CN211398760U - Fire engineering construction is with device of pre-buried pipeline - Google Patents

Fire engineering construction is with device of pre-buried pipeline Download PDF

Info

Publication number
CN211398760U
CN211398760U CN201922233311.3U CN201922233311U CN211398760U CN 211398760 U CN211398760 U CN 211398760U CN 201922233311 U CN201922233311 U CN 201922233311U CN 211398760 U CN211398760 U CN 211398760U
Authority
CN
China
Prior art keywords
base
block
rod
movable
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201922233311.3U
Other languages
Chinese (zh)
Inventor
程合来
秦琴
李普民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Qi'an Fire Technology Service Co ltd
Original Assignee
Shandong Qi'an Fire Technology Service Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Qi'an Fire Technology Service Co ltd filed Critical Shandong Qi'an Fire Technology Service Co ltd
Priority to CN201922233311.3U priority Critical patent/CN211398760U/en
Application granted granted Critical
Publication of CN211398760U publication Critical patent/CN211398760U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The utility model discloses a device of pre-buried pipeline for fire engineering construction, which comprises a base, one side of the upper end of the base is provided with a support frame, one end of the support frame, which is far away from the base, is provided with a handle, one side of the support frame, which is positioned at the upper end of the base, is provided with a balancing weight, one side of the balancing weight, which is positioned at the upper end of the base, is provided with a fixed frame, one side of the upper end of the fixed frame is provided with a top plate, the upper end of the top plate is provided with a lifting motor, an output shaft of the lifting motor is provided with a pulley, a pull rope is sleeved on the pulley, the lower end of the pull rope is provided with a fixing device, the lower end of the base is provided with a plurality of fixed rods, one side of the fixed rods is provided with a roller, the upper end of screw rod is equipped with connecting block and rotatory piece in proper order, and the both sides of connecting block all are equipped with the fixed block.

Description

Fire engineering construction is with device of pre-buried pipeline
Technical Field
The utility model relates to a fire engineering field particularly, relates to a fire engineering construction is with pre-buried pipeline's device.
Background
At present, the fire control is closely relevant with everyone's life safety, among the prior art, through burying the fire pipeline underground, makes the fire pipeline be located the earth's surface below, prevents that the fire pipeline from damaging, prolongs the life-span of fire pipeline, has guaranteed people's life safety.
However, the traditional embedded fire fighting pipeline draws the pipeline into a pre-selected pipe groove manually, so that a large amount of manpower is consumed, the pipeline embedding efficiency is low, and the construction period is prolonged.
SUMMERY OF THE UTILITY MODEL
The technical task of the utility model is to above not enough, provide a fire engineering construction is with pre-buried pipeline's device, solve the difficult problem of placing the pipe chase of pipeline.
The technical scheme of the utility model is realized like this:
the utility model provides a fire engineering construction is with device of buried pipeline in advance, includes the base, upper end one side of base is equipped with the support frame, the support frame is kept away from the one end of base is equipped with the handle, one side of support frame just is located the upper end of base is equipped with the balancing weight, one side of balancing weight just is located the upper end of base is equipped with the mount, upper end one side of mount is equipped with the roof, the upper end of roof is equipped with elevator motor, elevator motor's output shaft is equipped with the pulley, the cover is equipped with the stay cord on the pulley, the lower extreme of stay cord is equipped with fixing device, the lower extreme of base is equipped with a plurality of dead levers.
Preferably, the roller is connected with the fixed rod through a movable shaft.
Preferably, a reinforcing plate is arranged on one side of the fixing frame and positioned at the upper end of the base, and the pull rope is a steel wire rope.
Preferably, fixing device includes two sets of movable rods, and is two sets of the intermediate position of movable rod passes through the bracing piece and connects, it is equipped with the screw rod to alternate on the bracing piece, the upper end of screw rod is equipped with connecting block and rotatory piece in proper order, the both sides of connecting block all are equipped with the fixed block, the fixed block with connect through two sets of connecting rods between the upper end of movable rod, the lower extreme of movable rod is equipped with the movable block, one side of movable block is equipped with the clamp splice.
Preferably, the two groups of clamping blocks are both arc-shaped structures, and anti-skid grains are arranged on one side of each clamping block.
Preferably, the upper end of the supporting rod is provided with a threaded hole matched with the screw rod.
Preferably, the upper end of the fixing block is fixedly connected with the lower end of the pull rope through a fixing ring.
The utility model has the advantages that:
1. the two ends of the pipeline are respectively fixed by two groups of equipment, the pipeline is driven to move downwards by a lifting motor, the pipeline is further installed in the pipe chase, and the equipment can move at the upper end of the pipe chase;
2. through the both ends centre gripping of fixing device to the pipeline, and fixed more firm, can not take place to relax, set up the balancing weight through the upper end of base, improved the stability of equipment, can not empty.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a device for embedding a pipeline for fire engineering construction according to an embodiment of the present invention;
fig. 2 is a schematic structural diagram of a fixing device according to an embodiment of the present invention.
In the figure:
1. a base; 2. a support frame; 3. a handle; 4. a balancing weight; 5. a fixed mount; 6. a top plate; 7. a lifting motor; 8. a pulley; 9. pulling a rope; 10. a fixing device; 11. fixing the rod; 12. a roller; 13. a movable shaft; 14. a reinforcing plate; 15. a movable rod; 16. a support bar; 17. a screw; 18. connecting blocks; 19. rotating the block; 20. a fixed block; 21. a connecting rod; 22. a movable block; 23. a clamping block; 24. anti-skid lines; 25. a threaded hole; 26. and (4) fixing the ring.
Detailed Description
The invention will be further explained with reference to the drawings and the specific embodiments.
Embodiment, as shown in fig. 1, according to the utility model discloses a fire engineering construction is with device of buried pipeline in advance, including base 1, base 1's upper end one side is equipped with support frame 2, the one end that base 1 was kept away from to support frame 2 is equipped with handle 3, one side of support frame 2 and the upper end that is located base 1 are equipped with balancing weight 4, one side of balancing weight 4 and the upper end that is located base 1 are equipped with mount 5, upper end one side of mount 5 is equipped with roof 6, the upper end of roof 6 is equipped with elevator motor 7, elevator motor 7's output shaft is equipped with pulley 8, the cover is equipped with stay cord 9 on pulley 8, the lower extreme of stay cord 9 is equipped with fixing device 10, base 1's lower extreme is equipped with a plurality of dead levers 11.
Specifically, the idler wheel 12 and the fixed rod 11 are connected through the movable shaft 13, the idler wheel 12 convenient to rotate is arranged on the fixed frame 5, the reinforcing plate 14 is arranged on one side of the fixed frame 5 and located at the upper end of the base 1, the fixed frame 5 is more stable, and the stay rope 9 is made of steel wire ropes, so that toughness is improved.
The structure and function of the fastening device 10 will be described in detail below.
As shown in fig. 2, the fixing device 10 includes two sets of movable rods 15, the middle positions of the two sets of movable rods 15 are connected through a support rod 16, a screw rod 17 is inserted into the support rod 16, a connecting block 18 and a rotating block 19 are sequentially arranged at the upper end of the screw rod 17, fixed blocks 20 are arranged on two sides of the connecting block 18, the fixed blocks 20 are connected with the upper ends of the movable rods 15 through two sets of connecting rods 21, a movable block 22 is arranged at the lower end of each movable rod 15, and a clamping block 23 is arranged on one side of each movable block 22.
Specifically, two sets of clamp blocks 23 all are the arc structure, and one side of clamp block 23 is equipped with anti-skidding line 24, has improved the frictional force of clamp block 23, and the upper end of bracing piece 16 is seted up with screw rod 17 matched with screw hole 25, and the upper end of fixed block 20 passes through solid fixed ring 26 fixed connection with the lower extreme of stay cord 9.
For the convenience of understanding the technical solution of the present invention, the following detailed description is made on the working principle or the operation mode of the present invention in the practical process.
In practical application: through fixing the both ends of pipeline respectively in fixing device 10 on two sets of equipment, drive base 1 through handle 3 and support frame 2 and move, and then base 1 can remove in the upper end of pipe box, make elevator motor 7 work through external control switch, and then elevator motor 7 drives stay cord 9 downstream, and then drive fixing device 10 downstream, make the pipeline move to the pipe box, through rotatory piece 19 in the rotatory fixing device 10, make and drive screw rod 17 and rotate, and then the lower extreme of screw rod 17 drives bracing piece 16 and moves from top to bottom, and then the both ends of bracing piece 16 drive movable rod 15 and move, make the lower extreme of movable rod 15 drive movable block 22 and move, and then two sets of movable blocks 22 drive two sets of clamp splice 23 motion respectively, make clamp splice 23 fix the pipeline, anti-skidding line 24 on the clamp splice 23 has increased the frictional force.
In summary, with the aid of the technical solution of the present invention, two sets of the equipment are used to fix two ends of the pipeline respectively, the lifting motor 7 is used to drive the pipeline to move downwards, and the pipeline is installed in the pipe chase, and the equipment can move at the upper end of the pipe chase; through the both ends centre gripping of fixing device 10 to the pipeline, and fixed more firm, can not take place to relax, set up balancing weight 4 through the upper end of base 1, improved the stability of equipment, can not empty.
Through the above detailed description, the person skilled in the art can easily realize the present invention. It should be understood, however, that the intention is not to limit the invention to the particular embodiments described. On the basis of the disclosed embodiments, a person skilled in the art can combine different technical features at will, thereby implementing different technical solutions.

Claims (7)

1. The device for the pre-buried pipeline for the fire engineering construction is characterized by comprising a base (1), wherein a support frame (2) is arranged on one side of the upper end of the base (1), a handle (3) is arranged at one end, far away from the base (1), of the support frame (2), a balancing weight (4) is arranged at the upper end of the base (1) on one side of the support frame (2), a fixing frame (5) is arranged at one side of the balancing weight (4) and located at the upper end of the base (1), a top plate (6) is arranged on one side of the upper end of the fixing frame (5), a lifting motor (7) is arranged at the upper end of the top plate (6), a pulley (8) is arranged on an output shaft of the lifting motor (7), a pull rope (9) is sleeved on the pulley (8), a fixing device (10) is arranged at the lower end of the pull rope (9), a, and one side of each fixed rod (11) is provided with a roller (12).
2. The device for embedding the pipeline in advance for the fire engineering construction as claimed in claim 1, wherein the roller (12) is connected with the fixed rod (11) through a movable shaft (13).
3. The device of claim 1, wherein a reinforcing plate (14) is arranged on one side of the fixing frame (5) and at the upper end of the base (1), and the pull rope (9) is a steel wire rope.
4. The device of claim 1, characterized in that fixing device (10) includes two sets of movable rods (15), and is two sets of the intermediate position of movable rod (15) passes through bracing piece (16) to be connected, it is equipped with screw rod (17) to alternate on bracing piece (16), the upper end of screw rod (17) is equipped with connecting block (18) and rotatory piece (19) in proper order, the both sides of connecting block (18) all are equipped with fixed block (20), fixed block (20) with connect through two sets of connecting rod (21) between the upper end of movable rod (15), the lower extreme of movable rod (15) is equipped with movable block (22), one side of movable block (22) is equipped with clamp splice (23).
5. The device of claim 4, wherein the two groups of clamping blocks (23) are of arc-shaped structures, and anti-skid grains (24) are arranged on one side of each clamping block (23).
6. The device of claim 5, wherein the upper end of the support rod (16) is provided with a threaded hole (25) matched with the screw (17).
7. The device of claim 6, wherein the upper end of the fixing block (20) is fixedly connected with the lower end of the pull rope (9) through a fixing ring (26).
CN201922233311.3U 2019-12-13 2019-12-13 Fire engineering construction is with device of pre-buried pipeline Expired - Fee Related CN211398760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922233311.3U CN211398760U (en) 2019-12-13 2019-12-13 Fire engineering construction is with device of pre-buried pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922233311.3U CN211398760U (en) 2019-12-13 2019-12-13 Fire engineering construction is with device of pre-buried pipeline

Publications (1)

Publication Number Publication Date
CN211398760U true CN211398760U (en) 2020-09-01

Family

ID=72210831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922233311.3U Expired - Fee Related CN211398760U (en) 2019-12-13 2019-12-13 Fire engineering construction is with device of pre-buried pipeline

Country Status (1)

Country Link
CN (1) CN211398760U (en)

Similar Documents

Publication Publication Date Title
CN109487927B (en) Cable net supporting type glass curtain wall and construction method
CN211444722U (en) Fixing device is used in construction of water conservancy water and electricity pipeline
CN113213330B (en) Electric pole hoisting device for electric power construction
CN213171204U (en) Construction equipment hoisting device
CN211398760U (en) Fire engineering construction is with device of pre-buried pipeline
CN104150393B (en) A kind of micro power power equipment rotary hoisting device
CN201952742U (en) Suspension bridge cable changing device
CN203998709U (en) A kind of super laborsaving electrical equipment lifting appliance
CN105926458A (en) Double-drive device and method automatic in rubber rod penetrating
CN218595910U (en) Steel beam lifting device for steel structure installation
CN213976722U (en) Fire engineering construction is with device of pre-buried pipeline
CN216918480U (en) Pipeline lifting device
CN215934313U (en) Threading construction auxiliary device for building electrical engineering
CN105862604A (en) Dual-drive automatic tube penetrating machine and method
CN106049287A (en) Device and method for automatically penetrating through rubber bar
CN1321256C (en) Oil-pumping workover rig
CN209839329U (en) Support frame is used in water supply pipe installation
CN105908634A (en) Dual-drive device and method for automatic poling
CN210457242U (en) Detachable hoist engine hoist device
CN105970827A (en) Device and method for automatically threading pipe
CN102030272A (en) Building equipment hoisting device
CN216235770U (en) Auxiliary device is used in water conservancy construction pipeline installation
CN218174466U (en) Hoisting equipment for sewage pipeline construction
CN211338622U (en) Steel rope winding device for building lifting equipment and beneficial to avoiding slipping
CN218579417U (en) A balancing unit for building material hoist and mount

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200901

Termination date: 20211213

CF01 Termination of patent right due to non-payment of annual fee