CN216235770U - Auxiliary device is used in water conservancy construction pipeline installation - Google Patents
Auxiliary device is used in water conservancy construction pipeline installation Download PDFInfo
- Publication number
- CN216235770U CN216235770U CN202123030040.5U CN202123030040U CN216235770U CN 216235770 U CN216235770 U CN 216235770U CN 202123030040 U CN202123030040 U CN 202123030040U CN 216235770 U CN216235770 U CN 216235770U
- Authority
- CN
- China
- Prior art keywords
- fixed
- auxiliary device
- water conservancy
- conservancy construction
- construction pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 34
- 238000009434 installation Methods 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 238000004804 winding Methods 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005096 rolling process Methods 0.000 abstract 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000011083 cement mortar Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000011372 high-strength concrete Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及管道工程施工技术领域,尤其涉及一种水利施工管道安装用辅助装置。The utility model relates to the technical field of pipeline engineering construction, in particular to an auxiliary device for pipeline installation in water conservancy construction.
背景技术Background technique
水利管道一般的材质分为多种,多数采用预应力钢筒混凝土管,是指在带有钢筒的高强混凝土管芯上缠绕环向预应力钢丝,再在其上喷制致密的水泥砂浆保护层而制成的输水管,是目前最常用的输水管;这种输水管的重量较重,一般都是采用大型机械进行吊装,然后再通过人力辅助进行对接安装的,虽然大型机械在一般的场景下方便进行施工,但是其施工准确度对于器械驾驶员有着很高的要求,当大型机械的驾驶员熟练度较差时,对于施工的进度有很大的影响。The general materials of water conservancy pipelines are divided into various types, most of which are prestressed concrete cylinder pipes, which means that a hoop prestressed steel wire is wound on a high-strength concrete pipe core with a steel cylinder, and then dense cement mortar is sprayed on it for protection. The water pipe made of layers is the most commonly used water pipe at present; this kind of water pipe is heavy, and is generally hoisted by large-scale machinery, and then docked and installed with human assistance. Although large-scale machinery is generally used in general It is convenient to carry out construction in the scene, but its construction accuracy has high requirements for the equipment driver. When the driver of large machinery is not proficient, it will have a great impact on the progress of the construction.
实用新型内容Utility model content
本实用新型的目的是针对背景技术中存在的问题,提出一种便于加快管道安装的水利施工管道安装用辅助装置。The purpose of the utility model is to solve the problems existing in the background technology, and propose an auxiliary device for pipeline installation in water conservancy construction, which is convenient for speeding up pipeline installation.
本实用新型的技术方案:一种水利施工管道安装用辅助装置,包括行架以及固定在行架上侧的一对耳板,两个所述耳板之间转动连接有圆杆,所述圆杆上固定套设有蜗轮,所述行架的上侧固定有电机,所述电机的输出轴上固定有与蜗轮啮合传动的蜗杆,所述圆杆上固定套设有一对收卷轮,两个所述收卷轮上均固定有吊装线,两个所述吊装线的下端均贯穿行架上侧且均固定连接有安装吊,两个所述安装吊上均设置有捆索,所述行架的下侧设置有用于调节吊装线的调节机构。The technical scheme of the present utility model is as follows: an auxiliary device for installation of water conservancy construction pipelines, comprising a row frame and a pair of lugs fixed on the upper side of the row frame, a round rod is rotatably connected between the two lugs, and the A worm wheel is fixedly sleeved on the rod, a motor is fixed on the upper side of the travel frame, a worm that meshes with the worm wheel is fixed on the output shaft of the motor, and a pair of winding wheels is fixedly sleeved on the round rod. A hoisting line is fixed on each of the rewinding wheels, the lower ends of the two hoisting lines pass through the upper side of the rack and are fixedly connected with installation hoists, and two installation hoistings are provided with binding cables. The lower side of the rack is provided with an adjustment mechanism for adjusting the hoisting line.
优选的,所述行架包括顶板以及固定在顶板四角处的支撑梁,位于同一侧的两个所述支撑梁之间固定有连接板,每个所述连接板的下侧均安装有一对移动轮。Preferably, the row frame includes a top plate and support beams fixed at four corners of the top plate, a connecting plate is fixed between the two supporting beams on the same side, and a pair of moving plates is installed on the lower side of each connecting plate wheel.
优选的,所述行架的上侧开设有用于收卷两个吊装线的方孔,两个所述吊装线分别位于两个方孔内。Preferably, the upper side of the rack is provided with square holes for winding two hoisting wires, and the two hoisting wires are respectively located in the two square holes.
优选的,所述安装吊呈U字形,所述安装吊的两侧均开设有卡槽,所述捆索的两端均固定有T字块,所述T字块卡接在卡槽内。Preferably, the installation hanger is U-shaped, the two sides of the installation hanger are provided with card slots, and the two ends of the strapping cable are fixed with T-shaped blocks, and the T-shaped blocks are clipped in the card grooves.
优选的,所述调节机构包括固定在行架下侧的一对矩形板,两个所述矩形板之间设置有螺纹杆,所述螺纹杆上螺纹连接有活动套设在两个吊装线上的方杆,所述螺纹杆的两端分别贯穿两个矩形板且均固定连接有圆盘。Preferably, the adjustment mechanism includes a pair of rectangular plates fixed on the lower side of the carriage, a threaded rod is arranged between the two rectangular plates, and the threaded rod is threadedly connected with a movable sleeve and is arranged on the two hoisting lines The two ends of the threaded rod respectively penetrate two rectangular plates and are fixedly connected with discs.
优选的,两个所述矩形板相互远离的一侧均开设有供螺纹杆滑动的滑动通槽,所述螺纹杆位于滑动通槽内。Preferably, the sides of the two rectangular plates away from each other are provided with sliding through grooves for threaded rods to slide, and the threaded rods are located in the sliding through grooves.
优选的,每个所述圆盘相互远离的一侧以螺纹杆为圆心圆周方向等距开设有多个圆孔,两个所述矩形板相互远离的一侧均等开设有多个定位孔。Preferably, a plurality of circular holes are equally spaced in the circumferential direction with the threaded rod as the center on the side away from each other of the discs, and a plurality of positioning holes are equally opened on the side of the two rectangular plates away from each other.
优选的,所述行架的下侧通过挂绳悬挂有一对能插接在圆孔以及定位孔中的插销。Preferably, a pair of pins that can be inserted into the circular hole and the positioning hole are suspended from the lower side of the rack through a lanyard.
与现有技术相比,本实用新型具有如下有益的技术效果:Compared with the prior art, the utility model has the following beneficial technical effects:
通过收卷轮对吊装线的收卷,配合上安装吊与捆索的固定,方便将水管进行吊起,并且通过蜗轮与蜗杆的配合,能够实现收卷的自动锁止,避免松脱;配合上行架的可移动特点,方便进行水管的调动,在调节机构的使用下,能够进行大范围的调整,可实现精确的管路配合,有利于加快管道的施工进度。The hoisting line is reeled by the rewinding wheel, combined with the fixing of the installation hoist and the rope, it is convenient to hoist the water pipe, and through the cooperation of the worm gear and the worm, the automatic locking of the rewinding can be realized to avoid loosening; The movable feature of the upper frame is convenient for the mobilization of the water pipe. With the use of the adjusting mechanism, it can be adjusted in a large range, which can realize precise pipeline coordination and is conducive to speeding up the construction progress of the pipeline.
附图说明Description of drawings
图1给出本实用新型一种实施例的结构示意图;Fig. 1 provides the structural representation of a kind of embodiment of the present utility model;
图2为图1的正视图;Fig. 2 is the front view of Fig. 1;
图3为图1的A处放大结构示意图。FIG. 3 is an enlarged schematic view of the structure at A of FIG. 1 .
附图标记:1、行架;2、耳板;3、圆杆;4、蜗轮;5、电机;6、蜗杆;7、收卷轮;8、吊装线;9、安装吊;10、捆索;11、矩形板;12、螺纹杆;13、方杆;14、圆盘;15、插销。Reference numerals: 1. Rack; 2. Ear plate; 3. Round rod; 4. Worm gear; 5. Motor; 6. Worm; 7. Winding wheel; 8. Hoisting line; cable; 11, rectangular plate; 12, threaded rod; 13, square rod; 14, disc; 15, latch.
具体实施方式Detailed ways
下文结合附图和具体实施例对本实用新型的技术方案做进一步说明。The technical solutions of the present invention will be further described below with reference to the accompanying drawings and specific embodiments.
实施例一Example 1
如图1所示,本实用新型提出的一种水利施工管道安装用辅助装置,包括行架1以及固定在行架1上侧的一对耳板2,行架1包括顶板以及固定在顶板四角处的支撑梁,位于同一侧的两个支撑梁之间固定有连接板,每个连接板的下侧均安装有一对移动轮;两个耳板2之间转动连接有圆杆3,圆杆3上固定套设有蜗轮4,行架1的上侧固定有电机5,电机5的输出轴上固定有与蜗轮4啮合传动的蜗杆6,圆杆3上固定套设有一对收卷轮7,两个收卷轮7上均固定有吊装线8,行架1的上侧开设有用于收卷两个吊装线8的方孔,两个吊装线8分别位于两个方孔内;两个吊装线8的下端均贯穿行架1上侧且均固定连接有安装吊9,两个安装吊9上均设置有捆索10,安装吊9呈U字形,安装吊9的两侧均开设有卡槽,捆索10的两端均固定有T字块,T字块卡接在卡槽内;行架1的下侧设置有用于调节吊装线8的调节机构。As shown in FIG. 1 , an auxiliary device for installation of water conservancy construction pipelines proposed by the present invention includes a
基于实施例一的工作原理是:在使用时,将通过行架1的移动轮移动到需要的位置,先将捆索10从安装吊9上的卡槽内取出没然后将捆索10放置在需要吊装的水管下侧,然后再将捆索10安装在安装吊9上,再将电机5接通电源,电机5的输出轴带动蜗杆6进行转动,进而蜗杆6与蜗轮4啮合传动,蜗轮4带动圆杆3在耳板2之间转动,使得圆杆3上的收卷轮7对吊装线8进行收卷工作,使得吊装线8通过安装吊9将捆索10固定的水管吊起,方便人工进行水管的位置的调节。The working principle based on the first embodiment is: when in use, move the moving wheel passing through the
实施例二
如图1-3所示,本实用新型提出的一种水利施工管道安装用辅助装置,基于实施例一,本实施例还包括:调节机构包括固定在行架1下侧的一对矩形板11,两个矩形板11之间设置有螺纹杆12,螺纹杆12上螺纹连接有活动套设在两个吊装线8上的方杆13,螺纹杆12的两端分别贯穿两个矩形板11且均固定连接有圆盘14,圆盘14的外圆周面上固定有多个拨动杆。两个矩形板11相互远离的一侧均开设有供螺纹杆12滑动的滑动通槽,螺纹杆12位于滑动通槽内。每个圆盘14相互远离的一侧以螺纹杆12为圆心圆周方向等距开设有多个圆孔,两个矩形板11相互远离的一侧均等开设有多个定位孔。行架1的下侧通过挂绳悬挂有一对能插接在圆孔以及定位孔中的插销15。As shown in FIGS. 1-3 , the utility model proposes an auxiliary device for installation of water conservancy construction pipelines. Based on the first embodiment, this embodiment further includes: the adjusting mechanism includes a pair of
基于实施例二的工作原理是:在使用时,吊装起来的水管需要进行辅助的调节,先将插销15从圆孔中拔出,将圆盘14通过拨动杆进行转动,进而圆盘14上螺纹连接的方杆13发生移动,进而吊装线8下侧的水管在方杆13的调节作用下实现了左右的位置调节,当需要对水管进行前后位置调节时,推动方杆13,使得与方杆13螺纹连接的螺纹杆12在矩形板11的滑动通槽内滑动,使得水管能够调节到合适的位置,使得圆盘14上的圆孔与矩形板11上的定位孔位置对应,然后将插销15插接到位置对应的圆孔和插接孔中,实现再次对水管的位置调节,然后通过启动电机,当调节后水管的位置高于对接位置时,将电机启动,使得收卷轮7实现对吊装线8的放线,实现调节;当高度低于对接位置时,将电机启动,使得收卷轮7对吊装线8进行收线,进而实现调节;在安装水管时能够更加方便准确,有利于提高水管的安装速度。The working principle based on the second embodiment is: when in use, the hoisted water pipe needs to be assisted adjustment, first pull out the
上述具体实施例仅仅是本实用新型的几种优选的实施例,基于本实用新型的技术方案和上述实施例的相关启示,本领域技术人员可以对上述具体实施例做出多种替代性的改进和组合。The above-mentioned specific embodiments are only several preferred embodiments of the present invention. Based on the technical solutions of the present invention and the relevant enlightenment of the above-mentioned embodiments, those skilled in the art can make various alternative improvements to the above-mentioned specific embodiments. and combination.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202123030040.5U CN216235770U (en) | 2021-11-30 | 2021-11-30 | Auxiliary device is used in water conservancy construction pipeline installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202123030040.5U CN216235770U (en) | 2021-11-30 | 2021-11-30 | Auxiliary device is used in water conservancy construction pipeline installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN216235770U true CN216235770U (en) | 2022-04-08 |
Family
ID=80960337
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202123030040.5U Expired - Fee Related CN216235770U (en) | 2021-11-30 | 2021-11-30 | Auxiliary device is used in water conservancy construction pipeline installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN216235770U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119503623A (en) * | 2024-11-26 | 2025-02-25 | 中铁二局集团有限公司 | A quick lifting device for assembled components and use method thereof |
-
2021
- 2021-11-30 CN CN202123030040.5U patent/CN216235770U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119503623A (en) * | 2024-11-26 | 2025-02-25 | 中铁二局集团有限公司 | A quick lifting device for assembled components and use method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110890717B (en) | A method of releasing and laying cables from a cable reel | |
| CN213171204U (en) | Construction equipment hoisting device | |
| CN216235770U (en) | Auxiliary device is used in water conservancy construction pipeline installation | |
| CN108775196A (en) | Lifting and self-climbing combined mechanism for erecting power transmission tower | |
| CN115126932A (en) | Construction pipeline laying device for municipal construction and use method thereof | |
| CN106516884A (en) | Cable take-up mechanism | |
| CN207275925U (en) | Wire retracting device | |
| CN222100862U (en) | A movable aggregate bin device for pouring soft foundation anti-seepage wall | |
| CN210419067U (en) | Movable plate lifting device for ship box body repair | |
| CN211619666U (en) | Cable take-up and pay-off device for electric power construction | |
| CN208981895U (en) | Lifting and self-climbing combined mechanism for erecting power transmission tower | |
| CN218809510U (en) | Cable pay-off device | |
| CN217984295U (en) | Cable promotes laying device fast | |
| CN218619679U (en) | Cable winding and unwinding devices for electromechanical installation engineering | |
| CN216613850U (en) | Logistics crane arm-pulling mechanism | |
| CN216564295U (en) | A cable laying auxiliary device for construction engineering | |
| CN202785449U (en) | Rope coiling-and-uncoiling all-in-one crane | |
| CN219136250U (en) | Lifting platform for pipeline installation | |
| CN217894899U (en) | Pipeline mobile device for hydraulic engineering | |
| CN221140661U (en) | Auxiliary carrying device for underground pipeline construction | |
| CN222293383U (en) | A heavy structural part lifting device | |
| CN221093517U (en) | Pipeline laying auxiliary device for water supply and drainage | |
| CN217756750U (en) | Building machine electrical engineering assembled installation device | |
| CN219525811U (en) | Stranded wire flexible support | |
| CN220926018U (en) | Steel construction crossbeam hoist device for civil engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20230608 Address after: No. 185, Jinshui Avenue, Longnan Town, Longnan Economic and Technological Development Zone, Longnan City, Ganzhou City, Jiangxi Province 341000 Patentee after: Jiangxi Dutian Construction Engineering Co.,Ltd. Address before: Room 1, building 170000, East Panyu Avenue, Panyu District, Guangzhou 510000, Guangdong Province Patentee before: Weng Huiyun |
|
| TR01 | Transfer of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220408 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |