CN215758544U - Bridge bent cap construction staple bolt bearing structure - Google Patents

Bridge bent cap construction staple bolt bearing structure Download PDF

Info

Publication number
CN215758544U
CN215758544U CN202121793193.2U CN202121793193U CN215758544U CN 215758544 U CN215758544 U CN 215758544U CN 202121793193 U CN202121793193 U CN 202121793193U CN 215758544 U CN215758544 U CN 215758544U
Authority
CN
China
Prior art keywords
cross beam
hanging
hoop
bearing structure
bent cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121793193.2U
Other languages
Chinese (zh)
Inventor
郑亮
李映来
甘贺德
安玉国
党积荣
刘帅军
蔡军
屈文涛
高鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN202121793193.2U priority Critical patent/CN215758544U/en
Application granted granted Critical
Publication of CN215758544U publication Critical patent/CN215758544U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a bridge capping beam construction hoop supporting structure, which comprises: the device comprises a first cross beam, a second cross beam, a first pull rod, a second pull rod, a hoop, a hanging basket, a connecting arm, a hanging lug and a jack; the first cross beam and the second cross beam are horizontally arranged in parallel; two groups of first pull rods and second pull rods are arranged between the first cross beam and the second cross beam; a plurality of jacks are arranged at the bottoms of the first cross beam and the second cross beam; the jacks are respectively arranged at the top ends of the two hoops; two connecting arms are arranged on two sides of the hoop, and the connecting arms are provided with hanging lugs; two hanging baskets are hung on the connecting arms on the two sides of the hoop through the hanging lugs, so that the construction quality and the construction progress can be greatly improved when the device is used for bridge capping beam construction, and the economic benefit is improved.

Description

Bridge bent cap construction staple bolt bearing structure
Technical Field
The utility model relates to the technical field of bridge capping beam construction, in particular to a hoop supporting structure for bridge capping beam construction.
Background
The bridge capping beam construction difficulty is higher, the construction is carried out by adopting a full red support in the traditional method, although the method is simple, for the pier column with higher height, the full red support needs more rods and steel materials, and the bottom needs to be subjected to foundation hardening; the construction process is time-consuming and labor-consuming, and the labor cost and the material cost are high.
SUMMERY OF THE UTILITY MODEL
Aiming at the problems in the prior art, the utility model provides the anchor ear supporting structure for bridge capping beam construction, which greatly reduces the required supporting materials, does not need to harden the bottom foundation, saves time and labor and improves the construction efficiency of the bridge capping beam.
In order to realize the purpose of the utility model, the utility model adopts the following technical scheme:
the utility model provides a bridge bent cap construction staple bolt bearing structure, includes: the device comprises a first cross beam, a second cross beam, a first pull rod, a second pull rod, a hoop, a hanging basket, a connecting arm, a hanging lug and a jack; the first cross beam and the second cross beam are horizontally arranged in parallel; two groups of first pull rods and second pull rods are arranged between the first cross beam and the second cross beam; a plurality of jacks are arranged at the bottoms of the first cross beam and the second cross beam; the jacks are respectively arranged at the top ends of the two hoops; two connecting arms are arranged on two sides of the hoop, and the connecting arms are provided with hanging lugs; two hanging baskets are hung on the connecting arms at the two sides of the hoop through hanging lugs.
Preferably, the hoop comprises two semicircular arc connecting pieces bent by steel plates and connecting bolts; jacks are arranged at the tops of two ends of each semi-arc connecting piece, and connecting arms are arranged at the bottoms of the two ends of each semi-arc connecting piece; the two ends of the semicircular arc-shaped connecting piece are respectively provided with a connecting part, the connecting part is provided with a plurality of triangular plates and screw holes, and the triangular plates are connected with the outer side of the semicircular arc-shaped connecting piece; the connecting bolt connects the two semicircular connecting pieces through the screw hole on the connecting part.
Preferably, the connecting arm on set up a plurality of hangers from top to bottom, set up safety bolt on every hanger.
Preferably, the hanging basket comprises an upright post, a square tube, a hook, a bottom plate, supporting legs and a rubber pad; four upright columns are arranged and respectively distributed at four corners of the hanging basket; a plurality of square tubes are arranged among the four upright posts; the two hooks are arranged at the upper part of one side of the hanging basket; the bottom of the hanging basket is provided with a bottom plate; two supporting legs are arranged on the lower portion of the hanging basket on the same side of the hook, and each supporting leg is provided with a rubber pad.
Preferably, the connecting bolt is an M24 bolt.
Preferably, the first cross beam and the second cross beam are both made of I40a I-shaped steel.
Compared with the prior art, the utility model has the following beneficial effects:
when the device is used for bridge capping beam construction, the construction quality and the construction progress can be greatly improved, and the economic benefit is improved; the device has low requirements on the foundation during construction, good construction quality, short construction period and no damage to the appearance quality of the pier stud, the installation height of the hoop can be changed along with the height of the pier stud, no additional skid or distribution beam for adjusting the height of the bottom die is needed, the adaptability is strong, and the device can be adopted as long as the device is a cylindrical pier stud no matter whether the device is on shore in water or not, and has certain reliability and advancement.
Drawings
FIG. 1 is a schematic structural diagram of a bridge capping beam construction hoop support structure of the utility model;
FIG. 2 is a schematic view of a hoop structure of the hoop support structure for bridge capping beam construction according to the present invention;
FIG. 3 is a schematic structural diagram of a connecting arm of a bridge capping beam construction hoop supporting structure according to the present invention;
FIG. 4 is a schematic structural diagram of a hanging basket 6 of a bridge capping beam construction hoop support structure of the utility model;
in the figure: the hanging basket comprises a first cross beam 1, a second cross beam 2, a first pull rod 3, a second pull rod 4, a hoop 5, a hanging basket 6, a pier column 7, a semi-arc-shaped connecting piece 51, a jack 52, a connecting bolt 53, a connecting part 54, a connecting arm 55, a hanging lug 56, a safety bolt 57, an upright post 61, a square tube 62, a hook 63, a bottom plate 64, a supporting leg 65 and a rubber pad 66.
Detailed Description
The drawings in the embodiments of the utility model will be combined; the technical scheme in the embodiment of the utility model is clearly and completely described as follows:
as shown in fig. 1 to 4, in one embodiment of the present invention, a bridge capping beam construction hoop support structure includes: the device comprises a first cross beam 1, a second cross beam 2, a first pull rod 3, a second pull rod 4, a hoop 5, a hanging basket 6, a connecting arm 55, a hanging lug 56 and a jack 52; the first cross beam 1 and the second cross beam 2 are horizontally arranged in parallel; two groups of pull rods I3 and two groups of pull rods II 4 are arranged between the cross beam I1 and the cross beam II 2; a plurality of jacks 52 are arranged at the bottoms of the first beam 1 and the second beam 2; the jacks 52 are respectively arranged at the top ends of the two hoops 5; two connecting arms 55 are arranged on two sides of the hoop 5, and the connecting arms 55 are provided with hanging lugs 56; the connecting arms 55 at both sides of the hoop 5 are hung with two hanging baskets 6 through hanging lugs 56, namely, the two connecting arms 55 at the same side of the hoop 5 are hung with one hanging basket 6.
In specific implementation, the two hoops 5 are respectively fixed on the two pier studs 7, and the hanging basket 6 is hung; entering constructors; the first cross beam 1 and the second cross beam 2 are respectively arranged on two sides of the two pier studs 7 through the aid of a crane and constructors, the two groups of pull rods 3 and the two groups of pull rods 4 are respectively arranged on two sides of the two pier studs 7, the two pier studs 7 are clamped in a shape like a Chinese character 'jing', and the overall stability of the first cross beam 1 and the second cross beam 2 is improved; constructors adjust the heights of the first cross beam 1 and the second cross beam 2 through the jacks 52, and after the adjustment is completed, the bent cap combination steel die is installed on the bent cap combination steel die.
In an embodiment of the present invention, the hoop 5 includes two semi-arc connectors 51 bent from a steel plate and a connecting bolt 53; jacks 52 are arranged at the tops of two ends of each semi-arc connecting piece 51, and connecting arms 55 are arranged at the bottoms of the two ends; the first cross beam 1 and the second cross beam 2 can be better supported, and meanwhile, the operation of operators in the hanging basket 6 is facilitated; the two ends of the semi-arc connecting piece 51 are respectively provided with a connecting part 54, the connecting part 54 is provided with a plurality of triangular plates and screw holes, the triangular plates are connected with the outer side of the semi-arc connecting piece 51, and the connecting strength of the connecting part 54 and the semi-arc connecting piece 51 is improved; the connecting bolt 53 connects the two semicircular connecting members 51 through a screw hole of the connecting portion 54.
In an embodiment of the present invention, in order to meet the requirements of different heights of the hanging basket 6 and further improve the safety, a plurality of hanging lugs 56 are arranged on the connecting arm 55 from top to bottom, and a safety bolt 57 is arranged on each hanging lug 56.
In one embodiment of the present invention, the basket 6 includes a column 61, a square tube 62, a hook 63, a bottom plate 64, a leg 65, and a rubber pad 66; four upright posts 61 are respectively distributed at four corners of the hanging basket 6; a plurality of square tubes 62 are arranged among the four upright posts 61; the number of the hooks 63 is two, and the two hooks 63 are arranged at the upper part of one side of the hanging basket 6; the bottom of the hanging basket 6 is provided with a bottom plate 64; two legs 65, each with a rubber pad 66, are provided on the basket 6 on the same side and below the hook 63. During the specific use, hang on hangers 56 of linking arm 55 through couple 63, push up on pier stud 7 through two landing legs 65, have rubber pad 66 on the landing leg and improve frictional force, avoid hanging flower basket 6 to rock, improve hanging flower basket 6's stability.
In one embodiment of the present invention, in order to satisfy the connection strength, the connection bolt 53 is an M24 bolt.
In one embodiment of the utility model, in order to enable the first beam 1 and the second beam 2 to support the cover beam combination steel mould; the first beam 1 and the second beam 2 are both made of I40a I-steel.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be able to cover the technical scope of the present invention by equivalent replacement or change according to the technical solution and the modified concept of the present invention within the technical scope of the present invention.

Claims (6)

1. The utility model provides a bridge bent cap construction staple bolt bearing structure, includes: the device comprises a first cross beam, a second cross beam, a first pull rod, a second pull rod, a hoop, a hanging basket, a connecting arm, a hanging lug and a jack; the method is characterized in that: the first cross beam and the second cross beam are horizontally arranged in parallel; two groups of first pull rods and second pull rods are arranged between the first cross beam and the second cross beam; a plurality of jacks are arranged at the bottoms of the first cross beam and the second cross beam; the jacks are respectively arranged at the top ends of the two hoops; two connecting arms are arranged on two sides of the hoop, and the connecting arms are provided with hanging lugs; two hanging baskets are hung on the connecting arms at the two sides of the hoop through hanging lugs.
2. The bridge bent cap construction staple bolt bearing structure of claim 1, characterized in that: the hoop comprises two semi-arc connecting pieces bent by steel plates and connecting bolts; jacks are arranged at the tops of two ends of each semi-arc connecting piece, and connecting arms are arranged at the bottoms of the two ends of each semi-arc connecting piece; the two ends of the semicircular arc-shaped connecting piece are respectively provided with a connecting part, the connecting part is provided with a plurality of triangular plates and screw holes, and the triangular plates are connected with the outer side of the semicircular arc-shaped connecting piece; the connecting bolt connects the two semicircular connecting pieces through the screw hole on the connecting part.
3. The bridge bent cap construction staple bolt bearing structure of claim 1, characterized in that: the connecting arm on set up a plurality of hangers from top to bottom, set up safety bolt on every hanger.
4. The bridge bent cap construction staple bolt bearing structure of claim 1, characterized in that: the hanging basket comprises an upright post, a square tube, a hook, a bottom plate, a supporting leg and a rubber pad; four upright columns are arranged and respectively distributed at four corners of the hanging basket; a plurality of square tubes are arranged among the four upright posts; the two hooks are arranged at the upper part of one side of the hanging basket; the bottom of the hanging basket is provided with a bottom plate; two supporting legs are arranged on the lower portion of the hanging basket on the same side of the hook, and each supporting leg is provided with a rubber pad.
5. The bridge bent cap construction staple bolt bearing structure of claim 2, characterized in that: the connecting bolt is an M24 bolt.
6. The bridge bent cap construction staple bolt bearing structure of claim 1, characterized in that: the first cross beam and the second cross beam are both made of I40a I-shaped steel.
CN202121793193.2U 2021-08-03 2021-08-03 Bridge bent cap construction staple bolt bearing structure Active CN215758544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121793193.2U CN215758544U (en) 2021-08-03 2021-08-03 Bridge bent cap construction staple bolt bearing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121793193.2U CN215758544U (en) 2021-08-03 2021-08-03 Bridge bent cap construction staple bolt bearing structure

Publications (1)

Publication Number Publication Date
CN215758544U true CN215758544U (en) 2022-02-08

Family

ID=80109422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121793193.2U Active CN215758544U (en) 2021-08-03 2021-08-03 Bridge bent cap construction staple bolt bearing structure

Country Status (1)

Country Link
CN (1) CN215758544U (en)

Similar Documents

Publication Publication Date Title
CN108252534B (en) Column top construction device for truss installation
CN101693329A (en) Pairing welding device for oil storage tanks and method thereof
CN215758544U (en) Bridge bent cap construction staple bolt bearing structure
CN105369745A (en) Bridge support exchanging and lifting reaction frame
CN113265950A (en) Support for large cantilever bent cap construction and construction method thereof
CN210597044U (en) Support seat is adjusted to support pillar crossbeam of assembling
CN208701509U (en) Universal telescopic support frame suitable for V-type bridge pier
CN215978530U (en) Steel beam sliding installation device
CN210616901U (en) Precast beam prestressing force stretch-draw platform
CN210886958U (en) Bridge assembled bent cap installation support stores pylon
CN210561782U (en) Pier support is changed with supplementary construction equipment
CN210393407U (en) Elevation positioning control device for hoisting large embedded part
CN208105313U (en) A kind of device for the overturning of prefabricated underground pipe gallery framework of steel reinforcement
CN1025510C (en) Lifting method for parts of water tower and its lifting machines and tools
CN218665066U (en) Giant steel column hoisting and turning device
CN212358307U (en) Guide frame convenient to engineering pile is transferred and is hung down
CN219010989U (en) Auxiliary bracket for 0# block
CN220377134U (en) Support device attached to bridge pier column for jacking
CN212631709U (en) Four-person bungee jumping bed
CN218933616U (en) Raft foundation guide wall hanging die supporting limiting bracket
CN216096304U (en) Casting rod anti-falling frame for low-pressure vacuum semi-continuous casting system
CN218480600U (en) Auxiliary device for hanging and installing large boiler drum
CN214329836U (en) Construction hanging bracket for slip form system
CN216196457U (en) Scaffold for building of high stability
CN219840356U (en) Hanging basket support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant