CN109750604A - An easy-to-use bridge erecting machine - Google Patents
An easy-to-use bridge erecting machine Download PDFInfo
- Publication number
- CN109750604A CN109750604A CN201910115028.2A CN201910115028A CN109750604A CN 109750604 A CN109750604 A CN 109750604A CN 201910115028 A CN201910115028 A CN 201910115028A CN 109750604 A CN109750604 A CN 109750604A
- Authority
- CN
- China
- Prior art keywords
- fixed
- bridge erector
- fixedly installed
- main body
- wire winding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000004804 winding Methods 0.000 claims abstract description 29
- 230000000694 effects Effects 0.000 claims abstract description 16
- 210000001364 upper extremity Anatomy 0.000 claims description 9
- 238000009434 installation Methods 0.000 claims description 5
- 239000007787 solid Substances 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 14
- 238000000034 method Methods 0.000 description 7
- 244000062793 Sorghum vulgare Species 0.000 description 3
- 235000019713 millet Nutrition 0.000 description 3
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to construction engineering technical fields, and a kind of Bridge Erector easy to use, including Bridge Erector main body are disclosed, the Bridge Erector main body, fixing bearing is fixedly installed at the top of the Bridge Erector main body, the internal activity of the fixing bearing is equipped with movable pad.The Bridge Erector easy to use, expansion bracket is installed by the internal activity of fixed spreader, the internal activity of expansion bracket is equipped with connection frame, the inside of connection frame is fixedly installed with lifting platform, it is moved up and down convenient for lifting platform, by being fixedly installed with Wire winding shaft on the output shaft of driving motor, the outer cover of Wire winding shaft is equipped with flexible rope, it is rotated convenient for Wire winding shaft by the power of driving motor, to the flexible rope of folding and unfolding, by being provided with fixed block at the top of lifting platform, the flexible rope that is internally provided with of fixed block is sequentially connected with Wire winding shaft, convenient for the rotation raising and lowering of the fixed Wire winding shaft of lifting platform, construction personnel is transmitted up and down.
Description
Technical field
The present invention relates to construction engineering technical field, specially a kind of Bridge Erector easy to use.
Background technique
Bridge Erector is exactly the equipment that prefabricated beam piece is placed into prefabricated bridge pier and is got on, and Bridge Erector belongs to crane
Scope is put down after being then transported to position because its major function is to lift beam piece, Bridge Erector and lifting in general sense
Machine is very different, it is required that condition it is harsh, and there are beam on piece travelings, or cry vertical shift, and Bridge Erector is divided into erection
Highway bridge, conventional railway bridge, railway of passengers' private line bridge etc. are several.
The Bridge Erector of existing market, will rise fine strain of millet, fortune fine strain of millet with dress fine strain of millet be effectively combined together with, improve project installation into
Degree, saves a large amount of man power and material, however in use, construction personnel needs to move up and down in Bridge Erector to consolidate
Fixed and installation, high altitude operation ladder has certain risk, while bringing inconvenience in the majority to construction personnel, so propose one kind
Bridge Erector easy to use solves the above problems.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of Bridge Erectors easy to use, have easy to use etc. excellent
Point solves construction personnel and needs to move up and down in Bridge Erector to be fixed and install, and high altitude operation ladder has certain danger
It is dangerous, while bringing the problem of inconvenience in the majority to construction personnel.
(2) technical solution
To realize above-mentioned purpose easy to use, the invention provides the following technical scheme: a kind of Bridge Erector easy to use, packet
Include Bridge Erector main body, the Bridge Erector main body is fixedly installed with fixing bearing, the fixing axle at the top of the Bridge Erector main body
The internal activity held is equipped with movable pad, and support column is fixedly installed at the top of the Bridge Erector main body, the support column
Top is fixedly installed with fixed spreader, and the inside of the fixed spreader is fixedly installed with driving motor, the driving motor it is defeated
It is fixedly connected with Wire winding shaft on shaft, fixed frame is fixedly connected at the top of the fixed spreader, the inside of the fixed frame is living
It is dynamic that expansion bracket is installed, the inside of the fixed frame and it is located at the top of expansion bracket and is fixedly installed with limit plate, the expansion bracket
Internal activity connection frame is installed, the inside of the connection frame is fixedly installed with lifting platform, and the top of the lifting platform is fixed
Fixed block is installed, the inside of the fixed block is fixedly installed with flexible rope, the back side of the support column and is located at bridge formation owner
Front support rod is fixedly installed at the top of body, the bottom of the front support rod is fixedly connected with front leg strut, the bottom of the front leg strut
Portion is movably installed with movable supporting legs, and the bottom of the movable supporting legs is fixedly installed with mounting plate.
Preferably, the top of the Bridge Erector main body is fixedly mounted there are two support column, and the Bridge Erector main body passes through two
A support column is fixedly connected with fixed spreader.
Preferably, the outer cover of the Wire winding shaft is fixed by flexible rope with fixed block equipped with flexible rope, the Wire winding shaft
Connection.
Preferably, the top of the connection frame and expansion bracket is fixedly installed with limit plate, the inside of the fixed spreader
Driving motor there are two being fixedly mounted.
Preferably, Wire winding shaft is fixedly installed on the output shaft of two driving motors, two Wire winding shafts are equal
Fixed block is fixedly connected with by flexible rope.
Preferably, the bottom of two fixed blocks is fixedly connected to lifting platform, and two lifting platforms pass through company
Frame, expansion bracket and fixed frame is connect to be fixedly connected with fixed spreader.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of Bridge Erector easy to use, have it is following the utility model has the advantages that
The Bridge Erector easy to use is equipped with expansion bracket by the internal activity of fixed spreader, and the inside of expansion bracket is living
Dynamic to be equipped with connection frame, the inside of connection frame is fixedly installed with lifting platform, moves up and down convenient for lifting platform, passes through driving motor
Wire winding shaft is fixedly installed on output shaft, the outer cover of Wire winding shaft passes through the dynamic of driving motor equipped with flexible rope convenient for Wire winding shaft
Power is rotated, thus the flexible rope of folding and unfolding, by being provided with fixed block at the top of lifting platform, being internally provided with for fixed block is flexible
Rope is sequentially connected with Wire winding shaft, convenient for the rotation raising and lowering of the fixed Wire winding shaft of lifting platform, construction personnel is transmitted up and down, is led to
It crosses at the top of Bridge Erector main body and is provided with fixing bearing, the internal activity of fixing bearing is connected with movable pad, is convenient for constructor
Member enters the inside of lifting platform by movable pad, while facilitating and being withdrawn, and construction personnel is avoided directly to swash in front leg strut
Row has achieved the purpose that be easy to use.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
In figure: 1 Bridge Erector main body, 2 fixing bearings, 3 movable pads, 4 support columns, 5 fixed spreaders, 6 driving motors, 7 are received
Spool, 8 fixed frames, 9 expansion brackets, 10 limit plates, 11 connection frames, 12 lifting platforms, 13 fixed blocks, 14 flexible ropes, 15 front support rods,
16 front leg struts, 17 movable supporting legs, 18 mounting plates.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, a kind of Bridge Erector easy to use, including Bridge Erector main body 1, Bridge Erector main body 1, Bridge Erector main body
1 top is fixedly installed with fixing bearing 2, and the internal activity of fixing bearing 2 is equipped with movable pad 3, the top of Bridge Erector main body 1
Portion is fixedly installed with support column 4, and there are two support columns 4 for the top fixed installation of Bridge Erector main body 1, and the top of support column 4 is fixed
Fixed spreader 5 is installed, Bridge Erector main body 1 is fixedly connected by two support columns 4 with fixed spreader 5, the inside of fixed spreader 5
It is fixedly installed with driving motor 6, there are two driving motor 6, the output shafts of driving motor 6 for the inside fixed installation of fixed spreader 5
On be fixedly connected with Wire winding shaft 7, state and be fixedly installed with Wire winding shaft 7 on the output shaft of driving motor 6, the top of fixed spreader 5
It is fixedly connected with fixed frame 8, the internal activity of fixed frame 8 is equipped with expansion bracket 9, the inside of fixed frame 8 and is located at expansion bracket 9
Top is fixedly installed with limit plate 10, and the internal activity of expansion bracket 9 is equipped with connection frame 11, the top of connection frame 11 and expansion bracket 9
Portion is fixedly installed with limit plate 10, and the inside of connection frame 11 is fixedly installed with lifting platform 12, and two lifting platforms 12 pass through company
Frame 11, expansion bracket 9 and fixed frame 8 is connect to be fixedly connected with fixed spreader 5, the top of lifting platform 12 is fixedly installed with fixed block 13,
The bottom of two fixed blocks 13 is fixedly connected to lifting platform 12, and two Wire winding shafts 7 are fixedly connected with by flexible rope 14
Determine block 13, the inside of fixed block 13 is fixedly installed with flexible rope 14, and for the outer cover of Wire winding shaft 7 equipped with flexible rope 14, Wire winding shaft 7 is logical
It crosses flexible rope 14 to be fixedly connected with fixed block 13, the back side of support column 4 and before being fixedly installed with positioned at the top of Bridge Erector main body 1
Support rod 15, the bottom of front support rod 15 are fixedly connected with front leg strut 16, and the bottom of front leg strut 16 is movably installed with movable supporting legs
17, the bottom of movable supporting legs 17 is fixedly installed with mounting plate 18.
In conclusion the Bridge Erector easy to use, is equipped with expansion bracket 9 by the internal activity of fixed spreader 5, stretches
The internal activity of frame 9 is equipped with connection frame 11, and the inside of connection frame 11 is fixedly installed with lifting platform 12, is convenient for about 12 lifting platform
It is mobile, Wire winding shaft 7 is fixedly installed on the output shaft by driving motor 6, the outer cover of Wire winding shaft 7 is equipped with flexible rope 14, just
It is rotated in Wire winding shaft 7 by the power of driving motor 6, so that the flexible rope 14 of folding and unfolding, is arranged by the top of lifting platform 12
There is fixed block 13, the flexible rope 14 that is internally provided with of fixed block 13 is sequentially connected with Wire winding shaft 7, convenient for the fixed take-up of lifting platform 12
Construction personnel is transmitted up and down, the top of Bridge Erector main body 1 is provided with fixing bearing 2 by the rotation raising and lowering of axis 7,
The internal activity of fixing bearing 2 is connected with movable pad 3, is entered in lifting platform 12 convenient for construction personnel by movable pad 3
Portion, while facilitating and being withdrawn, it avoids construction personnel from directly creeping on front leg strut 16, has achieved the purpose that be easy to use, solution
The construction personnel that determined needs to move up and down in Bridge Erector to be fixed and install, and high altitude operation ladder has certain risk,
The problem of inconvenience in the majority is brought to construction personnel simultaneously.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that
There is also other identical elements in process, method, article or equipment including the element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of Bridge Erector easy to use, including Bridge Erector main body (1), it is characterised in that: the Bridge Erector main body (1), institute
It states and is fixedly installed at the top of Bridge Erector main body (1) fixing bearing (2), the internal activity of the fixing bearing (2) is equipped with work
It moves backing plate (3), is fixedly installed with support column (4) at the top of the Bridge Erector main body (1), the top of the support column (4) is fixed
It is equipped with fixed spreader (5), the inside of the fixed spreader (5) is fixedly installed with driving motor (6), the driving motor (6)
Output shaft on be fixedly connected with Wire winding shaft (7), be fixedly connected with fixed frame (8) at the top of the fixed spreader (5), it is described solid
The internal activity for determining frame (8) is equipped with expansion bracket (9), the inside of the fixed frame (8) and be located at expansion bracket (9) top fix
It is equipped with limit plate (10), the internal activity of the expansion bracket (9) is equipped with connection frame (11), the inside of the connection frame (11)
It is fixedly installed with lifting platform (12), is fixedly installed with fixed block (13) at the top of the lifting platform (12), the fixed block (13)
Inside be fixedly installed with flexible rope (14), the fixed peace in the back side of the support column (4) and the top for being located at Bridge Erector main body (1)
Equipped with front support rod (15), the bottom of the front support rod (15) is fixedly connected with front leg strut (16), the front leg strut (16)
Bottom is movably installed with movable supporting legs (17), and the bottom of the movable supporting legs (17) is fixedly installed with mounting plate (18).
2. a kind of Bridge Erector easy to use according to claim 1, it is characterised in that: the Bridge Erector main body (1)
Top is fixedly mounted there are two support column (4), and the Bridge Erector main body (1) is solid by two support columns (4) and fixed spreader (5)
Fixed connection.
3. a kind of Bridge Erector easy to use according to claim 1, it is characterised in that: the outside of the Wire winding shaft (7)
It is set with flexible rope (14), the Wire winding shaft (7) is fixedly connected by flexible rope (14) with fixed block (13).
4. a kind of Bridge Erector easy to use according to claim 1, it is characterised in that: the connection frame (11) and flexible
The top of frame (9) is fixedly installed with limit plate (10), and there are two driving motors for the inside fixed installation of the fixed spreader (5)
(6)。
5. a kind of Bridge Erector easy to use according to claim 1, it is characterised in that: two driving motors (6)
Output shaft on be fixedly installed with Wire winding shaft (7), two Wire winding shafts (7) are fixedly connected with by flexible rope (14)
Determine block (13).
6. a kind of Bridge Erector easy to use according to claim 1, it is characterised in that: two fixed blocks (13)
Bottom is fixedly connected to lifting platform (12), and two lifting platforms (12) by connection frame (11), expansion bracket (9) and are fixed
Frame (8) is fixedly connected with fixed spreader (5).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910115028.2A CN109750604A (en) | 2019-02-14 | 2019-02-14 | An easy-to-use bridge erecting machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201910115028.2A CN109750604A (en) | 2019-02-14 | 2019-02-14 | An easy-to-use bridge erecting machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN109750604A true CN109750604A (en) | 2019-05-14 |
Family
ID=66407579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201910115028.2A Pending CN109750604A (en) | 2019-02-14 | 2019-02-14 | An easy-to-use bridge erecting machine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN109750604A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110541367A (en) * | 2019-09-25 | 2019-12-06 | 中铁十六局集团有限公司 | Rotating mechanism of segment beam bridge erecting machine |
Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0579018A (en) * | 1991-09-18 | 1993-03-30 | P S Co Ltd | Bridge girder laying device |
| KR20090067974A (en) * | 2007-12-21 | 2009-06-25 | 재단법인 포항산업과학연구원 | Bridge construction equipment |
| CN201400996Y (en) * | 2009-04-14 | 2010-02-10 | 中铁二十一局集团有限公司 | Construction frame of post-pouring flange plate |
| CN101942806A (en) * | 2010-09-26 | 2011-01-12 | 中国水利水电第七工程局有限公司 | Bridge girder erection machine protective guard |
| WO2011143923A1 (en) * | 2010-05-19 | 2011-11-24 | 北京万桥兴业机械有限公司 | Transportation and erection integrated machine with displacement platforms and method for erecting bridge using the same |
| CN203866709U (en) * | 2014-04-02 | 2014-10-08 | 北京建鼎国铁工程设计有限公司 | Bridge girder erection machine used for integrally laying steel girders and ballast bed plates |
| CN204401476U (en) * | 2014-12-30 | 2015-06-17 | 中铁十七局集团第三工程有限公司 | A kind of cat ladder be located at bottom Bridge Erector nose girder |
| CN105369744A (en) * | 2015-11-25 | 2016-03-02 | 燕山大学 | Suspended operation platform for bridge installation |
| CN105863235A (en) * | 2016-06-17 | 2016-08-17 | 佛山市联智新创科技有限公司 | No-swing hanging basket device with automatic positioning function |
| CN206942159U (en) * | 2017-05-20 | 2018-01-30 | 吕旭 | A kind of construction site boom hoisting |
| CN207003257U (en) * | 2017-05-22 | 2018-02-13 | 中铁十五局集团有限公司 | Sliding type ladder stand for beam joint in process of erecting box beam by bridge erecting machine |
| CN207453489U (en) * | 2017-08-03 | 2018-06-05 | 李波 | Wall construction support platform |
| CN207513142U (en) * | 2017-11-08 | 2018-06-19 | 山东科技大学 | A kind of cradle for constructional engineering |
| CN108222484A (en) * | 2017-12-27 | 2018-06-29 | 三重能有限公司 | Tower constructing device and its from elevating method |
| CN108221698A (en) * | 2018-02-09 | 2018-06-29 | 中铁六局集团有限公司 | Bridge Erector low level transition engineering method |
-
2019
- 2019-02-14 CN CN201910115028.2A patent/CN109750604A/en active Pending
Patent Citations (15)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0579018A (en) * | 1991-09-18 | 1993-03-30 | P S Co Ltd | Bridge girder laying device |
| KR20090067974A (en) * | 2007-12-21 | 2009-06-25 | 재단법인 포항산업과학연구원 | Bridge construction equipment |
| CN201400996Y (en) * | 2009-04-14 | 2010-02-10 | 中铁二十一局集团有限公司 | Construction frame of post-pouring flange plate |
| WO2011143923A1 (en) * | 2010-05-19 | 2011-11-24 | 北京万桥兴业机械有限公司 | Transportation and erection integrated machine with displacement platforms and method for erecting bridge using the same |
| CN101942806A (en) * | 2010-09-26 | 2011-01-12 | 中国水利水电第七工程局有限公司 | Bridge girder erection machine protective guard |
| CN203866709U (en) * | 2014-04-02 | 2014-10-08 | 北京建鼎国铁工程设计有限公司 | Bridge girder erection machine used for integrally laying steel girders and ballast bed plates |
| CN204401476U (en) * | 2014-12-30 | 2015-06-17 | 中铁十七局集团第三工程有限公司 | A kind of cat ladder be located at bottom Bridge Erector nose girder |
| CN105369744A (en) * | 2015-11-25 | 2016-03-02 | 燕山大学 | Suspended operation platform for bridge installation |
| CN105863235A (en) * | 2016-06-17 | 2016-08-17 | 佛山市联智新创科技有限公司 | No-swing hanging basket device with automatic positioning function |
| CN206942159U (en) * | 2017-05-20 | 2018-01-30 | 吕旭 | A kind of construction site boom hoisting |
| CN207003257U (en) * | 2017-05-22 | 2018-02-13 | 中铁十五局集团有限公司 | Sliding type ladder stand for beam joint in process of erecting box beam by bridge erecting machine |
| CN207453489U (en) * | 2017-08-03 | 2018-06-05 | 李波 | Wall construction support platform |
| CN207513142U (en) * | 2017-11-08 | 2018-06-19 | 山东科技大学 | A kind of cradle for constructional engineering |
| CN108222484A (en) * | 2017-12-27 | 2018-06-29 | 三重能有限公司 | Tower constructing device and its from elevating method |
| CN108221698A (en) * | 2018-02-09 | 2018-06-29 | 中铁六局集团有限公司 | Bridge Erector low level transition engineering method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110541367A (en) * | 2019-09-25 | 2019-12-06 | 中铁十六局集团有限公司 | Rotating mechanism of segment beam bridge erecting machine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106939707B (en) | A kind of restricted clearance large-scale steel structure supporting platform from method for improving | |
| CN106545172A (en) | A kind of installation method of high-altitude long-span steel truss | |
| CN104150353B (en) | A kind of dismountable bridge crane of liftable | |
| CN104674665A (en) | Installation method for corridor bridge of large space steel structure | |
| CN110397289A (en) | A kind of comprehensive setting up girder stood in house capital and have automatic traveling function | |
| CN111608078A (en) | A kind of construction method of combined Bailey sheet cable hanging tower | |
| CN105544406B (en) | Bailey beam is sliding to remove device and its method for dismounting | |
| CN107816209A (en) | The large-scale Roof Truss construction technology of installation is lifted across outer both sides | |
| CN206590793U (en) | Connect arm assembly and the movable arm tower crane comprising the device in the air | |
| CN212315371U (en) | Cable installation lifting device for cable-stayed bridge | |
| CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
| CN106087775B (en) | For setting up intercity track and subway U beam self-balancing via hole type Bridge Erectors | |
| CN109750604A (en) | An easy-to-use bridge erecting machine | |
| CN105040591A (en) | Positioning device for waveform steel web and positioning method thereof | |
| CN208024056U (en) | A kind of double flat arm ground type pole | |
| CN102635061B (en) | Mountain stream river-crossing inclined zipper trestle and hoisting method thereof | |
| CN202611340U (en) | Self-propelled road bed protective barrier transportation and installation all-in-one machine | |
| CN222990595U (en) | Multifunctional portal for suspension bridge construction | |
| CN212224666U (en) | Steel truss assembling system | |
| CN210341680U (en) | Door type corrugated steel web plate installation and overhanging type hanging bracket structure | |
| CN207498824U (en) | A kind of hanger radial type single track bridge inspection car | |
| CN204126297U (en) | A kind of temporary support of steel truss roof | |
| CN210134344U (en) | Trolley for mounting bridge center joint drain pipe | |
| CN220953018U (en) | Basket is hung in construction of collapsible precast beam diaphragm | |
| CN107217669B (en) | Pile pulling equipment and quick moving method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190514 |