CN203188117U - Fixing device of bridge guardrail metal stand column base - Google Patents

Fixing device of bridge guardrail metal stand column base Download PDF

Info

Publication number
CN203188117U
CN203188117U CN 201320212565 CN201320212565U CN203188117U CN 203188117 U CN203188117 U CN 203188117U CN 201320212565 CN201320212565 CN 201320212565 CN 201320212565 U CN201320212565 U CN 201320212565U CN 203188117 U CN203188117 U CN 203188117U
Authority
CN
China
Prior art keywords
steel plate
leveling
column base
steel
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320212565
Other languages
Chinese (zh)
Inventor
张宪堂
张颖颖
周红敏
王洪立
程元胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN 201320212565 priority Critical patent/CN203188117U/en
Application granted granted Critical
Publication of CN203188117U publication Critical patent/CN203188117U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a fixing device of a bridge guardrail metal stand column base. According to the fixing device, a leveling steel plate used for fixing the stand column base is arranged on a bridge guardrail steel reinforcement framework of a concrete structure, the leveling steel plate is provided with unthreaded holes corresponding to stand column base mounting holes, and two anchoring steel plates corresponding to the leveling steel plate up and down are symmetrically arranged below the top layer of longitudinal steel reinforcements of the steel reinforcement framework. Fixing bolts penetrate through the anchoring steel plates and are exposed out of the upper end of the leveling steel plate, the lower ends of the fixing bolts abut against a bridge girder surface layer, the leveling steel plate is welded on the steel reinforcement framework after being leveled, and then the leveling steel plate and a guardrail of a concrete structure are integrally formed in a pouring mode. According to the fixing device, metal stand column base holes are directly aligned to the exposed ends of the fixing bolts, nuts are screwed down at the exposed ends after stand columns are located, and therefore mounting is simple and fast. Due to the fact that the fixing device and the steel reinforcement framework are welded together, the metal stand columns are stably fixed and are not prone to being pulled out.

Description

The fastening devices of Bridge guardrail metal upright post base
Technical field
The utility model relates to Bridge guardrail, relates in particular to the metal upright post on the Bridge guardrail.
Background technology
At present, the beams of metal post fence is used constantly at bridge increases.Beams of metal post fence structure can effectively be protected errant vehicle, effectively reduces the probability that above-mentioned accident takes place, the loss that the minimizing accident causes, the traffic safety level of raising speedway.In addition, guard bar structure has from anti-dazzle function, can effectively save the antiglare shield expense, and the convenient LED lamp lighting device of installing of guard bar structure can effectively be saved the lamp stand expense simultaneously.
Because guardrail metal upright post opposing horizontal loading design load is bigger, whether except requiring base must have enough intensity, the rigidity, installing firmly also is the decisive factor of keeping beams of metal post fence side direction and vertical stability.Present mounting method is by pre-embedded bolt montant to be fixed on the protective guard, so install and fix not firmly, does not have enough holding capacity to resist external force such as wind-force, automobile impacting, is very easily blown down with external force by wind-force and extracts.
The utility model content
The utility model is exactly to have proposed a kind of simple and practical Bridge guardrail column base fastening devices at the problems referred to above.
For achieving the above object, the utility model adopts following scheme:
A kind of Bridge guardrail metal upright post base fastening devices, it is characterized in that, it is to settle a leveling steel plate that is used for the vertical columns base on the cage of reinforcement of Bridge guardrail concrete structure, the leveling steel plate is provided with the unthreaded hole corresponding with column base installing hole, two anchor plates of symmetrical placement below the top layer longitudinal reinforcement of Bridge guardrail concrete structure reinforcing bars skeleton, two anchor plates are corresponding up and down with the leveling steel plate, also be provided with the unthreaded hole corresponding with column base installing hole on the every anchor plate, the unthreaded hole of leveling steel plate is corresponding up and down with the unthreaded hole of anchor plate; Unthreaded hole by anchor plate is equipped with set bolt, nut on the set bolt is held the back set bolt to anchor plate and is exposed from the unthreaded hole of leveling steel plate, the lower end of set bolt withstands on the bridge main beam surface layer, is welded on the cage of reinforcement of concrete guardrail after the leveling of leveling steel plate; And then build with the concrete structure guardrail and to be integral.
For leveling steel plate and cage of reinforcement are connected firmly, with the bar dowel advance expenditure of the space of cage of reinforcement, by bar dowel the cage of reinforcement of leveling steel plate and concrete guardrail is welded together after the leveling of leveling steel plate.
Good effect of the present utility model is, erect when metal upright post is installed at protective guard, directly with the appearing of metal upright post base aperture secured in alignment bolt, after the stud location on appearing fastening nut get final product, so install simple and fast; Because this device and cage of reinforcement weld together, so the metal upright post fixation is difficult for being pulled out.
Description of drawings
Fig. 1 is the utility model elevation;
Fig. 2 is the utility model lateral view;
Fig. 3 is the utility model vertical view.
Among the figure: 1-leveling steel plate, 2-bar dowel, the top layer reinforcing bar of 3-cage of reinforcement, 4-anchor plate, 5-nut, 6-set bolt, 7-cage of reinforcement.
The specific embodiment
As Figure 1-3, Bridge guardrail metal upright post base fastening devices of the present utility model, be on the cage of reinforcement 7 of bridge concrete structure guardrail, to settle a leveling steel plate 1 that is used for the vertical columns base, leveling steel plate 1 is provided with the unthreaded hole corresponding with column base installing hole, two anchor plates 4 of symmetrical placement below the top layer longitudinal reinforcement 3 of cage of reinforcement, two anchor plates 4 are corresponding about in the of 1 with the leveling steel plate, also be provided with the unthreaded hole corresponding with column base installing hole on the every anchor plate 4, the unthreaded hole of leveling steel plate 1 is corresponding up and down with the unthreaded hole of anchor plate 4; By unthreaded hole set bolt 6 is installed, nut 5 on the set bolt 6 is held back set bolt 6 to anchor plate 4 and is exposed from the unthreaded hole of leveling steel plate 1, the lower end of set bolt 6 withstands on the bridge main beam surface layer, is welded on after 1 leveling of leveling steel plate on the cage of reinforcement 7 of concrete guardrail; And then build with the concrete structure guardrail and to be integral.
For leveling steel plate 1 and cage of reinforcement 7 are connected firmly, use bar dowel 2 advance expenditures of field fabrication after 1 leveling of leveling steel plate with the space of cage of reinforcement 7, by bar dowel 2 leveling steel plate 1 and cage of reinforcement 7 are firmly welded together.

Claims (2)

1.一种桥梁护栏金属立柱底座的固定装置,其特征在于,它是在桥梁护栏混凝土结构的钢筋骨架上面安置一块用于固定立柱底座的调平钢板,调平钢板上设有与立柱底座安装孔对应的光孔,在桥梁护栏混凝土结构钢筋骨架的顶层纵向钢筋下面对称安置两块锚固钢板,两块锚固钢板与调平钢板上下对应,每块锚固钢板上也设有与立柱底座安装孔对应的光孔,调平钢板的光孔与锚固钢板的光孔上下对应;通过锚固钢板的光孔安装有固定螺栓,固定螺栓上的螺母把锚固钢板托住后固定螺栓再从调平钢板的光孔中露出,固定螺栓的下端顶在桥梁主梁面层上,调平钢板调平后焊接在混凝土护栏的钢筋骨架上;然后再与混凝土结构护栏浇筑成一体。1. A fixing device for a metal column base of a bridge guardrail is characterized in that it is to place a leveling steel plate for fixing the column base above the steel skeleton of the concrete structure of the bridge guardrail, and the leveling steel plate is provided with a column base for installation For the light hole corresponding to the hole, two anchor steel plates are symmetrically placed under the top longitudinal steel bar of the concrete structure of the bridge guardrail. The two anchor steel plates correspond to the leveling steel plates. The light hole of the leveling steel plate corresponds to the light hole of the anchoring steel plate up and down; a fixing bolt is installed through the light hole of the anchoring steel plate, and the nut on the fixing bolt holds the anchoring plate The holes are exposed, and the lower ends of the fixing bolts are pushed against the surface of the main beam of the bridge. The leveling steel plate is welded to the steel skeleton of the concrete guardrail after being leveled; 2.如权利要求1所述的桥梁护栏金属立柱底座的固定装置,其特征在于,调平钢板调平后与钢筋骨架的空隙用短钢筋垫支,通过短钢筋使调平钢板与混凝土护栏的钢筋骨架焊接在一起。2. The fixing device of the metal column base of bridge guardrail as claimed in claim 1, it is characterized in that, the gap between the leveling steel plate and the steel bar skeleton is supported by a short steel bar after the leveling steel bar is leveled, and the steel bar of the leveling steel plate and the concrete guardrail is made by the short steel bar The skeleton is welded together.
CN 201320212565 2013-04-24 2013-04-24 Fixing device of bridge guardrail metal stand column base Expired - Fee Related CN203188117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320212565 CN203188117U (en) 2013-04-24 2013-04-24 Fixing device of bridge guardrail metal stand column base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320212565 CN203188117U (en) 2013-04-24 2013-04-24 Fixing device of bridge guardrail metal stand column base

Publications (1)

Publication Number Publication Date
CN203188117U true CN203188117U (en) 2013-09-11

Family

ID=49104987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320212565 Expired - Fee Related CN203188117U (en) 2013-04-24 2013-04-24 Fixing device of bridge guardrail metal stand column base

Country Status (1)

Country Link
CN (1) CN203188117U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088130A (en) * 2016-08-23 2016-11-09 大庆石化工程有限公司 A kind of positioner for high-voltage and ultra-high pipe pier bolt and the localization method of high-voltage and ultra-high pipe pier bolt
CN111005314A (en) * 2019-12-13 2020-04-14 贵州桥梁建设集团有限责任公司 Bridge floor steel guardrail embedded part positioning structure
CN113356047A (en) * 2021-06-29 2021-09-07 北京城建设计发展集团股份有限公司 Combined bridge anti-collision guardrail stand column structure and installation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088130A (en) * 2016-08-23 2016-11-09 大庆石化工程有限公司 A kind of positioner for high-voltage and ultra-high pipe pier bolt and the localization method of high-voltage and ultra-high pipe pier bolt
CN106088130B (en) * 2016-08-23 2019-05-10 大庆石化工程有限公司 It is a kind of for the positioning device of high-voltage and ultra-high pipe pier bolt and the localization method of high-voltage and ultra-high pipe pier bolt
CN111005314A (en) * 2019-12-13 2020-04-14 贵州桥梁建设集团有限责任公司 Bridge floor steel guardrail embedded part positioning structure
CN113356047A (en) * 2021-06-29 2021-09-07 北京城建设计发展集团股份有限公司 Combined bridge anti-collision guardrail stand column structure and installation method thereof

Similar Documents

Publication Publication Date Title
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN103243651B (en) Method for fixedly installing and leveling base of metal upright column of bridge guardrail
CN210134353U (en) Bracket type hoop bracket for bent cap construction
CN104532735A (en) Assembly type steel bridge and building method thereof
KR101251124B1 (en) Support structure
CN104033166B (en) A kind of portal frame system of tunnel lining trolley
KR101114840B1 (en) Assembly for support which is reinforced
CN101951191A (en) Adjustable-height bracket base for photovoltaic array bracket
CN204455794U (en) A kind of assembled steel bridge
KR20110002801U (en) Shock-absorbing structure of post
KR101338390B1 (en) Support fixed apparatus
CN222908576U (en) An operating platform for cast-in-place box beams
KR101388253B1 (en) Base structure of road facility
CN211596568U (en) Novel road and bridge protection device
CN212426839U (en) Pre-buried bridge sign steel foundation device is exempted from to reserve by pin-connected panel
CN209816676U (en) Ox leg type hoop
JP5699180B2 (en) How to build a solar panel stand
KR200433150Y1 (en) Fixture for street lamp post
KR101354455B1 (en) In-ground supporting structure of a post
KR101247717B1 (en) Baseplate for a post
KR20130059665A (en) Structure of the folded type pole
KR100971144B1 (en) Traffic lights bolt holding device
CN220468709U (en) Barriers for civil engineering bridges
KR101881325B1 (en) Apparatus for modular structure foundation
CN218405215U (en) Temporary guardrail for super-large-diameter shield tunnel construction channel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130911

Termination date: 20180424

CF01 Termination of patent right due to non-payment of annual fee