CN215795839U - Frame is put with prefabricated building materials to building engineering - Google Patents

Frame is put with prefabricated building materials to building engineering Download PDF

Info

Publication number
CN215795839U
CN215795839U CN202121938943.0U CN202121938943U CN215795839U CN 215795839 U CN215795839 U CN 215795839U CN 202121938943 U CN202121938943 U CN 202121938943U CN 215795839 U CN215795839 U CN 215795839U
Authority
CN
China
Prior art keywords
fixedly connected
frame
bearing
prefabricated building
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121938943.0U
Other languages
Chinese (zh)
Inventor
舒历梅
李梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202121938943.0U priority Critical patent/CN215795839U/en
Application granted granted Critical
Publication of CN215795839U publication Critical patent/CN215795839U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a prefabricated building material placing frame for building engineering, which comprises two bearing seats, wherein two bearing seats are respectively connected with a protection mechanism, each protection mechanism comprises a soft rubber pad fixedly connected to the bearing seat, the upper end of each soft rubber pad is fixedly connected with a non-slip pad, a plurality of limiting mechanisms are respectively arranged on the two bearing seats, the protection mechanism is connected with two bearing mechanisms, the two bearing mechanisms are respectively connected with a moving mechanism, the two moving mechanisms are respectively connected with an adjusting mechanism, and the two adjusting mechanisms are respectively connected with a fixing mechanism. The stair building material can be gradually laid down, so that the stair building material can be conveniently lifted by constructors, the damage to other stair building materials is avoided, the work of the constructors is further facilitated, and the work efficiency of the constructors is indirectly improved.

Description

Frame is put with prefabricated building materials to building engineering
Technical Field
The utility model relates to the technical field of placing devices, in particular to a prefabricated building material placing frame for constructional engineering.
Background
With the continuous development of economy and the continuous rise of the scientific and technical level, the use frequency and frequency of prefabricated building materials in the building industry are gradually increased, and the prefabricated building materials are processed and manufactured in factories after a large amount of field operation work in the traditional construction mode is transferred to the factories, and then are transported to a building construction site to be assembled and installed on the site in a reliable connection mode.
In actual conditions, in the prefabricated building construction place, the type and the quantity of prefabricated building materials are all very much, and current stair prefabricated building materials are when placing, generally place on the billet, when needs use, constructor adopts the mode of handling to assemble prefabricated stair, but at this construction in-process, because prefabricated stair all are vertical to be placed, and stair are in the horizontality at the in-process of assembly, stair prefabricated building materials weight is heavier simultaneously, and the volume is longer, therefore constructor is inconvenient to place stair prefabricated building materials level, so at the in-process of handling, very easily lead to stair prefabricated building materials to touch other stair prefabricated building materials, further lead to its damage, thereby influenced constructor's normal construction.
Therefore, the prefabricated building material placing frame for the building engineering is provided to solve the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the defects in the prior art and provides a prefabricated building material placing frame for construction engineering.
In order to achieve the purpose, the utility model adopts the following technical scheme:
the utility model provides a frame is put with prefabricated building materials to building engineering, includes two and bears the seat, two bear and all be connected with protection machanism on the seat, two bear and all be equipped with a plurality of stop gear on the seat, protection machanism is last to be connected with two and bears the mechanism, two bear and all be connected with moving mechanism, two on the mechanism all be connected with adjustment mechanism, two on the adjustment mechanism all be connected with fixed establishment.
Preferably, the protection mechanism comprises a soft rubber pad fixedly connected to the bearing seat, the upper end of the soft rubber pad is fixedly connected with an anti-slip pad, and one of the bearing seats is fixedly connected with a plurality of connecting plates connected with the other bearing seat.
Preferably, the limiting mechanism comprises a limiting column arranged on the bearing seat, a protective lantern ring is sleeved on the limiting column, and a connecting screw rod in threaded connection with the bearing seat is fixedly connected to the limiting column.
Preferably, the bearing mechanism comprises the same movable box fixedly connected to the plurality of connecting plates, a servo motor is fixedly connected to the side wall of the movable box, and a strip-shaped opening is formed in the movable box.
Preferably, the moving mechanism comprises a screw rod arranged in the moving box and connected with a servo motor driving shaft, a moving assembly matched with the strip-shaped opening is in threaded connection with the screw rod, and a connecting rod is rotatably connected to the moving assembly.
Preferably, adjustment mechanism is including rotating the sleeve post of connecting in connecting rod one end, fixedly connected with fixation nut on the lateral wall of sleeve post, threaded connection has the set screw on the fixation nut.
Preferably, the fixing mechanism comprises a moving frame inserted on the sleeve column, the moving frame is fixedly connected with two insertion plates, one of the two insertion plates is fixedly connected with a limit nut on the side wall of the insertion plate, and the limit nut is connected with a limit screw through threads.
Compared with the prior art, the utility model has the beneficial effects that:
in this device, through the use of spacing post, soft cushion, slipmat, protection lantern ring and connecting screw, wherein spacing post can be cut apart different stair building materials, and the protection lantern ring, soft cushion and slipmat can protect the stair building materials simultaneously to avoided the damage of stair building materials, cut apart different stair building materials simultaneously, further make things convenient for constructor's later stage operation, further made things convenient for constructor's work.
Through servo motor, the lead screw, remove the subassembly, the connecting rod, the cover post, fixation nut, the fixed screw, remove the frame, the use of picture peg and spacing screw, the staff can be directly in the picture peg disect insertion stair building materials, then the staff can directly rotate the spacing screw, just so can make the stair building materials obtain spacingly, later the staff rethread controller starts servo motor, just so can make the lead screw rotate, further just can make the removal subassembly remove to one side, thereby just can make the stair building materials lie flat gradually, just so can make things convenient for constructor to carry out the handling, the damage of other stair building materials has also been avoided simultaneously, further work that has made things convenient for constructor, indirect constructor's work efficiency that has improved.
Drawings
Fig. 1 is a schematic structural view of a prefabricated building material shelf for construction engineering according to the present invention;
fig. 2 is a schematic view of a local connection structure of a prefabricated building material placing frame for construction engineering according to the present invention;
fig. 3 is a schematic top view of a prefabricated building material shelf for construction engineering according to the present invention;
fig. 4 is a schematic side view of a prefabricated building material shelf for construction engineering according to the present invention.
In the figure: the automatic assembling device comprises a bearing seat 1, a soft rubber cushion 2, a non-slip cushion 3, a connecting plate 4, a limiting column 5, a protective lantern ring 6, a connecting screw rod 7, a servo motor 8, a strip-shaped opening 9, a screw rod 10, a moving assembly 11, a connecting rod 12, a sleeve column 13, a fixing nut 14, a fixing screw 15, a moving frame 16, an inserting plate 17, a limiting nut 18, a limiting screw 19 and a moving box 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, a frame is put with prefabricated building materials to building engineering, including two bear seat 1, two bear and all be connected with protection machanism on the seat 1, protection machanism includes soft cushion 2 of fixed connection on bearing seat 1, the upper end fixedly connected with slipmat 3 of soft cushion 2, wherein especially notice, slipmat 3 and soft cushion 2 can improve the protectiveness of device to the stair building materials, further protection the stair building materials, thereby the damage of stair building materials has been avoided, one of them bears on the seat 1 fixedly connected with polylith and another one bear connecting plate 4 that seat 1 is connected, wherein especially notice, connecting plate 4 can make two bear seat 1 more stable, thereby make the overall installation more stable.
All be equipped with a plurality of stop gear on two bear seat 1, stop gear is including setting up in the spacing post 5 that bears on the seat 1, has cup jointed the protection lantern ring 6 on the spacing post 5, and wherein the protection lantern ring 6 is the rubber material for the material to can protect the stair building materials, fixedly connected with and the connecting screw 7 who bears seat 1 threaded connection on the spacing post 5, wherein what especially noted is, bear and be equipped with the screw hole on the seat 1, and connecting screw 7 can with screw hole threaded connection.
In the process of actual operation, constructors can directly place the stair building materials on two bearing seats 1, then insert the connecting screw rod 7 on the limiting column 5 into the threaded hole of the bearing seat 1, and meanwhile, the constructors rotate the connecting screw rod 7, so that the limiting column 5 can be limited to be placed on the stair building materials, and the constructors can place and store the stair building materials.
The protection mechanism is connected with two bearing mechanisms, each bearing mechanism comprises the same movable box 20 fixedly connected to the corresponding connecting plate 4, the servo motor 8 is fixedly connected to the side wall of each movable box 20, the motors 8 are in the prior art, and the movable boxes 20 are provided with strip-shaped openings 9.
All be connected with moving mechanism on two bear the weight of the mechanism, moving mechanism is including setting up the lead screw 10 that is connected with 8 drive shafts of servo motor in removing box 20, threaded connection has the removal subassembly 11 with bar opening 9 assorted on the lead screw 10, wherein especially notice remove the subassembly 11 and constitute by nut and connecting piece, wherein the shape and the bar opening 9 of connecting piece are unanimous, thereby can make bar opening 9 carry on spacingly to the connecting piece, further convenient removal subassembly 11 removes according to the screw direction of lead screw 10, it is connected with connecting rod 12 to rotate on the removal subassembly 11.
Both are connected with adjustment mechanism on two moving mechanism, and adjustment mechanism is including rotating the sleeve post 13 of connecting in connecting rod 12 one end, fixedly connected with fixation nut 14 on the lateral wall of sleeve post 13, and threaded connection has set screw 15 on fixation nut 14, and wherein it is especially noted that, the lateral wall of sleeve post 13 is passed and extends to inside to set screw 15 can move according to fixation nut 14's screw thread direction.
All be connected with fixed establishment on two adjustment mechanism, fixed establishment is including inserting the removal frame 16 of locating on cover post 13, removes two picture peg 17 of fixedly connected with on the frame 16, and fixedly connected with stop nut 18 on the lateral wall of one of them picture peg 17, and stop nut 18 goes up the screw thread and is connected with stop screw 19, and wherein especially notice, one of them picture peg 17 is passed to stop screw 19's one end to stop screw 19 can move according to stop nut 18's screw thread direction.
In the actual operation process, a constructor can directly insert the two inserting plates 17 on the moving frame 16 into the stair assembly, then the constructor rotates the limiting screws 18, so that the stair assembly is fixed, the constructor then adjusts the moving frame 16 again so that the moving frame 16 is in a proper position, and then the constructor rotates the fixing screw 15, the movable frame 16 is fixed with the aid of the fixing nut 14, and the operator then activates the servo motor 18 through the controller, which causes the screw 10 to rotate, and since the moving assembly 11 is limited by the strip-shaped opening 9, the connecting rod 12 can be gradually moved backwards, therefore, the stair building materials can be gradually laid flat, and further convenience is brought to constructors to hoist the stair building materials, so that the work of the constructors is facilitated, and the work efficiency of the constructors is indirectly improved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and equivalent alternatives or modifications according to the technical solution of the present invention and the inventive concept thereof should be covered by the scope of the present invention.

Claims (7)

1. The utility model provides a frame is put with prefabricated building materials to building engineering, includes two and bears seat (1), its characterized in that, two bear and all be connected with protection machanism on seat (1), two bear and all be equipped with a plurality of stop gear on seat (1), the last two mechanisms that bear that are connected with of protection machanism, two all be connected with moving mechanism, two on the bearing machanism all be connected with adjustment mechanism, two on the moving mechanism all be connected with fixed establishment.
2. The placement frame for prefabricated building materials for building engineering as claimed in claim 1, wherein the protection mechanism comprises a soft rubber mat (2) fixedly connected to the bearing seat (1), the upper end of the soft rubber mat (2) is fixedly connected with a non-slip mat (3), and one of the bearing seats (1) is fixedly connected with a plurality of connecting plates (4) connected with the other bearing seat (1).
3. The prefabricated building material placing frame for the building engineering according to claim 1, wherein the limiting mechanism comprises a limiting column (5) arranged on the bearing seat (1), a protective sleeve ring (6) is sleeved on the limiting column (5), and a connecting screw rod (7) in threaded connection with the bearing seat (1) is fixedly connected to the limiting column (5).
4. The prefabricated building material placing frame for the building engineering as claimed in claim 2, wherein the bearing mechanism comprises a same movable box (20) fixedly connected to the plurality of connecting plates (4), a servo motor (8) is fixedly connected to a side wall of the movable box (20), and a strip-shaped opening (9) is formed in the movable box (20).
5. The prefabricated building material placing frame for the building engineering as claimed in claim 4, wherein the moving mechanism comprises a screw rod (10) arranged in the moving box (20) and connected with a driving shaft of the servo motor (8), a moving component (11) matched with the strip-shaped opening (9) is connected to the screw rod (10) in a threaded manner, and a connecting rod (12) is connected to the moving component (11) in a rotating manner.
6. The prefabricated building material placing frame for the building engineering as claimed in claim 5, wherein the adjusting mechanism comprises a sleeve column (13) rotatably connected to one end of the connecting rod (12), a fixing nut (14) is fixedly connected to a side wall of the sleeve column (13), and a fixing screw (15) is threadedly connected to the fixing nut (14).
7. The placement frame for the prefabricated building materials for the building engineering as claimed in claim 6, wherein the fixing mechanism comprises a movable frame (16) inserted on the sleeve column (13), two insertion plates (17) are fixedly connected to the movable frame (16), a limit nut (18) is fixedly connected to the side wall of one of the insertion plates (17), and a limit screw (19) is connected to the limit nut (18) through a thread.
CN202121938943.0U 2021-08-18 2021-08-18 Frame is put with prefabricated building materials to building engineering Active CN215795839U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121938943.0U CN215795839U (en) 2021-08-18 2021-08-18 Frame is put with prefabricated building materials to building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121938943.0U CN215795839U (en) 2021-08-18 2021-08-18 Frame is put with prefabricated building materials to building engineering

Publications (1)

Publication Number Publication Date
CN215795839U true CN215795839U (en) 2022-02-11

Family

ID=80133045

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121938943.0U Active CN215795839U (en) 2021-08-18 2021-08-18 Frame is put with prefabricated building materials to building engineering

Country Status (1)

Country Link
CN (1) CN215795839U (en)

Similar Documents

Publication Publication Date Title
CN110303341B (en) Multifunctional steel structure cutting and drilling device
CN215795839U (en) Frame is put with prefabricated building materials to building engineering
CN210012513U (en) Building decoration is with fixed stable panel discharge apparatus
CN104670940B (en) A kind of sheet material feeding machanism
CN218272264U (en) Online water quality monitoring equipment probe
CN205116677U (en) Electric lift split heads
CN216480010U (en) Practical training platform of programming sequence control technology for computer science technology
CN208067875U (en) Balanced type fixture
CN210313335U (en) Lifting device for engineering machinery maintenance
CN105275194A (en) Electric lifting horse stool
CN212712097U (en) Full-automatic cable conveyor
CN210950551U (en) Auxiliary device for mechanical equipment installation
CN108999566B (en) Rigid-flexible pile composite foundation installation equipment
CN113579920A (en) Overturning type rectifier production equipment convenient to clamp
CN220051743U (en) Angle-adjustable industrial robot fault detection platform
CN207522862U (en) Ceiling automatic material taking, punching and fastening machine
CN211078401U (en) Lifting device for construction
CN213380392U (en) High machine of milling foot of four feet in aluminum alloy floor bottom surface
CN218776574U (en) Prefabricated formula wallboard storage rack
CN218746228U (en) Positioning device for industrial robot to process parts
CN209887507U (en) Height-adjustable double-sided perforated door and window combination machine
CN211439947U (en) Anti-toppling supporting device for interior decoration material
CN219803569U (en) Flower stand convenient to remove
CN217975446U (en) Control device for flatness of poured terrace
CN218264836U (en) Construction support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant