CN212358307U CN202020963424.9U CN202020963424U CN212358307U CN 212358307 U CN212358307 U CN 212358307U CN 202020963424 U CN202020963424 U CN 202020963424U CN 212358307 U CN212358307 U CN 212358307U
Authority
CN
China
Prior art keywords
frame
limiting frame
hole
engineering pile
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020963424.9U
Other languages
Chinese (zh)
Inventor
李广华
杜智勇
王玉
白黎明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction No7 Engineering Co Ltd
Original Assignee
Beijing Urban Construction No7 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction No7 Engineering Co Ltd filed Critical Beijing Urban Construction No7 Engineering Co Ltd
Priority to CN202020963424.9U priority Critical patent/CN212358307U/en
Application granted granted Critical
Publication of CN212358307U publication Critical patent/CN212358307U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A guide frame convenient for adjusting the verticality of an engineering pile comprises a frame body; the frame body comprises an upright post, a lower limiting frame, a middle limiting frame, an upper limiting frame, an operating platform and a guardrail; the lower parts of the adjacent upright posts are connected with bottom beams, and the tops of the adjacent upright posts are connected with top beams; the lower limiting frame is horizontally arranged in a rectangular frame formed by enclosing the bottom beams, and the middle part of the lower limiting frame is provided with a lower limiting hole; the lower limiting frame is provided with a lower adjustable screw; the upper limiting frame is horizontally arranged in a rectangular frame formed by enclosing top beams, and an upper limiting hole is formed in the middle of the upper limiting frame; a vertical support is arranged between the lower limiting frame and the upper limiting frame; the middle limiting frame is horizontally connected between the vertical supports, and a middle limiting hole is formed in the middle of the middle limiting frame; the middle limiting frame is provided with a middle adjustable screw; an operation platform is laid on the upper limiting frame, and a pile hoisting hole is formed in the operation platform. The utility model provides a slow, the steel column of traditional construction method construction transfers the technical problem that hangs down time is long, the construction precision is low and construction quality is poor.

Description

Guide frame convenient to engineering pile is transferred and is hung down
Technical Field
The utility model belongs to the technical field of structural engineering, especially a leading truck convenient to engineering stake is transferred and is hung down.
Background
With the gradual popularization of the top-down construction method engineering, the top-down construction method core technology is of great importance in one-column-one-pile construction. In the prior art, in the process of adjusting the verticality of the steel column, the construction is slow, the verticality adjusting time of the steel column is long, and the construction period is influenced; the measures such as the steel plate is plugged in the base of the original guide frame often have errors, the operation is frequent, time and labor are wasted, the requirement on construction precision cannot be met, and the construction quality is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a leading truck convenient to engineering stake is transferred and is hung down solves traditional construction method and transfers the in-process that hangs down at the steel column, and the time of hanging down is longer, influence time limit for a project, construction precision hang down and construction quality is poor technical problem slowly, steel column transfer.
In order to achieve the above purpose, the utility model adopts the following technical scheme.
A guide frame convenient for adjusting the verticality of an engineering pile comprises a frame body; the frame body comprises an upright post, a lower limiting frame, a middle limiting frame and an upper limiting frame; the guide frame also comprises an operation platform and a guardrail; the four upright posts are arranged in a rectangular shape, and the bottom of each upright post is provided with an adjustable base; the bottom beam is connected between the lower parts of the adjacent upright columns, and the top beam is connected between the tops of the adjacent upright columns; the lower limiting frame is horizontally arranged in a rectangular frame formed by enclosing the bottom beams, and a lower limiting hole penetrating through the engineering pile is formed in the middle of the lower limiting frame; lower adjustable screw rods used for adjusting verticality of the engineering pile are arranged on the lower limiting frame and positioned around the lower limiting hole at intervals; the upper limiting frame is horizontally arranged in a rectangular frame formed by enclosing top beams, and an upper limiting hole penetrating through the engineering pile is formed in the middle of the upper limiting frame; a group of vertical supports are arranged between the lower limiting frame and the upper limiting frame and around the lower limiting hole at intervals; the middle limiting frame is horizontally connected between the group of vertical supports, and a middle limiting hole penetrating through the engineering pile is formed in the middle of the middle limiting frame; middle adjustable screw rods for adjusting verticality of the engineering pile are arranged on the middle limiting frame and around the middle limiting hole at intervals; the operation platform is laid on the upper limiting frame, and a pile hoisting hole is formed in the position, corresponding to the upper limiting hole, on the plate surface of the operation platform; the guardrail sets up along the top edge of support body, leaves exit in one side of guardrail.
Preferably, a ladder stand is arranged between the bottom beam and the top beam and at a position corresponding to the inlet and the outlet.
Preferably, the guardrail is formed by welding steel pipes or steel bars or section steel, and the height of the guardrail is more than or equal to 1.2 m.
Preferably, hanging plates are arranged at the bottom of the middle limiting frame at intervals along the periphery of the middle limiting hole; and hoisting holes are formed in the hanging plate.
Preferably, bolt holes are formed in the lower limiting frame and positioned around the lower limiting hole; the lower adjustable screw rod horizontally penetrates through the bolt hole and is in threaded connection with the lower limiting frame; bolt holes are formed in the middle limiting frame and positioned around the middle limiting hole; the middle adjustable screw rod horizontally penetrates through the bolt hole and is in threaded connection with the middle limiting frame.
Preferably, the outer end of the middle adjustable screw rod is provided with a first operating end; and a second operating end is arranged at the outer end of the lower adjustable screw rod.
Compared with the prior art, the utility model has the following characteristics and beneficial effect.
1. The utility model provides a be convenient for engineering pile transfers guide frame that hangs down increases support body leveling function on original basis, can furthest shorten engineering pile and transfer the time of hanging down, and easy operation, and the construction precision is high, has both satisfied the high accuracy requirement of a post-pile construction, guarantees construction quality, has guaranteed the requirement of construction progress again.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is the structure schematic diagram of the utility model discloses a leading truck convenient to engineering stake is transferred and is hung down.
Fig. 2 is a schematic structural view of the middle frame body of the present invention.
Reference numerals: 1-frame body, 1.1-upright post, 1.2-lower limit frame, 1.3-middle limit frame, 1.4-upper limit frame, 1.5-bottom beam, 1.6-top beam, 1.7-vertical support, 2-operation platform, 3-ladder stand, 4-adjustable base, 5-guardrail, 6-lower limit hole, 7-lower adjustable screw, 7.1-second operation end, 8-upper limit hole, 9-middle limit hole, 10-middle adjustable screw, 10.1-first operation end, 11-pile hoisting hole, 12-inlet and outlet, 13-hanging plate and 14-hoisting hole.
Detailed Description
As shown in fig. 1 and 2, the guide frame convenient for adjusting the verticality of the engineering pile comprises a frame body 1; the frame body 1 comprises an upright post 1.1, a lower limiting frame 1.2, a middle limiting frame 1.3 and an upper limiting frame 1.4; the guide frame also comprises an operation platform 2 and a guardrail 5; four upright columns 1.1 are arranged in a rectangular shape, and the bottom of each upright column 1.1 is provided with an adjustable base 4; a bottom beam 1.5 is connected between the lower parts of the adjacent upright columns 1.1, and a top beam 1.6 is connected between the tops of the adjacent upright columns 1.1; the lower limiting frame 1.2 is horizontally arranged in a rectangular frame surrounded by the bottom beams 1.5, and a lower limiting hole 6 penetrating through the engineering pile is formed in the middle of the lower limiting frame 1.2; lower adjustable screw rods 7 for adjusting verticality of the engineering pile are arranged on the lower limiting frame 1.2 and positioned around the lower limiting hole 6 at intervals; the upper limiting frame 1.4 is horizontally arranged in a rectangular frame surrounded by the top beams 1.6, and an upper limiting hole 8 penetrating through the engineering pile is formed in the middle of the upper limiting frame 1.4; a group of vertical supports 1.7 are arranged between the lower limiting frame 1.2 and the upper limiting frame 1.4 and around the lower limiting hole 6 at intervals; the middle limiting frame 1.3 is horizontally connected among the group of vertical supports 1.7, and a middle limiting hole 9 penetrating through the engineering pile is formed in the middle of the middle limiting frame 1.3; middle adjustable screw rods 10 for adjusting verticality of the engineering pile are arranged on the middle limiting frame 1.3 and around the middle limiting hole 9 at intervals; the operating platform 2 is laid on the upper limiting frame 1.4, and a pile hoisting hole 11 is formed in the position, corresponding to the upper limiting hole 8, on the plate surface of the operating platform 2; guardrail 5 sets up along the top edge of support body 1, leaves exit 12 in one side of guardrail 5.
In this embodiment, the engineering pile is similar to a "one-column-one-pile" form, and a one-column-one-pile is defined as: and arranging a vertical supporting structure form of a vertical supporting pile at the position of a structural column.
In this embodiment, a ladder stand 3 is disposed between the bottom beam 1.5 and the top beam 1.6 and at a position corresponding to the inlet/outlet 12.
In this embodiment, guardrail 5 adopts steel pipe or reinforcing bar or shaped steel welding to form, and guardrail 5's height more than or equal to 1.2 m.
In this embodiment, hanging plates 13 are arranged at intervals at the bottom of the middle limiting frame 1.3 along the periphery of the middle limiting hole 9; and hoisting holes 14 are formed in the hanging plate 13.
In this embodiment, bolt holes are arranged on the lower limiting frame 1.2 and around the lower limiting hole 6; the lower adjustable screw 7 horizontally penetrates through the bolt hole and is in threaded connection with the lower limiting frame 1.2; bolt holes are formed in the middle limiting frame 1.3 and positioned around the middle limiting hole 9; the middle adjustable screw 10 horizontally penetrates through the bolt hole and is in threaded connection with the middle limiting frame 1.3.
In this embodiment, the outer end of the middle adjustable screw 10 is provided with a first operating end 10.1; the outer end of the lower adjustable screw 7 is provided with a second operating end 7.1.
In this embodiment, the pile hanging opening 11 is adjusted according to the specification and the cross-sectional form of the engineering pile, and is also applicable to the circular or other irregular cross-sectional engineering piles.
In this embodiment, the adjustable base 4 is in threaded connection with the upright column 1.1; the adjustable base 4 adopts the positive and negative screw principle, and the screw of the adjustable base 4 is twisted to make the frame body 1 horizontal.
In the embodiment, the upright column 1.1 is made of square steel or H-shaped steel or steel pipes; the lower limiting frame 1.2, the middle limiting frame 1.3 and the upper limiting frame 1.4 are all made of H-shaped steel or I-shaped steel or channel steel; the top beam 1.6 and the bottom beam 1.5 are both made of H-shaped steel or I-shaped steel or channel steel or square steel; the material is required to be safe and reliable, and the construction load can be met.
In the embodiment, the ladder stand 3 is respectively welded with the top beam 1.6 and the bottom beam 1.5, so that the welding is required to be firm, and the construction safety is ensured.
In this embodiment, operation platform 2 adopts wire net or steel sheet to weld in the top of upper portion spacing frame 1.4, requires operation platform 2 to satisfy the construction load of going up the people.
In the embodiment, the hanging plate 13 is made of a semicircular steel plate, the thickness of the hanging plate 13 is not less than 16mm, and the hanging plate is reliably welded with the middle limiting frame 1.3; the diameter of the hoisting hole 14 is 45-55 mm, and the hoisting hole is used for hanging the chain block.
In this embodiment, the diameters of the middle adjustable screw 10 and the lower adjustable screw 7 are not less than 30mm, and the inner ends of the middle adjustable screw 10 and the lower adjustable screw 7 are required to be polished smoothly.
In this embodiment, the type selection of the chain block needs to be determined according to the weight of the steel column.
The above embodiments are not exhaustive of the specific embodiments, and other embodiments are possible, and the above embodiments are intended to illustrate, but not limit the scope of the present invention, and all applications coming from the simple changes of the present invention fall within the scope of the present invention.

Claims (6)

1. A guide frame convenient for adjusting the verticality of an engineering pile comprises a frame body (1); the frame body (1) comprises an upright post (1.1), a lower limiting frame (1.2), a middle limiting frame (1.3) and an upper limiting frame (1.4); the method is characterized in that: the guide frame also comprises an operation platform (2) and a guardrail (5); four upright posts (1.1) are arranged in a rectangular shape, and the bottom of each upright post (1.1) is provided with an adjustable base (4); a bottom beam (1.5) is connected between the lower parts of the adjacent upright columns (1.1), and a top beam (1.6) is connected between the tops of the adjacent upright columns (1.1); the lower limiting frame (1.2) is horizontally arranged in a rectangular frame surrounded by the bottom beams (1.5), and a lower limiting hole (6) penetrating through the engineering pile is formed in the middle of the lower limiting frame (1.2); lower adjustable screw rods (7) used for adjusting verticality of the engineering pile are arranged on the lower limiting frame (1.2) and positioned around the lower limiting hole (6) at intervals; the upper limiting frame (1.4) is horizontally arranged in a rectangular frame formed by enclosing top beams (1.6), and an upper limiting hole (8) penetrating through the engineering pile is formed in the middle of the upper limiting frame (1.4); a group of vertical supports (1.7) are arranged between the lower limiting frame (1.2) and the upper limiting frame (1.4) and around the lower limiting hole (6) at intervals; the middle limiting frame (1.3) is horizontally connected between the vertical supports (1.7), and a middle limiting hole (9) penetrating through the engineering pile is formed in the middle of the middle limiting frame (1.3); middle adjustable screw rods (10) used for adjusting verticality of the engineering pile are arranged on the middle limiting frame (1.3) and positioned around the middle limiting hole (9) at intervals; the operation platform (2) is laid on the upper limiting frame (1.4), and a pile hoisting hole (11) is formed in the position, corresponding to the upper limiting hole (8), on the plate surface of the operation platform (2); the guardrail (5) is arranged along the top edge of the frame body (1), and an inlet and an outlet (12) are reserved on one side of the guardrail (5).
2. The guide frame convenient for verticality adjustment of an engineering pile according to claim 1, is characterized in that: a ladder (3) is arranged between the bottom beam (1.5) and the top beam (1.6) and at the position corresponding to the inlet and the outlet (12).
3. The guide frame convenient for verticality adjustment of an engineering pile according to claim 1, is characterized in that: the guardrail (5) is formed by welding steel pipes or steel bars or section steel, and the height of the guardrail (5) is more than or equal to 1.2 m.
4. The guide frame convenient for verticality adjustment of an engineering pile according to claim 1, is characterized in that: hanging plates (13) are arranged at the bottom of the middle limiting frame (1.3) at intervals along the periphery of the middle limiting hole (9); and hoisting holes (14) are formed in the hanging plate (13).
5. The guide frame convenient for verticality adjustment of an engineering pile according to claim 1, is characterized in that: bolt holes are formed in the lower limiting frame (1.2) and positioned around the lower limiting hole (6); the lower adjustable screw (7) horizontally penetrates through the bolt hole and is in threaded connection with the lower limiting frame (1.2); bolt holes are formed in the middle limiting frame (1.3) and positioned around the middle limiting hole (9); the middle adjustable screw (10) horizontally penetrates through the bolt hole and is in threaded connection with the middle limiting frame (1.3).
6. The guide frame convenient for verticality adjustment of an engineering pile according to claim 1, is characterized in that: the outer end of the middle adjustable screw rod (10) is provided with a first operating end (10.1); and a second operating end (7.1) is arranged at the outer end of the lower adjustable screw rod (7).
CN202020963424.9U 2020-06-01 2020-06-01 Guide frame convenient to engineering pile is transferred and is hung down Active CN212358307U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020963424.9U CN212358307U (en) 2020-06-01 2020-06-01 Guide frame convenient to engineering pile is transferred and is hung down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020963424.9U CN212358307U (en) 2020-06-01 2020-06-01 Guide frame convenient to engineering pile is transferred and is hung down

Publications (1)

Publication Number Publication Date
CN212358307U true CN212358307U (en) 2021-01-15

Family

ID=74156197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020963424.9U Active CN212358307U (en) 2020-06-01 2020-06-01 Guide frame convenient to engineering pile is transferred and is hung down

Country Status (1)

Country Link
CN (1) CN212358307U (en)

Similar Documents

Publication Publication Date Title
CN210766774U (en) Positioning device for steel reinforcement cage and lattice column
CN110722318A (en) Precise adjustable steel truss assembling jig frame and assembling method
CN212715972U (en) Prefabricated bed-jig suitable for multiple specification pier stud reinforcing bar
CN215947902U (en) Tie beam template support system in adjustable highway cylinder mound
CN216277017U (en) Steel column installation tool for cup-rim type foundation
CN212358307U (en) Guide frame convenient to engineering pile is transferred and is hung down
CN212384891U (en) Accurate adjustable steel truss assembles bed-jig
CN103343639A (en) Efficiently-adjusting module sliding system
CN206589121U (en) It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate
CN217824194U (en) Light combined calandria fixing structure
CN103334584B (en) Template regulating system for sliding form system
CN203361735U (en) Sliding mode system with function of efficient adjustment
CN206015700U (en) A kind of raft foundation steelframe support
CN203361633U (en) Template regulating system of sliding form system
CN209779626U (en) Upright pile positioning and lowering auxiliary device
CN209924121U (en) Independent supporting structure for assembly type building construction
CN210621685U (en) System for supporting upper-layer steel bars of bottom plate by using anti-floating anchor rods
CN202194073U (en) Large-volume long-cantilever capping beam construction device
CN215594039U (en) Deep basal pit slope lattice column reinforcing apparatus
CN213951962U (en) Cast-in-place diaphragm operation platform of precast beam with adjustable
CN217629470U (en) Auxiliary device for construction of steel reinforcement cage of bent cap
CN203284737U (en) Steel bar supporting formwork of thin-wall hollow high pier
CN216379276U (en) Door opening support
CN219326997U (en) Accurate installation and positioning device for cable guide pipe
CN215758544U (en) Bridge bent cap construction staple bolt bearing structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant