CN215976672U - Assembly type prestressed construction waste recycled aggregate road - Google Patents

Assembly type prestressed construction waste recycled aggregate road Download PDF

Info

Publication number
CN215976672U
CN215976672U CN202122448115.5U CN202122448115U CN215976672U CN 215976672 U CN215976672 U CN 215976672U CN 202122448115 U CN202122448115 U CN 202122448115U CN 215976672 U CN215976672 U CN 215976672U
Authority
CN
China
Prior art keywords
connecting portion
road
recycled
regeneration
road body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122448115.5U
Other languages
Chinese (zh)
Inventor
潘伟敏
邱平举
夏杨灵
洪财进
王小锋
王建星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Huayuan Construction Engineering Group Co ltd
Original Assignee
Fujian Huayuan Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Huayuan Construction Engineering Group Co ltd filed Critical Fujian Huayuan Construction Engineering Group Co ltd
Priority to CN202122448115.5U priority Critical patent/CN215976672U/en
Application granted granted Critical
Publication of CN215976672U publication Critical patent/CN215976672U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to an assembled prestressing force construction waste recycled aggregate road belongs to the technical field of construction road, including the ground, the last fixed surface of ground installs the recycled road body, be provided with first connecting portion on the side of recycled road body, the recycled road body is provided with the second connecting portion on keeping away from the side of first connecting portion. This assembled prestressing force building rubbish recycled aggregate road, be connected the cooperation joint through fixture block and fixed block and first connecting portion and second, thereby assemble between two recycled road bodies, through taking out or directly destroying fixture block and fixed block, can realize the quick dismantlement to the recycled road body, the water conservancy diversion effect through guiding gutter and ponding groove, the long-time condition that stops on recycled road body surface of ponding has effectively been reduced, save ponding through the retaining chamber, the erosion and the destruction of ponding to the recycled road body have been slowed down, make the recycled road after the use can put into the secondary and use.

Description

Assembly type prestressed construction waste recycled aggregate road
Technical Field
The application relates to the technical field of building roads, in particular to an assembly type prestress building garbage recycled aggregate road.
Background
The construction waste refers to residue soil, waste material, sludge and other wastes generated in the process of constructing, laying, dismantling and repairing various buildings, structures, pipe networks and the like by construction, construction units or individuals, and can be prepared into processing aggregate of an assembly type road by treating the construction waste, so that the construction waste can be effectively utilized.
Although the assembled prestressed road using construction waste regeneration in the prior art has a good application space, water is easily accumulated on the surface of the road in the using process, the accumulated water is difficult to naturally disperse, the road loss after the road is used for one time is large, secondary recycling is not facilitated, and the road after the assembly is difficult to disassemble, so that the recycling rate of the road is reduced, and the purpose of energy conservation is not achieved.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides an assembly type prestressed construction waste recycled aggregate road which has the advantages of being convenient to disassemble the road, effectively slowing down the difficulty of rainwater flowing to erode the road structure and the like, and solves the problem that the existing assembly type road is inconvenient to carry out secondary utilization after being put into use.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides an assembled prestressing force construction waste recycled aggregate road, includes the ground, the last fixed surface of ground installs the recycled road body, be provided with first connecting portion on the side of recycled road body, the recycled road body is provided with second connecting portion on keeping away from the side of first connecting portion, the guiding gutter has been seted up at the top of recycled road body, two be provided with the fastener between the recycled road body.
The fastener includes the mounting panel, the bottom of mounting panel is provided with fixed block and fixture block, the fixed block respectively with the corresponding joint of first connecting portion and second connecting portion, the fixture block respectively with the corresponding joint of first connecting portion and second connecting portion, the retaining chamber has been seted up to the inside of fixed block, the ponding groove has been seted up at the top of mounting panel.
Furthermore, first connecting portion and second are connected and are the L shaped plate, and the right angle end of first connecting portion and second connecting portion all faces away from the side of regeneration road body, and the height difference of first connecting portion and second connecting portion just satisfies two regeneration road bodies under interconnect, and the position is corresponding about first connecting portion and the second connecting portion on the relative side.
Furthermore, the fixed block corresponds to a gap between the two first connecting portions and the two second connecting portions on the same side surface, and the fixture block is correspondingly clamped with a rectangular space formed between the first connecting portions and the second connecting portions on the opposite surfaces of the two regeneration road bodies.
Further, the diversion trench and the water collecting trench are mutually perpendicular and intersected, and the diversion trench inclines towards two side edges of the regeneration road body.
Furthermore, a leak hole is communicated between the water accumulating tank and the water storage cavity and is a conical hole.
Further, the width of the mounting plate is the same as the length of the first connecting portion.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
this assembled prestressing force building rubbish regeneration aggregate road, through setting up first connecting portion and second connecting portion, the fixture block, the fixed block, be connected the cooperation joint through fixture block and fixed block and first connecting portion and second, thereby assemble between two regeneration road bodies, through taking out or directly destroying fixture block and fixed block, can realize the quick dismantlement to the regeneration road body, be convenient for take out the reutilization to the road, through setting up the guiding gutter, the ponding groove, the small opening, the retaining chamber, the water conservancy diversion effect through guiding gutter and ponding groove, the long-time condition that stops in regeneration road body surface of ponding has effectively been reduced, save ponding through the retaining chamber, the erosion and the destruction of ponding to the regeneration road body have been slowed down, make the regeneration road after the use can put into the secondary use, be favorable to the energy-conserving recycle to the resource.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a perspective view of the present invention;
fig. 3 is a schematic diagram of the internal structure of the card member of the present invention.
In the figure: 1 regeneration road body, 2 foundations, 3 first connecting parts, 4 second connecting parts, 5 guiding gutters, 6 clamping parts, 61 mounting plates, 62 fixing blocks, 63 clamping blocks, 64 water storage cavities, 65 water collecting tanks and 66 leakage holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Please refer to fig. 1-2, an assembled prestressed construction waste recycled aggregate road in this embodiment, includes a foundation 2, a recycled road body 1 is fixedly installed on an upper surface of the foundation 2, the recycled road body 1 is divided into a plurality of sections, a structure between each recycled road body 1 is the same, and the left and right sides of each recycled road body are horizontally arranged on a surface of the foundation 2, a first connecting portion 3 is fixedly installed on a side surface of the recycled road body 1, a second connecting portion 4 is fixedly installed on a side surface of the recycled road body 1 far away from the first connecting portion 3, the first connecting portion 3 and the second connecting portion 4 have the same structure and opposite directions, and the first connecting portion 3 and the second connecting portion 4 have different heights, and it is satisfied that the first connecting portion 3 and the second connecting portion 4 on opposite side surfaces are corresponding to each other in position under interconnection.
In this embodiment, first connecting portion 3 and second are connected 4 and are the L shaped plate, and the right angle end of first connecting portion 3 and second connecting portion 4 all faces away from the side of regeneration road body 1 for under two regeneration road body 1 interconnect, can form the rectangle space from top to bottom through first connecting portion 3 and second connecting portion 4, subsequent assembly and dismantlement of being convenient for.
Please refer to fig. 3, in order to assemble and connect two regeneration road bodies, in this embodiment, a clamping member 6 is disposed between two regeneration road bodies 1, the clamping member 6 includes a mounting plate 61, the width of the mounting plate 61 is the same as the length of the first connecting portion 3, so that the mounting plate 61 can be attached to the side wall between two regeneration road bodies 1, the bottom of the mounting plate 61 is fixedly mounted with a fixing block 62 and a clamping block 63, the first connecting portion 3 and the second connecting portion 4 are clamped and fixed by the fixing block 62 and the clamping block 63 under use, a water storage cavity 64 is further formed inside the fixing block 62, the water storage cavity 64 can collect accumulated water, and the internal structure of the regeneration road body 1 directly eroded by rainwater is effectively reduced.
In this embodiment, the fixed block 62 corresponds to the gap between two first connecting portions 3 and two second connecting portions 4 on the same side, and the fixture block 63 is correspondingly clamped with the rectangular space formed between the first connecting portion 3 and the second connecting portion 4 on the opposite surfaces of the two regenerated road bodies 1, so that the two regenerated road bodies 1 can be assembled and connected through the fixed block 62 and the fixture block 63.
In order to guide the accumulated water, the top of the regeneration road body 1 is provided with a guide groove 5, the top of the mounting plate 61 is provided with a water accumulation groove 65 corresponding to the guide groove 5, a leakage hole 66 is communicated between the water accumulation groove 65 and the water storage cavity 64, the leakage hole 66 is a conical hole, and the accumulated water in the water accumulation groove 65 can flow into the water storage cavity 64 to finish storage.
The diversion trench 5 and the water collecting trench 65 are mutually perpendicular and intersected, and the diversion trench 5 slightly inclines towards two side edges of the regeneration road body 1, so that accumulated water at the top of the regeneration road body 1 can uniformly flow into the water collecting trench 65.
The working principle of the above embodiment is as follows: by relatively approaching the two regeneration road bodies 1 to the left and right and butting, the clamping piece 6 is inserted into the gap between the two regeneration road bodies 1 from top to bottom, so that the clamping block 63 is clamped with the rectangular cavity between the first connecting part 3 and the second connecting part 4, and the fixing block 62 is mutually clamped with the cavities between the two first connecting parts 3 and the two second connecting parts 4, thereby realizing the assembly of the two regeneration road bodies 1, when the regeneration road bodies need to be disassembled, only the clamping piece 6 needs to be taken out, the separation of the two regeneration road bodies 1 can be realized, when water is accumulated on the surface of the regeneration road body 1, water flows to the upper surface of the clamping piece 6 between the two regeneration road bodies 1 through the diversion trench 5, the water accumulation groove 65 formed in the upper surface of the mounting plate 61 in the clamping piece 6 flows to the leakage hole 66, the water is gathered into the water accumulation cavity 64 to be stored, and the phenomenon that accumulated water is remained on the road surface for a long time to permeate and corrode the inner structure of the regeneration road body 1 is effectively reduced.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides an assembled prestressing force building rubbish recycled aggregate road, includes ground (2), its characterized in that: a regeneration road body (1) is fixedly mounted on the upper surface of the foundation (2), a first connecting part (3) is arranged on one side surface of the regeneration road body (1), a second connecting part (4) is arranged on one side surface, far away from the first connecting part (3), of the regeneration road body (1), a flow guide groove (5) is formed in the top of the regeneration road body (1), and a clamping part (6) is arranged between the two regeneration road bodies (1);
fastener (6) include mounting panel (61), the bottom of mounting panel (61) is provided with fixed block (62) and fixture block (63), fixed block (62) respectively with first connecting portion (3) and the corresponding joint of second connecting portion (4), fixture block (63) respectively with first connecting portion (3) and the corresponding joint of second connecting portion (4), water storage cavity (64) have been seted up to the inside of fixed block (62), ponding groove (65) have been seted up at the top of mounting panel (61).
2. The fabricated prestressed construction waste recycled aggregate road of claim 1, wherein: first connecting portion (3) and second connecting portion (4) are the L shaped plate, and the right angle end of first connecting portion (3) and second connecting portion (4) all faces towards the side of keeping away from regeneration road body (1), and the height difference of first connecting portion (3) and second connecting portion (4), and satisfies two regeneration road bodies (1) under interconnect, and the position is corresponding about first connecting portion (3) and the second connecting portion (4) on the relative side.
3. The fabricated prestressed construction waste recycled aggregate road of claim 1, wherein: fixed block (62) are corresponding with the clearance between two first connecting portion (3) and two second connecting portion (4) on same side, and the corresponding joint in rectangle space that forms between first connecting portion (3) and the second connecting portion (4) on fixture block (63) and two regeneration road body (1) opposite faces simultaneously.
4. The fabricated prestressed construction waste recycled aggregate road of claim 1, wherein: the diversion trench (5) and the water accumulation trench (65) are mutually perpendicular and intersected, and the diversion trench (5) inclines towards two side edges of the regeneration road body (1).
5. The fabricated prestressed construction waste recycled aggregate road of claim 1, wherein: a leakage hole (66) is communicated between the water collecting tank (65) and the water storage cavity (64), and the leakage hole (66) is a conical hole.
6. The fabricated prestressed construction waste recycled aggregate road of claim 1, wherein: the width of the mounting plate (61) is the same as the length of the first connecting part (3).
CN202122448115.5U 2021-10-12 2021-10-12 Assembly type prestressed construction waste recycled aggregate road Active CN215976672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122448115.5U CN215976672U (en) 2021-10-12 2021-10-12 Assembly type prestressed construction waste recycled aggregate road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122448115.5U CN215976672U (en) 2021-10-12 2021-10-12 Assembly type prestressed construction waste recycled aggregate road

Publications (1)

Publication Number Publication Date
CN215976672U true CN215976672U (en) 2022-03-08

Family

ID=80568981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122448115.5U Active CN215976672U (en) 2021-10-12 2021-10-12 Assembly type prestressed construction waste recycled aggregate road

Country Status (1)

Country Link
CN (1) CN215976672U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115726239A (en) * 2022-12-09 2023-03-03 广东众强建设工程有限公司 Prestressed pavement and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115726239A (en) * 2022-12-09 2023-03-03 广东众强建设工程有限公司 Prestressed pavement and construction method thereof

Similar Documents

Publication Publication Date Title
CN215976672U (en) Assembly type prestressed construction waste recycled aggregate road
CN201459905U (en) Urban rainwater drainage system
CN105220595A (en) A kind of construction work temporary road structure and construction method thereof
CN210684922U (en) Post-cast strip centralized drainage pipeline component
CN212612247U (en) Small-sized sewage intercepting box culvert for river treatment
CN205976514U (en) Interim simple tool formula carwash factory in building site
CN110409830A (en) A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used
CN212103531U (en) Environment-friendly temporary road system
CN212128843U (en) Bridge expansion joint with water intercepting groove
CN210288620U (en) Prefabricated resin concrete escape canal
CN212153269U (en) Make river course view surface of water silt reducing equipment of installation fast
CN208235959U (en) A kind of building construction temporary drainage structure
CN212270579U (en) Water permeable component for water storage and supply of sponge city
CN210263093U (en) Highway bridge construction cofferdam device
CN211080478U (en) Drainage ditch device for concrete structure plate surface deformation joint position
CN106049651A (en) Urban water-logging prevention and control method
CN214574462U (en) HDPE escape canal for rainwater treatment
CN216920431U (en) Ecological retaining wall of hydraulic engineering
CN217679559U (en) Catch basin
CN220079793U (en) Assembled box corrugated steel plate culvert
CN218713735U (en) Assembled drainage device of side slope of road bed
CN204825633U (en) Structure that precast beam bay formula overpass expansion joint percolating water was dredged in an organized way
CN219011441U (en) Road surface rainwater drainage system and road surface rainwater drainage unit thereof
CN213951798U (en) Combined temporary drainage device
CN213625963U (en) High-strength linear drainage ditch

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant