CN216075804U - Closing-in structure of bathroom platform and curtain wall - Google Patents
Closing-in structure of bathroom platform and curtain wall Download PDFInfo
- Publication number
- CN216075804U CN216075804U CN202122710354.3U CN202122710354U CN216075804U CN 216075804 U CN216075804 U CN 216075804U CN 202122710354 U CN202122710354 U CN 202122710354U CN 216075804 U CN216075804 U CN 216075804U
- Authority
- CN
- China
- Prior art keywords
- vertical plate
- riser
- closing
- curtain wall
- top surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
The utility model relates to a bathroom platform and curtain binding off structure relates to architectural design's field, and it includes the second riser of pegging graft in the first riser of wall and cement mortar tie coat in the bathroom, being located on the anti-skidding ceramic tile, first riser and second riser fixed connection. This application has water in the bathroom at first to be blockked by the second riser, then is blockked by first riser, and first riser can also support the effect of second riser in the water retaining.
Description
Technical Field
The application relates to the field of architectural design, especially relate to a bathroom platform and curtain binding off structure.
Background
The bathroom is the place that the indoor retaining is the most, therefore the drainage of bathroom is very important, if the water of bathroom infiltrates for a long time under the ground, will cause the destruction to the fire-resistant layer under the ground or floor heating layer, therefore the better bathroom platform of waterproof performance is very important.
In the related art, a fireproof layer is arranged in a curtain wall; the toilet is paved by adopting waterproof floor tiles, gaps are filled between the waterproof floor tiles and the vertical wall of the toilet by adopting concrete, and a drainage port is arranged in the toilet.
In summary, the inventor thinks that when the closing opening of the adjacent curtain wall is positioned under the platform of the toilet, if water leaks in the toilet, the water in the toilet can seep into the fireproof layer, and the fireproof effect of the fireproof layer is affected.
SUMMERY OF THE UTILITY MODEL
If produce in solving the bathroom and leak, water in the bathroom can permeate the flame retardant coating, influences the problem of the fireproof effect of flame retardant coating, this application provides a bathroom platform and curtain binding off structure.
The application provides a pair of bathroom platform and curtain binding off structure adopts following technical scheme:
the utility model provides a bathroom platform and curtain binding off structure, includes the second riser of pegging graft in the first riser of bathroom interior wall and cement mortar tie coat, being located anti-skidding ceramic tile, first riser is highly high than the second riser, first riser and second riser fixed connection.
By adopting the technical scheme, the arrangement of the first vertical plate and the second vertical plate ensures that water in the toilet is firstly blocked by the second vertical plate and then blocked by the first vertical plate; because first riser is longer than second riser length, consequently first riser can also support the second riser in the manger plate, the combined design of first riser and second riser for the waterproof effect of bathroom platform and curtain receipts mouth department is better, is difficult to influence the fire behavior of flame retardant coating.
Optionally, the top surface of the first vertical plate is flush with the top surface of the second vertical plate.
Through adopting above-mentioned technical scheme, first riser flushes with second riser top surface, and on the one hand, water is difficult to get into between first riser and the second riser, and on the other hand, constructor makes things convenient for the construction, and the cleaning staff is convenient clean.
Optionally, the ridge of the top surface of the first vertical plate, which is far away from the second vertical plate, is an inclined surface; the ridge of the top surface of the second vertical plate far away from the first vertical plate is an inclined surface.
Through adopting above-mentioned technical scheme, the stupefied design for the inclined plane of first riser and second riser top surface for cleaner is difficult for damaging cleaner when cleaning the health.
Optionally, a reinforcing strip is fixedly connected to one side, close to the first vertical plate, of the second vertical plate, a reinforcing groove is formed in one side, close to the second vertical plate, of the first vertical plate, and the reinforcing strip is located in the first vertical plate.
By adopting the technical scheme, the arrangement of the reinforcing strips can enhance the connection strength between the first vertical plate and the second vertical plate; in the second aspect, water permeating between the first vertical plate and the second vertical plate can be prevented from continuously flowing into the ground, and the reinforcing strips have a blocking effect on the water.
Optionally, the cross-sectional area of the reinforcing strip far away from the second vertical plate is larger than the cross-sectional area of the reinforcing strip close to the second vertical plate.
Through adopting above-mentioned technical scheme, the cross sectional area that the second riser was kept away from to the reinforcing bar is greater than the cross sectional area that the reinforcing bar is close to the riser for reinforcing bar is more stable at first riser internal fixation, thereby the second riser is more stable with first riser is fixed.
Optionally, a waterproof sealing strip is fixedly bonded between the second vertical plate and the anti-slip floor tile.
Through adopting above-mentioned technical scheme, waterproof sealed setting for the bonding between second riser and the anti-skidding ceramic tile is glued firmly, and the leakproofness is stronger, and consequently, the waterproof performance of second riser is better.
Optionally, the first vertical plate and the second vertical plate are both made of stone plate materials.
Through adopting above-mentioned technical scheme, because first riser and second riser are made by the slabstone material, consequently, first riser and second riser not only self steadiness are stronger, and first riser and second riser are difficult to the infiltration.
Optionally, the ridge of the top surface of the first vertical plate, which is far away from the second vertical plate, is an arc surface; the ridge of the top surface of the second vertical plate far away from the first vertical plate is an arc surface.
Through adopting above-mentioned technical scheme, the stupefied design for the arc surface of first riser and second riser top surface for cleaner is difficult for damaging cleaner when cleaning the health.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the arrangement of the first vertical plate and the second vertical plate enables water in the toilet to be blocked by the second vertical plate firstly and then by the first vertical plate, and the first vertical plate can support the second vertical plate while retaining water;
2. the top surfaces of the first vertical plate and the second vertical plate are flush, so that water is not easy to enter between the first vertical plate and the second vertical plate, and on the other hand, construction is facilitated for constructors, and cleaning is facilitated for cleaners;
3. the ridges on the top surfaces of the first vertical plate and the second vertical plate are designed into inclined surfaces, so that cleaning personnel are not easy to be injured when cleaning.
Drawings
FIG. 1 is a schematic structural diagram of embodiment 1 of the present application;
fig. 2 is a schematic structural diagram of embodiment 2 of the present application.
Reference numerals: 1. a cement mortar bonding layer; 2. anti-skid floor tiles; 3. curtain wall; 4. a fire barrier layer; 5. a first vertical plate; 51. a reinforcing groove; 6. a second vertical plate; 7. a reinforcing strip; 8. a waterproof sealing strip.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
Example 1
The embodiment of the application discloses bathroom platform and curtain binding off structure. Referring to fig. 1, the closing structure for the basement and the curtain wall of the toilet comprises a first vertical plate 5 inserted between a cement mortar bonding layer 1 and an inner wall of the toilet and a second vertical plate 6 connected to an anti-skid floor tile 2, wherein the first vertical plate 5 is connected with the second vertical plate 6.
Referring to fig. 1, the first vertical plate 5 is a rectangular plate-shaped structure, in this embodiment, the height of the first vertical plate 5 is 70cm, the width of the first vertical plate 5 is 12cm, the first vertical plate 5 is made of a stone plate material, and the first vertical plate 5 is located above the fireproof layer 4 in the curtain wall 3 and is abutted to the fireproof layer 4; one side of the top surface of the first vertical plate 5, which is close to the inner wall of the toilet, is an inclined surface or an arc surface; waterproof sealant is filled among the first vertical plate 5, the cement mortar bonding layer 1, the fireproof layer 4 and the inner wall of the toilet.
Referring to fig. 1, the second vertical plate 6 is a rectangular plate-shaped structure, the second vertical plate 6 is made of a stone plate material, the height of the second vertical plate 6 is lower than that of the first vertical plate 5, in this embodiment, the height of the second vertical plate 6 is 20cm, the width of the second vertical plate is 12cm, and the second vertical plate 6 is located on the surface of the anti-skid floor tile 2; waterproof sealant is filled between the second vertical plate 6 and the anti-skid floor tile 2, and the second vertical plate 6 and the anti-skid floor tile 2 are bonded and fixed through the waterproof sealant. The top surface of the second vertical plate 6 is flush with the top surface of the first vertical plate 5; the edge of the top surface of the second vertical plate 6, which is far away from the first vertical plate 5, is an inclined surface or an arc surface. The second vertical plate 6 and the first vertical plate 5 are fixedly bonded through marble glue.
The implementation principle of toilet platform and curtain binding off structure of the embodiment of this application is: when a worker installs the first vertical plate 5 and the second vertical plate 6, the first vertical plate 5 is firstly inserted between the cement mortar bonding layer 1 and the inner wall of the toilet, and then waterproof sealant is filled for bonding and sealing; and then the second vertical plate 6 is placed on the anti-skid floor tile 2, the second vertical plate 6 and the anti-skid floor tile 2 are bonded and fixed by waterproof sealant, and the first vertical plate 5 and the second vertical plate 6 are bonded and fixed by marble glue. The first riser 5 and the second riser 6 of installing can effectually prevent that the water on the anti-skidding ceramic tile 2 in bathroom from getting into subaerially, influences flame retardant coating 4 and floor heating layer.
Example 2
Referring to fig. 2, the difference from embodiment 1 is that: a reinforcing groove 51 is formed in one side, close to the second vertical plate 6, of the first vertical plate 5, the cross section of the reinforcing groove 51 is in a trapezoid shape, and the side, close to the second vertical plate 6, of the cross section of the reinforcing groove 51 is closed; fixedly connected with reinforcing bar 7 on second riser 6, the cross sectional area of reinforcing bar 7 is trapezoidal, and the cross sectional shape of reinforcing bar 7 is the same with reinforcing groove 51 cross sectional shape, reinforcing bar 7 and second riser 6 integrated into one piece. And a waterproof sealing strip 8 is fixedly bonded between the second vertical plate 6 and the anti-skid floor tile 2.
The implementation principle of toilet platform and curtain binding off structure of the embodiment of this application is: the difference from embodiment 1 is that, before first vertical plate 5 is installed, reinforcing bar 7 is inserted into reinforcing groove 51, first vertical plate 5 is connected to second vertical plate 6, then first vertical plate 5 connected to second vertical plate 6 is installed, and the installation is performed according to the installation method of embodiment 1, and then second vertical plate 6 is installed according to the installation method of embodiment 1.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.
Claims (8)
1. The utility model provides a bathroom platform and curtain binding off structure which characterized in that: including pegging graft in first riser (5) of bathroom interior wall and cement mortar tie coat (1), second riser (6) that are located on anti-skidding ceramic tile (2), first riser (5) are highly high than second riser (6), first riser (5) and second riser (6) fixed connection.
2. The closing-in structure of the toilet platform and the curtain wall according to claim 1, characterized in that: the top surface of the first vertical plate (5) is flush with the top surface of the second vertical plate (6).
3. The closing-in structure of the toilet platform and the curtain wall according to claim 1, characterized in that: the ridge of the top surface of the first vertical plate (5) far away from the second vertical plate (6) is an inclined surface; the ridge of the top surface of the second vertical plate (6) far away from the first vertical plate (5) is an inclined surface.
4. The closing-in structure of the toilet platform and the curtain wall according to claim 1, characterized in that: second riser (6) are close to first riser (5) one side fixedly connected with and strengthen strip (7), and first riser (5) are close to second riser (6) one side and have seted up reinforcing groove (51), and strengthen strip (7) and are located first riser (5).
5. The closing-in structure of the toilet platform and the curtain wall according to claim 4, characterized in that: the cross-sectional area of the reinforcing strip (7) far away from the second vertical plate (6) is larger than that of the reinforcing strip (7) close to the second vertical plate (6).
6. The closing-in structure of the toilet platform and the curtain wall according to claim 1, characterized in that: and a waterproof sealing strip (8) is fixedly bonded between the second vertical plate (6) and the anti-skid floor tile (2).
7. The closing-in structure of the toilet platform and the curtain wall according to claim 1, characterized in that: the first vertical plate (5) and the second vertical plate (6) are both made of stone plate materials.
8. The closing-in structure of the toilet platform and the curtain wall according to claim 1, characterized in that: the edge of the top surface of the first vertical plate (5), which is far away from the second vertical plate (6), is an arc surface; the edge of the top surface of the second vertical plate (6) far away from the first vertical plate (5) is an arc surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122710354.3U CN216075804U (en) | 2021-11-05 | 2021-11-05 | Closing-in structure of bathroom platform and curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122710354.3U CN216075804U (en) | 2021-11-05 | 2021-11-05 | Closing-in structure of bathroom platform and curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216075804U true CN216075804U (en) | 2022-03-18 |
Family
ID=80659792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122710354.3U Active CN216075804U (en) | 2021-11-05 | 2021-11-05 | Closing-in structure of bathroom platform and curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216075804U (en) |
-
2021
- 2021-11-05 CN CN202122710354.3U patent/CN216075804U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8166719B2 (en) | System for flood proofing residential and light commercial buildings | |
US9341018B2 (en) | Combined flood proof door and window | |
CN111691467B (en) | Construction method for basement water prevention and drainage combination | |
CN109235693A (en) | A kind of assembling type steel structure composite thermal insulation external wall for building | |
CN216075804U (en) | Closing-in structure of bathroom platform and curtain wall | |
CN206220272U (en) | Ground hot water lays heating toilet doorway sealing damp proof insulation construction | |
CN107675811B (en) | Bathroom waterproof system and construction method | |
CN104818835B (en) | Toilet threshold stone waterproof structure and construction method | |
DE3414249A1 (en) | Drainage mats, ventilating mats and ventilated heat-insulating panels for the building industry | |
CN210738360U (en) | Window board and side board structure of building | |
CN210177863U (en) | Dry hanging system structure of outer wall finished product insulation board | |
TW451019B (en) | Water-proof and damp-proof method for basement side wall | |
CN108086489B (en) | Water stopping structure with height-adjustable water stopping pier and construction method thereof | |
CN214498769U (en) | Bathroom threshold stone waterproof construction | |
CN204609233U (en) | Washroom threshold stone waterproof construction | |
CN220705502U (en) | Threshold stone binding off does not have difference in height structure | |
CN211647771U (en) | Connecting node structure for sill of terrace and living room | |
CN215330982U (en) | Shower room stagnant water bank waterproof node | |
CN214942029U (en) | Water stop door sill for blocking water seepage between dry and wet rooms and ground waterproof structure | |
KR200358981Y1 (en) | Waterproof structure for building floor and slant block for the same | |
CN207776193U (en) | A kind of intercepting ditch construction of one layer of curtain wall facade of building | |
CN211923369U (en) | Waterproof structure | |
JP3059802U (en) | Floor drainage treatment structure for low-rise buildings | |
CN210621967U (en) | Shower room manger plate structure of mating formation | |
JPS59446A (en) | Building of house and practical building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |