CN203530859U - Bridge construction support base - Google Patents

Bridge construction support base Download PDF

Info

Publication number
CN203530859U
CN203530859U CN201320705681.2U CN201320705681U CN203530859U CN 203530859 U CN203530859 U CN 203530859U CN 201320705681 U CN201320705681 U CN 201320705681U CN 203530859 U CN203530859 U CN 203530859U
Authority
CN
China
Prior art keywords
support column
bridge construction
base plate
support base
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320705681.2U
Other languages
Chinese (zh)
Inventor
龚玉书
李君�
袁兴华
王明焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320705681.2U priority Critical patent/CN203530859U/en
Application granted granted Critical
Publication of CN203530859U publication Critical patent/CN203530859U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

A bridge construction support base relates to the technical field of bridge construction and comprises a bottom board (1), support columns (2), cushion boards (3), lifting switches (4), reinforcing ribs (5), anti-skidding nails (6) and a hydraulic device (7). The upper portion of the bottom board (1) is vertically provided three support columns (2) which are arranged in a triangular mode; the upper end of every support column (2) is provided with a corresponding cushion board (3), every support column (2) is provided with a corresponding lifting switch (4), and both sides of every support column (4) are provided with the corresponding reinforcing ribs (5); the bottom of the bottom board (1) is provided with a plurality of the anti-skidding nails (6); one side of the upper portion of the bottom board (1) is provided with the hydraulic device (7) which is connected with the lifting switches (4). The bridge construction support base is novel in structure and easy to height-adjust and by means of the anti-skidding nails at the bottom, achieves high security and practicality.

Description

Bridge construction base for supporting
Technical field
The utility model relates to technical field of bridge construction, is specifically related to a kind of bridge construction base for supporting.
Background technology
In recent years, along with the appearance of big-and-middle-sized bridge, beams of metal post fence is applied constantly on bridge to be increased.Beams of metal post fence structure can effectively be protected errant vehicle, effectively reduces the probability that above-mentioned accident occurs, the loss that minimizing accident causes, and the traffic safety level of raising speedway can be used as the column that Bridge Landscape throws light on simultaneously.Require beams of metal post fence column after concrete guardrail is installed, should guarantee vertically, otherwise can under wind action, topple over or reverse, under himself gravity and vertical uniform load q, produce eccentricity pressure, and then make cross section produce relatively large moment of flexure, be unfavorable for that it normally uses.When wind load is compared with large or eccentricly may surpass it when large and control interface supporting capacity limit value and produce destruction.Therefore, the vertical installation of beams of metal post fence column on pontic has a significant impact its normal use, and beams of metal post fence upright post base installs whether level is the decisive factor that guarantees that it is vertically installed.
In order to guarantee bridge beams of metal post fence column, vertically install, the general method of correcting before and after spirit level, sash weight that generally adopts, although the method is practical, but operating process is loaded down with trivial details, now also have and be much specifically designed to the base for supporting that bridge construction is used, but current base for supporting is simple in structure, be inconvenient to regulate height, base for supporting is placed and is easily skidded on the ground, and safety is not high, and practicality is not strong.
Summary of the invention
The purpose of this utility model is to provide a kind of bridge construction base for supporting, its novel structure, and the convenient height that regulates, and be provided with anti-skid stud bottom it, safety is good, practical.
In order to solve the existing problem of background technology, the utility model is by the following technical solutions: it comprises base plate 1, support column 2, backing plate 3, direction switch 4, reinforcing rib 5, anti-skid stud 6 and hydraulic means 7; The upper vertical of base plate 1 is provided with three support columns 2, the position setting triangular in shape of three support columns 2, the upper end of each support column 2 is provided with backing plate 3, on support column 2, be provided with direction switch 4, the both sides of support column 2 are respectively arranged with reinforcing rib 5, the bottom of base plate 1 is provided with several anti-skid studs 6, and a side on base plate 1 top is provided with hydraulic means 7, and hydraulic means 7 is connected with direction switch 4.
The utlity model has following beneficial effect: its novel structure, the convenient height that regulates, and be provided with anti-skid stud bottom it, safety is good, practical.
Accompanying drawing explanation:
Fig. 1 is structural representation of the present utility model,
Fig. 2 is top view of the present utility model.
The specific embodiment:
Referring to Fig. 1-2, this specific embodiment by the following technical solutions: it comprises base plate 1, support column 2, backing plate 3, direction switch 4, reinforcing rib 5, anti-skid stud 6 and hydraulic means 7; The upper vertical of base plate 1 is provided with three support columns 2, the position setting triangular in shape of three support columns 2, the upper end of each support column 2 is provided with backing plate 3, on support column 2, be provided with direction switch 4, the both sides of support column 2 are respectively arranged with reinforcing rib 5, the bottom of base plate 1 is provided with several anti-skid studs 6, and a side on base plate 1 top is provided with hydraulic means 7, and hydraulic means 7 is connected with direction switch 4.
This specific embodiment novel structure, the convenient height that regulates, and be provided with anti-skid stud bottom it, safety is good, practical.

Claims (1)

1. bridge construction base for supporting, is characterized in that it comprises base plate (1), support column (2), backing plate (3), direction switch (4), reinforcing rib (5), anti-skid stud (6) and hydraulic means (7); The upper vertical of base plate (1) is provided with three support columns (2), the position setting triangular in shape of three support columns (2), the upper end of each support column (2) is provided with backing plate (3), on support column (2), be provided with direction switch (4), the both sides of support column (2) are respectively arranged with reinforcing rib (5), the bottom of base plate (1) is provided with several anti-skid studs (6), one side on base plate (1) top is provided with hydraulic means (7), and hydraulic means (7) is connected with direction switch (4).
CN201320705681.2U 2013-11-11 2013-11-11 Bridge construction support base Expired - Fee Related CN203530859U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320705681.2U CN203530859U (en) 2013-11-11 2013-11-11 Bridge construction support base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320705681.2U CN203530859U (en) 2013-11-11 2013-11-11 Bridge construction support base

Publications (1)

Publication Number Publication Date
CN203530859U true CN203530859U (en) 2014-04-09

Family

ID=50417084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320705681.2U Expired - Fee Related CN203530859U (en) 2013-11-11 2013-11-11 Bridge construction support base

Country Status (1)

Country Link
CN (1) CN203530859U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100124A (en) * 2014-07-23 2014-10-15 国家电网公司 Holding pole base connecting and fixing device
CN104100124B (en) * 2014-07-23 2016-05-11 国家电网公司 A kind of holding pole base is connected and fixed device

Similar Documents

Publication Publication Date Title
CN105926483A (en) Angle-adjustable road warning device applicable to multiple road surfaces
CN207608812U (en) A kind of anti-device that comes to nothing of laminated rubber bearing
CN101250853A (en) Steel tower self-lifting installation method
CN203530859U (en) Bridge construction support base
CN202023308U (en) Awning mechanism for steel structure
CN207932985U (en) A kind of crane maintenance rig
CN205224272U (en) Steel construction factory building is with structure of encorbelmenting
CN215926006U (en) Town road side slope protection safety shield
CN203188117U (en) Fixing device of bridge guardrail metal stand column base
CN210482077U (en) Bearing device for bridge construction
CN210530504U (en) Multifunctional protective railing for construction site
CN204385606U (en) Bridge buffer
CN207109644U (en) A kind of traffic sign
CN210177997U (en) Safety protection fence for construction
CN204059415U (en) A kind of fall arrest inspection shaft
CN203222734U (en) Bridge guardrail metal stand column base construction leveling device
CN203846778U (en) Rear supporting structure of cantilever beam
CN202644590U (en) Foundation trench anti-floating structure for underground construction
CN206784247U (en) A kind of assemblnig guardrail for road
CN202544875U (en) Front canopy type temporary supporting suspension device for anchor pole supporting tunnel construction
CN202970428U (en) Movable shelf ladder with stable contact
CN204589784U (en) A kind of bridge construction be convenient to arched girder and changed
CN204703063U (en) A kind of Bridge guardrail
CN203700954U (en) Bridge guard railing
CN202544759U (en) Front canopy type temporary supporting device for anchor pole supporting tunnel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Gong Yushu

Inventor after: Li Jun

Inventor after: Shi Lili

Inventor after: Yang Hongsheng

Inventor before: Gong Yushu

Inventor before: Li Jun

Inventor before: Yuan Xinghua

Inventor before: Wang Mingyan

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GONG YUSHU LI JUN YUAN XINGHUA WANG MINGYAN TO: GONG YUSHU LI JUN SHI LILI YANG HONGSHENG

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20201111