated panels for green building construction
CN218434563U (en) Cable manufacture hoist and mount portal frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191220

Termination date: 20200524

CF01 Termination of patent right due to non-payment of annual fee