CN215830000U - Arc-shaped water pool formwork supporting system of bamboo plywood - Google Patents

Arc-shaped water pool formwork supporting system of bamboo plywood Download PDF

Info

Publication number
CN215830000U
CN215830000U CN202122752341.2U CN202122752341U CN215830000U CN 215830000 U CN215830000 U CN 215830000U CN 202122752341 U CN202122752341 U CN 202122752341U CN 215830000 U CN215830000 U CN 215830000U
Authority
CN
China
Prior art keywords
arc
steel pipe
bamboo
template
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122752341.2U
Other languages
Chinese (zh)
Inventor
李振宇
赵星星
冯成武
刘锋
刘骁毅
于有
马越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jingyi City Science And Industry Co ltd
Original Assignee
Beijing Jingyi City Science And Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingyi City Science And Industry Co ltd filed Critical Beijing Jingyi City Science And Industry Co ltd
Priority to CN202122752341.2U priority Critical patent/CN215830000U/en
Application granted granted Critical
Publication of CN215830000U publication Critical patent/CN215830000U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses an arc-shaped pool formwork supporting system of a bamboo plywood, which is characterized by comprising an arc-shaped steel pipe (1); the arc-shaped steel pipe (1) is fixedly connected to the bamboo glue template (6) through the split water stop bolt rod (2); the bamboo glue template (6) is fixedly connected with the scaffold; the split water bolt rod (2) comprises a horn head (3), a bolt rod (4) penetrating through the horn head (3) and a reinforcing member (5); the arc-shaped steel pipe (1) and the bamboo glue template (6) are fixedly connected through the screw hole on the reinforcing member (5). The utility model not only effectively controls the construction cost, but also has simple formwork operation, and can perfectly meet the requirements of the appearance, the impermeability and the like of the arc-shaped fair-faced concrete wall.

Description

Arc-shaped water pool formwork supporting system of bamboo plywood
Technical Field
The utility model relates to a building supporting template, in particular to an arc-shaped pool template supporting system of a bamboo plywood.
Background
With the rapid development of the building industry, the appearance of buildings is diversified, such as cylindrical structures, arc-shaped walls, circular sedimentation tanks and the like. The requirements for the template to ensure the appearance of the structure are high. Although the use of the sizing die can well satisfy the structural appearance, the cost of the building is increased, and the turnover frequency is limited.
The quality requirements of the construction of the arc-shaped bare concrete wall are as follows: the round pool requires a watertight fair-faced concrete structure, and the characteristics of the surface of the constructed template include flatness, smoothness, abutted seams, holes, lines, decorative patterns and various pollutants are easily rubbed on the concrete surface. Therefore, the utility model improves and designs the problems, and according to the facing requirement and the quality requirement of the fair-faced concrete, the fair-faced concrete template pays more attention to template type selection, template blocking, panel segmentation, arrangement of split bolts and template surface flatness.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an arc-shaped water pool formwork supporting system of a bamboo plywood, which improves an arc-shaped water pool formwork system, overcomes the defects of the traditional formwork system in order to meet the structural requirements of the fair-faced concrete, ensures that the formwork is light and convenient and is easy to assemble, saves the cost, and ensures the impermeability and the appearance of the concrete.
The purpose of the utility model is realized by the following technical scheme:
an arc-shaped water pool template supporting system of a bamboo plywood comprises an arc-shaped steel pipe; the arc-shaped steel pipe is fixedly connected to the bamboo glue template through a split water stop bolt rod; the bamboo glue template is fixedly connected with the scaffold; the supporting system is fixedly connected to a bottom plate of the inner wall of the water pool; an indwelling reinforcing steel bar head is arranged on the bottom plate of the inner wall of the water tank; the indwelling steel bar head is used for fixing the inclined support; the diagonal braces are used for diagonally bracing the bamboo glue template; the split water bolt rod comprises a horn head, a bolt rod penetrating through the horn head and a reinforcing member; the arc-shaped steel pipe and the bamboo glue template are fixedly connected through the screw hole in the reinforcing member.
The scaffold comprises a double-row inner scaffold and a double-row outer scaffold.
The arc-shaped steel pipe comprises an upper inner arc-shaped steel pipe and a lower inner arc-shaped steel pipe.
The arc-shaped steel pipe comprises an upper outer arc-shaped steel pipe and a lower outer arc-shaped steel pipe.
A vertical steel pipe is fixedly connected between the bamboo glue template and the counter-pulling water-stopping bolt rod through a penetrating bolt rod; the contact surface of the bamboo glue template and the vertically placed steel pipe is a line; therefore, the vertical joints between the bamboo glue templates and the vertical steel pipes are provided with vertical square wood.
The thickness of the vertically placed square timber is consistent and is 1-2 mm larger than the outer diameter of the steel pipe.
The holes of the bolts of the split water bolt rods and the holes on the bamboo glue template are distributed in a linear mode; the aperture of the bamboo glue template is 2-3mm larger than the diameter of the bolt rod.
The horizontal outer edge line of the upper outer arc-shaped steel pipe and the elastic line of the bottom plate of the inner wall of the water pool are in the same horizontal position and are used for accurately fixing the uppermost outer arc-shaped steel pipe; the number of the arc-shaped steel pipes fixed on the bamboo glue template adopts a thin row mode, and the number of the arc-shaped steel pipes is 1-2 for each layer of the bamboo glue template.
The tie bolt rod length L is the construction wall thickness-single flare head length.
Treating the horn head outer layer release agent with industrial wax and diesel oil; the horn head is sealed by using Portland cement and acrylic latex in a semi-dry mode.
Through the technical scheme, the utility model has the following technical advantages:
1. the template and the scaffold have strong integrity, the operation is simple, and the working procedures of the key control part are few, so the construction safety and the quality are easy to be ensured, and the construction period is also reduced. According to the construction test, no formwork runs on the structure, and the appearance of the wall is neat.
2. Not only can effectively control each index, but also has outstanding economical efficiency and saves material, mechanical cost and labor cost. The use of wood is reduced, and the cost of transportation, storage, preservation and the like of the wood is also reduced. Nails are hardly used for holding the square wood bamboo plywood in the construction, so that the service life of the bamboo plywood is prolonged. The technical operation is simple, the quality requirement of workers is not high, and the expenditure of labor cost is greatly reduced.
3. The machine pipe bender with controllable radian is used for manufacturing the arc-shaped steel pipe with required radian so as to ensure the structural radian of the arc-shaped water pool. The steel pipe requires a uniform radian and a smooth and springless appearance.
4. Standard steel tubes 48 x 3 were used instead of vertical square timber.
5. The split water-stop bolt rod with the horn head is used, so that the template can be conveniently disassembled and assembled, no pull rod is broken after the template is disassembled, the attractiveness of the arc-shaped wall is guaranteed, the horn head is convenient to disassemble, and the split water-stop bolt rod can be recycled.
6. The template system has small requirement on the template, does not need to use a special-shaped template, can meet the requirement by using the bamboo plywood, and can achieve no damage to the template when the template is disassembled and assembled, thereby enabling the template to be used for a plurality of times.
Drawings
FIG. 1 is a schematic view of the inner side of an arc-shaped pool wall form
FIG. 2 is a sectional view of an arc-shaped pool wall formwork
FIG. 3 is a schematic diagram of a stencil punching position structure
FIG. 4 is a schematic view of a supporting member
Numbering in the figures: 1-arc steel pipe, 2-split water stop bolt bar, 3-horn head, 4-bolt bar, 5-reinforcement member, 6-bamboo glue template, 7-double-row inner scaffold, 8-double-row outer scaffold, 9-upper portion inner arc steel pipe, 10-lower portion inner arc steel pipe,
11-upper outer arc steel pipe, 12-lower outer arc steel pipe, 13-inclined strut, 14-remaining reinforcing steel bar head, 15-square wood vertically placed on inner wall of template, 16-bottom plate of inner wall of water pool 17-vertical steel pipe
Detailed Description
The arc-shaped pool formwork supporting system of the bamboo plywood shown in the figures 1, 2, 3 and 4 comprises an arc-shaped steel pipe 1; the arc-shaped steel pipe is fixedly connected to the bamboo glue template 6 through the split water stop bolt rod 2; the bamboo glue template 6 is fixedly connected with the scaffold; the support system is fixedly connected to a bottom plate 16 on the inner wall of the water pool; a reserved reinforcing steel bar head 14 is arranged on the bottom plate of the inner wall of the water tank; the indwelling reinforcing steel bar head is used for fixing the inclined strut 13; the diagonal braces are used for diagonally bracing the bamboo glue template 6; the split water bolt rod comprises a horn head 3, a bolt rod 4 penetrating through the horn head 3 and a reinforcing member 5; the arc-shaped steel pipe 1 and the bamboo glue template 6 are fixedly connected through the screw holes on the reinforcing member 5.
The implementation steps are as follows:
designing a bare concrete template:
1) the design is deepened to the clear water concrete engineering comprehensively before the template design, properly solves the key problem that the veneer effect is influenced if: open joints, cicada joints, split bolt holes, construction joints, post-cast strip and the like.
2) Selecting a template system: selecting a template system which can meet the appearance quality requirement of the fair-faced concrete and has enough strength, rigidity and stability; the template system requires tight splicing, accurate specification and size, is convenient to assemble and disassemble, and can ensure the requirement of turnover use times.
3) Template blocking principle: in the allowable range of the hoisting load, the blocks are designed according to the distribution of cicada seams and open seams, and the forming, the integration, the modulization and the generalization of the blocks are considered.
4) Panel segmentation principle: the cicada seams and the open seams of the template are divided according to the positions, and the horizontal intersection and the vertical perpendicularity of the cicada seams and the open seams must be ensured.
5) Arranging split bolt holes: the decorative effect of regularity and symmetry should be achieved, and the stress requirement should be met.
6) And (3) node processing: and reasonably designing template nodes according to engineering design requirements and engineering characteristics.
Preparing materials:
(1) arc steel pipe 1 bent to corresponding radian
(2) Cutting the split bolt bar 2, length L being wall thickness-single horn head length
(3) Assembling the horn head 3 and the bolt rod 4, and treating the horn head by using an isolating agent
(4) The bamboo glue template 6 is perforated according to the designed position, and the aperture is 2-3mm larger than the diameter of the bolt rod 4.
The construction process flow comprises the following steps:
(1) popping an outer sideline of an arc-shaped steel pipe on the surface of the bottom plate 16 of the inner wall of the structure pool;
(2) building double rows of inner scaffold frames 7 and double rows of outer scaffold frames 8;
(3) using a hammer ball for correction, and fixing the arc-shaped steel pipe 9 in the uppermost layer;
(4) fixing the lower arc-shaped steel pipe 10 according to the suspension wire of the arc-shaped steel pipe 9 at the uppermost layer, and thinly discharging;
(5) placing an inner membrane bamboo glue template of the bamboo glue template 6; the outer membrane bamboo glue template is arranged at the other end of the split water-stop bolt rod;
(6) the vertical steel pipes 17 are placed through split bolts with horn heads at intervals of 15 cm; and the inner arc steel pipe 9 is encrypted according to the position of the template hole;
(7) standing an outer bamboo glue template 6;
(8) vertically placing the outer vertical steel pipes 17 at intervals of 15 cm;
(9) an outer arc steel pipe 9 is added and an outer cap of the outer opposite pulling water bolt rod 2 is fastened.
The construction method and the key points are as follows:
(1) the advanced calculation is needed before the snapping line of the surface of the bottom plate of the structure, and the radius of the structure is as follows:
r=R-δ-Φ
r: radius of elastic thread
R is radius of inner wall of the tank
Phi: the diameter of the vertically placed steel pipe is 48mm
δ: template thickness (12-18mm)
The line must be rigorously rechecked. Since both the radius and arc of the wall are controlled by this line.
(2) The system has good template strength, rigidity and stability, but the inclined struts 13 are required to be added to ensure the integral stability and perpendicularity of the template during concrete pouring, and the reinforcing steel bar heads 14 are preferably reserved at corresponding positions during bottom plate pouring to reinforce the inclined struts 13. Since the inner scaffolding 7 is required to fix the uppermost arc-shaped steel pipe 9, the specification requirements are strictly fulfilled when erecting the scaffold.
(3) The arc-shaped steel pipe 9 is erected on the template, and the arc-shaped steel pipe is mechanically bent by using a pipe bending machine, so that the radian of the mechanical bent pipe is accurate, the uniform speed can be ensured during bending, and the consistency can be ensured after a small amount of backfill is carried out after the steel pipe is bent. The use of hammer ball correction to fix the uppermost inner arc steel pipe 9 is a key step in technical control in construction operation. The horizontal outer side line of the arc-shaped steel pipe 9 and the elastic line of the inner wall plate 16 of the bottom water pool are required to be at the same horizontal position.
(4) The quantity of rare row arc steel pipe 9 should have 1 ~ 2 for every layer of bamboo glued membrane 6, should transversely put when bamboo glued membrane 6 is assembled, and its advantage has two: firstly, the bamboo glue template has certain rigidity, when the bamboo glue template is transversely placed, the arc length of a single template is longer, and the structural size and the radian are easy to control. ② the usage amount of the square timber is reduced. When the steel pipe 17 is vertically placed on the inner mold, the theoretical contact surface of the bamboo glue template and the vertical steel pipe is a line, so that the vertical joint of the template must use a square method, the thickness of all used vertical square wood is consistent and is preferably 1-2 mm larger than the outer diameter of the steel pipe, and in order to prevent the bamboo glue mold from being embedded into the concrete, the square wood placed on the inner wall is preferably dense and is generally made of 5 multiplied by 5cm square wood. When the arc steel pipe 9 is encrypted, the joints are staggered by 25%. The vertical steel pipes 9 can be spliced, and the length of the square wood is not limited.
(5) And (3) carrying out treatment of an isolating agent on the pre-embedded horn head 3 of the pull water bolt 2 before installation so as to facilitate the dismantling of the horn head 3. According to multiple experiments in construction, industrial wax is preferably mixed with diesel oil to be melted, and the horn head is dipped to form a layer of isolating film on the surface of the horn head. The plugging of the horn hole is carried out by mixing the concrete with the portland cement with the same label and the acrylic latex, stirring to a semi-dry state, compacting into the inner surface of the hole, and leveling.
The arc-shaped water pool formwork supporting system of the bamboo plywood not only effectively controls the building cost, but also is simple in formwork supporting operation, and can perfectly meet the requirements of the appearance, the impermeability and the like of an arc-shaped fair-faced concrete wall.

Claims (9)

1. An arc pool formwork supporting system of a bamboo plywood is characterized by comprising an arc steel pipe (1); the arc-shaped steel pipe (1) is fixedly connected to the bamboo glue template (6) through the split water stop bolt rod (2); the bamboo glue template (6) is fixedly connected with the scaffold; the supporting system is fixedly connected to a bottom plate (16) of the inner wall of the pool; the bottom plate (16) of the inner wall of the water tank is provided with an indwelling reinforcing steel bar head (14); the indwelling reinforcing steel bar head (14) is used for fixing the inclined support (13); the diagonal supports (13) are used for diagonally supporting the bamboo glue template (6); the split water bolt rod (2) comprises a horn head (3), a bolt rod (4) penetrating through the horn head (3) and a reinforcing member (5); the arc-shaped steel pipe (1) and the bamboo glue template (6) are fixedly connected through the screw hole on the reinforcing member (5).
2. The bamboo plywood arc pool formwork support system of claim 1, wherein said scaffolding comprises double rows of inner scaffolding (7) and double rows of outer scaffolding (8).
3. The bamboo plywood arc pool formwork support system according to claim 1, wherein the arc steel pipe (1) comprises an upper inner arc steel pipe (9) and a lower inner arc steel pipe (10).
4. The bamboo plywood arc pool formwork support system according to claim 1, wherein the arc steel pipes comprise an upper outer arc steel pipe (11) and a lower outer arc steel pipe (12).
5. The bamboo plywood arc pool formwork support system according to claim 1, wherein a vertical steel pipe (17) is fixedly connected between the bamboo plywood formwork (6) and the counter-pull water bolt rod (2) through a penetrating bolt rod (4); the contact surface of the bamboo glue template (6) and the vertical steel pipe (17) is a line; therefore, the vertical joint between the bamboo glue template (6) and the vertical steel pipe (17) is provided with vertical square wood (15).
6. The bamboo plywood arc-shaped pool formwork supporting system is characterized in that the thicknesses of the vertically placed square timbers are consistent and are 1-2 mm larger than the outer diameter of the steel pipe.
7. The bamboo plywood arc pool formwork support system according to claim 1, wherein holes of bolts for pulling the water bolt rods and holes on the bamboo plywood formwork (6) are distributed in a linear mode; the aperture of the bamboo glue template (6) is 2-3mm larger than the diameter of the bolt rod.
8. The bamboo plywood arc pool formwork support system according to claim 3, wherein the horizontal outer edge line of the upper inner arc-shaped steel pipe (9) and the elastic line of the pool inner wall bottom plate (16) are in the same horizontal position and used for accurately fixing the uppermost outer arc-shaped steel pipe (11); the number of the arc-shaped steel pipes fixed on the bamboo glue template adopts a thin row mode, and the number of the arc-shaped steel pipes is 1-2 for each layer of the bamboo glue template.
9. The bamboo plywood arc pool formwork support system of claim 1, wherein the horn head outer layer release agent industrial wax is processed with diesel oil; the horn head is sealed by using Portland cement and acrylic latex in a semi-dry mode.
CN202122752341.2U 2021-11-11 2021-11-11 Arc-shaped water pool formwork supporting system of bamboo plywood Active CN215830000U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122752341.2U CN215830000U (en) 2021-11-11 2021-11-11 Arc-shaped water pool formwork supporting system of bamboo plywood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122752341.2U CN215830000U (en) 2021-11-11 2021-11-11 Arc-shaped water pool formwork supporting system of bamboo plywood

Publications (1)

Publication Number Publication Date
CN215830000U true CN215830000U (en) 2022-02-15

Family

ID=80202967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122752341.2U Active CN215830000U (en) 2021-11-11 2021-11-11 Arc-shaped water pool formwork supporting system of bamboo plywood

Country Status (1)

Country Link
CN (1) CN215830000U (en)

Similar Documents

Publication Publication Date Title
US10837166B2 (en) Building structure and construction method for same
CN202627491U (en) Forming template for deformation joint position shear wall of high-rise building
CN105569331A (en) Simple supporting method for cylindrical concrete formwork
CN110306832B (en) Construction method for integral migration of artistic clear water wall of historical building
CN110630011A (en) Template reinforcing system for double shear walls at deformation joint and construction method thereof
CN211257811U (en) Turnover screw rod for laminated slab cast-in-place slab band
CN102704678A (en) Shaping template for shear wall in deformation joint position of high-rise building
CN210976588U (en) Template reinforcing system for double shear walls at deformation joint
CN110284729B (en) Historical building wall block type cutting and dismantling method
CN111395754A (en) Method for implementing formwork supporting system
CN114482375A (en) Integral joint type reinforced concrete laminated slab and construction method
CN215830000U (en) Arc-shaped water pool formwork supporting system of bamboo plywood
CN211974047U (en) Multi-process integrated assembling-free light wall for building assembly
CN110847598A (en) Thin-wall hollow pier diaphragm plate bottom formwork and construction method
CN216552610U (en) Cast-in-place area of assembled superimposed sheet hangs mould device can have enough to meet need
CN115045499A (en) Deformation joint wall formwork reinforcing method
CN212802189U (en) Assembly type disassembly-free template
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
CN211369523U (en) Template system of expansion joint shear force wall
CN113622594A (en) Construction method for constructional column without formwork
CN113323385A (en) Constructional column formwork structure of T-shaped wall of closed space and formwork supporting method thereof
CN111424883A (en) Prestressed cast-in-place clear water concrete inclined column structure and construction method thereof
CN1117202C (en) Shutterings for prefabricating reinforced concretes of beams and columns for building frame and their installation technique
CN219006422U (en) Prefabricated cushion cap template of foam concrete
CN220579832U (en) Box culvert splayed wall body formwork structure with inner supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant