CN216034267U - Temporary water passing device for building construction site - Google Patents

Temporary water passing device for building construction site Download PDF

Info

Publication number
CN216034267U
CN216034267U CN202122363922.7U CN202122363922U CN216034267U CN 216034267 U CN216034267 U CN 216034267U CN 202122363922 U CN202122363922 U CN 202122363922U CN 216034267 U CN216034267 U CN 216034267U
Authority
CN
China
Prior art keywords
water passing
construction site
building construction
sides
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122363922.7U
Other languages
Chinese (zh)
Inventor
赵家豪
匡浩
付笑禹
林畅宇
甘来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN202122363922.7U priority Critical patent/CN216034267U/en
Application granted granted Critical
Publication of CN216034267U publication Critical patent/CN216034267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model provides a temporary water passing device for a building construction site, which comprises: a water passing platform; the fixed brushes are fixedly arranged on two sides of the top of the water passing table; the through grooves are formed in two sides of the top of the water passing table; remove the sweeping structure, remove sweeping structure fixed mounting in the both sides of crossing water platform bottom, remove sweeping structure and include two slide bars, the equal sliding connection in both sides on two slide bar surfaces has the slider, the outside fixedly connected with polygon connecting rod of slider, the other end fixed mounting of polygon connecting rod has the arc brush, the inboard fixed mounting of slider has the spliced pole, the left side fixed mounting of spliced pole has first telescopic link, the left end of first telescopic link and the bottom fixed connection of crossing the water platform. The temporary water passing device for the building construction site, provided by the utility model, can reduce the labor amount of workers, is simple to operate, and does not need to be cleaned manually by using a brush, so that the working efficiency can be improved.

Description

Temporary water passing device for building construction site
Technical Field
The utility model relates to the field of building construction, in particular to a temporary water passing device for a building construction site.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place.
With the continuous development of society, the number of high-rise buildings is increased, and when a building activity is carried out, a transport vehicle is used for transporting building materials, and the transport vehicle transports the building materials to a building construction site, so that positions such as a vehicle body and tires of the transport vehicle are stuck to soil in the building construction site, particularly the construction site is wet, and when the soil is muddy, a water passing device is used for avoiding the soil being brought to a traffic road.
Traditional water installation of crossing all is that direct use water strikes it mostly, dashes earth and falls to cooperate the brush to use, and complex operation is complicated, and can increase artificial amount of labour, and work efficiency is low.
Therefore, it is necessary to provide a temporary water passing device for a construction site to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a temporary water passing device for a building construction site, which solves the problems that most of traditional water passing devices directly use water to impact the water passing devices, soil is flushed down to be matched with brushes for use, the operation is complex, the labor amount of workers is increased, and the working efficiency is low.
In order to solve the technical problem, the utility model provides a temporary water passing device for a building construction site, which comprises: a water passing platform;
the fixed brushes are fixedly arranged on two sides of the top of the water passing table;
the through grooves are formed in two sides of the top of the water passing table;
remove and sweep the structure, remove and sweep structure fixed mounting in cross the both sides of water platform bottom, remove and sweep the structure and include two slide bars, two the equal sliding connection in both sides on slide bar surface has the slider, the outside fixedly connected with polygon connecting rod of slider, the other end fixed mounting of polygon connecting rod has the arc brush, the inboard fixed mounting of slider has the spliced pole, the left side fixed mounting of spliced pole has first telescopic link, the left end of first telescopic link with cross the bottom fixed connection of water platform.
Preferably, the two sides of the water passing platform are provided with anti-slip strips.
Preferably, the two sides of the top of the water passing table are both provided with water seepage holes.
Preferably, the top of crossing the water platform has seted up square leak, the equal fixed mounting in front and the back of crossing the water platform top has the baffle.
Preferably, the bottom of the water passing table is provided with a collecting box, and a filter screen is fixedly arranged in the collecting box.
Preferably, the front and the back of the right side of the collecting box are fixedly provided with a second telescopic rod through a connecting plate, and the output end of the second telescopic rod is fixedly provided with a bucket.
Preferably, a drain outlet is formed in the left side of the collecting box, and a sealing plate is rotatably connected to the top of the drain outlet.
Preferably, the front and the back of the right side of the sealing plate are both rotatably connected with a telescopic pull rod structure, and the top of the telescopic pull rod structure is rotatably connected with the inner wall of the left side of the collecting box.
Compared with the prior art, the temporary water passing device for the building construction site has the following beneficial effects:
the utility model provides a temporary water passing device for a building construction site, which is characterized in that a first telescopic rod in a movable sweeping structure is started, a sliding block is pushed by the first telescopic rod to move on the surface of a sliding rod, so that a polygonal connecting rod of the sliding rod is driven to move, an arc-shaped brush is driven to move, meanwhile, a fixed brush of the arc-shaped brush is matched to perform soil cleaning work on the surface of a tire, meanwhile, a transport vehicle runs at a low speed on the surface of a water passing platform, water is sprayed on the surface of the tire manually, so that the manual labor amount can be reduced, the operation is simple, the cleaning by the brush is not needed manually, and the working efficiency can be improved.
Drawings
Fig. 1 is a schematic structural view of a first embodiment of a temporary water passing device at a construction site according to the present invention;
FIG. 2 is a schematic structural view of the mobile sweeping structure shown in FIG. 1;
FIG. 3 is a schematic view of the external perspective shown in FIG. 1;
FIG. 4 is a schematic side view of the structure of FIG. 1;
FIG. 5 is a schematic structural diagram of a temporary water passing device for a construction site according to a second embodiment of the present invention;
FIG. 6 is a schematic view showing the structure of a drain outlet shown in FIG. 5;
fig. 7 is a schematic structural diagram of the square leak shown in fig. 5.
Reference numbers in the figures: 1. a water passing platform, 2, an anti-slip strip, 3, a water seepage hole, 4, a fixed brush, 5, a through groove, 6, a movable sweeping structure, 61, a sliding rod, 62, a sliding block, 63, a polygonal connecting rod, 64, a connecting column, 65, an arc brush, 66 and a first telescopic rod,
7. the device comprises a square leak, 8 parts of a baffle, 9 parts of a collecting box, 10 parts of a filter screen, 11 parts of a drain outlet, 12 parts of a sealing plate, 13 parts of a telescopic pull rod structure, 14 parts of a bucket, 15 parts of a second telescopic rod.
Detailed Description
The utility model is further described with reference to the following figures and embodiments.
First embodiment
Referring to fig. 1, fig. 2, fig. 3 and fig. 4 in combination, wherein fig. 1 is a schematic structural view illustrating a first embodiment of a temporary water passing device for a building construction site according to the present invention; FIG. 2 is a schematic structural view of the mobile sweeping structure shown in FIG. 1; FIG. 3 is a schematic view of the external perspective shown in FIG. 1; fig. 4 is a schematic side view of the structure shown in fig. 1. A construction site temporary water passing device comprising: a water passing table 1;
the fixed brushes 4 are fixedly arranged on two sides of the top of the water passing platform 1;
the through grooves 5 are formed in two sides of the top of the water passing platform 1;
remove and sweep structure 6, remove and sweep structure 6 fixed mounting in cross the both sides of water platform 1 bottom, remove and sweep structure 6 and include two slide bars 61, two the equal sliding connection in both sides on slide bar 61 surface has slider 62, slider 62's outside fixedly connected with polygon connecting rod 63, polygon connecting rod 63's other end fixed mounting has arc brush 65, slider 62's inboard fixed mounting has spliced pole 64, the left side fixed mounting of spliced pole 64 has first telescopic link 66, the left end of first telescopic link 66 with cross the bottom fixed connection of water platform 1.
The quantity of slide bar 61 is two, and the equal sliding connection in surface both sides of two slide bars 61 has two sliders 62, and the inside of four sliders 62 carries out fixed mounting through spliced pole 64 and makes its parallel two be a set of, and carry out fixed connection through the dead lever between the spliced pole 64, make it become a whole, thereby can improve the synchronization that slider 62 removed, the while can be indirect improvement arc brush 65's mobility stability, arc brush 65 is the arc, thereby the surface that can laminate the tire is scrubbed it, reduce the dead angle.
And anti-slip strips 2 are arranged on both sides of the water passing platform 1.
The phenomenon that the transport vehicle slides when driving to the water passing platform 1 with soil on the ground can be avoided through the anti-slip strips 2, the driving stability of the transport vehicle can be improved,
and water seepage holes 3 are formed in the two sides of the top of the water passing platform 1.
The working principle of the temporary water passing device for the building construction site provided by the utility model is as follows:
when the soil on the surface of the tire of the transport vehicle needs to be cleaned, the transport vehicle runs to the top of the water platform 1, water is sprayed on the surface of the tire by workers, the first telescopic rod 66 in the mobile sweeping structure 6 is started at the same time, the sliding block 62 is pushed to move on the surface of the sliding rod 61 by starting the first telescopic rod 66, the connecting column 64 is driven to move by moving the sliding block 62, the sliding blocks 62 on the surfaces of the two sliding rods 61 move simultaneously, the polygonal connecting rod 63 is driven to move by moving the sliding block 62, the arc brush 65 is driven to move by moving the polygonal connecting rod 63, when the arc brush 65 works, the transport vehicle runs at a low speed on the surface of the water platform 1, and the arc brush 65 and the fixed brush 4 cooperate to scrub the outer surface and the inner side of the tire, removing soil on the surface of the tire.
The water for cleaning the soil is circulated outwards through the water seepage holes 3, so that the water cannot stay on the surface of the water passing platform 1.
Compared with the prior art, the temporary water passing device for the building construction site has the following beneficial effects:
through starting to remove first telescopic link 66 in sweeping structure 6, promote slider 62 through first telescopic link 66 and remove on the surface of slide bar 61, thereby drive its polygon connecting rod 63 and remove, thereby it removes to drive arc brush 65, it carries out earth cleaning work to the surface of tire to coordinate its stationary brush 4 simultaneously, the transport vechicle is traveling at the surperficial low-speed of crossing water platform 1 simultaneously, spout the surface at the tire through the manual work with water, thereby can reduce artificial amount of labour, the operation is simple, need not clear up through the manual work use brush, thereby can improve work efficiency.
Second embodiment
Referring to fig. 5, fig. 6 and fig. 7 in combination, based on the temporary water passing device for the building construction site provided by the first embodiment of the present application, a second embodiment of the present application provides another temporary water passing device for the building construction site. The second embodiment is only the preferred mode of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the difference that a construction site water installation temporarily that the second embodiment of this application provided lies in, a construction site water installation temporarily, cross the top of water platform 1 and seted up square leak 7, cross the equal fixed mounting in front and the back at water platform 1 top and have baffle 8.
Thereby can make it not a large amount of outside flows of muddy water that crosses water platform 1 surface through baffle 8, and lead to crossing the wet and increase the mire of soil outside water platform 1, lead to the staff to be glued, the volume that simultaneously can indirect improvement muddy water gets into to collection tank 9 to the waste of less water resource.
The bottom of the water passing table 1 is provided with a collecting box 9, and a filter screen 10 is fixedly arranged inside the collecting box 9.
The equal fixed mounting all around at collecting box 9 top has the inserted bar, crosses the equal fixed mounting spliced pole all around of water platform 1 bottom, injects its inserted bar into the inside of spliced pole, can improve the collecting box and cross the wholeness of water platform 1, and makes it cross and can not appear the skew between water platform 1 and the collecting box 9.
The front and the back of the right side of the collecting box 9 are fixedly provided with a second telescopic rod 15 through a connecting plate, and the output end of the second telescopic rod 15 is fixedly provided with a bucket 14.
A sewage draining outlet 11 is formed in the left side of the collecting box 9, and a sealing plate 12 is rotatably connected to the top of the sewage draining outlet 11.
A rubber gasket is fixedly mounted on the left side of the sealing plate 12, and the sealing performance of the sealing plate 12 when used for sealing the sewage discharge port 11 can be improved through the rubber gasket.
The front and the back of the right side of the sealing plate 12 are rotatably connected with a telescopic pull rod structure 13, and the top of the telescopic pull rod structure 13 is rotatably connected with the inner wall of the left side of the collecting box 9.
The telescopic pull rod structure 13 comprises a fixed rod, a sliding cavity is arranged inside the fixed rod, a moving rod is connected inside the sliding cavity in a sliding mode, a spring is arranged inside the sliding cavity on the surface of the moving rod, the bottom of the moving rod is rotatably connected with the right side of the sealing plate, and the top of the fixed rod is rotatably connected with the inner wall of the left side of the collecting box 9.
The working principle of the temporary water passing device for the building construction site provided by the utility model is as follows:
the transport vechicle is used water to carry out earth through crossing water platform 1 and is washed, and earth can fall on 1 surfaces of water platform, and earth flows into the inside of collecting box 9 through the position of square leak 7 again to fall on the surface of filter screen 10, rethread filter screen 10 filters it and makes its earth and separation of water, and earth stops on the surface of filter screen 10, and comparatively clean water carries out the inside of collecting box 9 and is in the bottom of filter screen 10.
When needs clear up earth, promote the scraper bowl 14 through starting second telescopic link 15 and remove to the left side, the drain 11 position of seting up its loam shovel to the left side of collection box 9, promote it simultaneously and seal board 12 and rotate, thereby make its telescopic pull rod structure 13 extension and make its inside spring take place elastic deformation, thereby make its drain 11 opened, make its earth from the position of drain 11 by discharge collection box 9, thereby rethread second telescopic link 15's withdrawal drives its scraper bowl 14 and removes to the right side, elastic deformation through the inside spring of telescopic pull rod structure 13 makes its telescopic pull rod structure 13 withdrawal this moment, thereby board 12 rotates is sealed in the pulling, thereby carry out the shutoff with drain 11.
Compared with the prior art, the temporary water passing device for the building construction site has the following beneficial effects:
at the water and the earth on water platform 1 surface, through the inside that square leak 7 flowed into collecting box 9, rethread filter screen 10 filters and makes its earth and separation of water, and earth stops on the surface of filter screen 10, and comparatively clean water enters into the bottom of filter screen 10 and persists, thereby stews and can carry out reuse, improves the water utilization ratio, thereby can the use of water economy resource, reduction use cost.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (8)

1. The utility model provides a water installation is crossed temporarily in building construction site which characterized in that includes: a water passing platform;
the fixed brushes are fixedly arranged on two sides of the top of the water passing table;
the through grooves are formed in two sides of the top of the water passing table;
remove and sweep the structure, remove and sweep structure fixed mounting in cross the both sides of water platform bottom, remove and sweep the structure and include two slide bars, two the equal sliding connection in both sides on slide bar surface has the slider, the outside fixedly connected with polygon connecting rod of slider, the other end fixed mounting of polygon connecting rod has the arc brush, the inboard fixed mounting of slider has the spliced pole, the left side fixed mounting of spliced pole has first telescopic link, the left end of first telescopic link with cross the bottom fixed connection of water platform.
2. The temporary water passing device for the building construction site according to claim 1, wherein anti-slip strips are arranged on two sides of the water passing platform.
3. The temporary water passing device for the building construction site as claimed in claim 1, wherein water seepage holes are formed on both sides of the top of the water passing platform.
4. The temporary water passing device for the building construction site as claimed in claim 1, wherein a square leak is formed in the top of the water passing table, and baffles are fixedly mounted on the front surface and the back surface of the top of the water passing table.
5. The temporary water passing device for the building construction site as claimed in claim 1, wherein a collection box is arranged at the bottom of the water passing platform, and a filter screen is fixedly arranged inside the collection box.
6. The temporary water passing device for the building construction site according to claim 5, wherein a second telescopic rod is fixedly installed on the front side and the back side of the right side of the collecting box through a connecting plate, and a bucket is fixedly installed at the output end of the second telescopic rod.
7. The temporary water passing device for the building construction site as claimed in claim 6, wherein a drain outlet is formed in the left side of the collection box, and a sealing plate is rotatably connected to the top of the drain outlet.
8. The temporary water passing device for the building construction site as claimed in claim 7, wherein the front and back sides of the right side of the sealing plate are rotatably connected with telescopic pull rod structures, and the top of each telescopic pull rod structure is rotatably connected with the inner wall of the left side of the collection box.
CN202122363922.7U 2021-09-28 2021-09-28 Temporary water passing device for building construction site Expired - Fee Related CN216034267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122363922.7U CN216034267U (en) 2021-09-28 2021-09-28 Temporary water passing device for building construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122363922.7U CN216034267U (en) 2021-09-28 2021-09-28 Temporary water passing device for building construction site

Publications (1)

Publication Number Publication Date
CN216034267U true CN216034267U (en) 2022-03-15

Family

ID=80546646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122363922.7U Expired - Fee Related CN216034267U (en) 2021-09-28 2021-09-28 Temporary water passing device for building construction site

Country Status (1)

Country Link
CN (1) CN216034267U (en)

Similar Documents

Publication Publication Date Title
CN206448209U (en) A kind of town road guard bar washing device of rinse water recycling
CN215563225U (en) Municipal works are with having well lid of preventing blockking up function
CN112012332A (en) Underground pipeline dredging robot and dredging method
CN206800494U (en) A kind of negative pressure transportation formula dredging robot
CN216034267U (en) Temporary water passing device for building construction site
CN210561923U (en) Slag removal device for civil engineering
CN207714223U (en) A kind of environment-friendly type road cleaning device
CN216786726U (en) Drainage roadbed structure of highway construction engineering
CN216379073U (en) Highway is concrete repair device for bridge maintenance
CN206721961U (en) A kind of helical blade type dredging robot
CN215977645U (en) Urban sewer silt cleaning device
CN214574041U (en) Urban road facing wall greening structure
CN112900336A (en) Asphalt pavement cleaning device for environmental engineering and use method
CN113771805A (en) Based on construction is with green dustproof mechanism
CN208447478U (en) Tunnel and Ti Bu dragging robot
CN218191282U (en) Highway engineering road bed road surface construction is with novel stone mud removal device that washes
CN206202252U (en) A kind of urban environmental protection slag-soil truck roof cleaning device
CN221255583U (en) Bulldozer with track cleaning function
CN219992660U (en) High-efficient road drainage structures
CN212921466U (en) Dust removal device for construction site vehicle
CN215621893U (en) Water receiving chassis for muck car washer
CN220469074U (en) Road and bridge is with sluicing device convenient to maintain
CN220465446U (en) But job site circulation uses washing car pond
CN217759252U (en) High efficiency pump suction type culvert dredging device
CN221000419U (en) PC stone material drainage brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220315