CN215926518U - Landscape anti-sedimentation structure convenient to construct - Google Patents

Landscape anti-sedimentation structure convenient to construct Download PDF

Info

Publication number
CN215926518U
CN215926518U CN202121953089.5U CN202121953089U CN215926518U CN 215926518 U CN215926518 U CN 215926518U CN 202121953089 U CN202121953089 U CN 202121953089U CN 215926518 U CN215926518 U CN 215926518U
Authority
CN
China
Prior art keywords
layer
granite
fixedly connected
plain soil
tread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121953089.5U
Other languages
Chinese (zh)
Inventor
郭桂钦
镇淑娟
黄景涛
敖蕾
荣仁忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Huafa Architectural Design Consulting Co Ltd
Zhuhai Huafa Group Co Ltd
Original Assignee
Zhuhai Huafa Architectural Design Consulting Co Ltd
Zhuhai Huafa Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Huafa Architectural Design Consulting Co Ltd, Zhuhai Huafa Group Co Ltd filed Critical Zhuhai Huafa Architectural Design Consulting Co Ltd
Priority to CN202121953089.5U priority Critical patent/CN215926518U/en
Application granted granted Critical
Publication of CN215926518U publication Critical patent/CN215926518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to the technical field of anti-settlement, in particular to a landscape anti-settlement structure convenient to construct, which comprises a plain soil layer, wherein broken stone cushion layers are fixedly connected to the bottom and the top of the plain soil layer, a brick masonry layer is fixedly connected to one sides of the plain soil layer and the broken stone cushion layers, a water outlet is arranged at the bottom of the brick masonry layer, and a building garage top plate is fixedly connected to the bottom of the broken stone cushion layer at the bottom of the plain soil layer. The utility model has the advantages that: in the sedimentation process, the building garage roof is a non-sedimentation area, the side wall area of the basement roof is subjected to brick laying and facing, so that the steps can be better and uniformly sedimentated, the height difference of the stone direct-connection field is increased only by raising the foundation in the later period, the original material is utilized, the sedimentation amount is small, and the safety of pedestrians is ensured; the scheme of the utility model enables the settlement place to achieve the combination of aesthetic property, functionality, safety and cost saving, and enables construction and maintenance to be more convenient and time-saving.

Description

Landscape anti-sedimentation structure convenient to construct
Technical Field
The utility model relates to the technical field of anti-settlement, in particular to a landscape anti-settlement structure convenient to construct.
Background
In soft foundation areas, uneven settlement often occurs in the above parts of buildings, basement roofs and peripheral joining areas (such as steps, platforms, roads, flower beds and the like), resulting in problems: the step is broken, the indoor space is difficult to reach, the maintenance frequency is too much, and the rectification cost is too high. At present, in a settlement area, settlement occurs. And adding steps or removing a sedimentation hard scene in the connection area, and connecting the uneven area again.
The prior art has the following defects:
1. the original material cannot be utilized, and the original construction foundation is usually dismantled;
2. the post-finishing method is not suitable for the original site, and the integral feeling of the site is damaged and the attractiveness is poor like patching;
3. the settlement amount is too large, and the safety of pedestrians cannot be guaranteed.
A landscape anti-settling structure convenient and convenient to construct is provided for settling at the steps of the landscape commercial street.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the defects of the prior art and provide a landscape anti-sedimentation structure convenient to construct.
The purpose of the utility model is realized by the following technical scheme: the landscape anti-settlement structure convenient to construct comprises a plain soil layer, wherein broken stone cushion layers are fixedly connected to the bottom and the top of the plain soil layer, a brick layer is fixedly connected to one side of the plain soil layer and one side of the broken stone cushion layer, a water outlet is formed in the bottom of the brick layer, a building garage top plate is fixedly connected to the bottom of the broken stone cushion layer at the bottom of the plain soil layer, a concrete layer is fixedly connected to the top of the broken stone cushion layer at the top of the plain soil layer, a dry and hard cement mortar layer is fixedly connected to the top of the concrete layer, and a granite layer is fixedly connected to the top of the dry and hard cement mortar layer;
the granite tread is fixedly connected to one side of the granite rock stratum, the granite tread is fixedly connected to the bottom of the granite tread, the bottom of the granite tread is connected with a set of granite tread and a set of granite tread, the bottom of the granite tread is fixedly connected with a dry and hard cement mortar layer, the dry and hard cement mortar layer is connected to one side of the granite rock stratum, the dry and hard cement mortar layer bottom of the granite tread is fixedly connected with a concrete layer, the bottom of the concrete layer bottom of the dry and hard cement mortar layer is fixedly connected with a broken stone cushion layer, and the bottom of the broken stone cushion layer at the bottom of the concrete layer is fixedly connected with a plain soil layer.
Optionally, the compaction coefficient of the plain soil layer is greater than 0.93, and the plain soil layer is formed by layered compaction.
Optionally, the thickness of the gravel cushion layer is 150 mm, and the thickness of the brick layer is 180 mm.
Optionally, the top of building garage roof and the bottom fixed connection on rubble bed course and brick layer, concrete layer's thickness is 120 millimeters, concrete layer adopts C20 concrete.
Optionally, the thickness on dry and hard cement mortar layer is 30 millimeters, the granite tread adopts the length and width that 100 millimeters is thick to be 600 respectively and 300 millimeters burn a sesame black granite, and the step surface course is with the thick whole stone of 100 millimeters, guarantees that the step can better evenly subside, and the later stage only needs bed up the basis to increase the stone material and connect the place difference in elevation in the same direction as, can utilize original material like this to the settlement volume is less, guarantees pedestrian's safety.
Optionally, what granite kicked surface adopted is that 20 millimeters thick length width is 200 respectively and 50 millimeters burns the face sesame black granite, subsides and is the unavoidable natural phenomenon, at the settlement in-process, gives as far as possible to join the even settlement in district, reduces the maintenance degree of difficulty.
The utility model has the following advantages:
1. the landscape anti-settlement structure convenient for construction comprises a macadam cushion layer fixedly connected to the bottom and the top of a plain soil layer, a brick layer fixedly connected to one side of the plain soil layer and the macadam cushion layer, a water outlet arranged at the bottom of the brick layer, a building garage roof fixedly connected to the bottom of the macadam cushion layer at the bottom of the plain soil layer, a concrete layer fixedly connected to the top of the macadam cushion layer at the top of the plain soil layer, a dry and hard cement mortar layer fixedly connected to the top of the concrete layer, a granite tread fixedly connected to one side of the granite layer, a granite tread fixedly connected to the bottom of the granite tread, a set of granite tread and granite tread connected to the bottom of the granite tread, a dry and hard cement mortar layer fixedly connected to the bottom of the granite tread, and a dry and hard cement mortar layer connected to one side of the granite layer, the hard cement mortar bed bottom fixedly connected with concrete layer of the bottom of granite tread, the bottom fixedly connected with rubble bed course of the concrete layer of hard cement mortar bed bottom, the bottom fixedly connected with plain soil layer of the rubble bed course of concrete layer bottom, it is the natural phenomenon that can't avoid to subside, in the settlement process, give up to the greatest extent and link up the district and evenly subside, reduce the maintenance degree of difficulty, the building garage roof is not subsided the region, the garage lateral wall is the subsidence area outward, basement roof lateral wall region begins to build the outer veneer of brick, prevent that the basal layer from leaking outward during subsiding, do whole basis under the step, the step surface course is with the whole stone of millimeter thickness, guarantee that the step can better evenly subside, later stage only needs bed hedgehopping basis to increase the stone material and connect the place difference in elevation in the same direction, can utilize original material like this, and it is less to subside the volume, guarantee pedestrian's safety.
2. The landscape anti-sedimentation structure convenient to construct has the advantages that the height difference of the sedimentation boundary is small, the accessibility of the function space is guaranteed, the safety of the site is guaranteed, the safety of pedestrians is guaranteed, and meanwhile, the site is more attractive when sedimentated.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
In the figure: the method comprises the following steps of 1-plain soil layer, 2-broken stone cushion layer, 3-brick layer, 4-water outlet, 5-building garage top plate, 6-concrete layer, 7-dry hard cement mortar layer, 8-granite, 9-granite tread and 10-granite kicking surface.
Detailed Description
The utility model will be further described with reference to the accompanying drawings, but the scope of the utility model is not limited to the following.
As shown in fig. 1, a landscape anti-settlement structure convenient for construction comprises a plain soil layer 1, wherein a broken stone cushion layer 2 is fixedly connected to the bottom and the top of the plain soil layer 1, a brick layer 3 is fixedly connected to one side of the plain soil layer 1 and one side of the broken stone cushion layer 2, a water outlet 4 is arranged at the bottom of the brick layer 3, a building garage top plate 5 is fixedly connected to the bottom of the broken stone cushion layer 2 at the bottom of the plain soil layer 1, a concrete layer 6 is fixedly connected to the top of the broken stone cushion layer 2 at the top of the plain soil layer 1, a dry and hard cement mortar layer 7 is fixedly connected to the top of the concrete layer 6, and a granite layer 8 is fixedly connected to the top of the dry and hard cement mortar layer 7;
granite tread 9 of one side fixedly connected with granite of granite stratum 8, granite tread 9's bottom fixedly connected with granite plays surface 10, granite plays surface 10's bottom is connected with a set of granite tread 9 and granite play surface 10 again, granite tread 9's bottom fixedly connected with dry and hard cement mortar layer 7, dry and hard cement mortar layer 7 is connected in granite stratum 8's one side, 7 bottom fixedly connected with concrete layer 6 of dry and hard cement mortar layer of granite tread 9's bottom, the bottom fixedly connected with rubble bed course 2 of the concrete layer 6 of dry and hard cement mortar layer 7 bottom, the bottom fixedly connected with plain soil layer 1 of the rubble bed course 2 of 6 bottoms of concrete layer.
As a preferred technical scheme of the utility model: the compaction coefficient of a plain soil layer 1 is greater than 0.93, the plain soil layer 1 is formed by layered tamping, the thickness of a broken stone cushion layer 2 is 150 mm, the thickness of a brick layer 3 is 180 mm, the top of a building garage top plate 5 is fixedly connected with the broken stone cushion layer 2 and the bottom of the brick layer 3, the thickness of a concrete layer 6 is 120 mm, the concrete layer 6 is made of C20 concrete, the thickness of a dry and hard cement mortar layer 7 is 30 mm, a granite tread 9 is made of baked sesame black granite with the length and width of 600 mm and 300 mm respectively, a step surface layer is made of 100 mm thick whole stone, steps can be better and uniformly settled, the height difference of a stone direct-connection site is increased only by heightening the foundation in the later stage, the original material can be utilized, the settlement amount is smaller, and the safety of pedestrians is ensured;
granite kicking surface adopts 20 mm thick length width respectively for 200 and 50 mm burn face sesame black granite, subsides the natural phenomenon that can't avoid, at the settlement in-process, gives as far as possible to join the even settlement in district, reduces the maintenance degree of difficulty.
The working process of the utility model is as follows:
s1, paving a broken stone cushion layer 2 on the top of a top plate 5 of a building garage, tamping a plain soil layer 1 on the top of the broken stone cushion layer 2, building a brick layer 3 on one side of the plain soil layer 1, arranging a water outlet 4 at the bottom of the brick layer 3, paving a broken stone cushion layer 2 on the top of the plain soil layer 1, paving a concrete layer 6 on the top of the broken stone cushion layer 1, paving a dry and hard cement mortar layer 7 on the top of the concrete layer 6, and paving a granite layer 8 on the top of the dry and hard cement mortar layer 7;
s2, paving two layers of granite tread 9 and granite tread 10 on one side of a granite rock layer 8, paving a cement mortar layer 7 at the bottom of the granite tread 9, paving a concrete layer 6 at the bottom of the cement mortar layer 7, and paving a plain soil layer 1 at the bottom of the concrete layer 6.
To sum up, the convenient-to-construct landscape anti-settlement structure is characterized in that during use, a macadam cushion layer 2 is fixedly connected to the bottom and the top of a vegetarian soil layer 1, a brick layer 3 is fixedly connected to one side of the vegetarian soil layer 1 and the macadam cushion layer 2, a water outlet 4 is arranged at the bottom of the brick layer 3, a building garage top plate 5 is fixedly connected to the bottom of the macadam cushion layer 2 at the bottom of the vegetarian soil layer 1, a concrete layer 6 is fixedly connected to the top of the macadam cushion layer 2 at the top of the vegetarian soil layer 1, a dry and hard cement mortar layer 7 is fixedly connected to the top of the concrete layer 6, a granite rock layer 8 is fixedly connected to the top of the dry and hard cement mortar layer 7, a granite tread 9 is fixedly connected to one side of the granite rock layer 8, a granite tread 10 is fixedly connected to the bottom of the granite tread 9, a set of granite tread 9 and granite tread 10 are further connected to the bottom of the granite tread 10, and a dry and hard cement mortar layer 7 is fixedly connected to the bottom of the tread 9, the dry and hard cement mortar layer 7 is connected to one side of a granite layer 8, the bottom of the dry and hard cement mortar layer 7 at the bottom of a granite tread 9 is fixedly connected with a concrete layer 6, the bottom of the concrete layer 6 at the bottom of the dry and hard cement mortar layer 7 is fixedly connected with a broken stone cushion layer 2, the bottom of the broken stone cushion layer 2 at the bottom of the concrete layer 6 is fixedly connected with a plain soil layer 1, the settlement is an unavoidable natural phenomenon, in the settlement process, the building garage roof 5 is given to a joint area as much as possible and is uniformly settled, the maintenance difficulty is reduced, a building garage roof 5 is a non-settlement area, a settlement area is arranged outside a garage side wall, a facing outside brick is built in a basement roof side wall area, the base layer is prevented from leaking outside during settlement, an integral foundation is arranged under a step, the step facing layer is made of 100 mm thick whole stone, the step can be better and uniformly settled, the height difference of a stone connecting place is increased only by heightening the foundation in the later period, so that the original material can be utilized, the settlement amount is small, so that the safety of pedestrians is ensured; the settlement boundary has small height difference, ensures the accessibility of functional space, the safety of the field and the safety of pedestrians, and simultaneously leads the field to be more beautiful when settled.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a structure is prevented subsiding by view of convenient construction, includes plain soil layer (1), its characterized in that: the bottom and the top of the plain soil layer (1) are fixedly connected with a gravel cushion layer (2), one side of the plain soil layer (1) and the gravel cushion layer (2) is fixedly connected with a brick layer (3), the bottom of the brick layer (3) is provided with a water outlet (4), the bottom of the gravel cushion layer (2) at the bottom of the plain soil layer (1) is fixedly connected with a building garage top plate (5), the top of the gravel cushion layer (2) at the top of the plain soil layer (1) is fixedly connected with a concrete layer (6), the top of the concrete layer (6) is fixedly connected with a dry and hard cement mortar layer (7), and the top of the dry and hard cement mortar layer (7) is fixedly connected with a granite layer (8);
one side of the granite layer (8) is fixedly connected with a granite tread (9), the bottom of the granite tread (9) is fixedly connected with a granite kicking surface (10), the bottom of the granite kicking surface (10) is connected with a group of granite tread (9) and granite kicking surface (10), the bottom of the granite tread (9) is fixedly connected with a dry and hard cement mortar layer (7), the dry and hard cement mortar layer (7) is connected with one side of the granite layer (8), the bottom of the dry and hard cement mortar layer (7) at the bottom of the granite tread (9) is fixedly connected with a concrete layer (6), the bottom of the concrete layer (6) at the bottom of the dry and hard cement mortar layer (7) is fixedly connected with a broken stone cushion layer (2), and the bottom of the gravel cushion layer (2) at the bottom of the concrete layer (6) is fixedly connected with a plain soil layer (1).
2. The convenient-to-construct landscape sedimentation preventing structure of claim 1, which is characterized in that: the compaction coefficient of the plain soil layer (1) is more than 0.93, and the plain soil layer (1) is formed by layered compaction.
3. The convenient-to-construct landscape sedimentation preventing structure of claim 1, which is characterized in that: the thickness of rubble bed course (2) is 150 millimeters, the thickness of brick layer (3) is 180 millimeters.
4. The convenient-to-construct landscape sedimentation preventing structure of claim 1, which is characterized in that: the top of building garage roof (5) and the bottom fixed connection on rubble bed course (2) and brick layer (3), the thickness on concrete layer (6) is 120 millimeters, concrete layer (6) adopt C20 concrete.
5. The convenient-to-construct landscape sedimentation preventing structure of claim 1, which is characterized in that: the thickness of the dry and hard cement mortar layer (7) is 30 mm, and the granite tread (9) adopts burning surface sesame black granite with the thickness of 100 mm and the length and the width of 600 mm and 300 mm respectively.
6. The convenient-to-construct landscape sedimentation preventing structure of claim 1, which is characterized in that: the granite kicking surface adopts 20 mm thick sesame black granite with the length and width of 200 mm and 50 mm respectively.
CN202121953089.5U 2021-08-19 2021-08-19 Landscape anti-sedimentation structure convenient to construct Active CN215926518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121953089.5U CN215926518U (en) 2021-08-19 2021-08-19 Landscape anti-sedimentation structure convenient to construct

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121953089.5U CN215926518U (en) 2021-08-19 2021-08-19 Landscape anti-sedimentation structure convenient to construct

Publications (1)

Publication Number Publication Date
CN215926518U true CN215926518U (en) 2022-03-01

Family

ID=80423696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121953089.5U Active CN215926518U (en) 2021-08-19 2021-08-19 Landscape anti-sedimentation structure convenient to construct

Country Status (1)

Country Link
CN (1) CN215926518U (en)

Similar Documents

Publication Publication Date Title
CN106049217B (en) Fabricated permeable paving method and block and paving structure
CN111576121B (en) Floor tile paving structure and floor tile paving construction process
CN102433819A (en) Semi-flexible structure permeable street and pavement method thereof
US8667752B2 (en) Interlocking construction systems and methods
CN106758638A (en) A kind of city sponge brick and its construction technology
CN105040554A (en) Garden path structure and paving construction technology thereof
CN103669147A (en) Pavement method of permeable ground and permeable pavement structure paved through pavement method
CN106381796A (en) Concrete water-permeable road surface as well as paving method thereof and maintenance and restoration method thereof
CN215926518U (en) Landscape anti-sedimentation structure convenient to construct
CN206721596U (en) A kind of pavement structure of permeable road
CN211227948U (en) Prefabricated water-permeable base layer block for laying green path drift diameter
CN114687263A (en) Prefabricated assembly type roadbed widening structure and construction method
CN210857095U (en) Structure suitable for view river flood control wall material stone wainscot
CN106996063A (en) A kind of pavement structure of permeable road
CN210596864U (en) Stone paving structure capable of preventing efflorescence
CN109653055A (en) A kind of through garden road discharge structure and construction technology
CN209508747U (en) A kind of through garden road discharge structure
CN220550395U (en) Pavement structure suitable for road is built to ancient
CN211229151U (en) Concrete masonry module
CN212153467U (en) Handing-over structure of basement roof and outdoor ground basis
CN220284873U (en) Retaining wall structure
CN217399303U (en) Kiln brick pitted surface green stone plate pavement system
CN217460825U (en) Recoverable prefabricated drainage ditch for building foundation pit slope top ground drainage ditch
CN216947696U (en) Precast concrete assembled road surface layer structure suitable for transformer substation
CN106544940A (en) A kind of garden road pile foundation type spit of fland step structure and construction technology

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant