CN215714623U - Basket is hung with construction to municipal works - Google Patents

Basket is hung with construction to municipal works Download PDF

Info

Publication number
CN215714623U
CN215714623U CN202122192078.6U CN202122192078U CN215714623U CN 215714623 U CN215714623 U CN 215714623U CN 202122192078 U CN202122192078 U CN 202122192078U CN 215714623 U CN215714623 U CN 215714623U
Authority
CN
China
Prior art keywords
construction
motor
control shaft
hanging basket
bearing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122192078.6U
Other languages
Chinese (zh)
Inventor
徐敬霞
宗雪锋
赵松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN202122192078.6U priority Critical patent/CN215714623U/en
Application granted granted Critical
Publication of CN215714623U publication Critical patent/CN215714623U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a construction hanging basket for municipal engineering, which comprises a construction road, wherein the construction road is provided with a hanging basket body; the control rotating mechanism is connected with the construction road through a bolt; the construction bearing device is connected with the control rotating mechanism; according to the utility model, the control rotating mechanism and the construction bearing device are arranged in the device, and the two sets of construction platforms are arranged in the construction bearing device, so that a good balance effect can be achieved, collapse caused by overweight of one side of the construction bearing device in the connection process can be prevented, the two sets of construction platforms are driven to rotate for 90 degrees by controlling the rotating mechanism, a complete construction platform is formed at the bottom of a bridge, meanwhile, the other set of construction platform is parallel to the bridge floor after rotating for 90 degrees, and construction, inspection and maintenance can be carried out on the surfaces of two sides of the bridge.

Description

Basket is hung with construction to municipal works
Technical Field
The utility model belongs to the technical field of municipal engineering, and particularly relates to a construction hanging basket for municipal engineering.
Background
In China, municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations; various public infrastructure construction supporting in city life all belong to municipal works category, for example common urban road, bridge, subway, underground pipeline etc. in the bridge construction process, because bridge or overpass road surface are located the eminence, just need use the basket of hanging to carry out supplementary construction in the work progress.
Based on the aforesaid, traditional construction string basket is only to sliding construction about going on with the perpendicular, and in the bridge work progress, traditional construction string basket can't extend to the overhead or bridge end and is under construction, and when daily maintenance and inspection, the difficulty of maintaining ten minutes is examined to the bridge end simultaneously, and the operation car of ascending a height can be to the overhead end inspection construction, but only to the place comparatively level and smooth with ground, and application scope is less.
Therefore, in view of the above, research and improvement are made for the existing structure and defects, and a construction hanging basket for municipal engineering is provided, so as to achieve the purpose of higher practical value.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problems, the utility model provides a construction hanging basket for municipal engineering, which aims to solve the problems that the traditional construction hanging basket proposed in the background technology only performs up-and-down sliding construction on a vertical plane, the traditional construction hanging basket cannot extend to an elevated frame or a bridge bottom for construction in the bridge construction process, the bridge bottom is difficult to inspect and maintain in daily maintenance and inspection, and an ascending operation vehicle can inspect and construct the elevated frame bottom but only aims at a place which is smooth to the ground, so that the application range is small.
The utility model relates to a purpose and an effect of a construction hanging basket for municipal engineering, which are achieved by the following specific technical means:
a construction hanging basket for municipal engineering comprises a construction road; the whole construction road is of a cuboid structure; the control rotating mechanisms are arranged in two groups, and are connected with the construction road through bolts;
the construction bearing devices are arranged in two groups, and the construction bearing devices are connected with the control rotating mechanism.
Further, the control rotation mechanism includes:
the fixing plate is fixedly connected with the construction road through bolts; the motor is settled the case, and bottom of the case portion and fixed plate fixed connection are settled to the motor, and the motor is settled incasement portion and is provided with the motor.
Further, the control rotation mechanism further includes:
one end of the gear belt is rotationally connected with a motor shaft in the motor accommodating box;
the top of the control shaft is rotatably inserted into the fixed plate, and the top of the control shaft is rotatably connected with a motor in the motor placement box through a gear belt.
Further, the control rotation mechanism includes:
the rotary baffle ring is fixedly arranged on the surface of the control shaft; the ladder stand is characterized in that one end of the ladder stand is fixedly arranged on the surface of the fixing plate;
one end of the limiting column is fixedly connected with the control shaft, and the top of the control shaft is slidably inserted into a semicircular sliding groove formed in the fixing plate.
Further, the construction bearing device comprises:
the fixed connecting plate is fixedly arranged on the surface of the control shaft; the construction platform is fixed on the surface of the fixed connecting plate, and the top of one group of the construction platforms is fixedly connected with the bottom of the ladder stand.
Further, the construction bearing device further comprises:
the top of the connecting groove is provided with a connecting chain, and the connecting groove is fixedly arranged on the surface of one group of construction platforms; and the insertion block is arranged on the surface of the construction platform on the other side.
Further, the construction bearing device further comprises:
the auxiliary supporting plate is fixedly arranged on the surface of the control shaft;
one end of the oblique supporting rod is fixedly connected with the auxiliary supporting plate, and the other end of the auxiliary supporting plate is fixedly connected with the bottom of the construction platform;
and the passing corridor is arranged between the two groups of construction platforms.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the control rotating mechanism and the construction bearing device are arranged in the device, and two sets of construction platforms are arranged in the construction bearing device, so that a good balance effect can be achieved, collapse caused by overweight of one side of the construction bearing device in the connection process can be prevented, the two sets of construction platforms are driven to rotate by 90 degrees through the control rotating mechanism, one set of construction platforms can rotate to the bridge bottom to be in butt joint with the construction platform on the other side, a complete construction platform is formed at the bridge bottom, construction and inspection maintenance can be carried out on the bridge bottom, meanwhile, the construction platform on the other set of construction platforms is kept parallel to the bridge floor through rotation of 90 degrees, and construction and inspection maintenance can be carried out on the surfaces on two sides of the bridge.
Drawings
Fig. 1 is a schematic side view of the present invention.
Fig. 2 is a schematic bottom view of the present invention.
Fig. 3 is a schematic sectional structure view of the control rotating mechanism of the present invention.
Fig. 4 is a schematic axial side view of the construction bearing device of the present invention.
Fig. 5 is a schematic diagram of a partially enlarged structure a of the present invention.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
1. constructing a road;
2. controlling the rotating mechanism;
201. a fixing plate; 202. a motor mounting box; 203. a gear belt; 204. a control shaft; 205. rotating the baffle ring; 206. climbing a ladder; 207. a limiting column;
3. constructing a bearing device;
301. fixing the connecting plate; 302. a construction platform; 303. connecting grooves; 304. an insertion block; 305. an auxiliary support plate; 306. an oblique supporting rod; 307. through the corridor.
Detailed Description
The embodiments of the present invention will be described in further detail with reference to the drawings and examples. The following examples are intended to illustrate the utility model but are not intended to limit the scope of the utility model.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing and simplifying the description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the utility model. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" are to be interpreted broadly, e.g., as being fixed or detachable or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
as shown in figures 1 to 5:
the utility model provides a construction hanging basket for municipal engineering, which comprises a construction road 1; the construction road 1 is integrally of a cuboid structure, and the construction road 1 comprises a viaduct, a bridge and the like; the control rotating mechanisms 2 are arranged in two groups, and the control rotating mechanisms 2 are connected with the construction road 1 through bolts; the rotation control mechanism 2 includes: the fixing plate 201 is of a Z-shaped structure, the fixing plate 201 is fixedly connected with the construction road 1 through bolts, and the Z-shaped fixing plate 201 can play a good supporting role; the construction bears the weight of the device 3, and the construction bears the weight of the device 3 quantity and sets up to two sets of, and the construction bears the weight of the device 3 and is connected with control slewing mechanism 2.
As shown in fig. 4, the rotation control mechanism 2 further includes:
the bottom of the motor installation box 202 is fixedly connected with the fixing plate 201, and a motor is arranged in the motor installation box 202; one end of the gear belt 203 is rotationally connected with a motor shaft in the motor installation box 202, and the gear belt 203 can play a transmission role; the top of the control shaft 204 is rotatably inserted into the fixing plate 201, the top of the control shaft 204 is rotatably connected with a motor in the motor accommodating box 202 through a gear belt 203, and the motor in the motor accommodating box 202 drives the control shaft 204 to rotate; the rotary baffle ring 205, the rotary baffle ring 205 is a circular structure, and the rotary baffle ring 205 is fixedly installed on the surface of the control shaft 204, and the control shaft 204 can play a supporting role; one end of the ladder 206 is fixedly arranged on the surface of the fixing plate 201; the limiting column 207 is of an L-shaped structure, one end of the limiting column 207 is fixedly connected with the control shaft 204, the top of the control shaft 204 is slidably inserted into a semicircular sliding groove formed in the fixing plate 201, and the control shaft 204 can play a role in limiting the rotation angle of the control shaft 204.
As shown in fig. 5, the construction load carrier 3 includes:
the fixed connecting plate 301, the fixed connecting plate 301 is a cuboid structure, and the fixed connecting plate 301 is fixedly installed on the surface of the control shaft 204; the construction platforms 302 are arranged in two groups, the construction platforms 302 are fixed on the surface of the fixed connecting plate 301, the tops of one group of the construction platforms 302 are fixedly connected with the bottoms of the ladder stands 206, and the construction platforms 302 are construction operation areas; the connecting groove 303 is a cube structure with a square groove formed inside, a connecting chain is arranged at the top of the connecting groove 303, the connecting groove 303 is fixedly installed on the surface of one of the construction platforms 302 and is fixedly connected with the construction platform 302 on the other side through the connecting chain; the inserting block 304 is of a cuboid structure, the inserting block 304 is installed on the surface of the construction platform 302 on the other side, and the inserting block 304 is inserted into a square groove formed in the connecting groove 303 to form a supporting effect; an auxiliary support plate 305, wherein the auxiliary support plate 305 is fixedly arranged on the surface of the control shaft 204; one end of the oblique supporting rod 306 is fixedly connected with the auxiliary supporting plate 305, and the other end of the auxiliary supporting plate 305 is fixedly connected with the bottom of the construction platform 302, so that a triangular supporting effect is formed; the passing corridor 307 is arranged between the two sets of construction platforms 302, and the passing corridor 307 has the function of facilitating the passage of personnel between the two sets of construction platforms 302.
In another embodiment, the motor inside the motor installation box 202 is started, the control shaft 204 is driven to rotate through the transmission of the gear belt 203, the rotation of the two sets of construction platforms 302 is completed, and the gear belt 203 is replaced with a driving chain to also play a driving role.
The specific use mode and function of the embodiment are as follows:
in the utility model, when in use, a large crane is used for placing the device on the left and right sides of a bridge or an overhead, the fixed plate 201 is fixedly connected with the two ends of a bridge floor through screws, at the moment, the construction bearing device 3 is positioned at the bottom of the bridge floor, a motor in the motor placing box 202 is started, the control shaft 204 is driven to rotate through the transmission of the gear belt 203, the rotating retaining ring 205 on the surface of the control shaft 204 can play a supporting role, the auxiliary supporting plate 305 and the inclined supporting rod 306 also play an auxiliary supporting role, the limiting column 207 is inserted into the semicircular sliding groove at the bottom of the fixed plate 201, the control shaft 204 can only rotate 90 degrees when rotating, two groups of construction platforms 302 rotate 90 degrees, one group of the construction platforms 302 can rotate to the bottom of the bridge and then be fixed, the other side of the construction platform 302 rotates again, the other side of the inserting block 304 can be inserted into the connecting groove 303 of the fixed construction platform 302, two sets of construction platform 302 of two sides accomplish the butt joint, set up through cat ladder 206 and walk corridor 307, make things convenient for personnel to pass on two sets of construction platform 302, then the connection chain through spread groove 303 top is carrying out further fixed, accomplishes and connects, and construction platform 302's another a set of rotation 90 degrees is parallel with the bridge floor, can be to the effect two sides of bridge construction and inspection.
The embodiments of this invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the utility model in the form disclosed, many modifications and variations will be apparent to those skilled in the art, which embodiments have been selected and described in order to better explain the principles of the utility model and the practical application, and to enable others of ordinary skill in the art to understand the utility model for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (7)

1. The utility model provides a basket is hung with construction to municipal works which characterized in that: comprises a construction road (1); the construction road (1) is of a cuboid structure as a whole; the number of the control rotating mechanisms (2) is two, and the control rotating mechanisms (2) are connected with the construction road (1) through bolts;
the construction bearing device (3), the number of the construction bearing devices (3) is set to be two, and the construction bearing devices (3) are connected with the control rotating mechanism (2).
2. The construction hanging basket for municipal engineering according to claim 1, wherein: the control rotation mechanism (2) includes:
the fixing plate (201), the fixing plate (201) is fixedly connected with the construction road (1) through bolts; the motor is arranged in the box (202), the bottom of the motor arranging box (202) is fixedly connected with the fixing plate (201), and the motor is arranged in the motor arranging box (202).
3. The construction hanging basket for municipal engineering according to claim 2, wherein: the control rotating mechanism (2) further comprises:
one end of the gear belt (203) is rotationally connected with a motor shaft in the motor installation box (202);
the top of the control shaft (204) is rotatably inserted into the fixing plate (201), and the top of the control shaft (204) is rotatably connected with a motor in the motor arranging box (202) through a gear belt (203).
4. The construction hanging basket for municipal engineering according to claim 2, wherein: the control rotation mechanism (2) includes:
the rotary baffle ring (205), the rotary baffle ring (205) is fixedly arranged on the surface of the control shaft (204); one end of the ladder stand (206) is fixedly arranged on the surface of the fixing plate (201);
one end of the limiting column (207) is fixedly connected with the control shaft (204), and the top of the control shaft (204) is inserted into a semicircular sliding groove formed in the fixing plate (201) in a sliding manner.
5. The construction hanging basket for municipal engineering according to claim 1, wherein: the construction bearing device (3) comprises:
the fixed connecting plate (301), the fixed connecting plate (301) is fixedly installed on the surface of the control shaft (204); the construction platform (302) is fixed on the surface of the fixed connecting plate (301), and the top of one group of construction platforms (302) is fixedly connected with the bottom of the ladder stand (206).
6. The construction hanging basket for municipal engineering according to claim 5, wherein: the construction bearing device (3) further comprises:
the top of the connecting groove (303) is provided with a connecting chain, and the connecting groove (303) is fixedly arranged on the surface of one group of construction platforms (302); and the inserting block (304), and the inserting block (304) is arranged on the surface of the construction platform (302) on the other side.
7. The construction hanging basket for municipal engineering according to claim 5, wherein: the construction bearing device (3) further comprises:
the auxiliary supporting plate (305), the auxiliary supporting plate (305) is fixedly arranged on the surface of the control shaft (204);
one end of the oblique supporting rod (306) is fixedly connected with the auxiliary supporting plate (305), and the other end of the auxiliary supporting plate (305) is fixedly connected with the bottom of the construction platform (302);
and the passing corridor (307) is arranged between the two sets of construction platforms (302).
CN202122192078.6U 2021-09-10 2021-09-10 Basket is hung with construction to municipal works Active CN215714623U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122192078.6U CN215714623U (en) 2021-09-10 2021-09-10 Basket is hung with construction to municipal works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122192078.6U CN215714623U (en) 2021-09-10 2021-09-10 Basket is hung with construction to municipal works

Publications (1)

Publication Number Publication Date
CN215714623U true CN215714623U (en) 2022-02-01

Family

ID=80018469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122192078.6U Active CN215714623U (en) 2021-09-10 2021-09-10 Basket is hung with construction to municipal works

Country Status (1)

Country Link
CN (1) CN215714623U (en)

Similar Documents

Publication Publication Date Title
CN110371823B (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction and construction method
CN211528292U (en) Traffic highway bridge detection device
CN105780646B (en) A kind of bridge maintenance equipment of automatically walk
CN111794754B (en) Pipe piece assembled derrick and construction method thereof
CN201770453U (en) Multi-mast movable lifting work platform for construction
CN201038657Y (en) Transmission line iron tower climbing machine
CN105178179B (en) A kind of method and device of railway bridge maintenance conditions around bridge pier
CN106437048A (en) Folding truss type full-automatic telescopic canopy and operation method thereof
CN215714623U (en) Basket is hung with construction to municipal works
CN111608078A (en) Construction method of combined Bailey cable crane tower
CN105386621A (en) Swing-arm type parking device
CN210366808U (en) Lifting and dismantling device for rail walking
CN108824202B (en) Support system for concrete cable-stayed bridge hanging basket installation and tower area beam cast-in-situ construction
CN211666622U (en) Test device capable of climbing up and down and turning plate to stand in counter-force well
CN215714714U (en) Hanging basket equipment for installing bridge guardrail
CN215254381U (en) Safety protection supporting platform for municipal engineering construction
CN205296937U (en) Swing -arm type parking equipment
CN208763390U (en) A kind of suspended operating platform
CN207498824U (en) A kind of hanger radial type single track bridge inspection car
CN109750604A (en) A kind of Bridge Erector easy to use
CN216737302U (en) Special tower crane for additionally installing elevator
CN111847189A (en) Well double-chain type home elevator
CN207749426U (en) A kind of bridge side guardrail template construction device
CN206053355U (en) A kind of tower concrete spreader
CN216898794U (en) Plane detection device for municipal works

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant