CN215946546U - Prefabricated baffle track hoist and mount system of fishway - Google Patents

Prefabricated baffle track hoist and mount system of fishway Download PDF

Info

Publication number
CN215946546U
CN215946546U CN202122543581.1U CN202122543581U CN215946546U CN 215946546 U CN215946546 U CN 215946546U CN 202122543581 U CN202122543581 U CN 202122543581U CN 215946546 U CN215946546 U CN 215946546U
Authority
CN
China
Prior art keywords
track
fishway
prefabricated
prefabricated partition
hoisting system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122543581.1U
Other languages
Chinese (zh)
Inventor
王园栋
纵霄
马卫忠
单承康
刘永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guiyang Engineering Corp Ltd
Original Assignee
PowerChina Guiyang Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guiyang Engineering Corp Ltd filed Critical PowerChina Guiyang Engineering Corp Ltd
Priority to CN202122543581.1U priority Critical patent/CN215946546U/en
Application granted granted Critical
Publication of CN215946546U publication Critical patent/CN215946546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Artificial Fish Reefs (AREA)

Abstract

The utility model discloses a fishway prefabricated partition plate track hoisting system, and belongs to the technical field of fishway construction. The system comprises a fishway and hoisting assemblies, wherein track embedded assemblies are arranged at the tops of two side walls of the fishway, and the hoisting assemblies are movably erected on the track embedded assemblies. With the pre-buried top at the boundary wall of track, erect hoisting assembly on the pre-buried subassembly of track, carry on spacingly to hoisting assembly's width direction through the pre-buried subassembly of track, hoisting assembly can move on the pre-buried subassembly of track steadily at prefabricated baffle hoist and mount in-process, operation convenient to use, and can not cause boundary wall surface damage. The track embedded component is good in connection stability with the side wall, the track can be effectively prevented from loosening, and the portal crane is guaranteed to stably move on the track.

Description

Prefabricated baffle track hoist and mount system of fishway
Technical Field
The utility model relates to a fishway prefabricated partition plate track hoisting system, and belongs to the technical field of fishway construction.
Background
The fishway is a common fish passing facility used by human beings when building river-blocking buildings such as hydropower stations, and the like, and is divided into various types, a vertical seam type fishway is adopted in China at present, and a seam formed in the middle of a partition plate in the fishway is a vertical seam. The cast-in-place reinforced concrete fishway is limited by factors such as construction space and the like, and has the problems of high construction difficulty and low construction efficiency. Therefore, an assembled fishway is often used. However, the partition prefabricated members of the traditional fabricated fishway are mainly hoisted and installed by using a truck crane, and the truck crane is limited by a construction operation site, so that the problem that the positions with poor construction traffic conditions can be solved only by increasing the model of the truck crane or changing the prefabricated partition plates into cast-in-place partition plates is solved.
Therefore, Chinese patent document with publication number CN213738240U discloses a device for mounting prefabricated guide and partition boards of an assembled fishway pool chamber, wherein edge limiting devices in the device are arranged on the inner side of the lower end of a truss of a mobile device, a left side and a right side of the truss are respectively provided with one steel angle, the steel angle is arranged in parallel at intervals, the intervals are slightly smaller than the vertical distance between two side walls, the steel angle is made of angle steel, when the mobile device walks on the upper end surfaces of the side walls, the lowest end of the angle steel is lower than the upper end surfaces of the side walls and is positioned in the interval between the two side walls, and the phenomenon that the bottom walking mechanism slides into the pool chamber due to deviation of the mobile device in the walking process is prevented, so that the whole device fails.
The device adopts two angle steels to carry on spacingly to its width direction, avoids running gear landing to the pool indoor, but, when the angle steel contacts with the side wall, can lead to the side wall surface by the angle steel fish tail on the one hand, and on the other hand can lead to the device card to die, just can begin to use the device after the clearance between angle steel and the side wall need readjust, and the operation is used inconveniently.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a fishway prefabricated partition plate track hoisting system.
The utility model is realized by the following technical scheme:
the utility model provides a prefabricated baffle track hoist and mount system of fishway, includes fishway and hoist and mount subassembly, the top of the both sides wall of fishway all is equipped with track embedded component, the hoist and mount subassembly adjustable shelf is established on track embedded component.
Reserved partition plate slotted holes are correspondingly formed in the bottom plate and the walls on the two sides of the fishway.
The shape and the size of the groove hole of the reserved partition plate are matched with those of a prefabricated partition plate of the fishway.
The top of prefabricated baffle is equipped with 1 or 2 rings.
And a cable groove is formed in the top of the side wall.
The hoisting component is a portal crane.
The track embedded component comprises a supporting plate and a track, the track is placed on the supporting plate, and the left side and the right side of the track are connected with the supporting plate through a pressing plate and a plurality of fasteners respectively.
Backup pad, clamp plate and fastener are all pre-buried in the side wall, and the top of side wall is equipped with the recess in the position corresponding with the track, and orbital bottom is pre-buried in the side wall, and the top extends to in the recess.
The fastener includes the double-screw bolt, all overlaps at the upside of clamp plate and the downside of backup pad on the double-screw bolt and is equipped with the nut.
The stud is L-shaped.
The utility model has the beneficial effects that: with the pre-buried top at the boundary wall of track, erect hoisting assembly on the pre-buried subassembly of track, carry on spacingly to hoisting assembly's width direction through the pre-buried subassembly of track, hoisting assembly can move on the pre-buried subassembly of track steadily at prefabricated baffle hoist and mount in-process, operation convenient to use, and can not cause boundary wall surface damage. The track embedded component is good in connection stability with the side wall, the track can be effectively prevented from loosening, and the portal crane is guaranteed to stably move on the track.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of an assembly structure of the track embedded component and the side wall according to the present invention;
FIG. 3 is a schematic top view of the fishway of the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 3 at point A;
FIG. 5 is a partial enlarged view of FIG. 3 at point B;
fig. 6 is a schematic view showing the structure of a prefabricated separator according to the present invention.
In the figure: the method comprises the following steps of 1-side wall, 2-prefabricated partition plate, 3-hoisting assembly, 4-cable groove, 5-track embedded assembly, 50-support plate, 51-track, 52-pressure plate, 53-fastener and 6-reserved partition plate slotted hole.
Detailed Description
The technical solution of the present invention is further described below, but the scope of the claimed invention is not limited to the described.
As shown in fig. 1 to 6, the fishway prefabricated partition plate track hoisting system comprises a fishway and hoisting assemblies 3, wherein track embedded assemblies 5 are mounted at the tops of two side walls 1 of the fishway, and the hoisting assemblies 3 are movably erected on the track embedded assemblies 5. With pre-buried subassembly 5 of track pre-buried at the top of boundary wall 1, erect hoist assembly 3 on pre-buried subassembly 5 of track, carry on spacingly through track pre-buried subassembly 5 to hoist assembly 3's width direction, hoist assembly 3 can steadily move on track pre-buried subassembly 5 at 2 hoist and mount in-process prefabricated baffle, operation convenient to use, and can not cause 1 surface damage of boundary wall.
Reserved partition plate slotted holes 6 are correspondingly arranged on the bottom plate and the two side walls 1 of the fishway. The mounting position of the prefabricated partition plate 2 is positioned through the reserved partition plate slotted hole 6, and the assembly efficiency of the fishway is improved. The depth of the reserved clapboard slotted hole 6 is 5 cm. When the prefabricated partition plate is used, the reserved partition plate slotted holes 6 and the prefabricated partition plates 2 are numbered, so that later-stage hoisting operation is facilitated.
The shape and the size of the pre-made clapboard slotted hole 6 are matched with the pre-made clapboard 2 of the fishway.
The top of the prefabricated partition board 2 is embedded with 1 or 2 lifting rings 7. The prefabricated partition plate 2 is convenient to hoist or overhaul.
And a cable groove 4 is reserved at the top of the side wall 1. It is convenient to lay the cable in the cable trench 4.
The hoisting component 3 is a portal crane.
The rail embedded assembly 5 comprises a supporting plate 50 and a rail 51, wherein the rail 51 is placed on the supporting plate 50, and the left side and the right side of the rail 51 are respectively connected with the supporting plate 50 through a pressing plate 52 and a plurality of fasteners 53.
The supporting plate 50, the pressing plate 52 and the fastener 53 are all embedded in the side wall 1, a groove is formed in the position, corresponding to the rail 51, of the top of the side wall 1, the bottom of the rail 51 is embedded in the side wall 1, and the top of the rail extends into the groove.
The fastening member 53 includes a stud, and nuts are respectively sleeved on the upper side of the pressing plate 52 and the lower side of the supporting plate 50 on the stud.
The stud is L-shaped. The track embedded component 5 is good in connection stability with the side wall 1, the track 51 can be effectively prevented from loosening, and the portal crane can be ensured to stably move on the track 51.
Specifically, a movable trolley is mounted on the portal crane, and the prefabricated partition plates 2 are hoisted into the corresponding reserved partition plate slotted holes 6 through lifting hooks of the portal crane to be fixed. During later operation and maintenance, the prefabricated partition plate 2 with problems can also be hoisted by a portal crane to be overhauled or replaced. If the gantry crane is not used for a long time during operation, it can be temporarily removed for storage.
According to the fishway prefabricated partition plate track hoisting system, the track embedded component 5 is embedded in the top of the side wall 1, the hoisting component 3 is erected on the track embedded component 5, the track embedded component 5 limits the width direction of the hoisting component 3, the hoisting component 3 can stably move on the track embedded component 5 in the hoisting process of the prefabricated partition plate 2, the operation and the use are convenient, and the surface damage of the side wall 1 cannot be caused. The track embedded component 5 is good in connection stability with the side wall 1, the track 51 can be effectively prevented from loosening, and the portal crane can be ensured to stably move on the track 51.

Claims (10)

1. The utility model provides a prefabricated baffle track hoist and mount system of fishway which characterized in that: including fishway and hoist and mount subassembly (3), the top of the both sides wall (1) of fishway all is equipped with track embedded component (5), hoist and mount subassembly (3) activity is erect on track embedded component (5).
2. The fishway prefabricated partition track hoisting system of claim 1, characterized in that: reserved partition plate slotted holes (6) are correspondingly arranged on the bottom plate and the two side walls (1) of the fishway.
3. The fishway prefabricated partition track hoisting system of claim 2, wherein: the shape and the size of the reserved clapboard slotted hole (6) are matched with those of the prefabricated clapboard (2) of the fishway.
4. The fishway prefabricated partition track hoisting system of claim 3, wherein: the top of the prefabricated partition board (2) is provided with 1 or 2 lifting rings (7).
5. The fishway prefabricated partition track hoisting system of claim 1, characterized in that: and a cable groove (4) is formed in the top of the side wall (1).
6. The fishway prefabricated partition track hoisting system of claim 1, characterized in that: the hoisting component (3) is a portal crane.
7. The fishway prefabricated partition track hoisting system of claim 1, characterized in that: the track embedded component (5) comprises a supporting plate (50) and a track (51), wherein the track (51) is arranged on the supporting plate (50), and the left side and the right side of the track (51) are respectively connected with the supporting plate (50) through a pressing plate (52) and a plurality of fasteners (53).
8. The fishway prefabricated partition track hoisting system of claim 7, wherein: the supporting plate (50), the pressing plate (52) and the fastening piece (53) are all embedded in the side wall (1), the top of the side wall (1) is provided with a groove at a position corresponding to the rail (51), the bottom of the rail (51) is embedded in the side wall (1), and the top extends into the groove.
9. The fishway prefabricated partition track hoisting system of claim 7, wherein: the fastener (53) comprises a stud, and nuts are sleeved on the upper side of the pressing plate (52) and the lower side of the supporting plate (50) on the stud.
10. The fishway prefabricated partition track hoisting system of claim 9, wherein: the stud is L-shaped.
CN202122543581.1U 2021-10-21 2021-10-21 Prefabricated baffle track hoist and mount system of fishway Active CN215946546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122543581.1U CN215946546U (en) 2021-10-21 2021-10-21 Prefabricated baffle track hoist and mount system of fishway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122543581.1U CN215946546U (en) 2021-10-21 2021-10-21 Prefabricated baffle track hoist and mount system of fishway

Publications (1)

Publication Number Publication Date
CN215946546U true CN215946546U (en) 2022-03-04

Family

ID=80413814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122543581.1U Active CN215946546U (en) 2021-10-21 2021-10-21 Prefabricated baffle track hoist and mount system of fishway

Country Status (1)

Country Link
CN (1) CN215946546U (en)

Similar Documents

Publication Publication Date Title
CN106245919B (en) A kind of assembled architecture Automated assembly platform
CN106194216A (en) A kind of Rectangular Box Culvert and constructing tunnel chassis
CN111392585A (en) Movable rack for mounting electrical equipment and using method thereof
CN109056534B (en) Movable cast-in-situ bored pile construction platform and method
CN215946546U (en) Prefabricated baffle track hoist and mount system of fishway
CN210529495U (en) Lifting operation equipment for bridge engineering
CN213356779U (en) Overweight steel column translation transportation installation device
CN213572902U (en) Noise reduction type building construction platform
CN210217757U (en) Overlength lining cutting platform truck
CN210914945U (en) Hoisting device for upper structure of aluminum electrolytic cell
CN212453078U (en) Assembled bare concrete canopy
CN204552051U (en) The cradle structure of high-altitude crossbeam soffit monitoring point layout
CN206681015U (en) Deep basal pit Guan Liang stull disassemblerassembler
CN213418061U (en) Steel structure crossbeam of convenient connection
CN221052880U (en) Connection structure of steel structural beam
CN216838917U (en) Continuous steel box girder
CN220251544U (en) Assembled concrete structure detection device
CN215618785U (en) Concrete wallboard pouring device for civil construction engineering
CN220768874U (en) Standard knot structure and foundation conversion device for sectional construction
CN211496628U (en) Engineering electromechanical device installation mechanism
CN215758537U (en) Auxiliary device for erecting highway side beam in place by bridge girder erection machine
CN202227708U (en) Installation device for unit curtain wall board sheet
CN208844435U (en) Small-diameter circular pier hydraulic climbing formwork device
CN213540419U (en) PBA secretly digs platform truck support template system that two linings of station side bay detained and encircle
CN216336182U (en) Annular hanger

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant