CN216277940U - Supporting frame with settlement early warning prompt for geotechnical engineering construction - Google Patents
Supporting frame with settlement early warning prompt for geotechnical engineering construction Download PDFInfo
- Publication number
- CN216277940U CN216277940U CN202123082350.1U CN202123082350U CN216277940U CN 216277940 U CN216277940 U CN 216277940U CN 202123082350 U CN202123082350 U CN 202123082350U CN 216277940 U CN216277940 U CN 216277940U
- Authority
- CN
- China
- Prior art keywords
- early warning
- engineering construction
- alarm
- settlement
- geotechnical engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008093 supporting effect Effects 0.000 title claims abstract description 34
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 238000013459 approach Methods 0.000 abstract description 2
- 230000000694 effects Effects 0.000 description 4
- 239000002689 soil Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Landscapes
- Road Signs Or Road Markings (AREA)
Abstract
The utility model discloses a supporting frame with a settlement early warning prompt for geotechnical engineering construction, which comprises a cross beam, a settlement early warning structure and a telescopic rod, wherein side plates are arranged on the surfaces of two sides of the cross beam, a rigid spring is arranged on the surface of the bottom of each side plate, a lifting column is arranged at the bottom of each rigid spring, and an alarm is arranged on the front surface of the cross beam. According to the utility model, the settlement early warning structure is arranged and comprises the trigger rod, the alarm switch, the alarm and the pressure sensor, when settlement occurs at the top of the roadway, the side plate can extrude the rigid spring to enable the side plate to slowly approach the lifting column to drive the trigger rod to descend, and after the settlement early warning range is reached, the trigger rod can touch the alarm switch to enable the alarm to give an alarm.
Description
Technical Field
The utility model relates to the technical field of support frames, in particular to a support frame with settlement early warning prompt for geotechnical engineering construction.
Background
Geotechnical engineering is with solving rock mass and soil body engineering problem, including ground and basis, problem such as slope and underground works, as the research object of oneself, can extensively apply to braced frame at the in-process of geotechnical engineering construction, current geotechnical engineering construction braced frame, it is relatively poor to carry out the effect of auxiliary stay to the tunnel, help operating personnel to carry out the relatively poor effect that supports in the face of not equidimension tunnel or tunnel, and tunnel structural stability is changing, and ordinary braced frame does not subside the effect of early warning, and lead to the staff to subside because of the tunnel and take place danger easily, consequently, it solves above-mentioned problem to provide a braced frame for geotechnical engineering construction with subside early warning suggestion.
The defects of the existing supporting frame are as follows:
1. the prior art CN210087356U discloses a geotechnical engineering construction supporting device, which comprises a hydraulic cylinder, wherein a hydraulic push rod is fixedly arranged on the hydraulic cylinder, a first top plate is fixedly arranged at the top of the hydraulic push rod, a beam plate is fixedly arranged at the top of the first top plate, a second geogrid is fixedly arranged on the upper surface of the beam plate, and a first geogrid is fixedly arranged at the top of the second geogrid; in geotechnical engineering work progress, when meetting the operational environment of co-altitude, the pneumatic cylinder makes hydraulic push rod promote the roof No. one, drive the beam slab, first geogrid and second geogrid rise to predetermined position, first geogrid and second geogrid are the top that arch structure design is used for supporting the gallery, this device can height-adjusting adaptation different gallery structures, and is easy and simple to handle, reduce workflow, save time, the holistic work efficiency of geotechnical engineering construction has been improved, but this strutting arrangement is in-process supporting the tunnel, because the phenomenon of subsiding can appear at the tunnel top, strutting arrangement is because of lacking the structure that can carry out the early warning to the phenomenon of subsiding, and lead to the condition that subsides and subside to appear at the tunnel top, and cause the influence to staff's life safety.
2. The supporting effect of the existing supporting frame is general, and the common supporting frame cannot adapt to tunnels or tunnels with different sizes, so that the universality of the supporting frame is not high due to the lack of a structure capable of adjusting the supporting frame.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a supporting frame with settlement early warning prompt for geotechnical engineering construction, and aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a supporting frame with settlement early warning prompt for geotechnical engineering construction comprises a cross beam, a settlement early warning structure and a telescopic rod, wherein side plates are mounted on the surfaces of two sides of the cross beam, rigid springs are mounted on the surfaces of the bottoms of the side plates, and lifting columns are mounted at the bottoms of the rigid springs;
a settlement early warning structure is arranged on the surface of one side of the side plate and comprises a trigger rod, an alarm switch, an alarm and a pressure sensor, the trigger rod is arranged on the surface of one side of the side plate, the alarm switch is arranged on the surface of the lifting column, and the alarm switch is positioned below the trigger rod;
and an alarm is arranged on the front surface of the cross beam.
Preferably, the bottom surface equidistance of crossbeam installs the telescopic link, the base is installed to the bottom of telescopic link, the front slidable mounting of crossbeam has the fork expansion bracket of cutting, and cuts the centre that the fork expansion bracket is located two sets of telescopic links.
Preferably, the top surface of the cross beam is provided with a support rod, the top surface of the support rod is provided with an arc-shaped support plate, and two ends of the support plate are connected with the tops of the side plates.
Preferably, the surface of the telescopic rod is provided with a support rod, and one end of the support rod, which is far away from the telescopic rod, is connected with the bottom of the cross beam.
Preferably, the bottom end of the scissor type telescopic frame is in sliding connection with the front face of the base.
Preferably, the bottom surface of the base is provided with a conical fixing rod, and the conical fixing rod is positioned between the two groups of lifting columns.
Preferably, the internally mounted of backup pad has pressure sensor, alarm switch and alarm electric connection.
Compared with the prior art, the utility model has the beneficial effects that:
1. according to the utility model, the settlement early warning structure is arranged and comprises the trigger rod, the alarm switch, the alarm and the pressure sensor, when settlement occurs at the top of the roadway, the side plate and the lifting column can extrude the rigid spring, so that the side plate slowly approaches to the lifting column, the trigger rod is driven to descend, and after the settlement early warning range is reached, the trigger rod can touch the alarm switch, so that the alarm can give an early warning to remind workers of timely evacuation due to settlement at the top of the roadway.
2. According to the utility model, the supporting rod, the supporting plate, the cross beam, the telescopic rod, the scissor type telescopic frame, the base and the supporting rod are arranged, the top of a roadway can be supported through the matching of the supporting rod and the supporting plate, the stability of the roadway structure is ensured, when the roadways with different heights are required to be supported, because the rock soil of the roadway is not flat, when the height is adjusted through the lifting column alone, the stability of the whole supporting frame is not enough, the cross beam is driven to be lifted and lowered through the lifting of the telescopic rod and the telescopic of the scissor type telescopic frame, so that the cross beam pushes the arc-shaped supporting plate to support the roadways with different heights, and the supporting rod is matched to further support, so that the stability of the cross beam is maintained, and therefore, the supporting frame is adapted to the roadways or tunnels with different sizes through the adjustment of the height of the supporting frame, and the practicability of the supporting frame is improved.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic front sectional view of the present invention;
FIG. 3 is a schematic diagram of the settlement warning structure of the present invention;
FIG. 4 is a schematic structural view of a cross beam, a telescopic rod, a scissor type telescopic rack, a base, a conical fixed rod and a support rod of the utility model.
In the figure: 1. a cross beam; 2. a side plate; 3. a lifting column; 4. a settlement early warning structure; 401. a trigger lever; 402. an alarm switch; 403. an alarm; 404. a pressure sensor; 5. a support bar; 6. a support plate; 7. a telescopic rod; 8. a scissor-fork type telescopic frame; 9. a base; 10. a tapered fixing rod; 11. a strut; 12. a stiff spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1, 2 and 4, a supporting frame with a settlement early warning prompt for geotechnical engineering construction comprises a beam 1, a settlement early warning structure 4 and a telescopic rod 7, wherein side plates 2 are respectively installed on the two side surfaces of the beam 1, a rigid spring 12 is installed on the bottom surface of each side plate 2, and a lifting column 3 is installed at the bottom of each rigid spring 12;
specifically, the stability of the whole supporting frame is kept through the cross beam 1, the lifting columns 3 are matched with the side plates 2 to lift along with the cross beam 1, and the settlement early warning structure 4 is convenient to trigger through the rigid springs 12.
As shown in fig. 3, a braced frame is used in geotechnical engineering construction with subside early warning suggestion, including subsiding early warning structure 4, one side surface mounting of curb plate 2 has subsides early warning structure 4, subside early warning structure 4 including trigger bar 401, alarm switch 402, alarm 403 and pressure sensor 404, one side surface mounting of curb plate 2 has trigger bar 401, the surface mounting of lift post 3 has alarm switch 402, and alarm switch 402 is located the below of trigger bar 401, alarm 403 is installed in the front of crossbeam 1, the internally mounted of backup pad 6 has pressure sensor 404, alarm switch 402 and alarm 403 electric connection.
Specifically, when taking place to subside at the tunnel top, curb plate 2 can extrude rigid spring 12, makes curb plate 2 slowly be close to lift post 3 to drive trigger bar 401 and descend, after the early warning scope that reachs and subside, trigger bar 401 can touch alarm switch 402, thereby makes alarm 403 carry out the early warning, reminds the staff.
Can detect the support pressure at tunnel top through pressure sensor 404, the staff of being convenient for knows current support pressure in real time, through the early warning effect who subsides early warning structure 4, can carry out the early warning to the condition of subsiding at tunnel top, and the operating personnel of being convenient for withdraws in time to guarantee operating personnel's personal safety, improve braced frame's security.
The top surface mounting of crossbeam 1 has bracing piece 5, and the top surface mounting of bracing piece 5 has curved backup pad 6, and the both ends of backup pad 6 are connected with the top of curb plate 2.
Specifically, through the cooperation of bracing piece 5 and curved backup pad 6, can support the top ground in tunnel, guarantee the stability of tunnel structure.
The bottom surface of the base 9 is provided with a conical fixing rod 10, and the conical fixing rod 10 is positioned in the middle of the two groups of lifting columns 3.
Specifically, the stability of the structure above it is maintained by the base 9, and the entire supporting frame is stabilized by inserting the tapered fixing rod 10 into the soil of the roadway.
Example two: as shown in fig. 2, a braced frame is used in geotechnical engineering construction with subside early warning suggestion, telescopic link 7 is installed to the bottom surface equidistance of crossbeam 1, base 9 is installed to the bottom of telescopic link 7, the front slidable mounting of crossbeam 1 has scissors fork expansion bracket 8, and it is located the centre of two sets of telescopic links 7 to cut fork expansion bracket 8, the surface mounting of telescopic link 7 has branch 11, and branch 11 keeps away from the one end of telescopic link 7 and is connected with the bottom of crossbeam 1, the bottom of cutting fork expansion bracket 8 and the front sliding connection of base 9.
It is specific, when needs support the not tunnel of co-altitude, because the ground in tunnel is not level and smooth, when carrying out the adjustment of height through lift post 3 alone, whole braced frame's stability is not enough, the raising and lowering functions of raising and lowering functions through telescopic link 7 and the telescopic function's of scissor type expansion bracket 8 assistance work, promote crossbeam 1 and rise and reduce, thereby make crossbeam 1 promote curved backup pad 6 again and carry out the auxiliary stay to the tunnel of high difference, it further supports to cooperate branch 11 again, guarantee crossbeam 1's stability, from this through the height of adjusting braced frame, make it be fit for not tunnel or the tunnel of equidimension height not, thereby improve braced frame's extensive practicality.
The working principle is as follows: when using this braced frame to support geotechnical engineering's tunnel, transport braced frame earlier and carry out the tunnel that supports in, open scissors fork expansion bracket 8, start telescopic link 7 simultaneously, through the lift of telescopic link 7 and the flexible of scissors fork expansion bracket 8, drive crossbeam 1 and rise and reduce to make crossbeam 1 promote curved backup pad 6 and support the tunnel of co-altitude not.
Through the cooperation of bracing piece 5 and arc backup pad 6, come to support the top in tunnel, when tunnel top structure is unstable, the phenomenon that top ground subsides can appear, when taking place to subside at the tunnel top, curb plate 2 can extrude rigid spring 12, lead to curb plate 2 slowly to be close to lift post 3, thereby make curb plate 2 drive trigger bar 401 descend, after the early warning scope is subsided in the arrival, trigger bar 401 can touch the alarm switch 402 on the lift post 3, thereby make alarm 403 report to the police, remind the staff need in time withdraw, with the personal safety of guaranteeing the staff.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (7)
1. The utility model provides a braced frame for geotechnical engineering construction with subside early warning suggestion, includes crossbeam (1), subsides early warning structure (4) and telescopic link (7), its characterized in that: the lifting device comprises a crossbeam (1), side plates (2) are mounted on the surfaces of two sides of the crossbeam (1), a rigid spring (12) is mounted on the surface of the bottom of each side plate (2), and a lifting column (3) is mounted at the bottom of each rigid spring (12);
the settlement early warning device is characterized in that a settlement early warning structure (4) is arranged on the surface of one side of the side plate (2), the settlement early warning structure (4) comprises a trigger rod (401), an alarm switch (402), an alarm (403) and a pressure sensor (404), the trigger rod (401) is arranged on the surface of one side of the side plate (2), the alarm switch (402) is arranged on the surface of the lifting column (3), and the alarm switch (402) is located below the trigger rod (401);
and an alarm (403) is arranged on the front surface of the cross beam (1).
2. The supporting frame with settlement early warning prompt for geotechnical engineering construction according to claim 1, which is characterized in that: the telescopic rod (7) is installed to the bottom surface equidistance of crossbeam (1), base (9) are installed to the bottom of telescopic rod (7), the front slidable mounting of crossbeam (1) has and cuts fork expansion bracket (8), and cuts the centre that fork expansion bracket (8) are located two sets of telescopic rod (7).
3. The supporting frame with settlement early warning prompt for geotechnical engineering construction according to claim 1, which is characterized in that: the top surface mounting of crossbeam (1) has bracing piece (5), the top surface mounting of bracing piece (5) has curved backup pad (6), and the both ends of backup pad (6) are connected with the top of curb plate (2).
4. The supporting frame with settlement early warning prompt for geotechnical engineering construction according to claim 2, characterized in that: the surface mounting of telescopic link (7) has branch (11), and branch (11) keep away from the one end of telescopic link (7) and be connected with the bottom of crossbeam (1).
5. The supporting frame with settlement early warning prompt for geotechnical engineering construction according to claim 2, characterized in that: the bottom end of the scissor type telescopic frame (8) is connected with the front side of the base (9) in a sliding manner.
6. The supporting frame with settlement early warning prompt for geotechnical engineering construction according to claim 2, characterized in that: the bottom surface of the base (9) is provided with a conical fixing rod (10), and the conical fixing rod (10) is positioned between the two groups of lifting columns (3).
7. The supporting frame with settlement early warning prompt for geotechnical engineering construction according to claim 3, wherein: the internally mounted of backup pad (6) has pressure sensor (404), alarm switch (402) and alarm (403) electric connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123082350.1U CN216277940U (en) | 2021-12-09 | 2021-12-09 | Supporting frame with settlement early warning prompt for geotechnical engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202123082350.1U CN216277940U (en) | 2021-12-09 | 2021-12-09 | Supporting frame with settlement early warning prompt for geotechnical engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216277940U true CN216277940U (en) | 2022-04-12 |
Family
ID=81057020
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202123082350.1U Expired - Fee Related CN216277940U (en) | 2021-12-09 | 2021-12-09 | Supporting frame with settlement early warning prompt for geotechnical engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216277940U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114964148A (en) * | 2022-04-27 | 2022-08-30 | 商丘工学院 | Road and bridge are with subsiding deformation monitoring facilities based on big data |
CN116717290A (en) * | 2023-07-31 | 2023-09-08 | 窑街煤电集团有限公司 | Underground rock burst preventing device |
-
2021
- 2021-12-09 CN CN202123082350.1U patent/CN216277940U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114964148A (en) * | 2022-04-27 | 2022-08-30 | 商丘工学院 | Road and bridge are with subsiding deformation monitoring facilities based on big data |
CN116717290A (en) * | 2023-07-31 | 2023-09-08 | 窑街煤电集团有限公司 | Underground rock burst preventing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216277940U (en) | Supporting frame with settlement early warning prompt for geotechnical engineering construction | |
CN108824193A (en) | Bridge superstructure quickly removes, installation method and its replacement system | |
CN214221228U (en) | Collapse-preventing supporting device for coal mining | |
CN208009277U (en) | A kind of short sliding installation system of land-based area large-tonnage steel box beam | |
CN211975020U (en) | Naked hole supports safety protection platform truck and supports lift limit structure | |
CN201962689U (en) | Building foundation adapting to foundation deformation of worked-out area | |
CN204457786U (en) | The large diameter shield tunnel that digs after the dismounting of a kind of B section of jurisdiction builds subway station | |
CN208167484U (en) | The steel construction overline bridge being easily installed | |
CN208748661U (en) | A kind of profile steel bracket device for staying support to remove | |
CN202766967U (en) | Bridge adjustment support | |
CN210597042U (en) | Highway bridge hydraulic pressure heel post | |
CN210439157U (en) | Modular bracket bearing structure | |
CN209428961U (en) | A kind of steel box-girder installation bracket equipped with safe operation platform | |
CN208501505U (en) | Kiloton bridge superstructure fast replacement system | |
CN206693644U (en) | A kind of building roof lighting Zhongting steel construction changes column device | |
CN209873540U (en) | Inverted arch construction trestle for tunnel | |
CN205277281U (en) | Pneumatic working stand | |
CN216474561U (en) | Construction grouting device for cast-in-situ box girder of bridge | |
CN212896012U (en) | Road height limiting frame | |
CN218509526U (en) | Coal mine tunneling and supporting device | |
CN217976274U (en) | Supporting mechanism for coal mining | |
CN209875194U (en) | Single column support vehicle | |
CN214530223U (en) | Movable construction platform device for steel pipe arch bridge arch rib | |
CN211549755U (en) | Coal mine tunneling and supporting device | |
CN220789843U (en) | Track type supporting prefabricated retaining wall construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220412 |