CN214834809U - Template drilling-free clamp - Google Patents

Template drilling-free clamp Download PDF

Info

Publication number
CN214834809U
CN214834809U CN202022843452.XU CN202022843452U CN214834809U CN 214834809 U CN214834809 U CN 214834809U CN 202022843452 U CN202022843452 U CN 202022843452U CN 214834809 U CN214834809 U CN 214834809U
Authority
CN
China
Prior art keywords
template
clamp
anchor clamps
free
split bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022843452.XU
Other languages
Chinese (zh)
Inventor
李东胜
李琛
江少兵
田勇
孟锦
张波
张晋帼
陈生杰
赵洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202022843452.XU priority Critical patent/CN214834809U/en
Application granted granted Critical
Publication of CN214834809U publication Critical patent/CN214834809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model relates to a template exempts from tapping anchor clamps. The utility model discloses an anchor clamps and split bolt, anchor clamps are two, connect through split bolt between two anchor clamps, and the anchor clamps both sides are equipped with the otic placode, and the centre sets up the recess, sets up the round hole in the recess, and split bolt passes through round hole joining fixture. The utility model has the advantages of when reducing shear wall template construction consolidate the trompil, improve template turnover efficiency and green construction.

Description

Template drilling-free clamp
Technical Field
The utility model belongs to the technical field of the existing building templates exempts from trompil construction and specifically relates to a trompil anchor clamps are exempted from to template.
Background
In building construction, the traditional wood formwork system plays an irreplaceable role. When traditional wooden form system is under construction, the reinforcement of template often adopts the form of template drilling + split bolt, and the shaping effect of template drilling can all be influenced to location inaccuracy, operation workman's proficiency, and this kind of method very big increase the waste of material, be unfavorable for engineering cost's control, directly influence the usable number of times of template and the impression quality after concrete placement is accomplished.
SUMMERY OF THE UTILITY MODEL
In order to solve the above-mentioned technical problem who exists among the background art, the utility model provides a template that consolidates the trompil when reducing shear wall template construction, improves template turnover efficiency, green construction exempts from trompil anchor clamps.
The technical solution of the utility model is that: the utility model relates to a template exempts from tapping anchor clamps, its special character lies in: the template drilling-free clamp comprises two clamps and split bolts, wherein the two clamps are connected through the split bolts.
Preferably, the two sides of the clamp are provided with the lug plates, the middle of the clamp is provided with a groove, a round hole is formed in the groove, and the split bolt is connected with the clamp through the round hole.
Preferably, the template drilling-free clamp further comprises a main keel, wherein the main keel is transversely arranged on the outer side of the clamp and is fixedly connected with the clamp through a split bolt.
Preferably, the main keel is a double-square tube or a batten.
Preferably, the template is exempted from trompil anchor clamps and is still included the secondary joist, and the vertical setting of secondary joist is between two anchor clamps, through split bolt and anchor clamps fastening connection.
Preferably, the secondary joist is a square tube or a batten.
Preferably, a plurality of split bolts are uniformly distributed on the clamp.
Preferably, the basement outer wall with the pull screw phi 16 can be penetrated by the water screw.
Preferably, the clamp is made of stainless steel.
The utility model has the advantages that:
1. the installation process is simple, and the shaping is effectual.
2. The requirements of green construction are met, materials are saved in the using process, material waste is reduced, and the requirements of green construction are met.
3. After the use, the detachable and reusable mask is convenient to disassemble and use in a turnover way, and can be reused after being slightly corrected.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a schematic diagram of the template structure of the present invention.
Fig. 3 is the utility model discloses a vertical view is consolidated to anchor clamps template.
Fig. 4 is a sectional view a-a of fig. 3.
The reference numbers are as follows:
1. a clamp; 2. oppositely pulling the bolts; 3. an ear plate; 4. a groove; 5. a main keel; 6. a circular hole; 7. the secondary keel.
Detailed Description
The invention is described in further detail below with reference to the figures and the embodiments.
Referring to fig. 1-4, the utility model discloses specific embodiment's structure includes anchor clamps 1, main joist 5, secondary joist 7 and split bolt 2, and anchor clamps 1 is two, connects through split bolt 2 between two anchor clamps 1. The two sides of the clamp 1 are provided with the ear plates 3, the middle of the clamp is provided with the groove 4, the circular hole 6 is arranged in the groove 4, and the split bolt 2 is connected with the clamp 1 through the circular hole 6. The main joist 5 transversely sets up in anchor clamps 1 outside, through split bolt 2 and anchor clamps 1 fastening connection, main joist 5 is double square pipe or flitch. The vertical setting of secondary joist 7 is between two anchor clamps 1, through split bolt 2 and anchor clamps 1 fastening connection, and secondary joist 7 is square pipe or flitch. The split bolts 2 are a plurality of and are uniformly distributed on the clamp 1, the split screw rods adopt phi 16 basement outer wall wearable water stop screw rods, and the clamp 1 is made of stainless steel.
When specifically implementing, the utility model discloses an anchor clamps 1 that corrosion resistant plate processing formed places both sides plank sheathing on 1 otic placode 3 of anchor clamps, and after the template rigidity, vertical square steel pipe of placing is as secondary joist 7, transversely places twice side pipe at every way anchor clamps 1 center and is as main joist 5, and the interval is with the template width, and the enhancement is done at bottom and top. Then wear to the split bolt 2 and consolidate, the basement outer wall adopts stagnant water screw rod to be preferred.
The utility model discloses a concrete construction method as follows:
1) and (3) processing a clamp: performing template typesetting on structures such as a shear wall to be subjected to engineering and then performing clamp processing;
2) erecting a full shelf: according to the project template engineering construction scheme, a full scaffold system is erected to provide an operation platform for wall template construction;
3) assembling the template plane and installing a clamp: the templates at the two ends of the clamp 1 are horizontally placed, the clamp 1 is placed between the templates, the clamp 1 is pressed into the 15mm groove 4 reserved in the ear plate 3 of the clamp 1, and then the template outer wall surface side is temporarily reinforced by battens, so that the whole clamp is convenient to lift.
4) Hoisting the template: after the lower adjusting template is constructed, hoisting the template to ensure that the template is temporarily reinforced in place;
5) reinforcing the template: arranging the vertical secondary keels 7 at intervals of 300mm, and fixing the template with the secondary keels 7; then placing a transverse main keel 5, wherein the main keel 5 is in a double-steel-pipe or wood-square form, fastening templates on two sides after a clamp 1 penetrates through a split bolt 2, and then fixing the main keel 5, a secondary keel 7 and the templates;
6) leveling the board surface: after the template is erected, a vertical line is marked on the board surface by using an infrared laser level meter to serve as a base line, and the verticality and the flatness of the board surface are adjusted;
7) node processing, namely, because the wall surface has a corner, the corner part adopts a common reinforcing mode to carry out hole forming and reinforcing on the template; the support rods are arranged in advance in the wall body reinforcing steel bars, so that the size of the section of the wall body is ensured; according to the design requirement of a deepening drawing, a groove 4 is 15mm wide and actually 5mm more, and a sponge rubber strip is required for plugging;
8) removing the template: and the template dismounting sequence is strictly carried out according to the template construction scheme, namely supporting first and dismounting later.
And strictly forbidding violent disassembly when the clamp is disassembled.
The above is only the specific embodiments of the present disclosure, but the scope of the present disclosure is not limited thereto, and the scope of the present disclosure should be subject to the protection scope of the claims.

Claims (8)

1. The utility model provides a template drilling-free anchor clamps which characterized in that: this template exempts from trompil anchor clamps includes anchor clamps and split bolt, anchor clamps are two, connect through split bolt between two anchor clamps, the anchor clamps both sides are equipped with the otic placode, and the centre sets up the recess, set up the round hole in the recess, split bolt passes through round hole joining fixture.
2. The template aperture-free clamp of claim 1, wherein: the template drilling-free clamp further comprises a main keel, wherein the main keel is transversely arranged on the outer side of the clamp and is fixedly connected with the clamp through split bolts.
3. The template no-tapping clamp of claim 2, wherein: the main keel is a double-square tube or a batten.
4. The template no-tapping clamp of claim 3, wherein: the template drilling-free fixture further comprises a secondary keel, wherein the secondary keel is vertically arranged between the two fixtures and is fixedly connected with the fixtures through split bolts.
5. The template no-tapping clamp of claim 4, wherein: the secondary keel is a square tube or a batten.
6. The template aperture-free clamp of claim 5, wherein: the split bolts are a plurality of and are uniformly distributed on the clamp.
7. The template punch-free fixture of any one of claims 1 to 6, wherein: the opposite-pulling screw rod is a phi 16 basement outer wall capable of penetrating through the water stop screw rod.
8. The template no-tapping clamp of claim 7, wherein: the clamp is made of stainless steel.
CN202022843452.XU 2020-12-02 2020-12-02 Template drilling-free clamp Active CN214834809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022843452.XU CN214834809U (en) 2020-12-02 2020-12-02 Template drilling-free clamp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022843452.XU CN214834809U (en) 2020-12-02 2020-12-02 Template drilling-free clamp

Publications (1)

Publication Number Publication Date
CN214834809U true CN214834809U (en) 2021-11-23

Family

ID=78802046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022843452.XU Active CN214834809U (en) 2020-12-02 2020-12-02 Template drilling-free clamp

Country Status (1)

Country Link
CN (1) CN214834809U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443159A (en) * 2020-12-02 2021-03-05 中建三局集团有限公司 Template tapping-free clamp and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443159A (en) * 2020-12-02 2021-03-05 中建三局集团有限公司 Template tapping-free clamp and construction method thereof

Similar Documents

Publication Publication Date Title
CN106320691A (en) Aluminum-wood formwork construction method
CN111395754B (en) Method for implementing formwork supporting system
CN210105298U (en) Deformation joint department wall body formwork system
CN110029813B (en) Wall formwork construction method at deformation joint
CN214834809U (en) Template drilling-free clamp
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN213682129U (en) Deep foundation pit unilateral die carrier
CN219773324U (en) Concrete beam plate structure
CN110118014B (en) Exterior wall template system free of exterior scaffold and construction method thereof
CN209907936U (en) Integrated template system of cast-in-situ overhanging window board with secondary structure
CN211369529U (en) A template for expansion joint department
CN212773459U (en) Wall pouring template applied to expansion joint side
CN112443159A (en) Template tapping-free clamp and construction method thereof
CN210858015U (en) Supporting device for adjusting verticality of single-sided template
CN211369523U (en) Template system of expansion joint shear force wall
CN111535578A (en) Mounting process of template of cast-in-place structure
CN212002234U (en) Template is used in construction of water pump room wall
CN109138407A (en) Skyscraper early tears aluminium alloy inset stencil plate form bracing system construction technology open
CN220868784U (en) Template's no protruding coupling mechanism
CN212336729U (en) Formwork supporting system
CN218205698U (en) A formwork structure for high-rise building constructional column
CN215670176U (en) Detachable outer wall waterproof deformation joint construction structures
CN218668553U (en) Be used for anti-reinforced (rfd) structure of bank template of concrete
CN214329859U (en) Connecting structure of vertical wood formwork and vertical aluminum formwork
CN219864044U (en) Assembled template of sintering main building concrete column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant