CN216156290U - Greening landscape retaining wall and landscape footpath combined structure - Google Patents

Greening landscape retaining wall and landscape footpath combined structure Download PDF

Info

Publication number
CN216156290U
CN216156290U CN202121760607.1U CN202121760607U CN216156290U CN 216156290 U CN216156290 U CN 216156290U CN 202121760607 U CN202121760607 U CN 202121760607U CN 216156290 U CN216156290 U CN 216156290U
Authority
CN
China
Prior art keywords
retaining wall
landscape
layer
road
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121760607.1U
Other languages
Chinese (zh)
Inventor
赵庆
陈若诚
吴福广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongyifeng Suzhou Urban Construction And Development Co ltd
Original Assignee
Suzhou Zhonghengtong Road And Bridge Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhonghengtong Road And Bridge Group Co ltd filed Critical Suzhou Zhonghengtong Road And Bridge Group Co ltd
Priority to CN202121760607.1U priority Critical patent/CN216156290U/en
Application granted granted Critical
Publication of CN216156290U publication Critical patent/CN216156290U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a greening landscape retaining wall and landscape footpath combined structure, which comprises a retaining wall constructed along a water area and a landscape plank road using the same pouring layer as the retaining wall, wherein the pouring layer is a cement mortar layer, the retaining wall adopts concrete stones to construct a foundation, an auxiliary road is laid on the retaining wall on the side close to water, a landscape green belt is laid on the side close to the landscape plank road, the joint of the auxiliary road and the retaining wall is poured by the cement mortar layer, the constructing layers of the auxiliary road are respectively a plain soil layer, a gravel cushion layer, a concrete structure layer, a cement mortar layer and a retro concrete stone layer from bottom to top, the plain soil layer is tamped, the tamping coefficient is more than 93 percent, a pipeline is arranged in the retaining wall, one side of the pipeline is communicated with the water area, and the other side is communicated with a water storage tank, the retaining wall and the landscape plank road are constructed by using the same pouring layer, so that the stability of the plank road and the retaining wall is enhanced, the landscape is more natural, the landscape effect is improved, and the construction cost is reduced.

Description

Greening landscape retaining wall and landscape footpath combined structure
Technical Field
The utility model relates to the technical field of greening landscape construction, in particular to a greening landscape retaining wall and landscape footpath combined structure.
Background
The retaining wall is usually used for supporting roadbed filling or hillside soil body, preventing the filling or soil body from deforming and destabilizing, and also plays a role in preventing water and soil loss when used in a lake facing section. The traditional method comprises the following steps: the retaining wall and the landscape plank road are separately constructed. There are problems: the distance between people and nature is pulled while the use function is met, only one of the functions and the attractiveness can be selected, the separate construction cost is increased, and the trestle is not firm.
SUMMERY OF THE UTILITY MODEL
The utility model designs a greening landscape retaining wall and landscape footpath combined structure, which is characterized in that the retaining wall and the landscape plank road are built by using the same pouring layer, so that the nature is integrated, the landscape is improved, the structure is stable, the building cost is reduced, and the water collected by a water storage tank is utilized to water a greening belt to save resources.
The specific technical scheme is as follows: the utility model provides a afforestation view retaining wall and view pavement integrated configuration, including the retaining wall who builds along the waters and use the same view plank road of pouring the layer with the retaining wall, it is the cement mortar layer to pour the layer, the retaining wall adopts the concrete stone to build the ground, and the retaining wall of the side of just having water has still laid the auxiliary road, has laid the view greenbelt on the side of facing the view plank road.
According to the further technical scheme, a cement mortar layer is poured at the joint of the auxiliary road and the retaining wall, and the building layers of the auxiliary road are a plain soil layer, a broken stone cushion layer, a concrete structure layer, the cement mortar layer and an ancient concrete stone layer from bottom to top respectively.
According to the further technical scheme, the plain soil layer is tamped, the tamping coefficient is larger than 93%, and the antique concrete stone layer is paved by adopting colorful imitation gold hillstones.
According to a further technical scheme, the retro concrete stone layer is laid on the pouring layer of the landscape plank road, and is paved by adopting colorful imitated gold hill stones.
According to the further technical scheme, a pipeline is arranged in the retaining wall, one side of the pipeline is communicated with a water area, and the other side of the pipeline is communicated with a water storage pool.
Further technical scheme, the trough of lamp belt has been seted up to the plank road guardrail below of view plank road side, install the waterproof lamp in the trough of lamp belt.
The utility model has the advantages of
According to the utility model, the retaining wall and the landscape plank road are built by using the same pouring layer, so that the stability of the landscape plank road and the retaining wall is enhanced, the landscape effect is better integrated, the construction cost is reduced, and the water collected by the water storage tank is used for irrigating the green belt, so that the resources are saved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the construction of the secondary pouring deck of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the landscape stack cast layer structure of FIG. 1 according to the present invention;
fig. 4 is a schematic view of the structure of the lamp slot of fig. 1 according to the present invention.
In the figure: the building comprises an auxiliary road 1, a retro concrete stone layer 1-1, a cement mortar layer 1-2, a concrete structure layer 1-3, a macadam cushion layer 1-4, a plain soil layer 1-5, a retaining wall 2, a concrete stone 2-1, a landscape plank road 3, a plank road guardrail 4, a lamp belt 5-1, a lamp belt groove 5-1, a landscape green belt 6, a reservoir 7 and a pipeline 8.
Detailed Description
The essential features and advantages of the utility model will be further explained below with reference to examples, but the utility model is not limited to the examples listed.
Examples
Referring to fig. 1-4, a greening landscape retaining wall and landscape footpath composite structure comprises a retaining wall 2 constructed along a water area and a landscape plank road 3 using the same casting layer as the retaining wall 2, wherein the casting layer is a cement mortar layer 1-2, the retaining wall 2 adopts concrete stones 2-1 to construct a foundation, the concrete stones 2-1 adopt C25 type casting, the concrete stone type, the dosage and the casting thickness are comprehensively determined by technicians in the field according to actual terrain and landform, an auxiliary road 1 is further laid on the retaining wall 2 on the side close to water, concretely, as shown in fig. 2, the cement mortar layer 1-2 is adopted at the joint of the auxiliary road 1 and the retaining wall 2 for casting, and the construction layers of the auxiliary road 1 are respectively a plain soil layer 1-5, a gravel cushion layer 1-4, a concrete structure layer 1-3 and a cement mortar layer 1-2 from bottom to top, The antique concrete stone layer 1-1, specifically, the plain soil layer 1-5 is tamped, the tamping coefficient is more than 93%, and the antique concrete stone layer 1-1 is paved by colorful imitation gold mountain stones to play a role in enhancing the attractiveness;
as shown in fig. 3, the retro concrete stone layer 1-1 is also arranged on the upper layer of the landscape plank road 3, the cement mortar layer 1-2 poured together with the retaining wall 2 is arranged on the lower layer, and the retro concrete stone layer 1-1 is paved by adopting colorful imitation gold mountain stones to play a role in enhancing the appearance;
as shown in fig. 1, a pipeline 8 is arranged in the retaining wall 2, one side of the pipeline 8 is communicated with a water area, the other side of the pipeline is communicated with a water storage tank 7, specifically, a filter screen (not marked in the figure) is arranged at the end part of the pipeline communicated with the water area to prevent sundries from blocking a water inlet, a landscape green belt 6 is laid on one side of the landscape trestle 3, and when the landscape green belt 6 needs to be irrigated, water in the water storage tank 7 can be used for irrigating;
as shown in fig. 4, a light belt groove 5-1 is formed below the plank road guardrail 4 on the side of the landscape plank road 3, a waterproof light belt 5 is installed in the light belt groove 5-1, and the light belt 5 is an LED light belt.
According to the utility model, the retaining wall and the landscape plank road are built by using the same pouring layer, so that the stability of the landscape plank road and the retaining wall is enhanced, the landscape effect is better integrated, the construction cost is reduced, and the water collected by the water storage tank is used for irrigating the green belt, so that the resources are saved.
It should be noted that the above-mentioned preferred embodiments are merely illustrative of the technical concepts and features of the present invention, and are intended to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the scope of the present invention. All equivalent changes and modifications made according to the spirit of the present invention should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a afforestation view retaining wall and view pavement integrated configuration, its characterized in that, including the retaining wall who builds along the waters and use the same view plank road of pouring the layer with the retaining wall, it is the cement mortar layer to pour the layer, the retaining wall adopts the concrete stone to build the ground, and the retaining wall of the side of facing water has still laid the auxiliary road, has laid the view greenbelt on the side of facing the view plank road.
2. The combined structure of a greening landscape retaining wall and a landscape footpath as claimed in claim 1, wherein a cement mortar layer is poured at the joint of the sub-road and the retaining wall, and the building layers of the sub-road are a plain soil layer, a gravel cushion layer, a concrete structure layer, a cement mortar layer and an ancient concrete stone layer from bottom to top respectively.
3. A greening landscape retaining wall and landscape footpath combination structure as claimed in claim 2, wherein the plain soil layer is compacted, the compacting coefficient is more than 93%, and the ancient concrete stone layer is paved by colorful imitation gold mountain stones.
4. A greening landscape retaining wall and landscape footpath combination structure as claimed in claim 2, wherein the retro concrete stone layer is laid on the pouring layer of the landscape plank road, and the retro concrete stone layer is laid by using colorful imitated gold hill stones.
5. A landscape retaining wall and landscape footpath combination structure according to claim 1, wherein the retaining wall is internally provided with a pipeline, one side of the pipeline is communicated with the water area, and the other side of the pipeline is communicated with a water storage pool.
6. A landscape retaining wall and landscape footpath integrated configuration of claim 1, wherein a light trough is provided below the side of the landscape plank road, and a waterproof light strip is provided in the light trough.
CN202121760607.1U 2021-07-30 2021-07-30 Greening landscape retaining wall and landscape footpath combined structure Active CN216156290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121760607.1U CN216156290U (en) 2021-07-30 2021-07-30 Greening landscape retaining wall and landscape footpath combined structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121760607.1U CN216156290U (en) 2021-07-30 2021-07-30 Greening landscape retaining wall and landscape footpath combined structure

Publications (1)

Publication Number Publication Date
CN216156290U true CN216156290U (en) 2022-04-01

Family

ID=80837307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121760607.1U Active CN216156290U (en) 2021-07-30 2021-07-30 Greening landscape retaining wall and landscape footpath combined structure

Country Status (1)

Country Link
CN (1) CN216156290U (en)

Similar Documents

Publication Publication Date Title
CN207435896U (en) A kind of Collison fence for bridge of the plug-in planting groove of prefabricated
CN106149625B (en) A kind of ecological self-purification type landscape revetment reconstruction structure and its construction method
WO2020244177A1 (en) Roadside tree planting hole structure and construction method therefor
CN201826318U (en) Simple ecological slope protecting structure for loose soil of road
CN108589654A (en) A kind of ecological brick and its ecological revetment system
CN207619930U (en) A kind of high stable state ecoscape protective slope structure
CN201206233Y (en) Ecological footpath system
CN109252470A (en) A kind of expressway greening isolation strip and its construction method
CN213296390U (en) Ecological slope protection structure that interlocking-type ecological building block and reinforced earth combine
CN107119525B (en) It multifunctional ecological sponge-type assembled building blocks and is formed by terrace and mats formation and retaining wall
CN216156290U (en) Greening landscape retaining wall and landscape footpath combined structure
CN206438465U (en) A kind of ecological self-purification type landscape revetment reconstruction structure
CN214832388U (en) River course shore protection structure of reinforcing river bank steadiness
CN204849516U (en) Resistant lawn of trampleing on
CN114892502A (en) Environment-friendly road and bridge structure and construction method thereof
CN210507515U (en) Greening gravity type retaining wall
WO2002097199A1 (en) The landscape block with receiving rainwater within retaining wall
CN207109850U (en) A kind of ecological afforestation retaining wall
CN206396570U (en) A kind of garden road pile foundation type spit of fland walks structure
CN110409372A (en) A kind of landscape revetment conducive to riverbank water remediation
CN204282291U (en) City river frame pillar framework bank protection structure
CN215289938U (en) Structure of natural revetment grass slope into water
CN214783011U (en) Ecological floor structure
CN215052635U (en) Three-layer step ecological function belt structure for river engineering
CN212612277U (en) Ecological slope protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 215000 No.1, Nanhuan East Road, Suzhou City, Jiangsu Province

Patentee after: Zhongyifeng (Suzhou) Urban Construction and Development Co.,Ltd.

Address before: 215000 No.1, Nanhuan East Road, Suzhou City, Jiangsu Province

Patentee before: SUZHOU ZHONGHENGTONG ROAD AND BRIDGE GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder