CN216075241U - City underground pipe network corridor - Google Patents

City underground pipe network corridor Download PDF

Info

Publication number
CN216075241U
CN216075241U CN202122498492.XU CN202122498492U CN216075241U CN 216075241 U CN216075241 U CN 216075241U CN 202122498492 U CN202122498492 U CN 202122498492U CN 216075241 U CN216075241 U CN 216075241U
Authority
CN
China
Prior art keywords
corridor
maintenance
gallery
pipe network
underground pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122498492.XU
Other languages
Chinese (zh)
Inventor
张海峰
于颖
孙满义
王文涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Xingjin Municipal Engineering Co ltd
Original Assignee
Hebei Xingjin Municipal Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Xingjin Municipal Engineering Co ltd filed Critical Hebei Xingjin Municipal Engineering Co ltd
Priority to CN202122498492.XU priority Critical patent/CN216075241U/en
Application granted granted Critical
Publication of CN216075241U publication Critical patent/CN216075241U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of comprehensive pipe galleries, and discloses an urban underground pipe network gallery, which comprises a gallery base layer and a pavement layer, wherein the pavement layer is laid on the upper surface of the gallery base layer, a gallery is arranged in the gallery base layer, maintenance channels communicated with the interior of the gallery are arranged on the top surface of the pavement layer at equal intervals and vertically downwards, a plurality of groups of climbing rods are fixedly arranged on the inner wall surface of each maintenance channel from top to bottom at equal intervals, bearing columns are arranged at positions, corresponding to the maintenance channels, in the gallery, a plurality of groups of support frames are fixedly arranged on the inner bottom surface of the gallery at equal intervals, the upper ends of the support frames are of a downward-sunken semicircular structure, a plurality of groups of suspension frames are fixedly arranged on the inner top surface of the gallery at equal intervals, and by arranging a sliding cover, the maintenance channels are prevented from being exposed on the pavement layer due to loss to safety hazards, the effect of preventing the sliding cover from being lost is achieved.

Description

City underground pipe network corridor
Technical Field
The utility model relates to the technical field of comprehensive pipe galleries, in particular to an urban underground pipe network gallery.
Background
The underground comprehensive pipe gallery is built under the city for laying public tunnels of municipal pipelines such as power, communication, radio and television, water supply and the like in a centralized way, the urban underground pipe comprehensive corridor is also called as a common ditch and a common pipeline, is an intensive tunnel space built under the city, more than two municipal pipelines such as power, communication, gas, heat supply, water supply and drainage and the like are laid in the tunnel in a centralized way, and a special overhaul port, a hoisting port and a monitoring system are arranged for implementing unified planning, design, construction and maintenance, so that the underground comprehensive pipe gallery has the characteristics of comprehensiveness, long-term effect, maintainability, high technology, earthquake and disaster resistance, environmental protection, low cost, investment diversity, operational reliability and the like.
The existing inspection hole is usually covered at the position of the inspection hole by a well cover serving as a covering material, the section from a pipeline to the ground is called an inspection well, the inspection well is usually flush with the ground, so that a cover is needed for covering the inspection well, called the inspection well cover, the inspection well cover is usually made of reinforced cement, metal, reinforced plastic and other materials, the shape of the inspection well is mainly circular and square, but the well cover is not connected with the inspection well, people can freely move the well cover, and therefore the well cover is lost easily.
Therefore, an urban underground pipe network corridor is provided.
SUMMERY OF THE UTILITY MODEL
The utility model mainly solves the technical problems in the prior art and provides an urban underground pipe network corridor.
In order to achieve the purpose, the utility model adopts the following technical scheme that the urban underground pipe network gallery comprises a gallery base layer and a pavement layer, the pavement layer is laid on the upper surface of the gallery base layer, the gallery is arranged in the gallery base layer, maintenance channels communicated with the gallery are vertically and downwards arranged on the top surface of the pavement layer at equal intervals, a plurality of groups of climbing rods are fixedly arranged on the inner wall surface of the maintenance passage at equal intervals from top to bottom, a bearing column is arranged in the corridor at a position corresponding to the maintenance passage, a plurality of groups of supporting frames are fixedly arranged on the inner bottom surface of the gallery at equal intervals, the upper ends of the supporting frames are of a downward-sunken semicircular structure, the inner top surface of the corridor is fixedly provided with a plurality of groups of suspension brackets at equal intervals, and the top surface of the pavement layer is provided with a maintenance sliding cover with a structure matched with the maintenance channel at the position corresponding to the maintenance channel.
Preferably, the upper end of the bearing column is fixed with the upper side of the inner wall surface of the corridor, and the lower end of the bearing column is fixed on the inner bottom surface of the corridor.
Preferably, a plurality of groups of grooves are formed in the wall surface of one side of the bearing column from top to bottom at equal intervals, and a plurality of groups of bearing steel bars are arranged in the bearing column.
Preferably, the support frames are provided with liquid pipelines, and the suspension frames are provided with gas pipelines.
Preferably, the bottom surface of the maintenance sliding cover is fixedly provided with connecting blocks distributed in a left-right mirror image mode, and the ends, far away from each other, of the two groups of connecting blocks are fixedly provided with L-shaped sliding blocks.
Preferably, the position of the inner wall surface of the maintenance channel, which is close to the upper side, is provided with a slide rail with a structure matched with the L-shaped slide block.
Advantageous effects
The utility model provides an urban underground pipe network corridor. The method has the following beneficial effects:
(1) this city underground pipe network corridor promotes the maintenance sliding closure through the front and back, makes the maintenance sliding closure slide around the inside of slide rail through L shape slider, and the maintenance sliding closure slides around the maintenance sliding closure, makes things convenient for people to open the maintenance passageway or close the maintenance passageway, through setting up the sliding closure of embedded slip form, avoids the sliding closure to lose and leads to the maintenance passageway to expose and arouse safety on the pavement layer and draw the trouble, has reached the effect that prevents that the sliding closure from losing.
(2) This city underground pipe network corridor, people are in maintenance and installation, the inside that enters into the corridor through the maintenance passageway of seting up on the surface course, the inside that enters into the corridor through the multiunit climbing pole climbing that sets up on the maintenance passageway internal face, the inside bottom surface that comes to the corridor continues to climb downwards to the recess of seting up on the rethread heel post, through the climbing pole and the recess that set up, reached and made things convenient for maintainer to enter into the effect in the corridor, make things convenient for maintainer freely to pass in and out the corridor.
(3) This city underground pipe network corridor is provided with the bearing reinforcing bar through the heel post, makes whole heel post play the bearing supporting role in the inside of corridor, has increased security and steadiness in the corridor.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
The structures, ratios, sizes, and the like shown in the present specification are only used for matching with the contents disclosed in the specification, so as to be understood and read by those skilled in the art, and are not used to limit the conditions that the present invention can be implemented, so that the present invention has no technical significance, and any structural modifications, changes in the ratio relationship, or adjustments of the sizes, without affecting the effects and the achievable by the present invention, should still fall within the range that the technical contents disclosed in the present invention can cover.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic perspective view of a load-bearing column according to the present invention;
FIG. 3 is a schematic view of a three-dimensional structure of a maintenance slide cover according to the present invention;
FIG. 4 is an enlarged view of the structure at A in FIG. 1 according to the present invention.
Illustration of the drawings:
1. a gallery base layer; 2. a pavement layer; 3. a gallery; 4. maintaining the channel; 5. climbing a pole; 6. a load-bearing column; 7. a groove; 8. a load-bearing reinforcing bar; 9. a support frame; 10. a suspension bracket; 11. a liquid conduit; 12. a gas conduit; 13. maintaining the sliding cover; 14. connecting blocks; 15. an L-shaped slider; 16. a slide rail.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example (b): a city underground pipe network corridor is disclosed as shown in figures 1-4, which comprises a corridor base layer 1 and a pavement layer 2, wherein the pavement layer 2 is laid on the upper surface of the corridor base layer 1, a corridor 3 is arranged in the corridor base layer 1, a maintenance channel 4 communicated with the inside of the corridor 3 is vertically and downwards arranged on the top surface of the pavement layer 2 at equal intervals, a plurality of groups of climbing rods 5 are fixedly arranged on the inner wall surface of the maintenance channel 4 from top to bottom at equal intervals, a bearing column 6 is arranged at the position, corresponding to the maintenance channel 4, in the inside of the corridor 3, the upper end of the bearing column 6 is fixed with the upper side of the inner wall surface of the corridor 3, the lower end of the bearing column 6 is fixed on the inner bottom surface of the corridor 3, a plurality of groups of grooves 7 are arranged on one side wall surface of the bearing column 6 from top to bottom at equal intervals, people enter the inside of the corridor 3 through the maintenance channel 4 arranged on the pavement layer 2 in the maintenance and installation processes, climb into the inside of the corridor 3 through the plurality of groups of climbing rods 5 arranged on the inner wall surface of the maintenance channel 4, then continuously climbing downwards to the inner bottom surface of the gallery 3 through a groove 7 formed on the bearing column 6, a plurality of groups of bearing reinforcing steel bars 8 are arranged inside the bearing column 6, the whole bearing column 6 plays a role in bearing and supporting inside the gallery 3 through the bearing reinforcing steel bars 8 arranged inside the bearing column 6, a plurality of groups of supporting frames 9 are fixedly arranged on the inner bottom surface of the gallery 3 at equal intervals, the upper ends of the supporting frames 9 are of a downward-concave semicircular structure, liquid pipelines 11 are arranged on the groups of supporting frames 9, the supporting frames 9 play a role in supporting the liquid pipelines 11, a plurality of groups of suspension frames 10 are fixedly arranged on the inner top surface of the gallery 3 at equal intervals, gas pipelines 12 are arranged on the groups of suspension frames 10, the gas pipelines 12 are fixed and suspended through the groups of suspension frames 10, and a maintenance sliding cover 13 with a structure matched with the maintenance channel 4 is arranged at the position, corresponding to the maintenance channel 4, on the top surface layer 2, the bottom surface of maintenance sliding closure 13 is fixed with connecting block 14 that is left and right mirror image distribution, the equal fixed mounting of one end that two sets of connecting block 14 kept away from each other has L shape slider 15, L shape slider 15 is the piece that is the structure of invering L shape, the inner wall of maintenance passageway 4 is close to upside position department and is offered the slide rail 16 of structure and L shape slider 15 looks adaptation, maintenance sliding closure 13 passes through L shape slider 15 slidable mounting in the inside of slide rail 16, promote maintenance sliding closure 13 through the front and back, make maintenance sliding closure 13 slide around the inside of slide rail 16 through L shape slider 15.
The working principle of the utility model is as follows: in the maintenance and installation process, people enter the inside of corridor 3 through maintenance passageway 4 of seting up on the pavement layer 2, climb through the inside that the corridor 3 was entered into to multiunit climbing rod 5 that sets up on the maintenance passageway 4 internal face, and the inside bottom surface of corridor 3 is continued to climb downwards to the recess 7 of seting up on the rethread heel post 6.
Through being provided with bearing reinforcing bar 8 in the heel post 6, make whole heel post 6 play the bearing supporting role in the inside of corridor 3.
By pushing the maintenance sliding cover 13 forward and backward, the maintenance sliding cover 13 can slide forward and backward in the slide rail 16 through the L-shaped slide block 15, and the maintenance sliding cover 13 slides forward and backward, so that people can open the maintenance channel 4 or close the maintenance channel 4 conveniently.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a city underground pipe network corridor, includes corridor basic unit (1) and pavement layer (2), the top surface at corridor basic unit (1), its characterized in that are laid in pavement layer (2): set up corridor (3) in corridor basic unit (1), the vertical maintenance passageway (4) of communicating corridor (3) inside has been seted up downwards to the top surface equidistance of pavement layer (2), from last equidistance fixed mounting down has multiunit climbing pole (5) on the internal face of maintenance passageway (4), the inside position department that corresponds maintenance passageway (4) of corridor (3) is provided with heel post (6), equidistance fixed mounting has multiunit support frame (9) on the inside bottom surface of corridor (3), and the upper end of support frame (9) is undercut's semicircular structure, equidistance fixed mounting has multiunit mounted frame (10) on the inside top surface of corridor (3), the position department that the top surface of pavement layer (2) corresponds maintenance passageway (4) is provided with maintenance sliding closure (13) of structure and maintenance passageway (4) looks adaptation.
2. The urban underground pipe network corridor of claim 1, wherein: the upper end of the bearing column (6) is fixed with the upper side of the inner wall surface of the gallery (3), and the lower end of the bearing column (6) is fixed on the bottom surface of the inner part of the gallery (3).
3. The urban underground pipe network corridor of claim 1, wherein: a plurality of groups of grooves (7) are formed in the wall surface of one side of the bearing column (6) from top to bottom at equal intervals, and a plurality of groups of bearing reinforcing steel bars (8) are arranged inside the bearing column (6).
4. The urban underground pipe network corridor of claim 1, wherein: liquid pipelines (11) are arranged on the groups of support frames (9), and gas pipelines (12) are arranged on the groups of suspension frames (10).
5. The urban underground pipe network corridor of claim 1, wherein: the bottom surface of maintenance sliding closure (13) fixed mounting has connecting block (14) that are mirror image distribution about being, and two sets of equal fixed mounting of one end that connecting block (14) kept away from each other has L shape slider (15).
6. The urban underground pipe network corridor of claim 5, wherein: and a sliding rail (16) with a structure matched with the L-shaped sliding block (15) is arranged on the inner wall surface of the maintenance channel (4) close to the upper side.
CN202122498492.XU 2021-10-16 2021-10-16 City underground pipe network corridor Expired - Fee Related CN216075241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122498492.XU CN216075241U (en) 2021-10-16 2021-10-16 City underground pipe network corridor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122498492.XU CN216075241U (en) 2021-10-16 2021-10-16 City underground pipe network corridor

Publications (1)

Publication Number Publication Date
CN216075241U true CN216075241U (en) 2022-03-18

Family

ID=80639531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122498492.XU Expired - Fee Related CN216075241U (en) 2021-10-16 2021-10-16 City underground pipe network corridor

Country Status (1)

Country Link
CN (1) CN216075241U (en)

Similar Documents

Publication Publication Date Title
CN210529750U (en) Cable type utility tunnel system
CN213449635U (en) High-speed railway station room clear water concrete canopy and high-speed railway station
CN107769141A (en) Overhead type comprehensive wiring piping lane
CN216075241U (en) City underground pipe network corridor
CN214273648U (en) Three-circle shield constructs construction subway station structure
CN103404385B (en) A kind of modularization can Fast Construction dismounting landscape plant wall system
CN208039269U (en) A kind of three-layer pipe corridor section foundation pit supporting construction
CN112880089A (en) Subway station ground wind pavilion for rail transit
CN111733844A (en) Foundation pit drainage structure for urban underground comprehensive pipe gallery and construction method of foundation pit drainage structure
CN209874591U (en) Underground shaft type stereo bicycle/electric garage
CN105064533A (en) Back-mounted greening wall construction method
CN213828925U (en) Civil engineering pipe fitting rack
CN204238193U (en) Underground Hydro-electric Power Station fitting structure
CN105089024B (en) Underground workshop outgoing line arrangement mode and structure
CN210658441U (en) Utility tunnel convenient to stride underground building
CN114352326A (en) Assembled subway station and construction method thereof
CN210369035U (en) Subway station structure
CN207260192U (en) A kind of comprehensive pipe gallery structure
CN206545219U (en) Airport roof photovoltaic bracket basis and airport roof photovoltaic support structure
CN212983922U (en) Prefabricated construction of wisdom street lamp basis, inspection shaft complex
CN209760355U (en) Water supply system for sponge city
CN215977368U (en) Be used for shield structure form utility tunnel technology node well
CN219219112U (en) Well lid suitable for ground elevation change demand
CN109695347A (en) The construction techniques of curved device is held based on round steel
CN213926352U (en) Multilayer city utility tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220318