CN215714714U - Hanging basket equipment for installing bridge guardrail - Google Patents

Hanging basket equipment for installing bridge guardrail Download PDF

Info

Publication number
CN215714714U
CN215714714U CN202122363891.5U CN202122363891U CN215714714U CN 215714714 U CN215714714 U CN 215714714U CN 202122363891 U CN202122363891 U CN 202122363891U CN 215714714 U CN215714714 U CN 215714714U
Authority
CN
China
Prior art keywords
basket
construction
equipment
bridge
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122363891.5U
Other languages
Chinese (zh)
Inventor
殷俊阳
李功
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 3 Co Ltd
Original Assignee
Sinohydro Bureau 3 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 3 Co Ltd filed Critical Sinohydro Bureau 3 Co Ltd
Priority to CN202122363891.5U priority Critical patent/CN215714714U/en
Application granted granted Critical
Publication of CN215714714U publication Critical patent/CN215714714U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model provides hanging basket equipment for installing a bridge guardrail, which is characterized by comprising a balance weight basket, wherein a walking mechanism is installed at the bottom of the balance weight basket, two connecting cross rods which are parallel to the ground and extend out of the balance weight basket are arranged at the upper part of the balance weight basket, a construction basket is installed at the lower part of one end, far away from the balance weight basket, of each connecting cross rod, the construction basket comprises four connecting vertical rods, the two connecting vertical rods are connected with one connecting cross rod, and a working platform is fixedly installed at the lower parts of the four connecting vertical rods. According to the utility model, the balance weight basket is arranged to provide support and balance weight for the integral hanging basket equipment, the travelling mechanism is arranged below the balance weight basket, the hanging basket equipment can move freely at the upper part of a bridge, the construction basket is arranged on the connecting cross rod at the upper part of the balance weight basket, the construction basket extends out of the bridge, the installation of a guardrail at the outer side of the bridge is realized, the construction basket is formed by connecting the vertical rod and the working platform, a certain operation space is reserved for constructors during construction, the construction is convenient, and the hanging basket equipment can be repeatedly and continuously used.

Description

Hanging basket equipment for installing bridge guardrail
Technical Field
The utility model belongs to the technical field of guardrail installation, and particularly relates to hanging basket equipment for installing a bridge guardrail.
Background
Bridge railing is the guardrail that sets up on the bridge, its purpose is in order to prevent that the vehicle out of control from crossing outside the bridge, it can not break through to have messenger's vehicle, wear down, cross the bridge and beautify the function of bridge construction, the inboard construction of bridge concrete guardrail or maintenance are all very convenient, but the construction or the maintenance in its outside are difficult for going on, in order to realize the construction or the maintenance to the bridge railing outside, often need constructor side to go the outside operation, constructor's safety can't be guaranteed, for this reason hanging flower basket has appeared gradually on the market and has under construction or the maintenance to the bridge railing outside with help the staff, but prior art's hanging flower basket has the problem of following weak point: 1. when the working surface changes, the hanging basket needs to be moved to the next working surface manually, the operation is complicated, the wear of the hanging basket is increased, and the service life of the hanging basket is influenced; 2. the hanging basket in the prior art is supported and fixed through the balance weight or by means of external force, and therefore when the external force shifts or the balance weight causes problems, the hanging basket slides off relative to the position, the falling risk of the hanging basket easily occurs, and the safety performance of the hanging basket is low.
When the road and bridge construction, the hanging basket is needed to be used for decorating the outer wall of the guardrail, and the hanging basket is suitable for repairing the appearance of a pull rod hole or concrete after the outer side of the seat type guardrail of the highway and the municipal bridge is demolished. The hanging basket is a construction machine for high-altitude operation and is also a machine widely used in construction engineering. The prior art has the following problems: the conventional method for decorating the outer side of the guardrail is to adopt a small crane or two persons to install a hanging basket to the outer side of the guardrail in a matching way, the hanging basket is inconvenient and unsafe to move back and forth, the working personnel work at high altitude for a long time, the safety risk is high, certain defects exist, and the hanging basket is to be improved.
The existing ascending equipment or hanging basket equipment in the market is vehicle-mounted or large-sized electric equipment, the self dead weight is large, a large number of bridges in the existing bridge are designed into slow bridges, namely non-motor vehicles and pedestrian river-crossing bridges, and the bridge load is not enough to support the large-sized equipment.
Guardrail stand and bridge side steel sheet welded connection when bridge guardrail installs, the outside panel adopts self tapping screw connection with the stand, and personnel must stand in the bridge outside just can install, weld. A hanging basket with light dead weight, mobility, safety and reliability is urgently needed for installing guardrails on site. The existing hanging basket is based on the fact that the guardrail can be clamped on the guardrail after being manufactured, the guardrail can be used only by a solid steel guardrail or a concrete guardrail,
therefore, a hanging basket device for a guardrail, which does not need to be fixedly arranged on the guardrail and takes away the modeling or is used for the guardrail with gradual change, is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that the prior art is not enough, and provides hanging basket equipment for installing bridge guardrails, the hanging basket equipment is provided with a balance weight basket to support and provide balance weight for the whole hanging basket equipment, the hanging basket equipment can move freely on the upper part of a bridge by installing a walking mechanism below the balance weight basket, a construction basket is installed on a connecting cross rod on the upper part of the balance weight basket, the construction basket extends out of the bridge to realize installation of the guardrails on the outer side of the bridge, the construction basket is formed by connecting vertical rods and a working platform, a certain operation space is reserved for constructors during construction, construction is convenient, and the hanging basket equipment can be repeatedly and continuously used.
In order to solve the technical problems, the utility model adopts the technical scheme that: the utility model provides an installation hanging flower basket equipment for bridge railing, a serial communication port, including the counter weight basket, running gear is installed to counter weight basket bottom, counter weight basket upper portion is provided with and just stretches out two of counter weight basket with ground parallel and is connected the horizontal pole, it keeps away from counter weight basket one end lower part and installs the construction basket to connect the horizontal pole, the construction basket includes four connection montants, two it is connected with a connection horizontal pole, four to connect montant lower part fixed mounting has work platform.
Foretell installation hanging flower basket equipment for bridge railing, its characterized in that, be close to construction basket one side on the counter weight basket and be provided with two spinal branch props the montant that stretches out the counter weight basket, support the montant upper end and keep away from the bottom of construction basket one side with the counter weight basket and be connected through first support down tube, support the montant upper end and be connected the horizontal pole and keep away from construction basket one end and pass through the second and support the down tube and be connected.
The hanging basket equipment for installing the bridge guardrail is characterized in that a weight plate is installed at the lower portion of the weight basket, and a weight is placed on the weight plate.
The hanging basket equipment for installing the bridge guardrail is characterized in that a crawling ladder is arranged on one side, close to the construction basket, of the counterweight basket.
Foretell installation hanging flower basket equipment for bridge railing, its characterized in that, two connect the horizontal pole and keep away from the tip of counter weight basket and connect through first crossbeam, two connect the montant and keep away from the tip of counter weight basket and connect through the second crossbeam.
The hanging basket equipment for mounting the bridge guardrail is characterized in that the travelling mechanism is four universal wheels with brakes, which are respectively mounted at four corners of the bottom of the counterweight basket.
The hanging basket equipment for installing the bridge guardrail is characterized in that a plurality of ladder cross rods are installed between two connecting vertical rods on one connecting cross rod at intervals.
The hanging basket equipment for installing the bridge guardrail is characterized in that the bottom of the working platform, which is far away from one side of the connecting vertical rod, is connected with the connecting vertical rod through the reinforcing inclined rod.
The hanging basket equipment for installing the bridge guardrail is characterized in that a fence is installed on the periphery of the upper surface of the working platform.
Compared with the prior art, the utility model has the following advantages:
1. according to the utility model, the balance weight basket is arranged to provide support and balance weight for the integral hanging basket equipment, the travelling mechanism is arranged below the balance weight basket, the hanging basket equipment can move freely at the upper part of a bridge, the construction basket is arranged on the connecting cross rod at the upper part of the balance weight basket, the construction basket extends out of the bridge, the installation of a guardrail at the outer side of the bridge is realized, the construction basket is formed by connecting the vertical rod and the working platform, a certain operation space is reserved for constructors during construction, the construction is convenient, and the hanging basket equipment can be repeatedly and continuously used.
2. According to the utility model, the hanging basket equipment is reinforced by arranging the vertical supporting rods, the first inclined supporting rods, the second inclined supporting rods, the first cross beam connection, the second cross beam connection and the reinforcing inclined rods, so that the stability of the counterweight basket and the construction basket is ensured, and the construction safety is improved.
3. According to the utility model, the weight plate is installed and the weight is prevented, so that one side of the counterweight basket is weighted, one side of the construction basket can bear higher weight, and the construction safety is improved.
4. According to the utility model, the crawling ladders are arranged on the counterweight basket and the construction basket, so that constructors can conveniently enter the construction basket from the bridge side for construction, and the construction efficiency is improved.
5. The four universal wheels with the brakes are used as the travelling mechanism, when the hanging basket equipment needs to be moved, the brakes are released, the hanging basket equipment is moved to a specified position through the universal wheels, then the brakes are locked, the hanging basket equipment is guaranteed to be moved and stopped randomly, and the construction efficiency is improved.
The present invention will be described in further detail with reference to the accompanying drawings and examples.
Drawings
FIG. 1 is a schematic structural diagram of a hanging basket device for installing a bridge guardrail.
FIG. 2 is a schematic view showing the use state of the hanging basket device for installing the bridge guardrail.
Description of reference numerals:
1-counterweight basket; 1-a running gear; 1-2-connecting cross bars;
1-3-supporting vertical rods; 1-4-a first beam; 1-5-a second beam;
1-6-a first support diagonal; 1-7-a second supporting diagonal rod; 1-8-weight plate;
1-9-weight; 2, constructing a basket; 2-1-connecting a vertical rod;
2-a working platform; 2-3-reinforcing diagonal rod; 2-4-fence;
2-5-ladder rails; 3, climbing a ladder; 4, a bridge;
and 5, protecting the fence.
Detailed Description
As shown in figure 1, the hanging basket equipment for mounting the bridge guardrail comprises a balance weight basket 1, wherein a walking mechanism 1-1 is mounted at the bottom of the balance weight basket 1, two connecting cross rods 1-2 which are parallel to the ground and extend out of the balance weight basket 1 are arranged at the upper part of the balance weight basket 1, a construction basket 2 is mounted at the lower part of one end, far away from the balance weight basket 1, of each connecting cross rod 1-2, the construction basket 2 comprises four connecting vertical rods 2-1, the two connecting vertical rods 2-1 are connected with the connecting cross rods 1-2, and a working platform 2-2 is fixedly mounted at the lower parts of the four connecting vertical rods 2-1.
It should be noted that the counterweight basket 1 provides a supporting foundation and a counterweight for the integral basket equipment, so that the stable operation of the basket equipment is ensured, and the safety of constructors on the working platform 2-2 is ensured.
It should be noted that the travelling mechanism 1-1 is arranged below the counterweight basket 1, so that the hanging basket equipment can move freely on the upper part of the bridge 4 to complete the installation of the guardrail 5 of the whole bridge 4, the installation equipment is prevented from being disassembled, and the working efficiency is improved.
It should be noted that two connecting cross rods 1-2 which are parallel to the ground and extend out of the counterweight basket 1 are arranged at the upper part of the counterweight basket 1, and a construction basket 2 is arranged at one end, far away from the counterweight basket 1, of each connecting cross rod 1-2, so that the construction basket 2 extends out of the bridge 4, and the installation of the guardrail 5 outside the bridge 4 is realized.
It should be noted that, the construction basket 2 is formed by respectively connecting two connecting vertical rods 2-1 with one connecting cross rod 1-2 and fixedly installing the working platform 2-2 at the lower part of the four connecting vertical rods 2-1, so that the whole structure is stable, the safety coefficient of construction is improved, and a certain operation space is reserved for constructors during construction by arranging the working platform 2-2, and the construction is facilitated.
As shown in fig. 1, in this embodiment, two vertical support rods 1-3 extending out of the counterweight basket 1 are arranged on the counterweight basket 1 near the construction basket 2, the upper ends of the vertical support rods 1-3 are connected with the bottom of the counterweight basket 1 far away from the construction basket 2 through first inclined support rods 1-6, and the upper ends of the vertical support rods 1-3 are connected with the connecting cross rod 1-2 far away from the construction basket 2 through second inclined support rods 1-7. The hanging basket equipment is reinforced by arranging two groups of vertical supporting rods 1-3, first inclined supporting rods 1-6 and second inclined supporting rods 1-7, so that the stability of the balance weight basket 1 and the construction basket 2 is guaranteed, and the construction safety is guaranteed.
In the embodiment, as shown in fig. 1, weight plates 1-8 are mounted on the lower part of the weight basket 1, and weights 1-9 are placed on the weight plates 1-8. One side of the counterweight basket 1 is weighted by installing the weight plates 1-8 and placing the weights 1-9 on the weight plates 1-8, so that one side of the construction basket 2 can bear higher weight, and the construction safety is improved.
It should be noted that the weight is increased according to the number of the constructors and the weight, and the weight is generally 2 times of the total weight of the constructors on the operation platform.
As shown in fig. 1, in this embodiment, a ladder stand 3 is provided on the counterweight basket 1 on a side close to the construction basket 2. Through set up 3 constructors of cat ladder of being convenient for on counter weight basket 1 and advance into construction basket 2 from 4 sides of bridge and construct, improved work efficiency.
As shown in fig. 1, in this embodiment, the ends of the two connecting cross bars 1-2 far away from the counterweight basket 1 are connected by first cross beams 1-4, and the ends of the two connecting vertical bars 2-1 far away from the counterweight basket 1 are connected by second cross beams 1-5. The ends of the two connecting cross rods 1-2 are connected through the first cross beams 1-4, the ends of the two connecting vertical rods 2-1 are connected through the second cross beams 1-5, hanging basket equipment is reinforced, the stability of the balance weight basket 1 and the stability of the construction basket 2 are guaranteed, and the construction safety is guaranteed.
As shown in fig. 1, in this embodiment, the traveling mechanism 1-1 is four universal wheels with brakes respectively mounted at four corners of the bottom of the counterweight basket 1. Four universal wheels with brakes are arranged to serve as the travelling mechanisms 1-1, when the hanging basket equipment needs to be moved, the brakes are loosened, the hanging basket equipment is moved to a specified position through the universal wheels, then the brakes are locked, the hanging basket equipment is guaranteed to be moved and stopped randomly, and construction efficiency is improved.
As shown in fig. 1, in this embodiment, a plurality of ladder rails 2-5 are installed between two vertical connecting rods 2-1 on one connecting rail 1-2 at intervals. A plurality of ladder transverse rods 2-5 are arranged between two connecting vertical rods 2-1 at intervals, so that the ladder stand 3 is formed by the two connecting vertical rods 2-1 and the ladder transverse rods 2-5, constructors can conveniently enter the working platform 2-2 from the side of a bridge 4 to construct, the connecting vertical rods 2-1 are utilized, the ladder stand 3 does not need to be arranged independently, and the construction efficiency is improved.
As shown in FIG. 1, in this embodiment, the bottom of the working platform 2-2, which is far away from the connecting vertical rod 2-1, is connected to the connecting vertical rod 2-1 through a reinforcing diagonal rod 2-3. The working platform 2-2 is connected with the connecting vertical rod 2-1 through the reinforcing inclined rod 2-3, so that the stability of the working platform 2-2 is improved, and the construction safety is improved.
As shown in FIG. 1, in the present embodiment, a fence 2-4 is installed on the upper surface of the working platform 2-2. The fence 2-4 is arranged on the periphery of the upper surface of the working platform 2-2, so that constructors are prevented from falling off from the working platform 2-2, and the construction safety is improved.
As shown in fig. 2, in this embodiment, in actual use, the hanging basket device is moved to a position where a guardrail 5 needs to be installed, a brake is locked to keep the hanging basket device in a static state, then a weight plate 1-8 and a weight 1-9 are installed on a counterweight basket 1, and then a constructor enters a working platform 2-2 along a ladder stand 3 on the counterweight basket 1 and the ladder stand 3 formed by a connecting vertical rod 2-1 and a ladder cross rod 2-5 to construct a guardrail 5 of a bridge 4.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention in any way. Any simple modifications, alterations and equivalent changes made to the above embodiments according to the technical essence of the present invention are still within the scope of the technical solution of the present invention.

Claims (9)

1. The utility model provides an installation hanging flower basket equipment for bridge railing, its characterized in that, includes counter weight basket (1), running gear (1-1) is installed to counter weight basket (1) bottom, counter weight basket (1) upper portion is provided with two connecting horizontal poles (1-2) parallel with ground and stretching out counter weight basket (1), connecting horizontal pole (1-2) and keeping away from counter weight basket (1) one end lower part and install construction basket (2), construction basket (2) include four connecting montants (2-1), two connecting montant (2-1) is connected with a connecting horizontal pole (1-2), four connecting montant (2-1) lower part fixed mounting has work platform (2-2).
2. The hanging basket device for installing the bridge guardrail as claimed in claim 1, wherein two vertical support rods (1-3) extending out of the counterweight basket (1) are arranged on the counterweight basket (1) close to one side of the construction basket (2), the upper ends of the vertical support rods (1-3) are connected with the bottom of the counterweight basket (1) far away from the construction basket (2) through first inclined support rods (1-6), and the upper ends of the vertical support rods (1-3) are connected with one ends of the connecting cross rods (1-2) far away from the construction basket (2) through second inclined support rods (1-7).
3. The equipment for installing the hanging basket used for the bridge guardrail is characterized in that the weight plates (1-8) are installed at the lower part of the weight basket (1), and weights (1-9) are placed on the weight plates (1-8).
4. The equipment for installing the hanging basket used for the bridge guardrail as claimed in claim 1, wherein a ladder (3) is arranged on one side of the counterweight basket (1) close to the construction basket (2).
5. The basket equipment for installing the bridge guardrail is characterized in that the ends, far away from the balance weight basket (1), of the two connecting cross rods (1-2) are connected through first cross beams (1-4), and the ends, far away from the balance weight basket (1), of the two connecting vertical rods (2-1) are connected through second cross beams (1-5).
6. The equipment for installing the hanging basket for the bridge guardrail as claimed in claim 1, wherein the traveling mechanisms (1-1) are four universal wheels with brakes respectively installed at four corners of the bottom of the counterweight basket (1).
7. The device for installing the hanging basket for the bridge guardrail as claimed in claim 1, wherein a plurality of ladder rails (2-5) are installed between two connecting vertical rods (2-1) on one connecting rail (1-2) at intervals.
8. The basket equipment for installing the bridge guardrail is characterized in that the bottom of the working platform (2-2) far away from one side of the connecting vertical rod (2-1) is connected with the connecting vertical rod (2-1) through a reinforcing diagonal rod (2-3).
9. The equipment for installing the hanging basket for the bridge guardrail as claimed in claim 1, wherein the periphery of the upper surface of the working platform (2-2) is provided with a fence (2-4).
CN202122363891.5U 2021-09-28 2021-09-28 Hanging basket equipment for installing bridge guardrail Active CN215714714U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122363891.5U CN215714714U (en) 2021-09-28 2021-09-28 Hanging basket equipment for installing bridge guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122363891.5U CN215714714U (en) 2021-09-28 2021-09-28 Hanging basket equipment for installing bridge guardrail

Publications (1)

Publication Number Publication Date
CN215714714U true CN215714714U (en) 2022-02-01

Family

ID=80025941

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122363891.5U Active CN215714714U (en) 2021-09-28 2021-09-28 Hanging basket equipment for installing bridge guardrail

Country Status (1)

Country Link
CN (1) CN215714714U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114734181A (en) * 2022-04-20 2022-07-12 湖北辉创重型工程有限公司 Welding trolley for cantilever arm of steel box girder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114734181A (en) * 2022-04-20 2022-07-12 湖北辉创重型工程有限公司 Welding trolley for cantilever arm of steel box girder

Similar Documents

Publication Publication Date Title
EP2878731A1 (en) Bridge maintenance vehicle with hinge-connected type hanging bracket and capable of avoiding bridge-side obstacles
CN209942196U (en) Cantilever support system for large-volume concrete structure
CN215714714U (en) Hanging basket equipment for installing bridge guardrail
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN103806645B (en) A kind of light-duty intelligent hydraulic climbing apparatus with good wind resistance fireproof performance
CN110424746B (en) Method for installing roof truss and pavement in venue
CN210766497U (en) Left and right truss middle flange connection two-side double-column portal frame
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN205955164U (en) Portable steel truss operation platform
CN212766235U (en) Equipment suitable for prefabricated rail top air duct assembly construction of subway station
CN210238316U (en) Bridge inverted U-shaped hanging basket device
CN210217747U (en) Vault construction auxiliary device for tunnel construction
CN210366717U (en) Be applied to console mode and from climbing formula whole construction work platform
CN204038917U (en) Dismountable external hanging service platform
CN208345549U (en) A kind of additional elevator shaft structure of assembled being adapted to jack-up construction
CN210194435U (en) Movable trolley for transverse prestress construction of continuous beam
CN2649564Y (en) Plate house moving and mounting trolley
CN112726426A (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN112609578A (en) Method for mounting steel truss girder at top section of bridge pier of cable-stayed bridge
CN216551580U (en) Movable operation platform for outer side surface of beam plate
CN201961992U (en) High-low gantry crane which is used for hoisting T beam with large span and formed by steel tube stand columns
CN214329834U (en) Daylighting roof construction trolley system
CN218580464U (en) Suspension type bridge floor drainage construction work platform
CN218345960U (en) Construction structure of cross-river bridge
CN216074809U (en) Bridge rail guard template installation platform truck

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant