CN216011244U - Air conditioner fresh air handling unit furred ceiling mounting platform - Google Patents
Air conditioner fresh air handling unit furred ceiling mounting platform Download PDFInfo
- Publication number
- CN216011244U CN216011244U CN202121868794.5U CN202121868794U CN216011244U CN 216011244 U CN216011244 U CN 216011244U CN 202121868794 U CN202121868794 U CN 202121868794U CN 216011244 U CN216011244 U CN 216011244U
- Authority
- CN
- China
- Prior art keywords
- base
- suspended ceiling
- mounting platform
- handling unit
- fresh air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ventilation (AREA)
Abstract
The utility model provides a suspended ceiling mounting platform of an air conditioning fresh air handling unit, which comprises hanging rods, a suspended ceiling and a base, wherein the suspended ceiling and the base are arranged in parallel from top to bottom; this air conditioner fresh air handling unit furred ceiling mounting platform both can be favorable to fan unit on-the-spot hoist and mount installation (fall into base and jib two parts, adopt the bolt connection between jib and the base), the later routine maintenance of being convenient for again overhauls, even under the extreme condition that large-scale spare part damage needs take out the maintenance such as equipment motor, as long as will dismantle the guardrail and prevent shaking the bracing and take off can, and overhauld and be convenient for resume.
Description
Technical Field
The utility model mainly relates to the field of installation of purification air conditioning equipment, in particular to a suspended ceiling installation platform of an air conditioning fresh air unit.
Background
At present, most of fresh air units in domestic electronic plants are usually provided with independent fresh air rooms due to large air quantity, large volume and frequent filter replacement and daily maintenance, concrete foundations are made on the ground in advance according to the size of equipment, and the equipment is assembled in place in the rooms when the equipment arrives at the site.
Present small-size clean electronic factory building, for reasons such as initial investment cost expense and factory building structure, it is very little to do the new trend computer lab, the new trend computer lab is placed to the whole new trend air handling unit of part (undertake new trend cold burden and total wet load), the whole new trend of remaining processing unit (undertake indoor cold burden) is placed in the indoor furred ceiling, even reduced the size (will heat, humidification segment indoor does not, but the overall dimension of unit, weight is still very big, still need often to change the filter and do daily maintenance, this has provided the challenge to equipment fixing and maintenance.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a ceiling mounting platform of an air conditioning fresh air handling unit, which comprises a suspension rod 1, a ceiling 2 and a base 3, wherein the ceiling 2 and the base 3 are arranged in parallel up and down, the base 3 is fixedly connected with the ceiling 2 through the suspension rod 1,
a plurality of iron plates are arranged on the side surface of the suspended ceiling 2, each iron plate is fixedly connected with the concrete beam through a chemical anchor bolt, a plurality of suspenders 1 are arranged, a plurality of suspenders 1 are fixed corresponding to each iron plate in a welding mode, a fan unit placing area 4 is arranged at the upper end of the base 3, anti-shaking inclined struts 5 are arranged between the suspenders 1 on two sides of the fan unit placing area 4,
the base 3 upper end still is equipped with overhauls regional 6, and should overhaul regional 6 outside and set up removable railing 7.
Preferably, the overhaul region 6 is paved with a pattern steel plate with the thickness of 5 mm.
Preferably, a ladder stand 8 is arranged when there is a height difference between the suspended ceiling 2 and the base 3.
Preferably, the anti-sway brace 5 is of a cross-shaped structure.
Preferably, the base 3 is connected with the equipment in the fan unit placing area 4 through bolts, and vibration isolation rubber pads are laid on the base.
Preferably, the sway brace 5 and the base 3 are both connected with the suspension rod 1 in a bolting mode.
The utility model has the beneficial effects that:
this air conditioner fresh air handling unit furred ceiling mounting platform both can be favorable to fan unit on-the-spot hoist and mount installation (fall into base and jib two parts, adopt the bolt connection between jib and the base), the later routine maintenance of being convenient for again overhauls, even under the extreme condition that large-scale spare part damage needs take out the maintenance such as equipment motor, as long as will dismantle the guardrail and prevent shaking the bracing and take off can, and overhauld and be convenient for resume.
Drawings
FIG. 1 is a top view of the overall structure of the present invention;
FIG. 2 is a side view of the overall structure of the present invention;
in the figure, the position of the upper end of the main shaft,
1. a boom; 2. a suspended ceiling; 3. a base; 4. a fan unit placement area; 5. the sway prevention diagonal brace; 6. a maintenance area; 7. the handrail can be disassembled; 8. the ladder is climbed.
Detailed Description
In order to make the technical solutions of the present invention better understood and make the above features, objects, and advantages of the present invention more comprehensible, the present invention is further described with reference to the following examples. The examples are intended to illustrate the utility model only and are not intended to limit the scope of the utility model.
The technical method adopted for realizing the purpose of the patent of the utility model is as follows:
referring to fig. 1, firstly, the installation position and the size of the platform are determined according to the ceiling space and by combining the parameters (size and weight) of the equipment, and attention is paid to the fact that the calculation and the model selection of the size of the steel beam of the platform are carried out according to the running load (generally considered according to 2 times of the weight of the equipment) of the equipment in the process;
reserving an overhaul space of 800mm on the side of an overhaul door of the equipment, laying a pattern steel plate with the thickness of 5mm, and arranging a base of the detachable railing on the outer side of the area (welding a steel pipe with the length of phi 40 and 80mm on the base for inserting and fixing the detachable railing);
fig. 2 fixing iron plates to concrete beams using chemical anchors of M20;
because the space is not enough or the concrete beams can not be obtained, H steel can be used for supplementing the cross arm between the small beams (as can be seen in figure 2); after the work is finished, the upper part of the suspender (H150, 7, 10) is fully welded on the iron plate, and the lower part of the suspender is welded with the iron plate to prepare for bolting a platform base behind;
the platform base is prefabricated and well placed below a field installation position (the platform base can be processed on site due to the fact that the foundation is large), the fan unit is assembled and fixed on the platform base after entering a field, the fan unit and the base are hoisted to the lower portion of the suspender together through a hoist after the fan unit and the base are completed, and the suspender and the equipment base are bolted through an M20 high-strength bolt;
overhaul, whole platform has 800mm in the side of the access door to lay the decorative pattern steel sheet, set up detachable railing, prevent shaking the bracing and adopt detachablely overhauling at the side of overhauing simultaneously. Set up the cat ladder when having the discrepancy in elevation between furred ceiling and base.
As shown in fig. 1-2, the present invention includes: a suspension rod 1, a suspended ceiling 2 and a base 3 which are arranged in parallel up and down, wherein the base 3 is fixedly connected with the suspended ceiling 2 through the suspension rod 1,
a plurality of iron plates are arranged on the side surface of the suspended ceiling 2, each iron plate is fixedly connected with the concrete beam through a chemical anchor bolt, a plurality of suspenders 1 are arranged, a plurality of suspenders 1 are fixed corresponding to each iron plate in a welding mode, a fan unit placing area 4 is arranged at the upper end of the base 3, anti-shaking inclined struts 5 are arranged between the suspenders 1 on two sides of the fan unit placing area 4,
the base 3 upper end still is equipped with overhauls regional 6, and should overhaul regional 6 outside and set up removable railing 7.
In this embodiment, it is preferable that a pattern steel plate with a thickness of 5mm is laid in the inspection area 6.
In this embodiment, it is preferred that a ladder 8 is provided in case of a height difference between the ceiling 2 and the foundation 3.
In this embodiment, the sway brace 5 is preferably of a cross-shaped structure.
In this embodiment, the base 3 is preferably connected with the equipment in the fan unit placement area 4 by bolts, and vibration isolation rubber pads are laid on the base.
In this embodiment, the sway brace 5 and the base 3 are preferably connected to the suspension rod 1 by bolting.
In use, this air conditioner fresh air handling unit furred ceiling mounting platform both can be favorable to the on-the-spot hoist and mount installation of fan unit (fall into base and jib two parts, adopt the bolt joint between jib and the base), the later routine maintenance of being convenient for again overhauls, even under the extreme condition that large-scale spare part damage needs take out the maintenance such as equipment motor, as long as will dismantle the guardrail and prevent shaking the bracing and take off can, and overhauls and be convenient for resume.
The above-described embodiments are merely illustrative of the principles and utilities of the present patent application and are not intended to limit the present patent application. Modifications and variations can be made to the above-described embodiments by those skilled in the art without departing from the spirit and scope of this patent application. Accordingly, it is intended that all equivalent modifications or changes which can be made by those skilled in the art without departing from the spirit and technical concepts disclosed in the present application shall be covered by the claims of this patent application.
Claims (6)
1. A suspended ceiling mounting platform of a fresh air handling unit of an air conditioner is characterized by comprising a suspension rod (1), a suspended ceiling (2) and a base (3) which are arranged in parallel up and down, wherein the base (3) is fixedly connected with the suspended ceiling (2) through the suspension rod (1),
a plurality of iron plates are arranged on the side surface of the suspended ceiling (2), each iron plate is fixedly connected with the concrete beam through a chemical anchor bolt, a plurality of suspenders (1) are arranged, the plurality of suspenders (1) are fixed corresponding to each iron plate in a welding mode, a fan unit placing area (4) is arranged at the upper end of the base (3), anti-shaking inclined struts (5) are arranged between the suspenders (1) on two sides of the fan unit placing area (4),
the base (3) upper end still is equipped with overhauls regional (6), and should overhaul regional (6) outside and set up removable railing (7).
2. An air conditioning fresh air handling unit suspended ceiling mounting platform according to claim 1, wherein: and a pattern steel plate with the thickness of 5mm is laid in the overhaul area (6).
3. An air conditioning fresh air handling unit suspended ceiling mounting platform according to claim 2, wherein: and a ladder stand (8) is arranged when the height difference exists between the suspended ceiling (2) and the base (3).
4. An air conditioning fresh air handling unit suspended ceiling mounting platform according to claim 1, wherein: the anti-shaking inclined strut (5) is of a cross-shaped structure.
5. An air conditioning fresh air handling unit suspended ceiling mounting platform according to claim 1, wherein: the base (3) is connected with equipment in the fan unit placing area (4) through bolts, and vibration isolation rubber pads are laid on the base.
6. An air conditioning fresh air handling unit suspended ceiling mounting platform according to claim 5, wherein: the sway-preventing inclined strut (5) and the base (3) are connected with the suspender (1) in a bolting mode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121868794.5U CN216011244U (en) | 2021-08-11 | 2021-08-11 | Air conditioner fresh air handling unit furred ceiling mounting platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202121868794.5U CN216011244U (en) | 2021-08-11 | 2021-08-11 | Air conditioner fresh air handling unit furred ceiling mounting platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216011244U true CN216011244U (en) | 2022-03-11 |
Family
ID=80588475
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202121868794.5U Active CN216011244U (en) | 2021-08-11 | 2021-08-11 | Air conditioner fresh air handling unit furred ceiling mounting platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216011244U (en) |
-
2021
- 2021-08-11 CN CN202121868794.5U patent/CN216011244U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013452B (en) | A kind of flexible suspension formula building module structure | |
CN107100358B (en) | Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body | |
CN201826525U (en) | Climbing shuttering system device for buildings | |
CN108979131B (en) | Integral lifting platform device for high-rise building construction steel formwork and operation frame | |
CN109184061B (en) | Space structure overhanging eave suspended ceiling system structure and construction method | |
CN202483154U (en) | High bearing capacity suspending scaffold | |
CN216011244U (en) | Air conditioner fresh air handling unit furred ceiling mounting platform | |
CN207879008U (en) | Diameter Silo structure roof support system | |
CN111058609A (en) | Construction and protection integrated portable operation platform and method | |
CN102787717B (en) | Self-supporting combined steel template construction method | |
CN109990030A (en) | A kind of flexibility computer room shock mitigation system and its foundation construction method | |
CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
CN109989590A (en) | For the auxiliary fixing device of roof overlength steel girder erection and the hanging method of girder steel | |
CN206158146U (en) | Novel building section of thick bamboo well construction operation platform | |
CN108412101B (en) | Steel structure integrated floor slab and construction method thereof | |
JP4027170B2 (en) | External scaffold device and construction method of external scaffold device | |
CN112746704A (en) | Arch type steel-concrete combined ceiling structure of large-span giant underground workshop and construction method | |
CN220725814U (en) | Floor-free temporary support structure for floor support plate | |
CN109944430A (en) | A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation | |
CN213418435U (en) | Be applied to external protection frame of assembly type construction | |
CN215564317U (en) | Novel stores pylon for assembly type structure | |
CN214785196U (en) | Pre-assembly type combined floor bearing plate and floor | |
CN218841482U (en) | Pipeline lifting device for construction | |
CN112922322B (en) | Construction method of two-way cosine three-dimensional corrugated steel plate arch-shaped supporting system | |
CN210710386U (en) | Pre-buried hoisting apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |