WO2020244177A1 - Roadside tree planting hole structure and construction method therefor - Google Patents

Roadside tree planting hole structure and construction method therefor Download PDF

Info

Publication number
WO2020244177A1
WO2020244177A1 PCT/CN2019/122261 CN2019122261W WO2020244177A1 WO 2020244177 A1 WO2020244177 A1 WO 2020244177A1 CN 2019122261 W CN2019122261 W CN 2019122261W WO 2020244177 A1 WO2020244177 A1 WO 2020244177A1
Authority
WO
WIPO (PCT)
Prior art keywords
layer
planting hole
permeable
aquifer
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/CN2019/122261
Other languages
French (fr)
Chinese (zh)
Inventor
王光娜
黄思敏
关振鹏
周韵怡
江敏辉
郭瑞卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meijing Environmental Technology Co Ltd
Original Assignee
Guangdong Meijing Environmental Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Meijing Environmental Technology Co Ltd filed Critical Guangdong Meijing Environmental Technology Co Ltd
Publication of WO2020244177A1 publication Critical patent/WO2020244177A1/en
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G29/00Root feeders; Injecting fertilisers into the roots
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers

Definitions

  • the invention relates to the technical field of street tree planting holes, in particular to a street tree planting hole structure and a construction method thereof.
  • Street trees are an important part of urban landscaping landscape, and the growth status of street trees plays an important role in the landscape effect of urban roads. Street trees are planted by manually or mechanically borrowing soil below the ground surface to form tree holes, and backfilling the original soil excavated before planting seedlings. This kind of tree hole has a single structure and poor air permeability of the root system. In areas with poor soil penetration, the tree hole is prone to lack of water; whether it is watering or natural rainfall, the top soil layer of the tree hole is easy to compact, which affects the infiltration of surface water. It is difficult for the deep soil to store water effectively during the rainy season and watering period. Therefore, it is impossible to rely on the water stored in the dry season and delayed watering to support the growth of street trees. The survival rate of street trees is related to whether the surrounding soil ball is breathable and permeable. . Traditional planting holes cannot meet the above requirements, leading to roadside trees that are prone to yellow leaves, falling off, slow growth, and death of trees in severe cases.
  • the present invention provides a street tree planting hole structure and a construction method thereof, and solves the technical problem of effectively storing water through the planting hole structure and the aquifer structure and making the roots of the street tree effective.
  • One aspect of the present invention provides a street tree planting hole structure, in which a planting soil ball wrapped with a permeable geotextile bag is built in the planting hole, and an upper peripheral water storage layer is filled between the outer surface of the planting soil ball and the inner surface of the planting hole
  • the lower peripheral aquifer, the upper peripheral aquifer and the lower peripheral aquifer respectively include a top aquifer and a bottom aquifer
  • the water purification layer is located on the upper end of the top aquifer
  • the permeation layer is located in the water purification layer
  • the permeable brick layer is located on the upper end surface of the permeable layer
  • side stones are arranged around the permeable brick layer and the permeable layer.
  • the cross section of the planting hole is U-shaped.
  • the upper peripheral water storage layer and the lower peripheral water storage layer are sponge water storage medium soil layers mixed with coarse sand, loam and coconut chaff, with a thickness of 100-200 mm.
  • the water purification layer is composed of fly ash or water purification filter material, and has a thickness of 10-30 mm.
  • the permeable layer is composed of a mixture of crushed stone and coarse sand, with a thickness of 50-70 mm, and a particle size of the crushed stone of 20-40 mm.
  • the porosity of the crushed stone and the coarse sand is 35%-50%.
  • the permeable brick layer is composed of brick bodies made of permeable concrete poured into each other assembled, and the permeable brick layer is provided with at least two permeable holes longitudinally and a semi-arc drainage channel in the transverse direction.
  • Another aspect of the present invention provides a construction method of a street tree planting hole structure, which includes the following steps:
  • a planting ball wrapped with a permeable geotextile bag is placed in the planting hole, and the planting ball is located on the bottom aquifer;
  • the upper peripheral aquifer and the lower peripheral aquifer respectively include the top aquifer and The bottom aquifer;
  • step S2 a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff is laid on the bottom of the planting hole as the bottom water storage layer;
  • step S4 between the outer surface of the planting soil ball and the inner surface of the planting hole is filled with a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff as the upper peripheral water storage layer and the lower peripheral storage Water layer.
  • step S2 the bottom aquifer is disinfected with a 300-fold solution of carbendazim and then watered thoroughly.
  • step S3 includes:
  • the street tree planting hole structure of the present invention includes a permeable brick layer, a permeable layer, a water purification layer, an upper peripheral water storage layer, a permeable geotextile, a planting soil ball, and a lower peripheral water storage layer in turn from top to bottom.
  • the permeable brick layer is assembled by permeable bricks and laid on the top of the street tree planting holes. Watering water or rainwater passes through the permeable brick layer and flows through the permeable layer composed of gravel and coarse sand to reach the water purification layer composed of fly ash or water purification filter material. After adsorption and purification, the water purification layer enters the upper peripheral aquifer and the lower peripheral aquifer to store water.
  • the invention also discloses a construction method of the above-mentioned street tree planting hole structure.
  • the street tree planting hole structure of the present invention can facilitate the infiltration of water and accumulate around the root system of the street tree to form a root micro-reservoir; it not only regulates the surface runoff during the rainy season, but also exerts the water replenishment function in the water shortage season by conserving water, and the planting soil ball has special periphery
  • the water storage structure can also ensure the ventilation of the roots of the street trees, improve the survival rate of the street trees, make the street tree planting holes have the function of storing rainwater in rainy days, and releasing water for the growth of street trees on sunny days, reducing maintenance costs, and achieving the purpose of urban rainwater utilization.
  • Fig. 1 is a schematic structural diagram of the planting hole structure of the street tree in the present invention.
  • the figure includes: planting hole 1, permeable geotextile bag 2, planting soil ball 3, upper peripheral aquifer 4, lower peripheral aquifer 5, top aquifer 41, bottom aquifer 51, water purification layer 6, infiltration Layer 7, permeable brick layer 8, side stone 9.
  • this embodiment provides a street tree planting hole structure on the one hand.
  • a planting soil ball 3 wrapped with a permeable geotextile bag 2 is built in the planting hole 1.
  • the outer surface of the planting soil ball 3 is connected to the planting hole 1.
  • the upper peripheral aquifer 4 and the lower peripheral aquifer 5 are filled between the inner surface.
  • the upper peripheral aquifer 4 and the lower peripheral aquifer 5 respectively include a top aquifer 41 and a bottom aquifer 51.
  • Layer 6 is located on the upper end surface of the top water storage layer 41, the permeable layer 7 is located on the upper end surface of the water purification layer 6, the permeable brick layer 8 is located on the upper end surface of the permeable layer 7, and the permeable brick layer 8 and the permeable layer 7 are provided with Side stone 9.
  • the cross section of the planting hole is U-shaped.
  • the street tree planting hole is 1.25-1.5 meters long, 1-1.25 meters wide, and 1-1.5 meters deep; the planting hole has a cube planting hole with a side length of 20-30 cm in the middle.
  • the upper peripheral water storage layer and the lower peripheral water storage layer are sponge water storage medium soil layers mixed with coarse sand, loam and coconut chaff, with a thickness of 100-200mm, and the volume of the coarse sand The content accounts for 40%-50%, the volume content of loam soil accounts for 30%-40%, and the volume content of coconut bran accounts for 10%-30%.
  • the water purification layer is composed of fly ash or a water purification filter material with similar properties and low price, with a thickness of 10-30 mm.
  • the permeable layer is composed of a mixture of crushed stone and coarse sand, with a thickness of 50-70 mm, and a gravel particle size of 20-40 mm.
  • the porosity of the crushed stone and coarse sand is 35%-50%. .
  • the permeable brick layer is composed of brick bodies made of permeable concrete poured together, and at least 2-6 circular permeable holes are opened longitudinally in the permeable brick layer, and semi-arc drainage channels are opened laterally.
  • the water-permeable brick layer can select a color pattern according to the paving conditions around the planting hole.
  • ground water will enter through the permeable brick layer 8 to penetrate
  • the water purified by the water purification layer 6 will enter the upper peripheral aquifer 4 and the lower peripheral aquifer 5 for storage, and slowly release to support the growth of street trees.
  • the special structure of the aquifer also has good air permeability , Promote the growth of street tree roots.
  • Another aspect of the embodiments of the present invention provides a construction method of a street tree planting hole structure, which includes the following steps:
  • a planting ball wrapped with a permeable geotextile bag is placed in the planting hole, and the planting ball is located on the bottom aquifer;
  • the upper peripheral aquifer and the lower peripheral aquifer respectively include the top aquifer and The bottom aquifer;
  • stem through holes are round or square;
  • S8 Side stones are arranged around the permeable brick layer and the permeable layer.
  • the side stones and permeable brick layer are flush with the sidewalk ground to facilitate cleaning and pedestrian passage.
  • step S2 a mixture of coarse sand, loam and coconut chaff is laid on the bottom of the planting hole
  • the soil layer of the water storage medium is used as the bottom aquifer, and the loam can be mixed with nutrient soil, with a thickness of 150mm, and use carbendazim 300 times solution to disinfect the bottom aquifer and pour thoroughly;
  • step S3 includes:
  • the planting soil ball is hung vertically into the permeable geotextile bag, the planting direction is adjusted, and the planting soil is backfilled into the permeable geotextile bag until the bag is filled, that is, the backfilled planting soil and the cross section of the permeable geotextile bag are flush and leveled.
  • step S4 between the outer surface of the planting soil ball and the inner surface of the planting hole is filled with a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff as the upper peripheral water storage layer and the lower peripheral storage Water layer.
  • a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff as the upper peripheral water storage layer and the lower peripheral storage Water layer.
  • the thickness of the upper peripheral water storage layer is 100 mm.
  • the street tree planting hole structure formed by the construction method provided by this embodiment includes permeable brick layer, permeable layer, water purification layer, upper peripheral water storage layer, permeable geotextile, planting soil ball, and lower peripheral water storage in order from top to bottom Floor.
  • the permeable brick layer is assembled by permeable bricks and laid on the top of the street tree planting holes. Watering water or rainwater passes through the permeable brick layer and flows through the permeable layer composed of gravel and coarse sand to reach the water purification layer composed of fly ash or water purification filter material. After adsorption and purification, the water purification layer enters the upper peripheral aquifer and the lower peripheral aquifer to store water.
  • the embodiment of the present invention can facilitate the infiltration of water and accumulate around the roots of the street trees to form a root micro-reservoir; the special water storage structure around the planting soil ball can also ensure the ventilation of the roots of the street trees, improve the survival rate of the street trees, and reduce maintenance costs.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Sewage (AREA)
  • Road Paving Structures (AREA)

Abstract

A roadside tree planting hole structure, the planting hole structure comprising a planting soil ball (2) placed in a planting hole and wrapped in a water-permeable geotextile bag (1), an upper peripheral water storage layer (3) and a lower peripheral water storage layer (5) being filled between the outer surface of the planting soil ball and the inner surface of the planting hole, the upper and lower peripheral water storage layers respectively comprising a top (41) and bottom water storage layer (51), a water purification layer (6) being positioned on the upper end face of the top water storage layer, a permeable layer (7) being positioned on the upper end face of the water purification layer, a water-permeable brick layer (8) being positioned on the upper end face of the permeable layer, and the sides of the water-permeable brick layer and the permeable layer being provided with side stones (9). The present planting hole structure and construction method facilitate moisture infiltration and accumulation, forming a root system micro-reservoir; surface runoff during rainy season can be regulated, and a water replenishment function can be performed during dry season; the water accumulation structure can ensure ventilation of the root system of the roadside tree, such that the planting hole has the function of storing rainwater on rainy days and releasing accumulated water for the growth of the roadside tree on sunny days, reducing maintenance costs and achieving the objective of utilising urban rainwater resources. Also comprising a construction method for the roadside tree planting hole structure.

Description

一种行道树种植穴结构及其施工方法Street tree planting hole structure and construction method thereof 技术领域Technical field

本发明涉及行道树种植穴技术领域,尤其涉及一种行道树种植穴结构及其施工方法。The invention relates to the technical field of street tree planting holes, in particular to a street tree planting hole structure and a construction method thereof.

背景技术Background technique

行道树是城市园林绿化景观的重要组成部分,行道树的生长状况对城市道路的景观效果起到重要作用。行道树种植多是采用人工或机械在地表以下取土成为树穴,并待植入苗木后回填以前挖出的原土。这种树穴结构单一,树木根系透气性差,在土质渗透不良的区域,树穴容易缺水;不论是浇水灌溉还是自然降雨,树穴的表土层容易板结,影响地表水分下渗,树穴深层土壤难以在降雨时节及浇水时段有效地储蓄水分,因此,无法在干旱季节及延迟浇水的情况下依靠自身储蓄的水分供养行道树生长,行道树种植成活率与种植土球四周是否透气透水有关。传统的种植穴无法满足以上要求,导致行道树在生长的过程中容易出现叶片枯黄、脱落、生长缓慢、严重时树木死亡。Street trees are an important part of urban landscaping landscape, and the growth status of street trees plays an important role in the landscape effect of urban roads. Street trees are planted by manually or mechanically borrowing soil below the ground surface to form tree holes, and backfilling the original soil excavated before planting seedlings. This kind of tree hole has a single structure and poor air permeability of the root system. In areas with poor soil penetration, the tree hole is prone to lack of water; whether it is watering or natural rainfall, the top soil layer of the tree hole is easy to compact, which affects the infiltration of surface water. It is difficult for the deep soil to store water effectively during the rainy season and watering period. Therefore, it is impossible to rely on the water stored in the dry season and delayed watering to support the growth of street trees. The survival rate of street trees is related to whether the surrounding soil ball is breathable and permeable. . Traditional planting holes cannot meet the above requirements, leading to roadside trees that are prone to yellow leaves, falling off, slow growth, and death of trees in severe cases.

发明内容Summary of the invention

本发明针对上述现有技术的不足而提供一种行道树种植穴结构及其施工方法,解决了通过种植穴结构和蓄水层结构有效储蓄水分,并使行道树根系有效透气的技术问题。In view of the above-mentioned shortcomings of the prior art, the present invention provides a street tree planting hole structure and a construction method thereof, and solves the technical problem of effectively storing water through the planting hole structure and the aquifer structure and making the roots of the street tree effective.

本发明为解决上述问题所采用的技术方案为:The technical solutions adopted by the present invention to solve the above problems are:

本发明一方面提供一种行道树种植穴结构,在种植穴内置入用透水土工布袋包裹的种植土球,所述种植土球的外表面与种植穴的内表面之间填充有上部外围蓄水层和下部外围蓄水层,上部外围蓄水层与下部外围蓄水层分别包括顶部蓄水层和底部蓄水层,净水层位于所述顶部蓄水层的上端面,渗透层位于净水层的上端面,透水砖层位于渗透层的上端面,透水砖 层与渗透层的周边设置有侧石。One aspect of the present invention provides a street tree planting hole structure, in which a planting soil ball wrapped with a permeable geotextile bag is built in the planting hole, and an upper peripheral water storage layer is filled between the outer surface of the planting soil ball and the inner surface of the planting hole And the lower peripheral aquifer, the upper peripheral aquifer and the lower peripheral aquifer respectively include a top aquifer and a bottom aquifer, the water purification layer is located on the upper end of the top aquifer, and the permeation layer is located in the water purification layer The permeable brick layer is located on the upper end surface of the permeable layer, and side stones are arranged around the permeable brick layer and the permeable layer.

进一步地,所述种植穴的剖面呈U型形状。Further, the cross section of the planting hole is U-shaped.

进一步地,所述上部外围蓄水层和下部外围蓄水层是由粗砂、壤土、椰糠混合而成的海绵蓄水介质土层,厚度为100-200mm。Further, the upper peripheral water storage layer and the lower peripheral water storage layer are sponge water storage medium soil layers mixed with coarse sand, loam and coconut chaff, with a thickness of 100-200 mm.

进一步地,所述净水层由粉煤灰或净水滤料组成,厚度10-30mm。Further, the water purification layer is composed of fly ash or water purification filter material, and has a thickness of 10-30 mm.

进一步地,所述渗透层由碎石及粗砂混合组成,厚度50-70mm,碎石粒径为20-40mm,所述碎石与粗砂混合后孔隙率为35%-50%。Further, the permeable layer is composed of a mixture of crushed stone and coarse sand, with a thickness of 50-70 mm, and a particle size of the crushed stone of 20-40 mm. The porosity of the crushed stone and the coarse sand is 35%-50%.

进一步地,所述透水砖层由透水混凝土浇灌制成的砖体互相拼装组成,所述透水砖层纵向开设至少两个透水孔,横向开设半弧形的排水孔道。Further, the permeable brick layer is composed of brick bodies made of permeable concrete poured into each other assembled, and the permeable brick layer is provided with at least two permeable holes longitudinally and a semi-arc drainage channel in the transverse direction.

本发明另一方面提供一种行道树种植穴结构的施工方法,包括以下步骤:Another aspect of the present invention provides a construction method of a street tree planting hole structure, which includes the following steps:

S1.开挖种植穴,平整种植穴内表面;S1. Excavate the planting hole and level the inner surface of the planting hole;

S2.在种植穴的底部铺设底部蓄水层;S2. Lay a bottom aquifer at the bottom of the planting hole;

S3.在种植穴内置入用透水土工布袋包裹的种植土球,所述种植土球位于底部蓄水层上;S3. A planting ball wrapped with a permeable geotextile bag is placed in the planting hole, and the planting ball is located on the bottom aquifer;

S4.在所述种植土球的外表面与种植穴的内表面之间填充上部外围蓄水层和下部外围蓄水层,上部外围蓄水层与下部外围蓄水层分别包括顶部蓄水层和所述底部蓄水层;S4. Fill an upper peripheral aquifer and a lower peripheral aquifer between the outer surface of the planting soil ball and the inner surface of the planting hole. The upper peripheral aquifer and the lower peripheral aquifer respectively include the top aquifer and The bottom aquifer;

S5.在顶部蓄水层的上端面铺设净水层;S5. Lay a clean water layer on the upper end of the top aquifer;

S6.在净水层的上端面铺设渗透层;S6. Lay a permeable layer on the upper end of the water purification layer;

S7.在渗透层的上端面铺设透水砖层;S7. Lay a permeable brick layer on the upper end of the permeable layer;

S8.在透水砖层与渗透层的周边设置有侧石。S8. Side stones are arranged around the permeable brick layer and the permeable layer.

进一步地,在步骤S2中,在种植穴的底部铺设由粗砂、壤土及椰糠混合而成的蓄水介质土层作为底部蓄水层;Further, in step S2, a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff is laid on the bottom of the planting hole as the bottom water storage layer;

在步骤S4中,在所述种植土球的外表面与种植穴的内表面之间填充由粗砂、壤土及椰糠混合而成的蓄水介质土层作为上部外围蓄水层和下部 外围蓄水层。In step S4, between the outer surface of the planting soil ball and the inner surface of the planting hole is filled with a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff as the upper peripheral water storage layer and the lower peripheral storage Water layer.

进一步地,在步骤S2中,采用多菌灵300倍液对底部蓄水层进行消毒后浇透水。Further, in step S2, the bottom aquifer is disinfected with a 300-fold solution of carbendazim and then watered thoroughly.

更进一步地,步骤S3包括:Furthermore, step S3 includes:

S31.在底部蓄水层上放置透水土工布袋;S31. Place permeable geotextile bags on the bottom aquifer;

S32.种植土球置入透水土工布袋内,往透水土工布袋内回填种植土直至装满布袋。S32. Put the planting soil ball into the permeable geotextile bag, and backfill the planting soil into the permeable geotextile bag until the bag is full.

本发明的有益效果在于:本发明的行道树种植穴结构由上至下依次包括透水砖层、渗透层、净水层、上部外围蓄水层、透水土工布、种植土球以及下部外围蓄水层。透水砖层由透水砖拼装铺设在行道树种植穴上方,浇灌用水或者雨水通过透水砖层,流经碎石和粗砂组成的渗透层到达粉煤灰或净水滤料组成的净水层,在净水层吸附净化后进入上部外围蓄水层及下部外围蓄水层储蓄水分。本发明还公开了上述行道树种植穴结构的施工方法。本发明的行道树种植穴结构可便利水分下渗并蓄积在行道树根系周围,形成根系微水库;不仅调节降雨时节的地表径流,而且通过涵养水分发挥缺水时节的水分补充功能,种植土球外围特殊的蓄水结构还可以保证行道树根系透气,提高行道树成活率,使行道树种植穴具有雨天储蓄雨水,晴天释放蓄水供养行道树生长的功能,降低养护成本,达到城市雨水资源化利用的目的。The beneficial effect of the present invention is that the street tree planting hole structure of the present invention includes a permeable brick layer, a permeable layer, a water purification layer, an upper peripheral water storage layer, a permeable geotextile, a planting soil ball, and a lower peripheral water storage layer in turn from top to bottom. . The permeable brick layer is assembled by permeable bricks and laid on the top of the street tree planting holes. Watering water or rainwater passes through the permeable brick layer and flows through the permeable layer composed of gravel and coarse sand to reach the water purification layer composed of fly ash or water purification filter material. After adsorption and purification, the water purification layer enters the upper peripheral aquifer and the lower peripheral aquifer to store water. The invention also discloses a construction method of the above-mentioned street tree planting hole structure. The street tree planting hole structure of the present invention can facilitate the infiltration of water and accumulate around the root system of the street tree to form a root micro-reservoir; it not only regulates the surface runoff during the rainy season, but also exerts the water replenishment function in the water shortage season by conserving water, and the planting soil ball has special periphery The water storage structure can also ensure the ventilation of the roots of the street trees, improve the survival rate of the street trees, make the street tree planting holes have the function of storing rainwater in rainy days, and releasing water for the growth of street trees on sunny days, reducing maintenance costs, and achieving the purpose of urban rainwater utilization.

附图说明Description of the drawings

图1是本发明中行道树种植穴结构的结构示意图。Fig. 1 is a schematic structural diagram of the planting hole structure of the street tree in the present invention.

图中包括:种植穴1、透水土工布袋2、种植土球3、上部外围蓄水层4、下部外围蓄水层5、顶部蓄水层41、底部蓄水层51、净水层6、渗透层7、透水砖层8、侧石9。The figure includes: planting hole 1, permeable geotextile bag 2, planting soil ball 3, upper peripheral aquifer 4, lower peripheral aquifer 5, top aquifer 41, bottom aquifer 51, water purification layer 6, infiltration Layer 7, permeable brick layer 8, side stone 9.

具体实施方式Detailed ways

下面结合附图具体阐明本发明的实施方式,附图仅供参考和说明使用,不构成对本发明专利保护范围的限制。The following describes the implementation of the present invention in detail with reference to the accompanying drawings. The accompanying drawings are for reference and illustrative purposes only, and do not constitute a limitation on the scope of protection of the present invention.

如图1所示,本实施例一方面提供一种行道树种植穴结构,在种植穴1内置入用透水土工布袋2包裹的种植土球3,所述种植土球3的外表面与种植穴1的内表面之间填充有上部外围蓄水层4和下部外围蓄水层5,上部外围蓄水层4与下部外围蓄水层5分别包括顶部蓄水层41和底部蓄水层51,净水层6位于所述顶部蓄水层41的上端面,渗透层7位于净水层6的上端面,透水砖层8位于渗透层7的上端面,透水砖层8与渗透层7的周边设置有侧石9。As shown in FIG. 1, this embodiment provides a street tree planting hole structure on the one hand. A planting soil ball 3 wrapped with a permeable geotextile bag 2 is built in the planting hole 1. The outer surface of the planting soil ball 3 is connected to the planting hole 1. The upper peripheral aquifer 4 and the lower peripheral aquifer 5 are filled between the inner surface. The upper peripheral aquifer 4 and the lower peripheral aquifer 5 respectively include a top aquifer 41 and a bottom aquifer 51. Layer 6 is located on the upper end surface of the top water storage layer 41, the permeable layer 7 is located on the upper end surface of the water purification layer 6, the permeable brick layer 8 is located on the upper end surface of the permeable layer 7, and the permeable brick layer 8 and the permeable layer 7 are provided with Side stone 9.

在本实施例中,所述种植穴的剖面呈U型形状。作为优选,所述行道树种植穴长1.25-1.5米,宽1-1.25米,深1-1.5米;种植穴中间开设边长20-30cm的正方体种植通孔。In this embodiment, the cross section of the planting hole is U-shaped. Preferably, the street tree planting hole is 1.25-1.5 meters long, 1-1.25 meters wide, and 1-1.5 meters deep; the planting hole has a cube planting hole with a side length of 20-30 cm in the middle.

在本实施例中,所述上部外围蓄水层和下部外围蓄水层是由粗砂、壤土、椰糠混合而成的海绵蓄水介质土层,厚度为100-200mm,其中粗砂的体积含量占40%-50%,壤土体积含量占30%-40%,椰糠体积含量占比10%-30%。In this embodiment, the upper peripheral water storage layer and the lower peripheral water storage layer are sponge water storage medium soil layers mixed with coarse sand, loam and coconut chaff, with a thickness of 100-200mm, and the volume of the coarse sand The content accounts for 40%-50%, the volume content of loam soil accounts for 30%-40%, and the volume content of coconut bran accounts for 10%-30%.

在本实施例中,所述净水层由粉煤灰或与其性质相近并且价格低廉的净水滤料组成,厚度10-30mm。In this embodiment, the water purification layer is composed of fly ash or a water purification filter material with similar properties and low price, with a thickness of 10-30 mm.

在本实施例中,所述渗透层由碎石及粗砂混合组成,厚度50-70mm,碎石粒径为20-40mm,所述碎石与粗砂混合后孔隙率为35%-50%。In this embodiment, the permeable layer is composed of a mixture of crushed stone and coarse sand, with a thickness of 50-70 mm, and a gravel particle size of 20-40 mm. The porosity of the crushed stone and coarse sand is 35%-50%. .

在本实施例中,所述透水砖层由透水混凝土浇灌制成的砖体互相拼装组成,所述透水砖层纵向开设至少2-6个圆形透水孔,横向开设半弧形的排水孔道。作为优选,透水砖层可以根据种植穴周边的铺装情况选择颜色图案。In this embodiment, the permeable brick layer is composed of brick bodies made of permeable concrete poured together, and at least 2-6 circular permeable holes are opened longitudinally in the permeable brick layer, and semi-arc drainage channels are opened laterally. Preferably, the water-permeable brick layer can select a color pattern according to the paving conditions around the planting hole.

在本实施例中,在浇灌养护或者降雨时节,地面水分会通过透水砖层 8进入到渗透In this embodiment, during watering and maintenance or raining seasons, ground water will enter through the permeable brick layer 8 to penetrate

层7,由净水层6净化后的水分会进入到上部外围蓄水层4及下部外围蓄水层5进行储蓄,慢慢释放供养行道树生长,蓄水层的特殊结构还具有良好的透气性,促进行道树根系的生长。Layer 7, the water purified by the water purification layer 6 will enter the upper peripheral aquifer 4 and the lower peripheral aquifer 5 for storage, and slowly release to support the growth of street trees. The special structure of the aquifer also has good air permeability , Promote the growth of street tree roots.

本发明实施例另一方面提供一种行道树种植穴结构的施工方法,包括以下步骤:Another aspect of the embodiments of the present invention provides a construction method of a street tree planting hole structure, which includes the following steps:

S1.开挖种植穴,平整种植穴内表面土壤;S1. Excavate the planting hole and level the soil on the inner surface of the planting hole;

S2.在种植穴的底部铺设底部蓄水层;S2. Lay a bottom aquifer at the bottom of the planting hole;

S3.在种植穴内置入用透水土工布袋包裹的种植土球,所述种植土球位于底部蓄水层上;S3. A planting ball wrapped with a permeable geotextile bag is placed in the planting hole, and the planting ball is located on the bottom aquifer;

S4.在所述种植土球的外表面与种植穴的内表面之间填充上部外围蓄水层和下部外围蓄水层,上部外围蓄水层与下部外围蓄水层分别包括顶部蓄水层和所述底部蓄水层;S4. Fill an upper peripheral aquifer and a lower peripheral aquifer between the outer surface of the planting soil ball and the inner surface of the planting hole. The upper peripheral aquifer and the lower peripheral aquifer respectively include the top aquifer and The bottom aquifer;

S5.在顶部蓄水层的上端面铺设净水层,净水层厚度为10-30mm;S5. Lay a water purification layer on the upper end of the top aquifer, the thickness of the water purification layer is 10-30mm;

S6.在净水层的上端面铺设渗透层;S6. Lay a permeable layer on the upper end of the water purification layer;

S7.在渗透层的上端面铺设透水砖层,并在树茎周边预留树茎通孔,作为优选,树茎通孔为圆形或方形等形状;S7. Lay a permeable brick layer on the upper end of the permeable layer, and reserve stem through holes around the stems. Preferably, the stem through holes are round or square;

S8.在透水砖层与渗透层的周边设置有侧石,优选地,所述侧石和透水砖层与人行道地面平齐,方便清扫及行人通行。S8. Side stones are arranged around the permeable brick layer and the permeable layer. Preferably, the side stones and permeable brick layer are flush with the sidewalk ground to facilitate cleaning and pedestrian passage.

在本实施例中,在步骤S2中,在种植穴的底部铺设由粗砂、壤土及椰糠混合而成的In this embodiment, in step S2, a mixture of coarse sand, loam and coconut chaff is laid on the bottom of the planting hole

蓄水介质土层作为底部蓄水层,壤土可混加增肥营养土,厚度为150mm,并采用多菌灵300倍液对底部蓄水层进行消毒后浇透水;The soil layer of the water storage medium is used as the bottom aquifer, and the loam can be mixed with nutrient soil, with a thickness of 150mm, and use carbendazim 300 times solution to disinfect the bottom aquifer and pour thoroughly;

在本实施例中,步骤S3包括:In this embodiment, step S3 includes:

S31.在底部蓄水层上放置透水土工布袋;作为优选,透水土工布袋与种植穴内侧面相隔100-200mm;S31. Place a permeable geotextile bag on the bottom aquifer; preferably, the permeable geotextile bag is separated from the inner surface of the planting hole by 100-200mm;

S32.种植土球垂直吊入透水土工布袋内,调整栽植方向,往透水土工布袋内回填种植土直至装满布袋,即回填种植土与透水土工布袋断面平齐并找平。S32. The planting soil ball is hung vertically into the permeable geotextile bag, the planting direction is adjusted, and the planting soil is backfilled into the permeable geotextile bag until the bag is filled, that is, the backfilled planting soil and the cross section of the permeable geotextile bag are flush and leveled.

在步骤S4中,在所述种植土球的外表面与种植穴的内表面之间填充由粗砂、壤土及椰糠混合而成的蓄水介质土层作为上部外围蓄水层和下部外围蓄水层。作为优选,上部外围蓄水层厚度为100mm。In step S4, between the outer surface of the planting soil ball and the inner surface of the planting hole is filled with a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff as the upper peripheral water storage layer and the lower peripheral storage Water layer. Preferably, the thickness of the upper peripheral water storage layer is 100 mm.

通过本实施例提供的施工方法施工形成的行道树种植穴结构由上至下依次包括透水砖层、渗透层、净水层、上部外围蓄水层、透水土工布、种植土球以及下部外围蓄水层。透水砖层由透水砖拼装铺设在行道树种植穴上方,浇灌用水或者雨水通过透水砖层,流经碎石和粗砂组成的渗透层到达粉煤灰或净水滤料组成的净水层,在净水层吸附净化后进入上部外围蓄水层及下部外围蓄水层储蓄水分。本发明的实施例可便利水分下渗并蓄积在行道树根系周围,形成根系微水库;种植土球外围特殊的蓄水结构还可以保证行道树根系透气,提高行道树成活率,降低养护成本。The street tree planting hole structure formed by the construction method provided by this embodiment includes permeable brick layer, permeable layer, water purification layer, upper peripheral water storage layer, permeable geotextile, planting soil ball, and lower peripheral water storage in order from top to bottom Floor. The permeable brick layer is assembled by permeable bricks and laid on the top of the street tree planting holes. Watering water or rainwater passes through the permeable brick layer and flows through the permeable layer composed of gravel and coarse sand to reach the water purification layer composed of fly ash or water purification filter material. After adsorption and purification, the water purification layer enters the upper peripheral aquifer and the lower peripheral aquifer to store water. The embodiment of the present invention can facilitate the infiltration of water and accumulate around the roots of the street trees to form a root micro-reservoir; the special water storage structure around the planting soil ball can also ensure the ventilation of the roots of the street trees, improve the survival rate of the street trees, and reduce maintenance costs.

上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。The above-mentioned embodiments are preferred embodiments of the present invention, but the embodiments of the present invention are not limited by the above-mentioned embodiments, and any other changes, modifications, substitutions, combinations, etc. made without departing from the spirit and principle of the present invention Simplified, all should be equivalent replacement methods, and they are all included in the protection scope of the present invention.

Claims (10)

一种行道树种植穴结构,其特征在于:在种植穴内置入用透水土工布袋包裹的种植土球,所述种植土球的外表面与种植穴的内表面之间填充有上部外围蓄水层和下部外围蓄水层,上部外围蓄水层与下部外围蓄水层分别包括顶部蓄水层和底部蓄水层,净水层位于所述顶部蓄水层的上端面,渗透层位于净水层的上端面,透水砖层位于渗透层的上端面,透水砖层与渗透层的周边设置有侧石。A street tree planting hole structure, which is characterized in that: a planting soil ball wrapped with a permeable geotextile bag is built into the planting hole, and the outer surface of the planting soil ball and the inner surface of the planting hole are filled with an upper peripheral water storage layer and The lower peripheral aquifer. The upper peripheral aquifer and the lower peripheral aquifer respectively include a top aquifer and a bottom aquifer. The water purification layer is located on the upper end of the top aquifer, and the permeation layer is located at the end of the water purification layer. On the upper end surface, the permeable brick layer is located on the upper end surface of the permeable layer, and side stones are arranged around the permeable brick layer and the permeable layer. 根据权利要求1所述的行道树种植穴结构,其特征在于:所述种植穴的剖面呈U型形状。The street tree planting hole structure according to claim 1, wherein the cross section of the planting hole is U-shaped. 根据权利要求1所述的行道树种植穴结构,其特征在于:所述上部外围蓄水层和下部外围蓄水层是由粗砂、壤土、椰糠混合而成的海绵蓄水介质土层,厚度为100-200mm。The street tree planting hole structure according to claim 1, characterized in that: the upper peripheral aquifer and the lower peripheral aquifer are a sponge water storage medium soil layer mixed with coarse sand, loam, and coconut chaff. It is 100-200mm. 根据权利要求1所述的行道树种植穴结构,其特征在于:所述净水层由粉煤灰或净水滤料组成,厚度10-30mm。The street tree planting hole structure according to claim 1, wherein the water purification layer is composed of fly ash or water purification filter material, and has a thickness of 10-30 mm. 根据权利要求1所述的行道树种植穴结构,其特征在于:所述渗透层由碎石及粗砂混合组成,厚度50-70mm,碎石粒径为20-40mm,所述碎石与粗砂混合后孔隙率为35%-50%。The street tree planting hole structure according to claim 1, wherein the permeable layer is composed of a mixture of gravel and coarse sand, with a thickness of 50-70 mm, and a gravel particle size of 20-40 mm. The porosity after mixing is 35%-50%. 根据权利要求1所述的行道树种植穴结构,其特征在于:所述透水砖层由透水混凝土浇灌制成的砖体互相拼装组成,所述透水砖层纵向开设至少两个透水孔,横向开设半弧形的排水孔道。The street tree planting hole structure according to claim 1, wherein the permeable brick layer is composed of bricks made of permeable concrete poured into each other, and the permeable brick layer has at least two permeable holes in the longitudinal direction and half in the transverse direction. Curved drainage channel. 一种行道树种植穴结构的施工方法,其特征在于,包括以下步骤:A construction method of a street tree planting hole structure is characterized in that it comprises the following steps: S1.开挖种植穴,平整种植穴内表面;S1. Excavate the planting hole and level the inner surface of the planting hole; S2.在种植穴的底部铺设底部蓄水层;S2. Lay a bottom aquifer at the bottom of the planting hole; S3.在种植穴内置入用透水土工布袋包裹的种植土球,所述种植土球位于底部蓄水层上;S3. A planting ball wrapped with a permeable geotextile bag is placed in the planting hole, and the planting ball is located on the bottom aquifer; S4.在所述种植土球的外表面与种植穴的内表面之间填充上部外围蓄水层和下部外围蓄水层,上部外围蓄水层与下部外围蓄水层分别包括顶部蓄水层和所述底部蓄水层;S4. Fill an upper peripheral aquifer and a lower peripheral aquifer between the outer surface of the planting soil ball and the inner surface of the planting hole. The upper peripheral aquifer and the lower peripheral aquifer respectively include the top aquifer and The bottom aquifer; S5.在顶部蓄水层的上端面铺设净水层;S5. Lay a clean water layer on the upper end of the top aquifer; S6.在净水层的上端面铺设渗透层;S6. Lay a permeable layer on the upper end of the water purification layer; S7.在渗透层的上端面铺设透水砖层;S7. Lay a permeable brick layer on the upper end of the permeable layer; S8.在透水砖层与渗透层的周边设置有侧石。S8. Side stones are arranged around the permeable brick layer and the permeable layer. 根据权利要求7所述的行道树种植穴结构的施工方法,其特征在于:在步骤S2中,在种植穴的底部铺设由粗砂、壤土及椰糠混合而成的蓄水介质土层作为底部蓄水层;在步骤S4中,在所述种植土球的外表面与种植穴的内表面之间填充由粗砂、壤土及椰糠混合而成的蓄水介质土层作为上部外围蓄水层和下部外围蓄水层。The construction method of the street tree planting hole structure according to claim 7, characterized in that: in step S2, a water storage medium soil layer made of a mixture of coarse sand, loam and coconut chaff is laid on the bottom of the planting hole as the bottom storage Water layer; In step S4, between the outer surface of the planting soil ball and the inner surface of the planting hole is filled with a water storage medium soil layer that is a mixture of coarse sand, loam and coir as the upper peripheral water storage layer and The lower peripheral aquifer. 根据权利要求8所述的行道树种植穴结构的施工方法,其特征在于:在步骤S2中,采用多菌灵300倍液对底部蓄水层进行消毒后浇透水。The construction method of the street tree planting hole structure according to claim 8, characterized in that: in step S2, the bottom aquifer is disinfected with a 300-fold solution of carbendazim and then watered thoroughly. 根据权利要求7所述的行道树种植穴结构的施工方法,其特征在于:步骤S3包括:The construction method of the street tree planting hole structure according to claim 7, characterized in that: step S3 comprises: S31.在底部蓄水层上放置透水土工布袋;S31. Place permeable geotextile bags on the bottom aquifer; S32.种植土球置入透水土工布袋内,往透水土工布袋内回填种植土直至装满布袋。S32. Put the planting soil ball into the permeable geotextile bag, and backfill the planting soil into the permeable geotextile bag until the bag is full.
PCT/CN2019/122261 2019-06-03 2019-11-30 Roadside tree planting hole structure and construction method therefor Ceased WO2020244177A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910478275.9 2019-06-03
CN201910478275.9A CN110226430A (en) 2019-06-03 2019-06-03 A kind of avenue tree planting plant hole structure and its construction method

Publications (1)

Publication Number Publication Date
WO2020244177A1 true WO2020244177A1 (en) 2020-12-10

Family

ID=67858395

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2019/122261 Ceased WO2020244177A1 (en) 2019-06-03 2019-11-30 Roadside tree planting hole structure and construction method therefor

Country Status (2)

Country Link
CN (1) CN110226430A (en)
WO (1) WO2020244177A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110226430A (en) * 2019-06-03 2019-09-13 广东美景园林建设有限公司 A kind of avenue tree planting plant hole structure and its construction method
CN110574626B (en) * 2019-10-23 2021-04-16 浙江建设职业技术学院 A method of planting street trees that restricts surface arching
CN112772259B (en) * 2021-02-23 2022-05-27 广东飘之绿名木古树保护有限公司 Ancient tree transplanting water-replenishing and survival-promoting method
CN113229016B (en) * 2021-04-29 2023-03-24 岭南生态文旅股份有限公司 Deep root induction planting method suitable for urban wind-resistant green road arbor
CN113439604A (en) * 2021-08-06 2021-09-28 江苏兰馨园林有限公司 Planting method based on seedling root system protection net rack

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4719327B2 (en) * 1999-12-17 2011-07-06 みかど協和株式会社 Nutrient medium plant cultivation system
CN203290006U (en) * 2013-06-04 2013-11-20 浙江建设职业技术学院 Big tree salt and alkali prevention planting structure
CN106171616A (en) * 2016-08-30 2016-12-07 北京东方园林生态股份有限公司 A kind of draining kind plant hole structure of cleansing and recycling
CN107700632A (en) * 2017-09-27 2018-02-16 安徽省新路建设工程集团有限责任公司 The construction method of insulation infiltration combined type covered conduit
CN108118704A (en) * 2017-11-27 2018-06-05 江苏澳洋生态园林股份有限公司 Multiple green reparation structure of a kind of water storage water conservation massif and preparation method thereof
CN109122191A (en) * 2018-08-28 2019-01-04 南京百业园林景观有限公司 Big specification metasequoia complete crown transplants construction method
CN110226430A (en) * 2019-06-03 2019-09-13 广东美景园林建设有限公司 A kind of avenue tree planting plant hole structure and its construction method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101810123A (en) * 2009-02-25 2010-08-25 张强 Method for transplanting big tree
CN103548601B (en) * 2013-10-25 2015-05-13 北京建筑大学 Tree pool and method for filtering runoff rainwater through tree pool
CN204385875U (en) * 2014-12-29 2015-06-10 北京建筑大学 A kind of tree pond utilizing road rain water retaining
CN106818164A (en) * 2017-01-19 2017-06-13 北京乾景园林股份有限公司 A kind of salt-soda soil arbor implantation methods
CN207820627U (en) * 2017-12-12 2018-09-07 天津津彩工程设计咨询有限公司 A kind of eco-species tree pond suitable for the higher growing area of salt content
CN108012708A (en) * 2017-12-15 2018-05-11 上海园林工程设计有限公司 A kind of multifunctional ecological tree pond
CN109380090A (en) * 2018-11-13 2019-02-26 上海十方生态园林股份有限公司 A kind of eco-species plant hole rain recycling system
CN210695104U (en) * 2019-06-03 2020-06-09 广东美景园林建设有限公司 Cave structure is planted to shade tree

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4719327B2 (en) * 1999-12-17 2011-07-06 みかど協和株式会社 Nutrient medium plant cultivation system
CN203290006U (en) * 2013-06-04 2013-11-20 浙江建设职业技术学院 Big tree salt and alkali prevention planting structure
CN106171616A (en) * 2016-08-30 2016-12-07 北京东方园林生态股份有限公司 A kind of draining kind plant hole structure of cleansing and recycling
CN107700632A (en) * 2017-09-27 2018-02-16 安徽省新路建设工程集团有限责任公司 The construction method of insulation infiltration combined type covered conduit
CN107700632B (en) * 2017-09-27 2019-05-31 安徽省新路建设工程集团有限责任公司 The construction method of heat preservation infiltration combined type underdrain
CN108118704A (en) * 2017-11-27 2018-06-05 江苏澳洋生态园林股份有限公司 Multiple green reparation structure of a kind of water storage water conservation massif and preparation method thereof
CN109122191A (en) * 2018-08-28 2019-01-04 南京百业园林景观有限公司 Big specification metasequoia complete crown transplants construction method
CN110226430A (en) * 2019-06-03 2019-09-13 广东美景园林建设有限公司 A kind of avenue tree planting plant hole structure and its construction method

Also Published As

Publication number Publication date
CN110226430A (en) 2019-09-13

Similar Documents

Publication Publication Date Title
WO2020244177A1 (en) Roadside tree planting hole structure and construction method therefor
CN102296567B (en) Soft isolation zone method for slope protection at bank zone and surface source pollution control
CN205100360U (en) Urban road rainwater holds stagnant structure
CN108283080A (en) It is a kind of to set pond from ecology is poured for sponge city
CN205502122U (en) A rainwater collection clean system for urban afforestation
CN206547425U (en) A kind of side slope plants raw slot structure from seeping water
CN208472740U (en) A kind of cast-in-place eco-concrete of lightweight
CN219352477U (en) Structure for utilizing vine plants and shrubs to compound green side slope
CN212453028U (en) A rainwater storage tree pond tool
CN106499002B (en) Lawn greenery patches rainwater cyclic utilization system
CN109267626A (en) A kind of landscape ecology rainwater recycle utilizes system
CN205124593U (en) Irrigate infiltration pipe and be used for ecological water conservation irrigation system who resumes of side slope
CN209277095U (en) A kind of cast-in-place counterfort virescence concrete structure
CN208995858U (en) A kind of sponge urban road using ventilation anti-seepage sand
CN208105449U (en) A kind of ecostagnation pond
CN208219799U (en) A kind of road biology delay tank
CN110240280A (en) A rainwater purification system for garden road greening isolation belt
CN211849903U (en) A sloping rain garden
CN205171302U (en) Novel gardens floor file structure suitable for ancient tree protection is transplanted with megaphanerophyte
CN210695104U (en) Cave structure is planted to shade tree
CN104145673B (en) Based on water drainage and the integrated form greenbelt system of water conservation and water drainage and water-retaining method
CN207739092U (en) Landscape ecology Pavement Construction
CN208219672U (en) A kind of rainwater side slope based on mine reclamation
CN114197605B (en) Water-saving rainwater wetting pond and construction method
CN112012166B (en) Prefabricated pocket grass planting concrete prefabricated part and construction method

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19931755

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19931755

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 19931755

Country of ref document: EP

Kind code of ref document: A1