CN213976722U - Fire engineering construction is with device of pre-buried pipeline - Google Patents
Fire engineering construction is with device of pre-buried pipeline Download PDFInfo
- Publication number
- CN213976722U CN213976722U CN202023191047.0U CN202023191047U CN213976722U CN 213976722 U CN213976722 U CN 213976722U CN 202023191047 U CN202023191047 U CN 202023191047U CN 213976722 U CN213976722 U CN 213976722U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- traction cable
- clamping
- rotating
- fire engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 239000000725 suspension Substances 0.000 claims abstract description 21
- 238000005096 rolling process Methods 0.000 claims description 9
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
The utility model discloses a fire engineering construction is with device of pre-buried pipeline, including the engine bedplate, engine bedplate bottom install the rotation motor, the rotation motor drive be connected with stretch into the engine bedplate in the dwang, the engine bedplate on install the rotation platform that is connected with the dwang, the rotation platform on vertically be provided with the stand, the stand top install suspension beam, stand one side install drive mechanism, drive mechanism be connected with the pipeline clamping device through the traction cable line, suspension beam top symmetry be provided with supply the fixed leading wheel of traction cable line, realize the transport of pre-buried pipeline, need not the manual transport, utilize the setting of rotation motor to make the stand have the steering action simultaneously, need not to reserve too much settling space when using this equipment, it is more convenient, be convenient to hoist and carry the pre-buried pipeline of fire engineering, the labor is saved, the engineering cost is greatly reduced, and the construction period is shortened.
Description
Technical Field
The utility model belongs to the technical field of the architectural equipment and specifically relates to a fire engineering construction is with pre-buried pipeline's device is related to.
Background
At present, for the installation of the pre-buried pipe for the fire engineering, manual carrying is mostly adopted for burying, a lot of hands are needed for completing the installation, the engineering expenditure is increased, meanwhile, the efficiency of carrying the pre-buried pipe by hands is low, and the task cannot be completed within the construction period, so that a device of the pre-buried pipe for the fire engineering construction needs to be provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a fire engineering construction is with pre-buried pipeline's device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a fire engineering construction is with device of buried pipeline in advance, includes the engine bedplate, engine bedplate bottom install and rotate the motor, rotation motor drive be connected with and stretch into the engine bedplate in the dwang, the engine bedplate on install with the revolving stage that the dwang is connected, the revolving stage on the vertical stand that is provided with, stand top install suspension beam, stand one side install drive mechanism, drive mechanism be connected with pipeline clamping device through the traction cable rope, suspension beam top symmetry be provided with the confession the fixed leading wheel of traction cable rope, leading wheel bottom install the bolster, suspension beam head end be connected with the extension davit, the extension davit head end be provided with the directive wheel, the directive wheel with the traction cable rope be connected.
As a further technical solution of the present invention, the traction mechanism includes a rolling motor installed on the rotation table, a power rod connected to the rolling motor, a reel plate connected to the power rod, and a reel located in the reel plate, wherein the reel is connected to the traction cable.
As a further technical scheme of the utility model, the revolving stage in be provided with dwang intercommissural concave key.
As a further technical scheme of the utility model, pipeline clamping device include with the rings that the traction cable rope be connected, with the fixed plate that the rings are connected with be located the grip slipper of fixed plate below, grip slipper top both sides be provided with the centre gripping cylinder, the centre gripping cylinder on be provided with the spout, the spout in be equipped with the drive of centre gripping cylinder connected pipeline tong.
As a further technical proposal of the utility model, the bottom of the machine seat plate is provided with a wheel set.
Compared with the prior art, the beneficial effects of the utility model are that: the clamping cylinder is started to push away the pipeline clamp, the power rod is driven to rotate by the aid of the rolling motor after the pipeline clamp clamps the embedded pipeline, the reel is wound to pull the cable rope, the embedded pipeline is hung by the extension suspension arm, when the embedded pipeline is to be turned, the rotation motor is started to rotate the rotating platform, the stand column, the suspension beam, the extension suspension arm and the pipeline clamping device are driven to rotate integrally, the embedded pipeline is conveyed without manual movement, meanwhile, the stand column has a turning effect by the aid of the rotation motor, too much arrangement space does not need to be reserved when the equipment is used, the equipment is more convenient to use, the embedded pipeline of the fire engineering can be conveniently hoisted and conveyed, the manpower is saved, the engineering cost is greatly reduced, and the construction period is shortened.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Wherein: the device comprises a machine seat plate 1, a wheel set 2, a rotating motor 3, a rotating rod 4, a rotating platform 5, a concave key 6, a stand column 7, a rolling motor 8, a power rod 9, a suspension beam 10, a reel plate 11, a reel 12, a cushion frame 13, a guide wheel 14, an extension suspension arm 15, a steering wheel 16, a traction cable 17, a fixing plate 18, a clamping seat 19, a lifting ring 20, a clamping cylinder 21, a sliding groove 22 and a pipeline clamping hand 23.
Detailed Description
The following describes embodiments of the present invention with reference to the drawings and preferred embodiments.
Referring to fig. 1, a device for pre-burying a pipeline for fire engineering construction comprises a machine base plate 1, wherein a rotating motor 3 is installed at the bottom of the machine base plate 1, the rotating motor 3 is connected with a rotating rod 4 extending into the machine base plate 1 in a driving manner, a rotating table 5 connected with the rotating rod 4 is installed on the machine base plate 1, an upright post 7 is vertically arranged on the rotating table 5, a suspension beam 10 is installed at the top of the upright post 7, a traction mechanism is installed at one side of the upright post 7 and connected with a pipeline clamping device through a traction cable 17, guide wheels 14 for fixing the traction cable 17 are symmetrically arranged at the top of the suspension beam 10, a cushion frame 13 is installed at the bottom of the guide wheels 14, an extension boom 15 is connected to the head end of the suspension beam 10, and a steering wheel 16 is arranged at the head end of the extension boom 15, the steering wheel 16 is connected with the traction cable 17, the traction mechanism comprises a rolling motor 8 arranged on the rotating table 5, a power rod 9 in driving connection with the rolling motor 8, a scroll plate 11 connected with the power rod 9 and a scroll 12 positioned in the scroll plate 11, the scroll 12 is connected with the traction cable 17, a concave key 6 mutually assembled with the rotating rod 4 is arranged in the rotating table 5, the pipeline clamping device comprises a hanging ring 20 connected with the traction cable 17, a fixing plate 18 connected with the hanging ring 20 and a clamping seat 19 positioned below the fixing plate 18, clamping cylinders 21 are arranged on two sides above the clamping seat 19, sliding grooves 22 are arranged on the clamping cylinders 21, and pipeline clamping handles 23 in driving connection with the clamping cylinders 21 are arranged in the sliding grooves 22, the clamping cylinder 21 is started, the pipeline clamping hand 23 is pushed open, after the embedded pipeline is clamped by the pipeline clamping hand 23, the rolling motor 8 is started, the power rod 9 is driven to rotate, the reel 12 is made to roll the traction cable 17, the embedded pipeline is lifted by the extension suspension arm 15, when the embedded pipeline needs to be turned, the rotating motor 3 is started to enable the rotating platform 5 to rotate, the stand column 7, the suspension beam 10, the extension suspension arm 15 and the pipeline clamping device are driven to integrally rotate, the carrying of the embedded pipeline is achieved, manual moving is not needed, meanwhile, the stand column 7 has a turning effect by means of the arrangement of the rotating motor 3, too much arrangement space does not need to be reserved when the equipment is used, the equipment is more convenient, the embedded pipeline of fire engineering can be conveniently hoisted and carried, the manpower is saved, the engineering cost is greatly reduced, and the construction period is shortened.
Furthermore, the bottom of the seat board 1 is provided with a wheel set 2, so that the flexibility of the device is improved.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.
Claims (5)
1. The device for the pre-buried pipeline for the fire engineering construction comprises a machine seat plate (1) and is characterized in that a rotating motor (3) is installed at the bottom of the machine seat plate (1), the rotating motor (3) is connected with a rotating rod (4) extending into the machine seat plate (1) in a driving mode, a rotating table (5) connected with the rotating rod (4) is installed on the machine seat plate (1), an upright post (7) is vertically arranged on the rotating table (5), a suspension beam (10) is installed at the top of the upright post (7), a traction mechanism is installed on one side of the upright post (7), the traction mechanism is connected with a pipeline clamping device through a traction cable (17), guide wheels (14) for fixing the traction cable (17) are symmetrically arranged at the top of the suspension beam (10), and a cushion frame (13) is installed at the bottom of the guide wheels (14), the suspension beam (10) is connected with an extension suspension arm (15) at the head end, a steering wheel (16) is arranged at the head end of the extension suspension arm (15), and the steering wheel (16) is connected with the traction cable (17).
2. The device of claim 1, wherein the traction mechanism comprises a rolling motor (8) mounted on the rotating table (5), a power rod (9) in driving connection with the rolling motor (8), a reel plate (11) connected with the power rod (9), and a reel (12) located in the reel plate (11), and the reel (12) is connected with the traction cable (17).
3. The device of pre-buried pipeline for fire engineering construction according to claim 1, characterized in that a concave key (6) mutually assembled with the rotating rod (4) is arranged in the rotating table (5).
4. The device of claim 1, wherein the pipeline clamping device comprises a lifting ring (20) connected with the traction cable (17), a fixing plate (18) connected with the lifting ring (20), and a clamping seat (19) located below the fixing plate (18), clamping cylinders (21) are arranged on two sides above the clamping seat (19), sliding grooves (22) are formed in the clamping cylinders (21), and pipeline clamping handles (23) in driving connection with the clamping cylinders (21) are assembled in the sliding grooves (22).
5. The device for embedding the pipeline in the fire engineering construction is characterized in that the wheel set (2) is installed at the bottom of the machine seat plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023191047.0U CN213976722U (en) | 2020-12-26 | 2020-12-26 | Fire engineering construction is with device of pre-buried pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023191047.0U CN213976722U (en) | 2020-12-26 | 2020-12-26 | Fire engineering construction is with device of pre-buried pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN213976722U true CN213976722U (en) | 2021-08-17 |
Family
ID=77248162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023191047.0U Expired - Fee Related CN213976722U (en) | 2020-12-26 | 2020-12-26 | Fire engineering construction is with device of pre-buried pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN213976722U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115326560A (en) * | 2022-08-02 | 2022-11-11 | 九力绳缆有限公司 | Maritime work mooring rope strength detection device |
-
2020
- 2020-12-26 CN CN202023191047.0U patent/CN213976722U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115326560A (en) * | 2022-08-02 | 2022-11-11 | 九力绳缆有限公司 | Maritime work mooring rope strength detection device |
CN115326560B (en) * | 2022-08-02 | 2024-01-16 | 九力绳缆有限公司 | Marine engineering cable strength detection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208055826U (en) | A kind of kerbstone mounting auxiliary | |
CN105776038A (en) | Substation indoor cable trench cover plate hoisting device | |
CN212127258U (en) | Hoisting accessory for construction | |
CN213976722U (en) | Fire engineering construction is with device of pre-buried pipeline | |
CN211034762U (en) | Cable winding and unwinding and hoisting integrated combined vehicle | |
CN114084807A (en) | Tubular pile vacuum chuck crane and using method thereof | |
CN203359781U (en) | Hoisting device adopting clamp ring hoisting lug to hoist tower equipment | |
CN109019314B (en) | A kind of tubular pole safty hoisting method | |
CN210150629U (en) | Multipurpose crane for disassembling and assembling street lamp | |
CN214935515U (en) | Hoist and mount auxiliary assembly that construction bridge construction was used | |
CN215479279U (en) | Special hoisting equipment for large-displacement telescopic device | |
CN115041870A (en) | Positioning welding equipment and process for upright post for supporting suspension steel platform | |
CN205653079U (en) | Indoor cable trench cover hoisting accessory of transformer substation | |
CN220725921U (en) | Telegraph pole holder with double holding claw design | |
CN206927505U (en) | Sheet material carries special cantilever crane | |
CN218909572U (en) | Auxiliary installation equipment for power engineering | |
CN211398760U (en) | Fire engineering construction is with device of pre-buried pipeline | |
CN218860211U (en) | Auxiliary electric hoisting support for pipeline installation | |
CN216038301U (en) | A hoisting accessory for hydraulic engineering pipeline | |
CN220845178U (en) | Pile hanging auxiliary device | |
CN216893413U (en) | Industry platform for concrete cylinder construction | |
CN211594824U (en) | Track hoisting device and rail car | |
CN213894891U (en) | Wind power tower cylinder lifting clamp | |
CN219263371U (en) | Municipal pipeline laying device | |
CN216190520U (en) | Pipeline transportation and lifting device for municipal sewage disposal engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210817 |
|
CF01 | Termination of patent right due to non-payment of annual fee |