CN109653055A - A kind of through garden road discharge structure and construction technology - Google Patents
A kind of through garden road discharge structure and construction technology Download PDFInfo
- Publication number
- CN109653055A CN109653055A CN201910023789.5A CN201910023789A CN109653055A CN 109653055 A CN109653055 A CN 109653055A CN 201910023789 A CN201910023789 A CN 201910023789A CN 109653055 A CN109653055 A CN 109653055A
- Authority
- CN
- China
- Prior art keywords
- road
- garden
- garden road
- way face
- discharge structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/225—Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/22—Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
- E01C11/224—Surface drainage of streets
- E01C11/227—Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C15/00—Pavings specially adapted for footpaths, sidewalks or cycle tracks
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C5/00—Pavings made of prefabricated single units
- E01C5/04—Pavings made of prefabricated single units made of bricks
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of through garden road discharge structure and construction technologies, including garden road floor base, blotter, concrete cushion, binder course, the four-way face brick floor set gradually from top to bottom, and the road tooth brick positioned at two sides;The width of the four-way face brick layer is less than the width of binder course, and two gutters are respectively formed between the road tooth brick of two sides.Intermediate garden road floor base, blotter, concrete cushion and binder course are the bases of firm road integral strength, and two dypass tooth bricks protect firm road tooth, and form gutter between four-way face brick layer.Through garden road discharge structure of the invention is laid with using through four-way face brick, and stabilized structure is conducive to draining, and used pavement construction is easy for installation, simple process and low cost, avoids later period long term maintenance management.
Description
Technical field
The present invention relates to garden way road design field, especially a kind of through garden road discharge structure and construction technology.
Background technique
The regions such as many parks in city, square and house have a large amount of garden roads to be arranged at present, garden road in use due to
Base layer construction is emphasized to focus on aesthetic effect light industry skill, forms many landscape garden roads and using all based on traditional laying process
Shortly will appear garden paving stone cracking damage, base be collapsed upon rainy season road surface can a large amount of ponding, pedestrian can not walk in rainy season,
As maintenance will lead to gardens destruction for a long time not in time.Common garden road can become the drainage ditch of rainwater in rainy season, and pedestrian can not walk,
Long-term rain, which washes away, can also destroy garden line structure, and maintenance is inconvenient.
Summary of the invention
The technical problem to be solved by the present invention is in view of the deficiencies of the prior art, provide a kind of stabilized structure, be conducive to row
The through garden road discharge structure and its construction technology of water.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is as follows:
A kind of through garden road discharge structure, including garden road floor base, the blotter, concrete set gradually from top to bottom
Bed course, binder course, four-way face brick layer, and the road tooth brick positioned at two sides;The width of the four-way face brick layer is less than binder course
Two gutters are respectively formed between width, and the road tooth brick of two sides.Intermediate garden road floor base, blotter, concrete cushion and
Binder course is the basis of firm road integral strength, and two dypass tooth bricks protect firm road tooth, and are formed between four-way face brick layer
Gutter.
Further, the garden road floor base, blotter, concrete cushion, binder course are of same size, two sides respectively with road
Tooth brick is close to;Garden road floor base, blotter, concrete cushion, binder course and the total height of four-way face brick floor are not higher than two sides
The height of road tooth brick.
Preferably, the four-way face brick layer is arranged successively by several four-way face bricks and is laid with, and is set in the four-way face brick
There are horizontal horizontal and vertical connection through-hole, the mutual pairing of connection through-hole between adjacent four-way face brick, so that whole
A four-way face brick layer connection perforation, is conducive to gardens and drains.
Preferably, the connection through-hole is cylindrical hole, conducive to the crushing resistance on garden road surface.
Preferably, the width in the gutter is 50~60mm.
The blotter laying depth is 50~80mm.
High 100~the 120mm of four-way face brick.
The present invention also provides the construction technologies of above-mentioned through garden road discharge structure, include the following steps:
Step 1: it by the first shallow rear deep sequence backfill earthwork of Garden Engineering, is tamped using tabia base, laying garden road floor base;
Step 2: using rubble padding and compacting, then uses coarse sand blind, is laid with blotter;
Step 3: casting concrete is laid with concrete cushion;
Step 4: it is laid with the binder course of aqueous cement mortar or coarse sand;
Step 5: being laid with four-way face brick layer on binder course, and the road Bing Yuan two sides laying road tooth brick forms gutter.
Preferably, in step 3, after the completion of concreting, overlay film is maintained one week.
The utility model has the advantages that
Through garden road discharge structure of the invention is laid with using through four-way face brick, and stabilized structure is conducive to draining, rainy season
Rainwater on road surface is quickly discharged by four-way face brick, and road is not easy ponding and avoids skidding convenient for walking, used pavement construction peace
Dress is convenient, and simple process and low cost avoids later period long term maintenance management.
Detailed description of the invention
The present invention is done with reference to the accompanying drawings and detailed description and is further illustrated, of the invention is above-mentioned
And/or otherwise advantage will become apparent.
Fig. 1 is the schematic diagram of the through garden road discharge structure of embodiment.
Specific embodiment
According to following embodiments, the present invention may be better understood.
Structure depicted in Figure of description, ratio, size etc., only to cooperate the revealed content of specification, with
Understand for those skilled in the art and read, be not intended to limit the invention enforceable qualifications, therefore does not have technically
Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size can be generated not influencing the present invention
Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents can cover.Meanwhile
Cited such as "upper", "lower", "front", "rear", " centre " term in this specification are merely convenient to being illustrated for narration, and
It is non-that to limit the scope of the invention, relativeness is altered or modified, under the content of no substantial changes in technology, when
Also it is considered as the enforceable scope of the present invention.
As shown in Figure 1, the through garden road discharge structure includes garden road floor base 1, the rubble pad set gradually from top to bottom
Layer 2, concrete cushion 3, binder course 4, four-way face brick layer 7, and the road tooth brick 8 positioned at two sides;The width of the four-way face brick layer 7
Degree is less than the width of binder course 4, and two gutters 5 are respectively formed between the road tooth brick 8 of two sides.
Garden road floor base 1 is tamped using tabia base;Blotter 2 is one of bed course of 1 or more garden road floor base, is garden road knot
Structure basal layer is built up using aqueous cement concrete, sandstone, gravel, slabstone, industrial residue etc., and then coarse sand is filled compacting
To 50~80 millimeters of thickness;Concrete cushion 3 is formed using concreting, is that garden line structure consolidates layer;Binder course 4 is four
Coarse sand or cement mortar can be used for combining, levelling, draining in articulamentum between logical face brick layer 7 and concrete cushion 3
In conjunction with four-way face brick;The top layer on garden road is arranged in four-way face brick floor 7, is the structure sheaf that direct people's foot and atmosphere are in contact,
It is arranged successively to be laid with into interior by several high 100mm four-way face bricks and is connected to through-hole 6 equipped with horizontal horizontal and vertical cylindrical type,
The mutual pairing of connection through-hole 6 between adjacent four-way face brick, so that entire four-way face brick layer connection perforation, is conducive to gardens
Draining;The surface of four-way face brick should have good flatness and skid resistance, can be used precast concrete, permeable bread brick,
Lithotome, high-intensity plastic product or floor tile etc.;Road tooth brick 8 consolidates road tooth, and formed between four-way face brick layer it is wide by 50~
The gutter 5 of 60mm;Garden road floor base 1, blotter 2, concrete cushion 3, binder course 4 are of same size, two sides respectively with road tooth
Brick 8 is close to;Garden road floor base 1, blotter 2, concrete cushion 3, binder course 4 and the total height and road tooth brick 8 of four-way face brick floor 7
Height it is equal.
Above-mentioned through garden road discharge structure is completed using following construction technology:
(1), according to design working drawing, in place piling location, by drawing unwrapping wire, guarantee in advance by drawing according to specific needs
Garden road boundary of works area;
(2), according to construction drawing earth excavation, smooth garden road place is laid with garden road floor base 1, deep sequence, backfill after first shallow
Side is tamped using tabia base;
(3), according to the smooth garden road floor base of construction drawing, it is laid with blotter 2, using containing 3 centimetres of rubble padding and compactings to 50
The thickness of millimeter, then with a small amount of coarse sand blind;
(4), it is laid with concrete cushion 3, casting concrete enhances basic crushing resistance;
(5), after the completion of concrete cushion 3, overlay film is maintained one week;
(6), aqueous cement mortar or coarse sand binder course 4 are laid with.
(7), four-way face brick layer 7 is laid on binder course 4,4 width two sides of binder course stay 50 millimeters to be used as gutter 5;
(8), it is laid with the road tooth brick 8 of two sides;
(9), garden road four-way face brick floor, gutter, garden road seam, maintenance maintenance one week are cleaned.
The present invention provides a kind of through garden road discharge structure and the thinkings and method of construction technology, implement the skill
There are many method and approach of art scheme, the above is only a preferred embodiment of the present invention, it is noted that this technology is led
For the those of ordinary skill in domain, various improvements and modifications may be made without departing from the principle of the present invention, these
Improvements and modifications also should be regarded as protection scope of the present invention.The available prior art of each component part being not known in the present embodiment
It is realized.
Claims (9)
1. a kind of through garden road discharge structure, which is characterized in that including the garden road floor base (1), broken set gradually from top to bottom
Stone bed course (2), concrete cushion (3), binder course (4), four-way face brick layer (7), and the road tooth brick (8) positioned at two sides;It is described
The width of four-way face brick layer (7) is less than the width of binder course (4), and two drainings are respectively formed between the road tooth brick (8) of two sides
Ditch (5).
2. through garden road discharge structure according to claim 1, which is characterized in that the garden road floor base (1), rubble pad
Layer (2), concrete cushion (3), binder course (4) are of same size, and two sides are close to road tooth brick (8) respectively;It is garden road floor base (1), broken
Stone bed course (2), concrete cushion (3), binder course (4) and the total height of four-way face brick floor (7) are not higher than the road tooth brick (8) of two sides
Height.
3. through garden road discharge structure according to claim 1 or 2, which is characterized in that the four-way face brick layer (7) by
Several four-way face bricks, which are arranged successively, to be laid with, and horizontal horizontal and vertical connection through-hole (6) is equipped in the four-way face brick,
Connection through-hole (6) mutual pairing between adjacent four-way face brick.
4. through garden road discharge structure according to claim 3, which is characterized in that the connection through-hole (6) is cylinder
Shape through-hole.
5. through garden road discharge structure according to claim 1, which is characterized in that the width of the gutter (5) is
50~60mm.
6. through garden road discharge structure according to claim 1, which is characterized in that the blotter (2) is laid with thick
Degree is 50~80mm.
7. through garden road discharge structure according to claim 3, which is characterized in that the four-way face brick is high by 100~
120mm。
8. the construction technology of through garden road discharge structure described in claim 1, which comprises the steps of:
Step 1: it by the first shallow rear deep sequence backfill earthwork of Garden Engineering, is tamped using tabia base, laying garden road floor base (1);
Step 2: using rubble padding and compacting, then uses coarse sand blind, is laid with blotter (2);
Step 3: casting concrete is laid with concrete cushion (3);
Step 4: it is laid with the binder course (4) of aqueous cement mortar or coarse sand;
Step 5: being laid with four-way face brick layer (7) on binder course (4), and the road Bing Yuan two sides laying road tooth brick (8) forms gutter
(5)。
9. the construction technology of through garden road discharge structure according to claim 8, which is characterized in that in step 3, mix
After the completion of solidifying soil pours, overlay film is maintained one week.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910023789.5A CN109653055A (en) | 2019-01-10 | 2019-01-10 | A kind of through garden road discharge structure and construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910023789.5A CN109653055A (en) | 2019-01-10 | 2019-01-10 | A kind of through garden road discharge structure and construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109653055A true CN109653055A (en) | 2019-04-19 |
Family
ID=66119789
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910023789.5A Withdrawn CN109653055A (en) | 2019-01-10 | 2019-01-10 | A kind of through garden road discharge structure and construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109653055A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668323A (en) * | 2021-07-23 | 2021-11-19 | 上海宝冶集团有限公司 | Construction method for precast concrete antiskid plate surface with drainage system |
-
2019
- 2019-01-10 CN CN201910023789.5A patent/CN109653055A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113668323A (en) * | 2021-07-23 | 2021-11-19 | 上海宝冶集团有限公司 | Construction method for precast concrete antiskid plate surface with drainage system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758638A (en) | A kind of city sponge brick and its construction technology | |
CN204125814U (en) | A kind of garden path structure | |
CN206736675U (en) | A kind of cell pavement | |
CN111778806A (en) | Paving process for sidewalk floor tiles and floor tile structure thereof | |
CN215210279U (en) | Modular permeable pavement system | |
CN105484132B (en) | A kind of construction method that novel water permeable pavement is mated formation | |
CN202627166U (en) | Novel water-discharging ecological zone for town road | |
CN109653055A (en) | A kind of through garden road discharge structure and construction technology | |
CN209508747U (en) | A kind of through garden road discharge structure | |
CN206721596U (en) | A kind of pavement structure of permeable road | |
CN206396570U (en) | A kind of garden road pile foundation type spit of fland walks structure | |
CN214573096U (en) | Pavement paving structure with high water permeability | |
CN106544940B (en) | A kind of garden road pile foundation type spit of fland step structure and construction technology | |
CN105474942B (en) | The construction method on ground parking lawn | |
CN106996063A (en) | A kind of pavement structure of permeable road | |
CN104195918A (en) | Method for paving face bricks on pavement of pedestrian walkway | |
CN210596864U (en) | Stone paving structure capable of preventing efflorescence | |
CN107386053A (en) | A kind of construction method on pavement | |
CN209924091U (en) | Rectangular side ditch structure for reducing roadbed water level and discharging road surface | |
CN209010890U (en) | A kind of triangular concrete gutter structure for highway drainage | |
CN208777319U (en) | A kind of mound field structure kept suitable for soil quality | |
CN105220596A (en) | A kind of brick construction of seepage pavement method | |
CN207047996U (en) | A kind of terrace pavement system of ecological luminous stone | |
CN206015462U (en) | A kind of hidden-type yard drain | |
CN110700034A (en) | Novel distributed permeable pavement and paving method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190419 |